EP3652864 - CONSTRUCTION OF A POLAR CODE BASED ON A DISTANCE CRITERION AND A RELIABILITY CRITERION, IN PARTICULAR OF A MULTI-KERNEL POLAR CODE [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 15.07.2022 Database last updated on 26.07.2024 | |
Former | The patent has been granted Status updated on 06.08.2021 | ||
Former | Grant of patent is intended Status updated on 16.02.2021 | ||
Former | Request for examination was made Status updated on 17.04.2020 | ||
Former | The international publication has been made Status updated on 02.02.2019 | ||
Former | unknown Status updated on 01.09.2017 | Most recent event Tooltip | 14.06.2024 | Lapse of the patent in a contracting state New state(s): TR | published on 17.07.2024 [2024/29] | Applicant(s) | For all designated states Huawei Technologies Co., Ltd. Huawei Administration Building Bantian Longgang District Shenzhen, Guangdong 518129 / CN | [2020/21] | Inventor(s) | 01 /
BIOGLIO, Valerio c/o Huawei Technologies Duesseldorf GmbH Riesstr. 25 80992 Munich / DE | 02 /
LAND, Ingmar c/o Huawei Technologies Duesseldorf GmbH Riesstr. 25 80992 Munich / DE | 03 /
BELFIORE, Jean-Claude c/o Huawei Technologies Duesseldorf GmbH Riesstr. 25 80992 Munich / DE | 04 /
GABRY, Frederic c/o Huawei Technologies Duesseldorf GmbH Riesstr. 25 80992 Munich / DE | [2020/21] | Representative(s) | Maiwald GmbH Elisenhof Elisenstraße 3 80335 München / DE | [N/P] |
Former [2020/21] | Maiwald Patent- und Rechtsanwaltsgesellschaft mbH Elisenhof Elisenstraße 3 80335 München / DE | Application number, filing date | 17754084.6 | 26.07.2017 | [2020/21] | WO2017EP68930 | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2019020182 | Date: | 31.01.2019 | Language: | EN | [2019/05] | Type: | A1 Application with search report | No.: | EP3652864 | Date: | 20.05.2020 | Language: | EN | The application published by WIPO in one of the EPO official languages on 31.01.2019 takes the place of the publication of the European patent application. | [2020/21] | Type: | B1 Patent specification | No.: | EP3652864 | Date: | 08.09.2021 | Language: | EN | [2021/36] | Search report(s) | International search report - published on: | EP | 31.01.2019 | Classification | IPC: | H03M13/13, H03M13/03 | [2021/10] | CPC: |
H03M13/13 (EP,US);
H03M13/033 (EP);
H03M13/458 (US)
|
Former IPC [2020/21] | H03M13/13 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2020/21] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | MD | Not yet paid | Title | German: | KONSTRUKTION EINES POLARKODES BASIEREND AUF EINEM DISTANZ- UNE EINEM ZUVERLÄSSIGKEITSKRITERION, INSBESONDERE EINES MEHRKERNEL-POLARKODES | [2021/10] | English: | CONSTRUCTION OF A POLAR CODE BASED ON A DISTANCE CRITERION AND A RELIABILITY CRITERION, IN PARTICULAR OF A MULTI-KERNEL POLAR CODE | [2020/21] | French: | CONSTRUCTION D'UN CODE POLAIRE BASÉE SUR UN CRITÈRE DE DISTANCE ET UN CRITÈRE DE FIABILITÉ, EN PARTICULIER D'UN CODE POLAIRE MULTI-KERNEL | [2021/10] |
