blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3482227

EP3482227 - MOBILE TRANSCEIVER FOR ASSET TRACKING HAVING A POWER SAVING SCHEME FOR NETWORK ACCESS [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  13.08.2021
Database last updated on 02.09.2024
FormerThe patent has been granted
Status updated on  04.09.2020
FormerGrant of patent is intended
Status updated on  05.03.2020
FormerRequest for examination was made
Status updated on  12.04.2019
FormerThe international publication has been made
Status updated on  17.02.2018
Formerunknown
Status updated on  01.09.2017
Most recent event   Tooltip03.05.2024Lapse of the patent in a contracting state
New state(s): MK
published on 05.06.2024  [2024/23]
Applicant(s)For all designated states
BlackBerry Limited
2200 University Avenue East
Waterloo, Ontario N2K 0A7 / CA
[2020/41]
Former [2019/20]For all designated states
BlackBerry Limited
2200 University Avenue East
Waterloo, Ontario N2K 0A7 / US
Inventor(s)01 / MULAOSMANOVIC, Jasmin
2200 University Ave. E.
Ext. 71608
Waterloo, Ontario N2K 0A7 / CA
02 / LOMBARDI, Robert Joseph
186 East 31 Street
Hamilton, Ontario L8V 3P5 / CA
03 / BERRIZ, Sergio Javier
9440 SW 114 Street
Miami, FL 33176 / US
 [2019/20]
Representative(s)Hanna Moore + Curley
Garryard House
25-26 Earlsfort Terrace
Dublin 2, D02 PX51 / IE
[N/P]
Former [2019/20]Hanna Moore + Curley
Garryard House
25/26 Earlsfort Terrace
Dublin 2, D02 PX51 / IE
Application number, filing date17755336.902.08.2017
[2019/20]
WO2017US45084
Priority number, dateUS20161523097008.08.2016         Original published format: US201615230970
[2019/20]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2018031337
Date:15.02.2018
Language:EN
[2018/07]
Type: A1 Application with search report 
No.:EP3482227
Date:15.05.2019
Language:EN
The application published by WIPO in one of the EPO official languages on 15.02.2018 takes the place of the publication of the European patent application.
[2019/20]
Type: B1 Patent specification 
No.:EP3482227
Date:07.10.2020
Language:EN
[2020/41]
Search report(s)International search report - published on:EP15.02.2018
ClassificationIPC:G01S19/34, G01S5/02
[2019/20]
CPC:
G01S19/34 (EP,US); H04W64/00 (US); G01S19/13 (US);
G01S5/02521 (EP,US); H04L63/10 (US); H04W52/0245 (EP,US);
H04W60/04 (US); H04W8/005 (US); Y02D30/70 (EP,US) (-)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2019/20]
Extension statesBANot yet paid
MENot yet paid
Validation statesMANot yet paid
MDNot yet paid
TitleGerman:MOBILER SENDEEMPFÄNGER ZUR ANLAGENVERFOLGUNG MIT EINEM ENERGIESPARSCHEMA FÜR NETZWERKZUGANG[2019/20]
English:MOBILE TRANSCEIVER FOR ASSET TRACKING HAVING A POWER SAVING SCHEME FOR NETWORK ACCESS[2019/20]
French:ÉMETTEUR-RÉCEPTEUR MOBILE POUR LE SUIVI DE BIENS AYANT UN SCHÉMA D'ÉCONOMIE D'ÉNERGIE POUR L'ACCÈS AU RÉSEAU[2019/20]
Entry into regional phase06.02.2019National basic fee paid 
06.02.2019Designation fee(s) paid 
06.02.2019Examination fee paid 
Examination procedure06.02.2019Examination requested  [2019/20]
06.02.2019Date on which the examining division has become responsible
