blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News flashes

New version of the European Patent Register - SPC information for Unitary Patents.

2024-03-06

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3425364

EP3425364 - GAS LEAK POSITION ESTIMATION DEVICE, GAS LEAK POSITION ESTIMATION METHOD, AND GAS LEAK POSITION ESTIMATION PROGRAM [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  30.07.2021
Database last updated on 06.07.2024
FormerThe patent has been granted
Status updated on  21.08.2020
FormerGrant of patent is intended
Status updated on  21.04.2020
FormerExamination is in progress
Status updated on  10.08.2019
FormerRequest for examination was made
Status updated on  07.12.2018
FormerThe international publication has been made
Status updated on  08.09.2017
Most recent event   Tooltip03.05.2024Lapse of the patent in a contracting state
New state(s): MK
published on 05.06.2024  [2024/23]
Applicant(s)For all designated states
Konica Minolta, Inc.
2-7-2 Marunouchi
Chiyoda-ku
Tokyo 100-7015 / JP
[2019/02]
Inventor(s)01 / ZHANG, Xiaochen
c/o Konica Minolta Inc.
2-7-2 Marunouchi
Chiyoda-ku
Tokyo 100-7015 / JP
02 / ASANO, Motohiro
c/o Konica Minolta Inc.
2-7-2 Marunouchi
Chiyoda-ku
Tokyo 100-7015 / JP
03 / YAMAMOTO, Toshitsugu
c/o Konica Minolta Inc.
2-7-2 Marunouchi
Chiyoda-ku
Tokyo 100-7015 / JP
 [2019/02]
Representative(s)Hoffmann Eitle
Patent- und Rechtsanwälte PartmbB
Arabellastraße 30
81925 München / DE
[2019/02]
Application number, filing date17760029.328.02.2017
[2019/02]
WO2017JP07951
Priority number, dateJP2016004117103.03.2016         Original published format: JP 2016041171
[2019/02]
Filing languageJA
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2017150565
Date:08.09.2017
Language:JA
[2017/36]
Type: A1 Application with search report 
No.:EP3425364
Date:09.01.2019
Language:EN
[2019/02]
Type: B1 Patent specification 
No.:EP3425364
Date:23.09.2020
Language:EN
[2020/39]
Search report(s)International search report - published on:JP08.09.2017
(Supplementary) European search report - dispatched on:EP28.01.2019
ClassificationIPC:G01M3/00, G01M3/02, G01M3/38, G01N21/3504, G01N25/72, G06T7/00, G06T7/13, G06T7/12, G06T7/136, G06T7/174
[2020/13]
CPC:
G01M3/38 (EP,US); G01M3/002 (EP,US); G01N21/3504 (US);
G06T7/0004 (EP,US); G06T7/12 (EP,US); G06T7/136 (EP,US);
G06T7/174 (EP,US); G01N2021/1795 (US); G01N25/72 (EP,US);
G06T2207/10048 (EP,US); G06T2207/20221 (EP,US) (-)
Former IPC [2019/09]G01M3/02, G01M3/38, G01M3/00, G06T7/13, G01N21/3504
Former IPC [2019/02]G01M3/02
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2019/02]
Extension statesBANot yet paid
MENot yet paid
Validation statesMANot yet paid
MDNot yet paid
TitleGerman:VORRICHTUNG ZUR SCHÄTZUNG VON GASLECKPOSITIONEN, VERFAHREN ZUR SCHÄTZUNG VON GASLECKPOSITIONEN UND PROGRAMM ZUR SCHÄTZUNG VON GASLECKPOSITIONEN[2019/02]