Former [2020/21] | HERSTELLUNG EINES POLARCODES AUF DER GRUNDLAGE EINES DISTANZKRITERIUMS UND EINES ZUVERLÄSSIGKEITSKRITERIUMS, INSBESONDERE EINES MEHRKERN-POLARCODES | ||
Former [2020/21] | CONSTRUCTION D'UN CODE POLAIRE SUR LA BASE D'UN CRITÈRE DE DISTANCE ET D'UN CRITÈRE DE FIABILITÉ, EN PARTICULIER D'UN CODE POLAIRE À NOYAUX MULTIPLES | Entry into regional phase | 13.02.2020 | National basic fee paid | 13.02.2020 | Designation fee(s) paid | 13.02.2020 | Examination fee paid | Examination procedure | 13.02.2020 | Examination requested [2020/21] | 13.02.2020 | Date on which the examining division has become responsible | 26.08.2020 | Amendment by applicant (claims and/or description) | 17.02.2021 | Communication of intention to grant the patent | 23.05.2021 | Fee for grant paid | 23.05.2021 | Fee for publishing/printing paid | 21.06.2021 | Receipt of the translation of the claim(s) | Opposition(s) | 09.06.2022 | No opposition filed within time limit [2022/33] | Fees paid | Renewal fee | 13.02.2020 | Renewal fee patent year 03 | 31.07.2020 | Renewal fee patent year 04 | 30.07.2021 | Renewal fee patent year 05 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 26.07.2017 | AL | 08.09.2021 | AT | 08.09.2021 | CY | 08.09.2021 | CZ | 08.09.2021 | DK | 08.09.2021 | EE | 08.09.2021 | ES | 08.09.2021 | FI | 08.09.2021 | HR | 08.09.2021 | IT | 08.09.2021 | LT | 08.09.2021 | LV | 08.09.2021 | MC | 08.09.2021 | MK | 08.09.2021 | NL | 08.09.2021 | PL | 08.09.2021 | RO | 08.09.2021 | RS | 08.09.2021 | SE | 08.09.2021 | SI | 08.09.2021 | SK | 08.09.2021 | SM | 08.09.2021 | TR | 08.09.2021 | BG | 08.12.2021 | NO | 08.12.2021 | GR | 09.12.2021 | IS | 08.01.2022 | PT | 10.01.2022 | [2024/29] |
Former [2024/24] | HU | 26.07.2017 | |
AL | 08.09.2021 | ||
AT | 08.09.2021 | ||
CY | 08.09.2021 | ||
CZ | 08.09.2021 | ||
DK | 08.09.2021 | ||
EE | 08.09.2021 | ||
ES | 08.09.2021 | ||
FI | 08.09.2021 | ||
HR | 08.09.2021 | ||
IT | 08.09.2021 | ||
LT | 08.09.2021 | ||
LV | 08.09.2021 | ||
MC | 08.09.2021 | ||
MK | 08.09.2021 | ||
NL | 08.09.2021 | ||
PL | 08.09.2021 | ||
RO | 08.09.2021 | ||
RS | 08.09.2021 | ||
SE | 08.09.2021 | ||
SI | 08.09.2021 | ||
SK | 08.09.2021 | ||
SM | 08.09.2021 | ||
BG | 08.12.2021 | ||
NO | 08.12.2021 | ||
GR | 09.12.2021 | ||
IS | 08.01.2022 | ||
PT | 10.01.2022 | ||
Former [2024/23] | AL | 08.09.2021 | |
AT | 08.09.2021 | ||
CY | 08.09.2021 | ||
CZ | 08.09.2021 | ||
DK | 08.09.2021 | ||
EE | 08.09.2021 | ||
ES | 08.09.2021 | ||
FI | 08.09.2021 | ||
HR | 08.09.2021 | ||
IT | 08.09.2021 | ||
LT | 08.09.2021 | ||
LV | 08.09.2021 | ||
MC | 08.09.2021 | ||
MK | 08.09.2021 | ||
NL | 08.09.2021 | ||
PL | 08.09.2021 | ||
RO | 08.09.2021 | ||
RS | 08.09.2021 | ||
SE | 08.09.2021 | ||
SI | 08.09.2021 | ||
