EP3493963 - MOULD FOR A WIND TURBINE BLADE AND METHOD OF ASSEMBLING SAME [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 21.01.2022 Database last updated on 19.10.2024 | |
Former | The patent has been granted Status updated on 12.02.2021 | ||
Former | Grant of patent is intended Status updated on 06.10.2020 | ||
Former | Request for examination was made Status updated on 10.05.2019 | ||
Former | The international publication has been made Status updated on 10.02.2018 | ||
Former | unknown Status updated on 16.08.2017 | Most recent event Tooltip | 13.09.2024 | Lapse of the patent in a contracting state New state(s): MT | published on 16.10.2024 [2024/42] | Applicant(s) | For all designated states Vestas Wind Systems A/S Hedeager 42 8200 Aarhus N / DK | [2019/24] | Inventor(s) | 01 /
IRISSAPPANE, Vijayasankar Damtoften 15 2 TH 6950 Ringkøbing / DK | 02 /
DAVIS, Olav 153 Satchell Lane Hamble Hampshire SO31 4HP / GB | 03 /
PINO, Diego Andres c/o Vestas Wind Systems A/S Patents Department Hedeager 42 8200 Aarhus N / DK | [2019/24] | Representative(s) | Vestas Patents Department Hedeager 42 8200 Aarhus N / DK | [2019/24] | Application number, filing date | 17748639.6 | 01.08.2017 | [2019/24] | WO2017DK50254 | Priority number, date | DK20160070570 | 02.08.2016 Original published format: DK 201670570 | [2019/24] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2018024306 | Date: | 08.02.2018 | Language: | EN | [2018/06] | Type: | A1 Application with search report | No.: | EP3493963 | Date: | 12.06.2019 | Language: | EN | The application published by WIPO in one of the EPO official languages on 08.02.2018 takes the place of the publication of the European patent application. | [2019/24] | Type: | B1 Patent specification | No.: | EP3493963 | Date: | 17.03.2021 | Language: | EN | [2021/11] | Search report(s) | International search report - published on: | EP | 08.02.2018 | Classification | IPC: | B29C33/30, B29L31/08 | [2019/24] | CPC: |
B29C33/30 (EP,US);
B29C33/308 (US);
B29C70/345 (US);
B29C33/303 (EP,US);
B29L2031/085 (EP,US);
Y02P70/50 (EP,US)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2019/24] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | MD | Not yet paid | Title | German: | FORM FÜR EINE WINDTURBINENSCHAUFEL UND VERFAHREN ZUR MONTAGE DAVON | [2019/24] | English: | MOULD FOR A WIND TURBINE BLADE AND METHOD OF ASSEMBLING SAME | [2019/24] | French: | MOULE POUR PALE D'ÉOLIENNE ET PROCÉDÉ POUR SON ASSEMBLAGE | [2019/24] | Entry into regional phase | 31.01.2019 | National basic fee paid | 31.01.2019 | Designation fee(s) paid | 31.01.2019 | Examination fee paid | Examination procedure | 31.01.2019 | Examination requested [2019/24] | 31.01.2019 | Date on which the examining division has become responsible | 20.08.2019 | Amendment by applicant (claims and/or description) | 07.10.2020 | Communication of intention to grant the patent | 05.02.2021 | Fee for grant paid | 05.02.2021 | Fee for publishing/printing paid | 05.02.2021 | Receipt of the translation of the claim(s) | Opposition(s) | 20.12.2021 | No opposition filed within time limit [2022/08] | Fees paid | Renewal fee | 29.08.2019 | Renewal fee patent year 03 | 28.08.2020 | Renewal fee patent year 04 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 01.08.2017 | AL | 17.03.2021 | AT | 17.03.2021 | CY | 17.03.2021 | CZ | 17.03.2021 | EE | 17.03.2021 | FI | 17.03.2021 | HR | 17.03.2021 | IT | 17.03.2021 | LT | 17.03.2021 | LV | 17.03.2021 | MC | 17.03.2021 | MK | 17.03.2021 | MT | 17.03.2021 | NL | 17.03.2021 | PL | 17.03.2021 | RO | 17.03.2021 | RS | 17.03.2021 | SE | 17.03.2021 | SI | 17.03.2021 | SK | 17.03.2021 | SM | 17.03.2021 | TR | 17.03.2021 | BG | 17.06.2021 | NO | 17.06.2021 | GR | 18.06.2021 | IS | 17.07.2021 | PT | 19.07.2021 | IE | 01.08.2021 | LU | 01.08.2021 | BE | 31.08.2021 | CH | 31.08.2021 | FR | 31.08.2021 | LI | 31.08.2021 | [2024/42] |
Former [2024/29] | HU | 01.08.2017 | |
AL | 17.03.2021 | ||
AT | 17.03.2021 | ||
CY | 17.03.2021 | ||
CZ | 17.03.2021 | ||
EE | 17.03.2021 | ||
FI | 17.03.2021 | ||
HR | 17.03.2021 | ||
IT | 17.03.2021 | ||
LT | 17.03.2021 | ||
LV | 17.03.2021 | ||
MC | 17.03.2021 | ||
MK | 17.03.2021 | ||
NL | 17.03.2021 | ||
PL | 17.03.2021 | ||
RO | 17.03.2021 | ||
RS | 17.03.2021 | ||
SE | 17.03.2021 | ||
SI | 17.03.2021 | ||
SK | 17.03.2021 | ||
SM | 17.03.2021 | ||
TR | 17.03.2021 | ||
BG | 17.06.2021 | ||
NO | 17.06.2021 | ||
GR | 18.06.2021 | ||
IS | 17.07.2021 | ||
PT | 19.07.2021 | ||
IE | 01.08.2021 | ||
LU | 01.08.2021 | ||
BE | 31.08.2021 | ||
CH | 31.08.2021 | ||
FR | 31.08.2021 | ||
LI | 31.08.2021 | ||
Former [2024/23] | HU | 01.08.2017 | |
AL | 17.03.2021 | ||
AT | 17.03.2021 | ||
CY | 17.03.2021 | ||
CZ | 17.03.2021 | ||
EE | 17.03.2021 | ||
FI | 17.03.2021 | ||
HR | 17.03.2021 | ||
IT | 17.03.2021 | ||
LT | 17.03.2021 | ||
LV | 17.03.2021 | ||
MC | 17.03.2021 | ||
MK | 17.03.2021 | ||
NL | 17.03.2021 | ||
PL | 17.03.2021 | ||
RO | 17.03.2021 | ||
RS | 17.03.2021 | ||
SE | 17.03.2021 | ||
SI | 17.03.2021 | ||
SK | 17.03.2021 | ||
SM | 17.03.2021 | ||
BG | 17.06.2021 | ||
NO | 17.06.2021 | ||
GR | 18.06.2021 | ||
IS | 17.07.2021 | ||
PT | 19.07.2021 | ||
IE | 01.08.2021 | ||
LU | 01.08.2021 | ||
BE | 31.08.2021 | ||
CH | 31.08.2021 | ||
FR | 31.08.2021 | ||
LI | 31.08.2021 | ||
Former [2023/33] | HU | 01.08.2017 | |
AL | 17.03.2021 | ||
AT | 17.03.2021 | ||
CY | 17.03.2021 | ||
CZ | 17.03.2021 | ||
EE | 17.03.2021 | ||
FI | 17.03.2021 | ||
HR | 17.03.2021 | ||
IT | 17.03.2021 | ||
LT | 17.03.2021 | ||