English:GAS LEAK POSITION ESTIMATION DEVICE, GAS LEAK POSITION ESTIMATION METHOD, AND GAS LEAK POSITION ESTIMATION PROGRAM[2019/02]
French:DISPOSITIF D'ESTIMATION DE POSITION DE FUITE DE GAZ, PROCÉDÉ D'ESTIMATION DE POSITION DE FUITE DE GAZ, ET PROGRAMME D'ESTIMATION DE POSITION DE FUITE DE GAZ[2019/02]
Entry into regional phase10.08.2018Translation filed 
10.08.2018National basic fee paid 
10.08.2018Search fee paid 
10.08.2018Designation fee(s) paid 
10.08.2018Examination fee paid 
Examination proceduredeletedDate on which the examining division has become responsible
10.08.2018Examination requested  [2019/02]
30.07.2019Amendment by applicant (claims and/or description)
14.08.2019Despatch of a communication from the examining division (Time limit: M02)
10.10.2019Reply to a communication from the examining division
22.04.2020Communication of intention to grant the patent
13.08.2020Fee for grant paid
13.08.2020Fee for publishing/printing paid
13.08.2020Receipt of the translation of the claim(s)
Opposition(s)24.06.2021No opposition filed within time limit [2021/35]
Fees paidRenewal fee
13.02.2019Renewal fee patent year 03
13.02.2020Renewal fee patent year 04
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU28.02.2017
AL23.09.2020
AT23.09.2020
CY23.09.2020
CZ23.09.2020
DK23.09.2020
EE23.09.2020
ES23.09.2020
FI23.09.2020
HR23.09.2020
IT23.09.2020
LT23.09.2020
LV23.09.2020
MC23.09.2020
MK23.09.2020
NL23.09.2020
PL23.09.2020
RO23.09.2020
RS23.09.2020
SE23.09.2020
SI23.09.2020
SK23.09.2020
SM23.09.2020
BG23.12.2020
NO23.12.2020
GR24.12.2020
IS23.01.2021
PT25.01.2021
BE28.02.2021
CH28.02.2021
GB28.02.2021
IE28.02.2021
LI28.02.2021
LU28.02.2021
[2024/23]
Former [2023/33]HU28.02.2017
AL23.09.2020
AT23.09.2020
CY23.09.2020
CZ23.09.2020
DK23.09.2020
EE23.09.2020
ES23.09.2020
FI23.09.2020
HR23.09.2020
IT23.09.2020
LT23.09.2020
LV23.09.2020
MC23.09.2020
NL23.09.2020
PL23.09.2020
RO23.09.2020
RS23.09.2020
SE23.09.2020
SI23.09.2020
SK23.09.2020
SM23.09.2020
BG23.12.2020
NO23.12.2020
GR24.12.2020
IS23.01.2021
PT25.01.2021
BE28.02.2021
CH28.02.2021
GB28.02.2021
IE28.02.2021
LI28.02.2021
LU28.02.2021
Former [2023/30]AL23.09.2020
AT23.09.2020
CY23.09.2020
CZ23.09.2020
DK23.09.2020
EE23.09.2020
ES23.09.2020
FI23.09.2020
HR23.09.2020
IT23.09.2020
LT23.09.2020
LV23.09.2020
MC23.09.2020
NL23.09.2020
PL23.09.2020
RO23.09.2020
RS23.09.2020
SE23.09.2020
SI23.09.2020
SK23.09.2020
SM23.09.2020
BG23.12.2020
NO23.12.2020
GR24.12.2020
IS23.01.2021
PT25.01.2021
BE28.02.2021
CH28.02.2021
GB28.02.2021
IE28.02.2021
LI28.02.2021
LU28.02.2021
Former [2023/29]AL23.09.2020
AT23.09.2020
CZ23.09.2020
DK23.09.2020
EE23.09.2020
ES23.09.2020
FI23.09.2020
HR23.09.2020
IT23.09.2020
LT23.09.2020
LV23.09.2020
MC23.09.2020
NL23.09.2020
PL23.09.2020
RO23.09.2020
RS23.09.2020