SK | 08.09.2021 | ||
SM | 08.09.2021 | ||
BG | 08.12.2021 | ||
NO | 08.12.2021 | ||
GR | 09.12.2021 | ||
IS | 08.01.2022 | ||
PT | 10.01.2022 | ||
Former [2024/20] | AL | 08.09.2021 | |
AT | 08.09.2021 | ||
CY | 08.09.2021 | ||
CZ | 08.09.2021 | ||
DK | 08.09.2021 | ||
EE | 08.09.2021 | ||
ES | 08.09.2021 | ||
FI | 08.09.2021 | ||
HR | 08.09.2021 | ||
IT | 08.09.2021 | ||
LT | 08.09.2021 | ||
LV | 08.09.2021 | ||
MC | 08.09.2021 | ||
NL | 08.09.2021 | ||
PL | 08.09.2021 | ||
RO | 08.09.2021 | ||
RS | 08.09.2021 | ||
SE | 08.09.2021 | ||
SI | 08.09.2021 | ||
SK | 08.09.2021 | ||
SM | 08.09.2021 | ||
BG | 08.12.2021 | ||
NO | 08.12.2021 | ||
GR | 09.12.2021 | ||
IS | 08.01.2022 | ||
PT | 10.01.2022 | ||
Former [2023/11] | AL | 08.09.2021 | |
AT | 08.09.2021 | ||
CZ | 08.09.2021 | ||
DK | 08.09.2021 | ||
EE | 08.09.2021 | ||
ES | 08.09.2021 | ||
FI | 08.09.2021 | ||
HR | 08.09.2021 | ||
IT | 08.09.2021 | ||
LT | 08.09.2021 | ||
LV | 08.09.2021 | ||
MC | 08.09.2021 | ||
NL | 08.09.2021 | ||
PL | 08.09.2021 | ||
RO | 08.09.2021 | ||
RS | 08.09.2021 | ||
SE | 08.09.2021 | ||
SI | 08.09.2021 | ||
SK | 08.09.2021 | ||
SM | 08.09.2021 | ||
BG | 08.12.2021 | ||
NO | 08.12.2021 | ||
GR | 09.12.2021 | ||
IS | 08.01.2022 | ||
PT | 10.01.2022 | ||
Former [2023/10] | AL | 08.09.2021 | |
AT | 08.09.2021 | ||
CZ | 08.09.2021 | ||
DK | 08.09.2021 | ||
EE | 08.09.2021 | ||
ES | 08.09.2021 | ||
FI | 08.09.2021 | ||
HR | 08.09.2021 | ||
IT | 08.09.2021 | ||
LT | 08.09.2021 | ||
LV | 08.09.2021 | ||
NL | 08.09.2021 | ||
PL | 08.09.2021 | ||
RO | 08.09.2021 | ||
RS | 08.09.2021 | ||
SE | 08.09.2021 | ||
SI | 08.09.2021 | ||
SK | 08.09.2021 | ||
SM | 08.09.2021 | ||
BG | 08.12.2021 | ||
NO | 08.12.2021 | ||
GR | 09.12.2021 | ||
IS | 08.01.2022 | ||
PT | 10.01.2022 | ||
Former [2022/36] | AL | 08.09.2021 | |
AT | 08.09.2021 | ||
CZ | 08.09.2021 | ||
DK | 08.09.2021 | ||
EE | 08.09.2021 | ||
ES | 08.09.2021 | ||
FI | 08.09.2021 | ||
HR | 08.09.2021 | ||
LT | 08.09.2021 | ||
LV | 08.09.2021 | ||
NL | 08.09.2021 | ||
PL | 08.09.2021 | ||
RO | 08.09.2021 | ||
RS | 08.09.2021 | ||
SE | 08.09.2021 | ||
SI | 08.09.2021 | ||
SK | 08.09.2021 | ||
SM | 08.09.2021 | ||
BG | 08.12.2021 | ||
NO | 08.12.2021 | ||
GR | 09.12.2021 | ||
IS | 08.01.2022 | ||
PT | 10.01.2022 | ||
Former [2022/29] | AL | 08.09.2021 | |
AT | 08.09.2021 | ||
CZ | 08.09.2021 | ||
EE | 08.09.2021 | ||
ES | 08.09.2021 | ||
FI | 08.09.2021 | ||
HR | 08.09.2021 | ||
LT | 08.09.2021 | ||
LV | 08.09.2021 | ||
NL | 08.09.2021 | ||
PL | 08.09.2021 | ||
RO | 08.09.2021 | ||
RS | 08.09.2021 | ||
SE | 08.09.2021 | ||
SK | 08.09.2021 | ||
SM | 08.09.2021 | ||
BG | 08.12.2021 | ||
NO | 08.12.2021 | ||
GR | 09.12.2021 | ||
IS | 08.01.2022 | ||
PT | 10.01.2022 | ||
Former [2022/25] | AT | 08.09.2021 | |
CZ | 08.09.2021 | ||
EE | 08.09.2021 | ||
ES | 08.09.2021 | ||
FI | 08.09.2021 | ||
HR | 08.09.2021 | ||