LV | 17.03.2021 | ||
MC | 17.03.2021 | ||
NL | 17.03.2021 | ||
PL | 17.03.2021 | ||
RO | 17.03.2021 | ||
RS | 17.03.2021 | ||
SE | 17.03.2021 | ||
SI | 17.03.2021 | ||
SK | 17.03.2021 | ||
SM | 17.03.2021 | ||
BG | 17.06.2021 | ||
NO | 17.06.2021 | ||
GR | 18.06.2021 | ||
IS | 17.07.2021 | ||
PT | 19.07.2021 | ||
IE | 01.08.2021 | ||
LU | 01.08.2021 | ||
BE | 31.08.2021 | ||
CH | 31.08.2021 | ||
FR | 31.08.2021 | ||
LI | 31.08.2021 | ||
Former [2023/30] | AL | 17.03.2021 | |
AT | 17.03.2021 | ||
CY | 17.03.2021 | ||
CZ | 17.03.2021 | ||
EE | 17.03.2021 | ||
FI | 17.03.2021 | ||
HR | 17.03.2021 | ||
IT | 17.03.2021 | ||
LT | 17.03.2021 | ||
LV | 17.03.2021 | ||
MC | 17.03.2021 | ||
NL | 17.03.2021 | ||
PL | 17.03.2021 | ||
RO | 17.03.2021 | ||
RS | 17.03.2021 | ||
SE | 17.03.2021 | ||
SI | 17.03.2021 | ||
SK | 17.03.2021 | ||
SM | 17.03.2021 | ||
BG | 17.06.2021 | ||
NO | 17.06.2021 | ||
GR | 18.06.2021 | ||
IS | 17.07.2021 | ||
PT | 19.07.2021 | ||
IE | 01.08.2021 | ||
LU | 01.08.2021 | ||
BE | 31.08.2021 | ||
CH | 31.08.2021 | ||
FR | 31.08.2021 | ||
LI | 31.08.2021 | ||
Former [2022/35] | AL | 17.03.2021 | |
AT | 17.03.2021 | ||
CZ | 17.03.2021 | ||
EE | 17.03.2021 | ||
FI | 17.03.2021 | ||
HR | 17.03.2021 | ||
IT | 17.03.2021 | ||
LT | 17.03.2021 | ||
LV | 17.03.2021 | ||
MC | 17.03.2021 | ||
NL | 17.03.2021 | ||
PL | 17.03.2021 | ||
RO | 17.03.2021 | ||
RS | 17.03.2021 | ||
SE | 17.03.2021 | ||
SI | 17.03.2021 | ||
SK | 17.03.2021 | ||
SM | 17.03.2021 | ||
BG | 17.06.2021 | ||
NO | 17.06.2021 | ||
GR | 18.06.2021 | ||
IS | 17.07.2021 | ||
PT | 19.07.2021 | ||
IE | 01.08.2021 | ||
LU | 01.08.2021 | ||
BE | 31.08.2021 | ||
CH | 31.08.2021 | ||
FR | 31.08.2021 | ||
LI | 31.08.2021 | ||
Former [2022/34] | AL | 17.03.2021 | |
AT | 17.03.2021 | ||
CZ | 17.03.2021 | ||
EE | 17.03.2021 | ||
FI | 17.03.2021 | ||
HR | 17.03.2021 | ||
IT | 17.03.2021 | ||
LT | 17.03.2021 | ||
LV | 17.03.2021 | ||
MC | 17.03.2021 | ||
NL | 17.03.2021 | ||
PL | 17.03.2021 | ||
RO | 17.03.2021 | ||
RS | 17.03.2021 | ||
SE | 17.03.2021 | ||
SI | 17.03.2021 | ||
SK | 17.03.2021 | ||
SM | 17.03.2021 | ||
BG | 17.06.2021 | ||
NO | 17.06.2021 | ||
GR | 18.06.2021 | ||
IS | 17.07.2021 | ||
PT | 19.07.2021 | ||
LU | 01.08.2021 | ||
BE | 31.08.2021 | ||
CH | 31.08.2021 | ||
FR | 31.08.2021 | ||
LI | 31.08.2021 | ||
Former [2022/23] | AL | 17.03.2021 | |
AT | 17.03.2021 | ||
CZ | 17.03.2021 | ||
EE | 17.03.2021 | ||
FI | 17.03.2021 | ||
HR | 17.03.2021 | ||
IT | 17.03.2021 | ||
LT | 17.03.2021 | ||
LV | 17.03.2021 | ||
MC | 17.03.2021 | ||
NL | 17.03.2021 | ||
PL | 17.03.2021 | ||
RO | 17.03.2021 | ||
RS | 17.03.2021 | ||
SE | 17.03.2021 | ||
SI | 17.03.2021 | ||
SK | 17.03.2021 | ||
SM | 17.03.2021 | ||
BG | 17.06.2021 | ||
NO | 17.06.2021 | ||