SE23.09.2020
SI23.09.2020
SK23.09.2020
SM23.09.2020
BG23.12.2020
NO23.12.2020
GR24.12.2020
IS23.01.2021
PT25.01.2021
BE28.02.2021
CH28.02.2021
GB28.02.2021
IE28.02.2021
LI28.02.2021
LU28.02.2021
Former [2022/34]AL23.09.2020
AT23.09.2020
CZ23.09.2020
DK23.09.2020
EE23.09.2020
ES23.09.2020
FI23.09.2020
HR23.09.2020
IT23.09.2020
LT23.09.2020
LV23.09.2020
MC23.09.2020
PL23.09.2020
RO23.09.2020
RS23.09.2020
SE23.09.2020
SI23.09.2020
SK23.09.2020
SM23.09.2020
BG23.12.2020
NO23.12.2020
GR24.12.2020
IS23.01.2021
PT25.01.2021
BE28.02.2021
CH28.02.2021
GB28.02.2021
IE28.02.2021
LI28.02.2021
LU28.02.2021
Former [2022/09]AL23.09.2020
AT23.09.2020
CZ23.09.2020
DK23.09.2020
EE23.09.2020
ES23.09.2020
FI23.09.2020
HR23.09.2020
IT23.09.2020
LT23.09.2020
LV23.09.2020
MC23.09.2020
PL23.09.2020
RO23.09.2020
RS23.09.2020
SE23.09.2020
SI23.09.2020
SK23.09.2020
SM23.09.2020
BG23.12.2020
NO23.12.2020
GR24.12.2020
IS23.01.2021
PT25.01.2021
CH28.02.2021
GB28.02.2021
IE28.02.2021
LI28.02.2021
LU28.02.2021
Former [2022/07]AL23.09.2020
AT23.09.2020
CZ23.09.2020
DK23.09.2020
EE23.09.2020
ES23.09.2020
FI23.09.2020
HR23.09.2020
IT23.09.2020
LT23.09.2020
LV23.09.2020
MC23.09.2020
PL23.09.2020
RO23.09.2020
RS23.09.2020
SE23.09.2020
SI23.09.2020
SK23.09.2020
SM23.09.2020
BG23.12.2020
NO23.12.2020
GR24.12.2020
IS23.01.2021
PT25.01.2021
CH28.02.2021
IE28.02.2021
LI28.02.2021
LU28.02.2021
Former [2021/48]AL23.09.2020
AT23.09.2020
CZ23.09.2020
DK23.09.2020
EE23.09.2020
ES23.09.2020
FI23.09.2020
HR23.09.2020
IT23.09.2020
LT23.09.2020
LV23.09.2020
MC23.09.2020
PL23.09.2020
RO23.09.2020
RS23.09.2020
SE23.09.2020
SI23.09.2020
SK23.09.2020
SM23.09.2020
BG23.12.2020
NO23.12.2020
GR24.12.2020
IS23.01.2021
PT25.01.2021
CH28.02.2021
LI28.02.2021
LU28.02.2021
Former [2021/47]AL23.09.2020
AT23.09.2020
CZ23.09.2020
DK23.09.2020
EE23.09.2020
ES23.09.2020
FI23.09.2020
HR23.09.2020
LT23.09.2020
LV23.09.2020
MC23.09.2020
PL23.09.2020
RO23.09.2020
RS23.09.2020
SE23.09.2020
SI23.09.2020
SK23.09.2020
SM23.09.2020
BG23.12.2020
NO23.12.2020
GR24.12.2020
IS23.01.2021
PT25.01.2021
CH28.02.2021
LI28.02.2021
LU28.02.2021
Former [2021/41]AL23.09.2020
AT23.09.2020
CZ23.09.2020
DK23.09.2020
EE23.09.2020
ES23.09.2020
FI23.09.2020
HR23.09.2020
LT23.09.2020
LV23.09.2020
MC23.09.2020
PL23.09.2020
RO23.09.2020
RS23.09.2020
SE23.09.2020
SI23.09.2020
SK23.09.2020
SM23.09.2020
BG23.12.2020
NO23.12.2020
GR24.12.2020
IS23.01.2021
PT25.01.2021
Former [2021/37]AL23.09.2020
AT23.09.2020
CZ23.09.2020
DK23.09.2020
EE23.09.2020
ES23.09.2020
FI23.09.2020
HR23.09.2020
LT23.09.2020
LV23.09.2020
PL23.09.2020
RO23.09.2020
RS23.09.2020
SE23.09.2020
SI23.09.2020
SK23.09.2020
SM23.09.2020
BG23.12.2020
NO23.12.2020
GR24.12.2020
IS23.01.2021
PT25.01.2021
Former [2021/36]AL23.09.2020
AT23.09.2020
CZ23.09.2020
EE23.09.2020
ES23.09.2020
FI23.09.2020
HR23.09.2020
