EP3507157 - METHOD, APPARATUS AND COMPUTER PROGRAM FOR PRODUCING AND TRANSMITTING A PIECE OF DRIVER INFORMATION [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 12.05.2023 Database last updated on 19.10.2024 | |
Former | The patent has been granted Status updated on 03.06.2022 | ||
Former | Grant of patent is intended Status updated on 07.02.2022 | ||
Former | Request for examination was made Status updated on 07.06.2019 | ||
Former | The international publication has been made Status updated on 10.03.2018 | ||
Former | unknown Status updated on 01.09.2017 | Most recent event Tooltip | 13.09.2024 | Lapse of the patent in a contracting state New state(s): MT | published on 16.10.2024 [2024/42] | Applicant(s) | For all designated states Bayerische Motoren Werke Aktiengesellschaft Petuelring 130 80809 München / DE | [2019/28] | Inventor(s) | 01 /
AUGST, Alexander Am Haag 3 80937 Muenchen / DE | [2019/28] | Application number, filing date | 17755456.5 | 11.08.2017 | [2019/28] | WO2017EP70471 | Priority number, date | DE201610216590 | 01.09.2016 Original published format: DE102016216590 | [2019/28] | Filing language | DE | Procedural language | DE | Publication | Type: | A1 Application with search report | No.: | WO2018041607 | Date: | 08.03.2018 | Language: | DE | [2018/10] | Type: | A1 Application with search report | No.: | EP3507157 | Date: | 10.07.2019 | Language: | DE | The application published by WIPO in one of the EPO official languages on 08.03.2018 takes the place of the publication of the European patent application. | [2019/28] | Type: | B1 Patent specification | No.: | EP3507157 | Date: | 06.07.2022 | Language: | DE | [2022/27] | Search report(s) | International search report - published on: | EP | 08.03.2018 | Classification | IPC: | B60W50/16 | [2019/28] | CPC: |
B60W50/16 (EP,US);
B60C9/00 (US);
B60K35/25 (EP,US);
B60Q9/00 (US);
B60W50/0097 (US);
B60W50/0098 (US);
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2019/28] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | MD | Not yet paid | Title | German: | VERFAHREN, VORRICHTUNG UND COMPUTERPROGRAMM ZUR ERZEUGUNG UND ÜBERMITTLUNG EINER FAHRERINFORMATION | [2019/28] | English: | METHOD, APPARATUS AND COMPUTER PROGRAM FOR PRODUCING AND TRANSMITTING A PIECE OF DRIVER INFORMATION | [2019/28] | French: | PROCÉDÉ, DISPOSITIF ET PROGRAMME INFORMATIQUE SERVANT À PRODUIRE ET TRANSMETTRE UNE INFORMATION DESTINÉE AU CONDUCTEUR | [2019/28] | Entry into regional phase | 11.03.2019 | National basic fee paid | 11.03.2019 | Designation fee(s) paid | 11.03.2019 | Examination fee paid | Examination procedure | 11.03.2019 | Examination requested [2019/28] | 11.03.2019 | Date on which the examining division has become responsible | 17.10.2019 | Amendment by applicant (claims and/or description) | 08.02.2022 | Communication of intention to grant the patent | 24.05.2022 | Fee for grant paid | 24.05.2022 | Fee for publishing/printing paid | 24.05.2022 | Receipt of the translation of the claim(s) | Opposition(s) | 11.04.2023 | No opposition filed within time limit [2023/24] | Fees paid | Renewal fee | 20.08.2019 | Renewal fee patent year 03 | 25.08.2020 | Renewal fee patent year 04 | 23.08.2021 | Renewal fee patent year 05 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 11.08.2017 | AL | 06.07.2022 | BG | 06.07.2022 | CY | 06.07.2022 | CZ | 06.07.2022 | DK | 06.07.2022 | EE | 06.07.2022 | ES | 06.07.2022 | FI | 06.07.2022 | HR | 06.07.2022 | LT | 06.07.2022 | LV | 06.07.2022 | MC | 06.07.2022 | MK | 06.07.2022 | MT | 06.07.2022 | NL | 06.07.2022 | PL | 06.07.2022 | RO | 06.07.2022 | RS | 06.07.2022 | SE | 06.07.2022 | SI | 06.07.2022 | SK | 06.07.2022 | SM | 06.07.2022 | AT | 11.08.2022 | IE | 11.08.2022 | LU | 11.08.2022 | BE | 31.08.2022 | CH | 31.08.2022 | LI | 31.08.2022 | NO | 06.10.2022 | GR | 07.10.2022 | IS | 06.11.2022 | PT | 07.11.2022 | [2024/42] |
Former [2024/34] | HU | 11.08.2017 | |
AL | 06.07.2022 | ||
BG | 06.07.2022 | ||
CY | 06.07.2022 | ||
CZ | 06.07.2022 | ||
DK | 06.07.2022 | ||
EE | 06.07.2022 | ||
ES | 06.07.2022 | ||
FI | 06.07.2022 | ||
HR | 06.07.2022 | ||
LT | 06.07.2022 | ||
LV | 06.07.2022 | ||
MC | 06.07.2022 | ||
MK | 06.07.2022 | ||
NL | 06.07.2022 | ||
PL | 06.07.2022 | ||
RO | 06.07.2022 | ||
RS | 06.07.2022 | ||
SE | 06.07.2022 | ||
SI | 06.07.2022 | ||
SK | 06.07.2022 | ||
SM | 06.07.2022 | ||
AT | 11.08.2022 | ||
IE | 11.08.2022 | ||
LU | 11.08.2022 | ||
BE | 31.08.2022 | ||
CH | 31.08.2022 | ||
LI | 31.08.2022 | ||
NO | 06.10.2022 | ||
GR | 07.10.2022 | ||
IS | 06.11.2022 | ||
PT | 07.11.2022 | ||
Former [2024/27] | HU | 11.08.2017 | |
AL | 06.07.2022 | ||
CY | 06.07.2022 | ||
CZ | 06.07.2022 | ||
DK | 06.07.2022 | ||
EE | 06.07.2022 | ||
ES | 06.07.2022 | ||
FI | 06.07.2022 | ||
HR | 06.07.2022 | ||
LT | 06.07.2022 | ||
LV | 06.07.2022 | ||
MC | 06.07.2022 | ||
MK | 06.07.2022 | ||
NL | 06.07.2022 | ||
PL | 06.07.2022 | ||
RO | 06.07.2022 | ||
RS | 06.07.2022 | ||
SE | 06.07.2022 | ||
SI | 06.07.2022 | ||
SK | 06.07.2022 | ||
SM | 06.07.2022 | ||
AT | 11.08.2022 | ||
IE | 11.08.2022 | ||
LU | 11.08.2022 | ||
BE | 31.08.2022 | ||