04.09.2019Amendment by applicant (claims and/or description)
06.03.2020Communication of intention to grant the patent
02.07.2020Fee for grant paid
02.07.2020Fee for publishing/printing paid
02.07.2020Receipt of the translation of the claim(s)
Opposition(s)08.07.2021No opposition filed within time limit [2021/37]
Fees paidRenewal fee
27.08.2019Renewal fee patent year 03
27.08.2020Renewal fee patent year 04
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU02.08.2017
AL07.10.2020
AT07.10.2020
CY07.10.2020
CZ07.10.2020
DK07.10.2020
EE07.10.2020
ES07.10.2020
FI07.10.2020
HR07.10.2020
IT07.10.2020
LT07.10.2020
LV07.10.2020
MC07.10.2020
MK07.10.2020
NL07.10.2020
PL07.10.2020
RO07.10.2020
RS07.10.2020
SE07.10.2020
SI07.10.2020
SK07.10.2020
SM07.10.2020
BG07.01.2021
NO07.01.2021
GR08.01.2021
IS07.02.2021
PT08.02.2021
[2024/23]
Former [2023/33]HU02.08.2017
AL07.10.2020
AT07.10.2020
CY07.10.2020
CZ07.10.2020
DK07.10.2020
EE07.10.2020
ES07.10.2020
FI07.10.2020
HR07.10.2020
IT07.10.2020
LT07.10.2020
LV07.10.2020
MC07.10.2020
NL07.10.2020
PL07.10.2020
RO07.10.2020
RS07.10.2020
SE07.10.2020
SI07.10.2020
SK07.10.2020
SM07.10.2020
BG07.01.2021
NO07.01.2021
GR08.01.2021
IS07.02.2021
PT08.02.2021
Former [2023/30]AL07.10.2020
AT07.10.2020
CY07.10.2020
CZ07.10.2020
DK07.10.2020
EE07.10.2020
ES07.10.2020
FI07.10.2020
HR07.10.2020
IT07.10.2020
LT07.10.2020
LV07.10.2020
MC07.10.2020
NL07.10.2020
PL07.10.2020
RO07.10.2020
RS07.10.2020
SE07.10.2020
SI07.10.2020
SK07.10.2020
SM07.10.2020
BG07.01.2021
NO07.01.2021
GR08.01.2021
IS07.02.2021
PT08.02.2021
Former [2022/23]AL07.10.2020
AT07.10.2020
CZ07.10.2020
DK07.10.2020
EE07.10.2020
ES07.10.2020
FI07.10.2020
HR07.10.2020
IT07.10.2020
LT07.10.2020
LV07.10.2020
MC07.10.2020
NL07.10.2020
PL07.10.2020
RO07.10.2020
RS07.10.2020
SE07.10.2020
SI07.10.2020
SK07.10.2020
SM07.10.2020
BG07.01.2021
NO07.01.2021
GR08.01.2021
IS07.02.2021
PT08.02.2021
Former [2022/18]AL07.10.2020
AT07.10.2020
CZ07.10.2020
DK07.10.2020
EE07.10.2020
ES07.10.2020
FI07.10.2020
HR07.10.2020
IT07.10.2020
LT07.10.2020
LV07.10.2020
MC07.10.2020
NL07.10.2020
PL07.10.2020
RO07.10.2020
RS07.10.2020
SE07.10.2020
SI07.10.2020
SK07.10.2020
SM07.10.2020
BG07.01.2021
NO07.01.2021
GR08.01.2021
PT08.02.2021
Former [2022/10]AL07.10.2020
AT07.10.2020
CZ07.10.2020
DK07.10.2020
EE07.10.2020
ES07.10.2020
FI07.10.2020
HR07.10.2020
IT07.10.2020
LT07.10.2020
LV07.10.2020
NL07.10.2020
PL07.10.2020
RO07.10.2020
RS07.10.2020
SE07.10.2020
SI07.10.2020
SK07.10.2020
SM07.10.2020
BG07.01.2021
NO07.01.2021
GR08.01.2021
PT08.02.2021
Former [2021/50]AL07.10.2020
AT07.10.2020
CZ07.10.2020
DK07.10.2020
EE07.10.2020
ES07.10.2020
FI07.10.2020
HR07.10.2020
IT07.10.2020
LT07.10.2020
LV07.10.2020
NL07.10.2020
PL07.10.2020
RO07.10.2020
RS07.10.2020
SE07.10.2020
SI07.10.2020
SK07.10.2020
SM07.10.2020
BG07.01.2021
NO07.01.2021
GR08.01.2021
IS07.02.2021
PT08.02.2021
Former [2021/48]AL07.10.2020
AT07.10.2020
CZ07.10.2020
DK07.10.2020
EE07.10.2020
ES07.10.2020
FI07.10.2020
HR07.10.2020
IT07.10.2020
LT07.10.2020
LV07.10.2020
NL07.10.2020
PL07.10.2020
RO07.10.2020
RS07.10.2020
SE07.10.2020
SK07.10.2020
SM07.10.2020
BG07.01.2021