LT23.09.2020
LV23.09.2020
PL23.09.2020
RO23.09.2020
RS23.09.2020
SE23.09.2020
SI23.09.2020
SK23.09.2020
SM23.09.2020
BG23.12.2020
NO23.12.2020
GR24.12.2020
IS23.01.2021
PT25.01.2021
Former [2021/28]AL23.09.2020
AT23.09.2020
CZ23.09.2020
EE23.09.2020
ES23.09.2020
FI23.09.2020
HR23.09.2020
LT23.09.2020
LV23.09.2020
PL23.09.2020
RO23.09.2020
RS23.09.2020
SE23.09.2020
SK23.09.2020
SM23.09.2020
BG23.12.2020
NO23.12.2020
GR24.12.2020
IS23.01.2021
PT25.01.2021
Former [2021/25]AL23.09.2020
AT23.09.2020
CZ23.09.2020
EE23.09.2020
ES23.09.2020
FI23.09.2020
HR23.09.2020
LT23.09.2020
LV23.09.2020
PL23.09.2020
RO23.09.2020
RS23.09.2020
SE23.09.2020
SM23.09.2020
BG23.12.2020
NO23.12.2020
GR24.12.2020
IS23.01.2021
PT25.01.2021
Former [2021/23]AT23.09.2020
CZ23.09.2020
EE23.09.2020
FI23.09.2020
HR23.09.2020
LT23.09.2020
LV23.09.2020
RO23.09.2020
RS23.09.2020
SE23.09.2020
SM23.09.2020
BG23.12.2020
NO23.12.2020
GR24.12.2020
PT25.01.2021
Former [2021/22]CZ23.09.2020
EE23.09.2020
FI23.09.2020
HR23.09.2020
LT23.09.2020
LV23.09.2020
RO23.09.2020
RS23.09.2020
SE23.09.2020
SM23.09.2020
BG23.12.2020
NO23.12.2020
GR24.12.2020
PT25.01.2021
Former [2021/21]FI23.09.2020
HR23.09.2020
LT23.09.2020
LV23.09.2020
RS23.09.2020
SE23.09.2020
BG23.12.2020
NO23.12.2020
GR24.12.2020
PT25.01.2021
Former [2021/20]FI23.09.2020
HR23.09.2020
LT23.09.2020
LV23.09.2020
RS23.09.2020
SE23.09.2020
BG23.12.2020
NO23.12.2020
GR24.12.2020
Former [2021/10]FI23.09.2020
HR23.09.2020
LV23.09.2020
RS23.09.2020
SE23.09.2020
BG23.12.2020
NO23.12.2020
GR24.12.2020
Former [2021/08]FI23.09.2020
SE23.09.2020
BG23.12.2020
NO23.12.2020
Former [2021/07]FI23.09.2020
NO23.12.2020
Documents cited:Search[A]JPH08122197  (OSAKA GAS CO LTD, et al) [A] 1-18* the whole document *;
 [XAI]EP1512955  (GASOPTICS SWEDEN AB [SE]) [X] 1-3,6,15-18 * abstract * * paragraphs [0012] , [ 0027] * * paragraphs [0019] - [0025] * [A] 7-14 [I] 4,5;
 [XA]US2006220888  (GERMOUNI OMAR [US], et al) [X] 1,2,15-18 * abstract * * paragraphs [0021] , [ 0068] - [0069] * [A] 3-14
International search[A]JPS5215385  (HITACHI LTD) [A] 1-18* , entire text; all drawings (Family: none) *;
 [YA]JPS63246638  (TOKYO GAS CO LTD, et al) [Y] 1-2, 15-18 * , page 2, upper left, line 17 to page 3, upper right, line 17; fig. 1 to 4 (Family: none) * [A] 3-14;
 [A]JPH08122197  (OSAKA GAS CO LTD, et al) [A] 1-18 * , entire text; all drawings (Family: none) *;
 [YA]JP2000310577  (TOSHIBA CORP) [Y] 1-2, 15-18 * , paragraphs [0037] to [0110]; fig. 1 to 15 (Family: none) * [A] 3-14;
 [YA]JP2013190229  (CHUGOKU ELECTRIC POWER) [Y] 1-2, 15-18 * , paragraph [0019]; fig. 4 (Family: none) * [A] 3-14;
 [YA]JP2014055898  (MITSUBISHI HEAVY IND LTD) [Y] 1-2, 15-18 * , paragraph [0048]; fig. 8(B) (Family: none) * [A] 3-14
by applicantJP2012058093
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.