GR | 18.06.2021 | ||
IS | 17.07.2021 | ||
PT | 19.07.2021 | ||
LU | 01.08.2021 | ||
CH | 31.08.2021 | ||
LI | 31.08.2021 | ||
Former [2022/21] | AL | 17.03.2021 | |
AT | 17.03.2021 | ||
CZ | 17.03.2021 | ||
EE | 17.03.2021 | ||
FI | 17.03.2021 | ||
HR | 17.03.2021 | ||
LT | 17.03.2021 | ||
LV | 17.03.2021 | ||
MC | 17.03.2021 | ||
NL | 17.03.2021 | ||
PL | 17.03.2021 | ||
RO | 17.03.2021 | ||
RS | 17.03.2021 | ||
SE | 17.03.2021 | ||
SI | 17.03.2021 | ||
SK | 17.03.2021 | ||
SM | 17.03.2021 | ||
BG | 17.06.2021 | ||
NO | 17.06.2021 | ||
GR | 18.06.2021 | ||
PT | 19.07.2021 | ||
CH | 31.08.2021 | ||
LI | 31.08.2021 | ||
Former [2022/18] | AL | 17.03.2021 | |
AT | 17.03.2021 | ||
CZ | 17.03.2021 | ||
EE | 17.03.2021 | ||
FI | 17.03.2021 | ||
HR | 17.03.2021 | ||
LT | 17.03.2021 | ||
LV | 17.03.2021 | ||
MC | 17.03.2021 | ||
NL | 17.03.2021 | ||
PL | 17.03.2021 | ||
RO | 17.03.2021 | ||
RS | 17.03.2021 | ||
SE | 17.03.2021 | ||
SI | 17.03.2021 | ||
SK | 17.03.2021 | ||
SM | 17.03.2021 | ||
BG | 17.06.2021 | ||
NO | 17.06.2021 | ||
GR | 18.06.2021 | ||
PT | 19.07.2021 | ||
Former [2022/13] | AL | 17.03.2021 | |
AT | 17.03.2021 | ||
CZ | 17.03.2021 | ||
EE | 17.03.2021 | ||
FI | 17.03.2021 | ||
HR | 17.03.2021 | ||
LT | 17.03.2021 | ||
LV | 17.03.2021 | ||
NL | 17.03.2021 | ||
PL | 17.03.2021 | ||
RO | 17.03.2021 | ||
RS | 17.03.2021 | ||
SE | 17.03.2021 | ||
SI | 17.03.2021 | ||
SK | 17.03.2021 | ||
SM | 17.03.2021 | ||
BG | 17.06.2021 | ||
NO | 17.06.2021 | ||
GR | 18.06.2021 | ||
PT | 19.07.2021 | ||
Former [2022/10] | AL | 17.03.2021 | |
AT | 17.03.2021 | ||
CZ | 17.03.2021 | ||
EE | 17.03.2021 | ||
FI | 17.03.2021 | ||
HR | 17.03.2021 | ||
LT | 17.03.2021 | ||
LV | 17.03.2021 | ||
NL | 17.03.2021 | ||
PL | 17.03.2021 | ||
RO | 17.03.2021 | ||
RS | 17.03.2021 | ||
SE | 17.03.2021 | ||
SK | 17.03.2021 | ||
SM | 17.03.2021 | ||
BG | 17.06.2021 | ||
NO | 17.06.2021 | ||
GR | 18.06.2021 | ||
PT | 19.07.2021 | ||
Former [2022/07] | AL | 17.03.2021 | |
AT | 17.03.2021 | ||
CZ | 17.03.2021 | ||
EE | 17.03.2021 | ||
FI | 17.03.2021 | ||
HR | 17.03.2021 | ||
LT | 17.03.2021 | ||
LV | 17.03.2021 | ||
NL | 17.03.2021 | ||
PL | 17.03.2021 | ||
RO | 17.03.2021 | ||
RS | 17.03.2021 | ||
SE | 17.03.2021 | ||
SK | 17.03.2021 | ||
SM | 17.03.2021 | ||
BG | 17.06.2021 | ||
NO | 17.06.2021 | ||
GR | 18.06.2021 | ||
IS | 17.07.2021 | ||
PT | 19.07.2021 | ||
Former [2021/52] | AT | 17.03.2021 | |
CZ | 17.03.2021 | ||
EE | 17.03.2021 | ||
FI | 17.03.2021 | ||
HR | 17.03.2021 | ||
LT | 17.03.2021 | ||
LV | 17.03.2021 | ||
NL | 17.03.2021 | ||
PL | 17.03.2021 | ||
RO | 17.03.2021 | ||
RS | 17.03.2021 | ||
SE | 17.03.2021 | ||
SK | 17.03.2021 | ||
SM | 17.03.2021 | ||
BG | 17.06.2021 | ||
NO | 17.06.2021 | ||
GR | 18.06.2021 | ||
IS | 17.07.2021 | ||