CH | 31.08.2022 | ||
LI | 31.08.2022 | ||
NO | 06.10.2022 | ||
GR | 07.10.2022 | ||
IS | 06.11.2022 | ||
PT | 07.11.2022 | ||
Former [2024/21] | HU | 11.08.2017 | |
AL | 06.07.2022 | ||
CY | 06.07.2022 | ||
CZ | 06.07.2022 | ||
DK | 06.07.2022 | ||
EE | 06.07.2022 | ||
ES | 06.07.2022 | ||
FI | 06.07.2022 | ||
HR | 06.07.2022 | ||
LT | 06.07.2022 | ||
LV | 06.07.2022 | ||
MC | 06.07.2022 | ||
NL | 06.07.2022 | ||
PL | 06.07.2022 | ||
RO | 06.07.2022 | ||
RS | 06.07.2022 | ||
SE | 06.07.2022 | ||
SI | 06.07.2022 | ||
SK | 06.07.2022 | ||
SM | 06.07.2022 | ||
AT | 11.08.2022 | ||
IE | 11.08.2022 | ||
LU | 11.08.2022 | ||
BE | 31.08.2022 | ||
CH | 31.08.2022 | ||
LI | 31.08.2022 | ||
NO | 06.10.2022 | ||
GR | 07.10.2022 | ||
IS | 06.11.2022 | ||
PT | 07.11.2022 | ||
Former [2024/18] | HU | 11.08.2017 | |
AL | 06.07.2022 | ||
CZ | 06.07.2022 | ||
DK | 06.07.2022 | ||
EE | 06.07.2022 | ||
ES | 06.07.2022 | ||
FI | 06.07.2022 | ||
HR | 06.07.2022 | ||
LT | 06.07.2022 | ||
LV | 06.07.2022 | ||
MC | 06.07.2022 | ||
NL | 06.07.2022 | ||
PL | 06.07.2022 | ||
RO | 06.07.2022 | ||
RS | 06.07.2022 | ||
SE | 06.07.2022 | ||
SI | 06.07.2022 | ||
SK | 06.07.2022 | ||
SM | 06.07.2022 | ||
AT | 11.08.2022 | ||
IE | 11.08.2022 | ||
LU | 11.08.2022 | ||
BE | 31.08.2022 | ||
CH | 31.08.2022 | ||
LI | 31.08.2022 | ||
NO | 06.10.2022 | ||
GR | 07.10.2022 | ||
IS | 06.11.2022 | ||
PT | 07.11.2022 | ||
Former [2023/48] | AL | 06.07.2022 | |
CZ | 06.07.2022 | ||
DK | 06.07.2022 | ||
EE | 06.07.2022 | ||
ES | 06.07.2022 | ||
FI | 06.07.2022 | ||
HR | 06.07.2022 | ||
LT | 06.07.2022 | ||
LV | 06.07.2022 | ||
MC | 06.07.2022 | ||
NL | 06.07.2022 | ||
PL | 06.07.2022 | ||
RO | 06.07.2022 | ||
RS | 06.07.2022 | ||
SE | 06.07.2022 | ||
SI | 06.07.2022 | ||
SK | 06.07.2022 | ||
SM | 06.07.2022 | ||
AT | 11.08.2022 | ||
IE | 11.08.2022 | ||
LU | 11.08.2022 | ||
BE | 31.08.2022 | ||
CH | 31.08.2022 | ||
LI | 31.08.2022 | ||
NO | 06.10.2022 | ||
GR | 07.10.2022 | ||
IS | 06.11.2022 | ||
PT | 07.11.2022 | ||
Former [2023/42] | AL | 06.07.2022 | |
CZ | 06.07.2022 | ||
DK | 06.07.2022 | ||
EE | 06.07.2022 | ||
ES | 06.07.2022 | ||
FI | 06.07.2022 | ||
HR | 06.07.2022 | ||
LT | 06.07.2022 | ||
LV | 06.07.2022 | ||
MC | 06.07.2022 | ||
NL | 06.07.2022 | ||
PL | 06.07.2022 | ||
RO | 06.07.2022 | ||
RS | 06.07.2022 | ||
SE | 06.07.2022 | ||
SI | 06.07.2022 | ||
SK | 06.07.2022 | ||
SM | 06.07.2022 | ||
IE | 11.08.2022 | ||
LU | 11.08.2022 | ||
BE | 31.08.2022 | ||
CH | 31.08.2022 | ||
LI | 31.08.2022 | ||
NO | 06.10.2022 | ||
GR | 07.10.2022 | ||
IS | 06.11.2022 | ||
