blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3491236

EP3491236 - WIND TURBINE BLADE HAVING A LIGHTNING TIP RECEPTOR [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  19.03.2021
Database last updated on 03.08.2024
FormerThe patent has been granted
Status updated on  10.04.2020
FormerGrant of patent is intended
Status updated on  01.12.2019
FormerRequest for examination was made
Status updated on  03.05.2019
FormerThe international publication has been made
Status updated on  03.02.2018
Formerunknown
Status updated on  11.08.2017
Most recent event   Tooltip15.07.2022Lapse of the patent in a contracting state
New state(s): MK
published on 17.08.2022  [2022/33]
Applicant(s)For all designated states
Vestas Wind Systems A/S
Hedeager 42
8200 Aarhus N / DK
[2019/23]
Inventor(s)01 / JENSEN, Jakob Hjorth
Kildsigvej 17
6971 Spjald / DK
02 / LYKKEGAARD, Lasse
Ingridsvej 36
7400 Herning / DK
 [2019/23]
Representative(s)Vestas Patents Department
Hedeager 42
8200 Aarhus N / DK
[2019/23]
Application number, filing date17745979.927.07.2017
[2019/23]
WO2017DK50250
Priority number, dateDK2016007056529.07.2016         Original published format: DK 201670565
[2019/23]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2018019350
Date:01.02.2018
Language:EN
[2018/05]
Type: A1 Application with search report 
No.:EP3491236
Date:05.06.2019
Language:EN
The application published by WIPO in one of the EPO official languages on 01.02.2018 takes the place of the publication of the European patent application.
[2019/23]
Type: B1 Patent specification 
No.:EP3491236
Date:13.05.2020
Language:EN
[2020/20]
Search report(s)International search report - published on:EP01.02.2018
ClassificationIPC:F03D1/06, F03D80/30
[2019/23]
CPC:
F03D80/30 (EP,US); F03D1/0675 (EP,US); F05B2240/307 (EP);
F05B2280/105 (EP,US); F05B2280/1072 (EP,US); Y02E10/72 (EP,US)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2019/23]
Extension statesBANot yet paid
MENot yet paid
Validation statesMANot yet paid
MDNot yet paid
TitleGerman:WINDTURBINENSCHAUFEL MIT BLITZABLEITERSPITZENAUFNEHMER[2019/23]
English:WIND TURBINE BLADE HAVING A LIGHTNING TIP RECEPTOR[2019/23]
French:PALE D'ÉOLIENNE AYANT UN RÉCEPTEUR DE FOUDRE AU NIVEAU DE LA POINTE[2019/23]
Entry into regional phase29.01.2019National basic fee paid 
29.01.2019Designation fee(s) paid 
29.01.2019Examination fee paid 
Examination procedure29.01.2019Examination requested  [2019/23]
29.01.2019Date on which the examining division has become responsible
16.09.2019Amendment by applicant (claims and/or description)
02.12.2019Communication of intention to grant the patent
30.03.2020Fee for grant paid
30.03.2020Fee for publishing/printing paid
30.03.2020Receipt of the translation of the claim(s)
Opposition(s)16.02.2021No opposition filed within time limit [2021/16]
Fees paidRenewal fee
26.07.2019Renewal fee patent year 03
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU27.07.2017
AL13.05.2020
AT13.05.2020
CY13.05.2020
CZ13.05.2020
EE13.05.2020
ES13.05.2020
FI13.05.2020
HR13.05.2020
IT13.05.2020
LT13.05.2020
LV13.05.2020
MC13.05.2020
MK13.05.2020
MT13.05.2020
NL13.05.2020
PL13.05.2020
RO13.05.2020
RS13.05.2020
SE13.05.2020
SI13.05.2020
SK13.05.2020
SM13.05.2020
TR13.05.2020
IE27.07.2020
LU27.07.2020
BE31.07.2020
CH31.07.2020
LI31.07.2020
BG13.08.2020
NO13.08.2020
GR14.08.2020
IS13.09.2020
PT14.09.2020
[2022/33]
Former [2022/27]HU27.07.2017
AL13.05.2020
AT13.05.2020
CY13.05.2020
CZ13.05.2020
EE13.05.2020
ES13.05.2020
FI13.05.2020
HR13.05.2020
IT13.05.2020
LT13.05.2020
LV13.05.2020
MC13.05.2020
MT13.05.2020
NL13.05.2020
PL13.05.2020
RO13.05.2020
RS13.05.2020
SE13.05.2020
SI13.05.2020
SK13.05.2020
SM13.05.2020
TR13.05.2020
IE27.07.2020
LU27.07.2020
BE31.07.2020
CH31.07.2020
LI31.07.2020