LT | 08.09.2021 | ||
LV | 08.09.2021 | ||
NL | 08.09.2021 | ||
PL | 08.09.2021 | ||
RO | 08.09.2021 | ||
RS | 08.09.2021 | ||
SE | 08.09.2021 | ||
SK | 08.09.2021 | ||
SM | 08.09.2021 | ||
BG | 08.12.2021 | ||
NO | 08.12.2021 | ||
GR | 09.12.2021 | ||
IS | 08.01.2022 | ||
PT | 10.01.2022 | ||
Former [2022/24] | AT | 08.09.2021 | |
CZ | 08.09.2021 | ||
EE | 08.09.2021 | ||
ES | 08.09.2021 | ||
FI | 08.09.2021 | ||
HR | 08.09.2021 | ||
LT | 08.09.2021 | ||
LV | 08.09.2021 | ||
NL | 08.09.2021 | ||
PL | 08.09.2021 | ||
RO | 08.09.2021 | ||
RS | 08.09.2021 | ||
SE | 08.09.2021 | ||
SK | 08.09.2021 | ||
BG | 08.12.2021 | ||
NO | 08.12.2021 | ||
GR | 09.12.2021 | ||
IS | 08.01.2022 | ||
PT | 10.01.2022 | ||
Former [2022/23] | AT | 08.09.2021 | |
CZ | 08.09.2021 | ||
EE | 08.09.2021 | ||
ES | 08.09.2021 | ||
FI | 08.09.2021 | ||
HR | 08.09.2021 | ||
LT | 08.09.2021 | ||
LV | 08.09.2021 | ||
PL | 08.09.2021 | ||
RS | 08.09.2021 | ||
SE | 08.09.2021 | ||
SK | 08.09.2021 | ||
BG | 08.12.2021 | ||
NO | 08.12.2021 | ||
GR | 09.12.2021 | ||
PT | 10.01.2022 | ||
Former [2022/21] | AT | 08.09.2021 | |
ES | 08.09.2021 | ||
FI | 08.09.2021 | ||
HR | 08.09.2021 | ||
LT | 08.09.2021 | ||
LV | 08.09.2021 | ||
RS | 08.09.2021 | ||
SE | 08.09.2021 | ||
BG | 08.12.2021 | ||
NO | 08.12.2021 | ||
GR | 09.12.2021 | ||
Former [2022/10] | ES | 08.09.2021 | |
FI | 08.09.2021 | ||
HR | 08.09.2021 | ||
LT | 08.09.2021 | ||
LV | 08.09.2021 | ||
RS | 08.09.2021 | ||
SE | 08.09.2021 | ||
BG | 08.12.2021 | ||
NO | 08.12.2021 | ||
GR | 09.12.2021 | ||
Former [2022/09] | ES | 08.09.2021 | |
FI | 08.09.2021 | ||
LT | 08.09.2021 | ||
RS | 08.09.2021 | ||
SE | 08.09.2021 | ||
BG | 08.12.2021 | ||
NO | 08.12.2021 | ||
Former [2022/08] | ES | 08.09.2021 | |
FI | 08.09.2021 | ||
LT | 08.09.2021 | ||
SE | 08.09.2021 | ||
BG | 08.12.2021 | ||
NO | 08.12.2021 | ||
Former [2022/07] | LT | 08.09.2021 | |
NO | 08.12.2021 | Cited in | International search | [A]EP2899911 (HUAWEI TECH CO LTD [CN]) [A] 1-11 * the whole document * | [A] - Valerio Bioglio ET AL, "Minimum-Distance Based Construction of Multi-Kernel Polar Codes", (20170126), URL: https://arxiv.org/pdf/1701.07616.pdf, XP055350908 [A] 1-11 * the whole document * DOI: http://dx.doi.org/10.1109/GLOCOM.2017.8254147 | [A] - Bin Li ET AL, "A RM-Polar Codes", (20140721), URL: https://arxiv.org/ftp/arxiv/papers/1407/1407.5483.pdf, XP055270196 [A] 1-11 * the whole document * | [A] - Frederic Gabry ET AL, "Multi-kernel construction of polar codes", 2017 IEEE International Conference on Communications Workshops (ICC Workshops), doi:10.1109/ICCW.2017.7962750, ISBN 978-1-5090-1525-2, (20170310), pages 761 - 765, URL: https://arxiv.org/pdf/1612.06099.pdf, (20180329), XP055463941 [A] 1-11 * the whole document * DOI: http://dx.doi.org/10.1109/ICCW.2017.7962750 | by applicant | WO2016EP69593 | WO2016EP82555 |