PT | 07.11.2022 | ||
Former [2023/37] | AL | 06.07.2022 | |
CZ | 06.07.2022 | ||
DK | 06.07.2022 | ||
EE | 06.07.2022 | ||
ES | 06.07.2022 | ||
FI | 06.07.2022 | ||
HR | 06.07.2022 | ||
LT | 06.07.2022 | ||
LV | 06.07.2022 | ||
MC | 06.07.2022 | ||
NL | 06.07.2022 | ||
PL | 06.07.2022 | ||
RO | 06.07.2022 | ||
RS | 06.07.2022 | ||
SE | 06.07.2022 | ||
SI | 06.07.2022 | ||
SK | 06.07.2022 | ||
SM | 06.07.2022 | ||
IE | 11.08.2022 | ||
LU | 11.08.2022 | ||
CH | 31.08.2022 | ||
LI | 31.08.2022 | ||
NO | 06.10.2022 | ||
GR | 07.10.2022 | ||
IS | 06.11.2022 | ||
PT | 07.11.2022 | ||
Former [2023/33] | AL | 06.07.2022 | |
CZ | 06.07.2022 | ||
DK | 06.07.2022 | ||
EE | 06.07.2022 | ||
ES | 06.07.2022 | ||
FI | 06.07.2022 | ||
HR | 06.07.2022 | ||
LT | 06.07.2022 | ||
LV | 06.07.2022 | ||
MC | 06.07.2022 | ||
NL | 06.07.2022 | ||
PL | 06.07.2022 | ||
RO | 06.07.2022 | ||
RS | 06.07.2022 | ||
SE | 06.07.2022 | ||
SK | 06.07.2022 | ||
SM | 06.07.2022 | ||
IE | 11.08.2022 | ||
LU | 11.08.2022 | ||
CH | 31.08.2022 | ||
LI | 31.08.2022 | ||
NO | 06.10.2022 | ||
GR | 07.10.2022 | ||
IS | 06.11.2022 | ||
PT | 07.11.2022 | ||
Former [2023/29] | AL | 06.07.2022 | |
CZ | 06.07.2022 | ||
DK | 06.07.2022 | ||
EE | 06.07.2022 | ||
ES | 06.07.2022 | ||
FI | 06.07.2022 | ||
HR | 06.07.2022 | ||
LT | 06.07.2022 | ||
LV | 06.07.2022 | ||
MC | 06.07.2022 | ||
NL | 06.07.2022 | ||
PL | 06.07.2022 | ||
RO | 06.07.2022 | ||
RS | 06.07.2022 | ||
SE | 06.07.2022 | ||
SK | 06.07.2022 | ||
SM | 06.07.2022 | ||
LU | 11.08.2022 | ||
CH | 31.08.2022 | ||
LI | 31.08.2022 | ||
NO | 06.10.2022 | ||
GR | 07.10.2022 | ||
IS | 06.11.2022 | ||
PT | 07.11.2022 | ||
Former [2023/23] | CZ | 06.07.2022 | |
DK | 06.07.2022 | ||
EE | 06.07.2022 | ||
ES | 06.07.2022 | ||
FI | 06.07.2022 | ||
HR | 06.07.2022 | ||
LT | 06.07.2022 | ||
LV | 06.07.2022 | ||
MC | 06.07.2022 | ||
NL | 06.07.2022 | ||
PL | 06.07.2022 | ||
RO | 06.07.2022 | ||
RS | 06.07.2022 | ||
SE | 06.07.2022 | ||
SK | 06.07.2022 | ||
SM | 06.07.2022 | ||
LU | 11.08.2022 | ||
CH | 31.08.2022 | ||
LI | 31.08.2022 | ||
NO | 06.10.2022 | ||
GR | 07.10.2022 | ||
IS | 06.11.2022 | ||
PT | 07.11.2022 | ||
Former [2023/22] | CZ | 06.07.2022 | |
DK | 06.07.2022 | ||
ES | 06.07.2022 | ||
FI | 06.07.2022 | ||
HR | 06.07.2022 | ||
LT | 06.07.2022 | ||
LV | 06.07.2022 | ||
MC | 06.07.2022 | ||
NL | 06.07.2022 | ||
PL | 06.07.2022 | ||
RO | 06.07.2022 | ||
RS | 06.07.2022 | ||
SE | 06.07.2022 | ||
SM | 06.07.2022 | ||
LU | 11.08.2022 | ||
CH | 31.08.2022 | ||
LI | 31.08.2022 | ||
NO | 06.10.2022 | ||
GR | 07.10.2022 | ||