BG13.08.2020
NO13.08.2020
GR14.08.2020
IS13.09.2020
PT14.09.2020
Former [2021/37]AL13.05.2020
AT13.05.2020
CZ13.05.2020
EE13.05.2020
ES13.05.2020
FI13.05.2020
HR13.05.2020
IT13.05.2020
LT13.05.2020
LV13.05.2020
MC13.05.2020
NL13.05.2020
PL13.05.2020
RO13.05.2020
RS13.05.2020
SE13.05.2020
SI13.05.2020
SK13.05.2020
SM13.05.2020
IE27.07.2020
LU27.07.2020
BE31.07.2020
CH31.07.2020
LI31.07.2020
BG13.08.2020
NO13.08.2020
GR14.08.2020
IS13.09.2020
PT14.09.2020
Former [2021/24]AL13.05.2020
AT13.05.2020
CZ13.05.2020
EE13.05.2020
ES13.05.2020
FI13.05.2020
HR13.05.2020
IT13.05.2020
LT13.05.2020
LV13.05.2020
MC13.05.2020
NL13.05.2020
PL13.05.2020
RO13.05.2020
RS13.05.2020
SE13.05.2020
SI13.05.2020
SK13.05.2020
SM13.05.2020
LU27.07.2020
BE31.07.2020
CH31.07.2020
LI31.07.2020
BG13.08.2020
NO13.08.2020
GR14.08.2020
IS13.09.2020
PT14.09.2020
Former [2021/20]AL13.05.2020
AT13.05.2020
CZ13.05.2020
EE13.05.2020
ES13.05.2020
FI13.05.2020
HR13.05.2020
IT13.05.2020
LT13.05.2020
LV13.05.2020
MC13.05.2020
NL13.05.2020
PL13.05.2020
RO13.05.2020
RS13.05.2020
SE13.05.2020
SK13.05.2020
SM13.05.2020
LU27.07.2020
CH31.07.2020
LI31.07.2020
BG13.08.2020
NO13.08.2020
GR14.08.2020
IS13.09.2020
PT14.09.2020
Former [2021/14]AL13.05.2020
AT13.05.2020
CZ13.05.2020
EE13.05.2020
ES13.05.2020
FI13.05.2020
HR13.05.2020
IT13.05.2020
LT13.05.2020
LV13.05.2020
MC13.05.2020
NL13.05.2020
PL13.05.2020
RO13.05.2020
RS13.05.2020
SE13.05.2020
SK13.05.2020
SM13.05.2020
BG13.08.2020
NO13.08.2020
GR14.08.2020
IS13.09.2020
PT14.09.2020
Former [2021/10]AL13.05.2020
AT13.05.2020
CZ13.05.2020
EE13.05.2020
ES13.05.2020
FI13.05.2020
HR13.05.2020
IT13.05.2020
LT13.05.2020
LV13.05.2020
NL13.05.2020
PL13.05.2020
RO13.05.2020
RS13.05.2020
SE13.05.2020
SK13.05.2020
SM13.05.2020
BG13.08.2020
NO13.08.2020
GR14.08.2020
IS13.09.2020
PT14.09.2020
Former [2021/09]AL13.05.2020
AT13.05.2020
CZ13.05.2020
EE13.05.2020
ES13.05.2020
FI13.05.2020
HR13.05.2020
IT13.05.2020
LT13.05.2020
LV13.05.2020
NL13.05.2020
RO13.05.2020
RS13.05.2020
SE13.05.2020
SM13.05.2020
BG13.08.2020
NO13.08.2020
GR14.08.2020
IS13.09.2020
PT14.09.2020
Former [2021/04]AL13.05.2020
FI13.05.2020
HR13.05.2020
LT13.05.2020
LV13.05.2020
NL13.05.2020
RS13.05.2020
SE13.05.2020
BG13.08.2020
NO13.08.2020
GR14.08.2020
IS13.09.2020
PT14.09.2020
Former [2021/01]FI13.05.2020
HR13.05.2020
LT13.05.2020
LV13.05.2020
RS13.05.2020
SE13.05.2020
BG13.08.2020
NO13.08.2020
GR14.08.2020
IS13.09.2020
PT14.09.2020
Former [2020/51]FI13.05.2020
HR13.05.2020
LT13.05.2020
LV13.05.2020
RS13.05.2020
SE13.05.2020
NO13.08.2020
GR14.08.2020
IS13.09.2020
PT14.09.2020
Former [2020/50]FI13.05.2020
HR13.05.2020
LT13.05.2020
LV13.05.2020
SE13.05.2020
NO13.08.2020
GR14.08.2020
IS13.09.2020
PT14.09.2020
Former [2020/48]FI13.05.2020
LT13.05.2020
SE13.05.2020
NO13.08.2020
IS13.09.2020
PT14.09.2020
Former [2020/47]LT13.05.2020
NO13.08.2020
IS13.09.2020
Former [2020/46]IS13.09.2020
Cited inInternational search[XYI]DE102005051537  (LUCKS CHRISTOPH [DE]) [X] 1-6,8,17-19 * paragraphs [0001] , [0020] , [0022] , [0029] * * figures 1a-1d,2a-2d,4a-4c * [Y] 9,10,12-14 [I] 7,15,16;
 [Y]US2008193292  (STAM RONNY [NL], et al) [Y] 9 * paragraphs [0028] , [0033] , [0035] , [0037] , [0039] * * figures 2,4,5,6B,7 *;
 [A]EP2305999  (GEN ELECTRIC [US]) [A] 1-8,12,15,18,19 * paragraphs [0016] , [0018] * * figures 3,4 *;
 [XI]EP2789851  (MITSUBISHI HEAVY IND LTD [JP]) [X] 1-6,8,13-19 * paragraphs [0001] , [0049] , [0058] , [0082] * * figure 10 * [I] 7;
 [Y]WO2015003718  (VESTAS WIND SYS AS [DK]) [Y] 10,12-14 * page 1, lines 6-9 * * page 6, lines 6-16,19-22 * * figures 2,3 *;
 [A]DE102015200370  (HITACHI LTD [JP]) [A] 11 * paragraphs [0059] , [0060] ** figure 6 *
by applicantWO2005031158
 WO2015055213
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.