NO07.01.2021
GR08.01.2021
IS07.02.2021
PT08.02.2021
Former [2021/45]AL07.10.2020
AT07.10.2020
CZ07.10.2020
DK07.10.2020
EE07.10.2020
ES07.10.2020
FI07.10.2020
HR07.10.2020
LT07.10.2020
LV07.10.2020
NL07.10.2020
PL07.10.2020
RO07.10.2020
RS07.10.2020
SE07.10.2020
SK07.10.2020
SM07.10.2020
BG07.01.2021
NO07.01.2021
GR08.01.2021
IS07.02.2021
PT08.02.2021
Former [2021/37]AT07.10.2020
CZ07.10.2020
DK07.10.2020
EE07.10.2020
ES07.10.2020
FI07.10.2020
HR07.10.2020
LT07.10.2020
LV07.10.2020
NL07.10.2020
PL07.10.2020
RO07.10.2020
RS07.10.2020
SE07.10.2020
SK07.10.2020
SM07.10.2020
BG07.01.2021
NO07.01.2021
GR08.01.2021
IS07.02.2021
PT08.02.2021
Former [2021/36]AT07.10.2020
CZ07.10.2020
EE07.10.2020
ES07.10.2020
FI07.10.2020
HR07.10.2020
LT07.10.2020
LV07.10.2020
NL07.10.2020
PL07.10.2020
RO07.10.2020
RS07.10.2020
SE07.10.2020
SK07.10.2020
SM07.10.2020
BG07.01.2021
NO07.01.2021
GR08.01.2021
IS07.02.2021
PT08.02.2021
Former [2021/35]AT07.10.2020
CZ07.10.2020
ES07.10.2020
FI07.10.2020
HR07.10.2020
LT07.10.2020
LV07.10.2020
NL07.10.2020
PL07.10.2020
RO07.10.2020
RS07.10.2020
SE07.10.2020
SK07.10.2020
SM07.10.2020
BG07.01.2021
NO07.01.2021
GR08.01.2021
IS07.02.2021
PT08.02.2021
Former [2021/33]AT07.10.2020
ES07.10.2020
FI07.10.2020
HR07.10.2020
LT07.10.2020
LV07.10.2020
NL07.10.2020
PL07.10.2020
RS07.10.2020
SE07.10.2020
SM07.10.2020
BG07.01.2021
NO07.01.2021
GR08.01.2021
IS07.02.2021
PT08.02.2021
Former [2021/32]AT07.10.2020
ES07.10.2020
FI07.10.2020
HR07.10.2020
LV07.10.2020
NL07.10.2020
PL07.10.2020
RS07.10.2020
SE07.10.2020
SM07.10.2020
BG07.01.2021
NO07.01.2021
GR08.01.2021
IS07.02.2021
PT08.02.2021
Former [2021/30]AT07.10.2020
ES07.10.2020
FI07.10.2020
HR07.10.2020
LV07.10.2020
NL07.10.2020
PL07.10.2020
RS07.10.2020
SE07.10.2020
BG07.01.2021
NO07.01.2021
GR08.01.2021
IS07.02.2021
PT08.02.2021
Former [2021/28]AT07.10.2020
ES07.10.2020
FI07.10.2020
HR07.10.2020
LV07.10.2020
PL07.10.2020
RS07.10.2020
SE07.10.2020
BG07.01.2021
NO07.01.2021
GR08.01.2021
IS07.02.2021
PT08.02.2021
Former [2021/25]AT07.10.2020
ES07.10.2020
FI07.10.2020
LV07.10.2020
PL07.10.2020
RS07.10.2020
SE07.10.2020
BG07.01.2021
NO07.01.2021
GR08.01.2021
IS07.02.2021
PT08.02.2021
Former [2021/23]AT07.10.2020
FI07.10.2020
LV07.10.2020
RS07.10.2020
SE07.10.2020
BG07.01.2021
NO07.01.2021
GR08.01.2021
PT08.02.2021
Former [2021/22]FI07.10.2020
RS07.10.2020
NO07.01.2021
PT08.02.2021
Former [2021/21]FI07.10.2020
PT08.02.2021
Former [2021/20]FI07.10.2020
Cited inInternational search[A]US2007230420  (BUMILLER GEORGE B [US], et al) [A] 1-22 * paragraph [0062] - paragraph [0066]; figures 5A-5C *;
 [A]US2009102660  (EVANS ALLAN M [US], et al) [A] 1-22 * paragraph [0040] - paragraph [0045]; figures 1-4 *;
 [XAI]US2009143078  (TU JEROME C [US], et al) [X] 1,18,19,21 * paragraph [0036] - paragraph [0055]; figures 1-4 * [A] 16,17,20,22 [I] 2-15;
 [A]US2010250129  (BABITCH DANIEL [US], et al) [A] 1-20* paragraph [0032] - paragraph [0037]; figure 3 *;
 [A]US2011116453  (HUANG RONALD KERYUAN [US], et al) [A] 1-22 * paragraph [0024] - paragraph [0035]; figure 4 *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.