PT | 19.07.2021 | ||
Former [2021/51] | AT | 17.03.2021 | |
CZ | 17.03.2021 | ||
EE | 17.03.2021 | ||
FI | 17.03.2021 | ||
HR | 17.03.2021 | ||
LT | 17.03.2021 | ||
LV | 17.03.2021 | ||
NL | 17.03.2021 | ||
RO | 17.03.2021 | ||
RS | 17.03.2021 | ||
SE | 17.03.2021 | ||
SK | 17.03.2021 | ||
SM | 17.03.2021 | ||
BG | 17.06.2021 | ||
NO | 17.06.2021 | ||
GR | 18.06.2021 | ||
IS | 17.07.2021 | ||
PT | 19.07.2021 | ||
Former [2021/50] | AT | 17.03.2021 | |
CZ | 17.03.2021 | ||
EE | 17.03.2021 | ||
FI | 17.03.2021 | ||
HR | 17.03.2021 | ||
LT | 17.03.2021 | ||
LV | 17.03.2021 | ||
NL | 17.03.2021 | ||
RO | 17.03.2021 | ||
RS | 17.03.2021 | ||
SE | 17.03.2021 | ||
SK | 17.03.2021 | ||
SM | 17.03.2021 | ||
BG | 17.06.2021 | ||
NO | 17.06.2021 | ||
GR | 18.06.2021 | ||
PT | 19.07.2021 | ||
Former [2021/48] | AT | 17.03.2021 | |
CZ | 17.03.2021 | ||
EE | 17.03.2021 | ||
FI | 17.03.2021 | ||
HR | 17.03.2021 | ||
LT | 17.03.2021 | ||
LV | 17.03.2021 | ||
NL | 17.03.2021 | ||
RS | 17.03.2021 | ||
SE | 17.03.2021 | ||
SM | 17.03.2021 | ||
BG | 17.06.2021 | ||
NO | 17.06.2021 | ||
GR | 18.06.2021 | ||
Former [2021/46] | AT | 17.03.2021 | |
FI | 17.03.2021 | ||
HR | 17.03.2021 | ||
LT | 17.03.2021 | ||
LV | 17.03.2021 | ||
NL | 17.03.2021 | ||
RS | 17.03.2021 | ||
SE | 17.03.2021 | ||
SM | 17.03.2021 | ||
BG | 17.06.2021 | ||
NO | 17.06.2021 | ||
GR | 18.06.2021 | ||
Former [2021/43] | FI | 17.03.2021 | |
HR | 17.03.2021 | ||
LV | 17.03.2021 | ||
NL | 17.03.2021 | ||
RS | 17.03.2021 | ||
SE | 17.03.2021 | ||
BG | 17.06.2021 | ||
NO | 17.06.2021 | ||
GR | 18.06.2021 | ||
Former [2021/38] | FI | 17.03.2021 | |
HR | 17.03.2021 | ||
LV | 17.03.2021 | ||
RS | 17.03.2021 | ||
SE | 17.03.2021 | ||
BG | 17.06.2021 | ||
NO | 17.06.2021 | ||
GR | 18.06.2021 | ||
Former [2021/37] | FI | 17.03.2021 | |
HR | 17.03.2021 | ||
LV | 17.03.2021 | ||
RS | 17.03.2021 | ||
BG | 17.06.2021 | ||
NO | 17.06.2021 | ||
GR | 18.06.2021 | ||
Former [2021/36] | FI | 17.03.2021 | |
HR | 17.03.2021 | ||
BG | 17.06.2021 | ||
NO | 17.06.2021 | ||
GR | 18.06.2021 | ||
Former [2021/35] | FI | 17.03.2021 | |
HR | 17.03.2021 | ||
NO | 17.06.2021 | ||
Former [2021/33] | FI | 17.03.2021 | |
NO | 17.06.2021 | Cited in | International search | [A]CN201432382Y (RUBIN LIU) [A] 1-15 * figures 1,3 *; | [A]CN102310500 (GUANGDONG MINGYANG WIND POWER GROUP CO LTD) [A] 1-15 * figures 1-3 *; | [A]US2012061024 (STARKE ANDREAS [DE]) [A] 1-15 * figures 4,5 * * paragraphs [0010] , [0011] , [0012] , [0022] , [0039] , [0040] , [0042] *; | [XI]WO2013097859 (VESTAS WIND SYS AS [DK]) [X] 1,4,5,10-15 * page 2, line 24 - page 4, line 5 * * page 16 - page 21 * * figures 3,5a,5b,6,7,11 * [I] 8,9; | [A]CN103240878B (GUODIAN UNITED POWER TECHNOLOGY LIANYUNGANG COMPANY LTD) [A] 1-15* figure 1 * |