IS | 06.11.2022 | ||
PT | 07.11.2022 | ||
Former [2023/21] | DK | 06.07.2022 | |
ES | 06.07.2022 | ||
FI | 06.07.2022 | ||
HR | 06.07.2022 | ||
LT | 06.07.2022 | ||
LV | 06.07.2022 | ||
NL | 06.07.2022 | ||
PL | 06.07.2022 | ||
RS | 06.07.2022 | ||
SE | 06.07.2022 | ||
SM | 06.07.2022 | ||
LU | 11.08.2022 | ||
CH | 31.08.2022 | ||
LI | 31.08.2022 | ||
NO | 06.10.2022 | ||
GR | 07.10.2022 | ||
IS | 06.11.2022 | ||
PT | 07.11.2022 | ||
Former [2023/20] | ES | 06.07.2022 | |
FI | 06.07.2022 | ||
HR | 06.07.2022 | ||
LT | 06.07.2022 | ||
LV | 06.07.2022 | ||
NL | 06.07.2022 | ||
PL | 06.07.2022 | ||
RS | 06.07.2022 | ||
SE | 06.07.2022 | ||
SM | 06.07.2022 | ||
NO | 06.10.2022 | ||
GR | 07.10.2022 | ||
IS | 06.11.2022 | ||
PT | 07.11.2022 | ||
Former [2023/12] | ES | 06.07.2022 | |
FI | 06.07.2022 | ||
HR | 06.07.2022 | ||
LT | 06.07.2022 | ||
LV | 06.07.2022 | ||
NL | 06.07.2022 | ||
PL | 06.07.2022 | ||
RS | 06.07.2022 | ||
SE | 06.07.2022 | ||
NO | 06.10.2022 | ||
GR | 07.10.2022 | ||
IS | 06.11.2022 | ||
PT | 07.11.2022 | ||
Former [2023/11] | ES | 06.07.2022 | |
FI | 06.07.2022 | ||
HR | 06.07.2022 | ||
LT | 06.07.2022 | ||
LV | 06.07.2022 | ||
NL | 06.07.2022 | ||
PL | 06.07.2022 | ||
RS | 06.07.2022 | ||
SE | 06.07.2022 | ||
NO | 06.10.2022 | ||
GR | 07.10.2022 | ||
PT | 07.11.2022 | ||
Former [2023/10] | ES | 06.07.2022 | |
FI | 06.07.2022 | ||
HR | 06.07.2022 | ||
LT | 06.07.2022 | ||
LV | 06.07.2022 | ||
NL | 06.07.2022 | ||
RS | 06.07.2022 | ||
SE | 06.07.2022 | ||
NO | 06.10.2022 | ||
GR | 07.10.2022 | ||
PT | 07.11.2022 | ||
Former [2023/09] | ES | 06.07.2022 | |
FI | 06.07.2022 | ||
LT | 06.07.2022 | ||
LV | 06.07.2022 | ||
NL | 06.07.2022 | ||
RS | 06.07.2022 | ||
SE | 06.07.2022 | ||
NO | 06.10.2022 | ||
PT | 07.11.2022 | ||
Former [2023/08] | ES | 06.07.2022 | |
FI | 06.07.2022 | ||
LT | 06.07.2022 | ||
NL | 06.07.2022 | ||
RS | 06.07.2022 | ||
SE | 06.07.2022 | ||
NO | 06.10.2022 | ||
Former [2023/06] | NL | 06.07.2022 | Cited in | International search | [X]US2012126965 (SANMA NORIO [JP], et al) [X] 1,13,14 * figure 4 *; | [A]DE102012005882 (DAIMLER AG [DE]) [A] 1-14 * paragraphs [0011] - [0020]; figure 1 *; | [A]DE102011084903 (TAKATA AG [DE]) [A] 1-14* the whole document *; | [A]DE102012210300 (BOSCH GMBH ROBERT [DE]) [A] 1-14 * the whole document *; | [A]EP2716501 (NISSAN MOTOR [JP]) [A] 1-14 * the whole document *; | [XAY]WO2015092163 (DAV [FR]) [X] 1,2,5,9,13,14 * page 6 - page 9; figures 1,2 * [A] 3,6-8,10-12 [Y] 4; | [XY]US2015197283 (MARTI STEFAN [US], et al) [X] 1,4,5,13,14 * figures 1,2,7A-7C * [Y] 4 |