EP3507819 - A HIGH VOLTAGE CIRCUIT BREAKER [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 30.04.2021 Database last updated on 15.06.2024 | |
Former | The patent has been granted Status updated on 22.05.2020 | ||
Former | Grant of patent is intended Status updated on 19.03.2020 | ||
Former | Request for examination was made Status updated on 07.06.2019 | ||
Former | The international publication has been made Status updated on 10.03.2018 | ||
Former | unknown Status updated on 13.09.2017 | Most recent event Tooltip | 15.07.2022 | Lapse of the patent in a contracting state New state(s): MK | published on 17.08.2022 [2022/33] | Applicant(s) | For all designated states ABB Power Grids Switzerland AG Bruggerstrasse 72 5400 Baden / CH | [2020/42] |
Former [2019/28] | For all designated states ABB Schweiz AG Brown Boveri Strasse 6 5400 Baden / CH | Inventor(s) | 01 /
BACKMAN, Magnus Brudslöjevägen 39 722 46 Västerås / SE | 02 /
BORMANN, Dierk Stenyxgatan 13 723 53 Västerås / SE | 03 /
SALINAS, Ener Lillåuddsallén 9 722 10 Västerås / SE | 04 /
THOMAS, Richard Hagbacksgatan 2 784 74 Borlänge / SE | [2019/28] | Representative(s) | Kransell & Wennborg KB P.O. Box 27834 115 93 Stockholm / SE | [2019/28] | Application number, filing date | 17761473.2 | 30.08.2017 | [2019/28] | WO2017EP71723 | Priority number, date | EP20160186755 | 01.09.2016 Original published format: EP 16186755 | [2019/28] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2018041874 | Date: | 08.03.2018 | Language: | EN | [2018/10] | Type: | A1 Application with search report | No.: | EP3507819 | Date: | 10.07.2019 | Language: | EN | The application published by WIPO in one of the EPO official languages on 08.03.2018 takes the place of the publication of the European patent application. | [2019/28] | Type: | B1 Patent specification | No.: | EP3507819 | Date: | 24.06.2020 | Language: | EN | [2020/26] | Search report(s) | International search report - published on: | EP | 08.03.2018 | Classification | IPC: | H01H33/42, H01H33/28, H01H3/26, H01H3/28, H01H33/36, H01H33/38 | [2019/28] | CPC: |
H01H33/423 (EP);
H01H33/28 (EP);
H01H3/26 (EP);
H01H3/28 (EP);
H01H33/36 (EP);
H01H33/38 (EP);
H02J50/12 (EP)
(-)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2019/28] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | MD | Not yet paid | Title | German: | HOCHSPANNUNGSSCHUTZSCHALTER | [2019/28] | English: | A HIGH VOLTAGE CIRCUIT BREAKER | [2019/28] | French: | DISJONCTEUR HAUTE TENSION | [2020/15] |
Former [2019/28] | DISJONCTEUR À HAUTE TENSION | Entry into regional phase | 01.04.2019 | National basic fee paid | 01.04.2019 | Designation fee(s) paid | 01.04.2019 | Examination fee paid | Examination procedure | 01.04.2019 | Examination requested [2019/28] | 01.04.2019 | Date on which the examining division has become responsible | 20.03.2020 | Communication of intention to grant the patent | 14.05.2020 | Fee for grant paid | 14.05.2020 | Fee for publishing/printing paid | 14.05.2020 | Receipt of the translation of the claim(s) | Opposition(s) | 25.03.2021 | No opposition filed within time limit [2021/22] | Fees paid | Renewal fee | 26.08.2019 | Renewal fee patent year 03 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 30.08.2017 | AL | 24.06.2020 | AT | 24.06.2020 | CY | 24.06.2020 | CZ | 24.06.2020 | DK | 24.06.2020 | EE | 24.06.2020 | ES | 24.06.2020 | FI | 24.06.2020 | HR | 24.06.2020 | LT | 24.06.2020 | LV | 24.06.2020 | MC | 24.06.2020 | MK | 24.06.2020 | MT | 24.06.2020 | NL | 24.06.2020 | PL | 24.06.2020 | RO | 24.06.2020 | RS | 24.06.2020 | SI | 24.06.2020 | SK | 24.06.2020 | SM | 24.06.2020 | TR | 24.06.2020 | IE | 30.08.2020 | LU | 30.08.2020 | BE | 31.08.2020 | BG | 24.09.2020 | NO | 24.09.2020 | GR | 25.09.2020 | IS | 24.10.2020 | PT | 26.10.2020 | [2022/33] |
Former [2022/27] | HU | 30.08.2017 | |
AL | 24.06.2020 | ||
AT | 24.06.2020 | ||
CY | 24.06.2020 | ||
CZ | 24.06.2020 | ||
DK | 24.06.2020 | ||
EE | 24.06.2020 | ||
ES | 24.06.2020 | ||
FI | 24.06.2020 | ||
HR | 24.06.2020 | ||
LT | 24.06.2020 | ||
LV | 24.06.2020 | ||
MC | 24.06.2020 | ||
MT | 24.06.2020 | ||
NL | 24.06.2020 | ||
PL | 24.06.2020 | ||
RO | 24.06.2020 | ||
RS | 24.06.2020 | ||
SI | 24.06.2020 | ||
SK | 24.06.2020 | ||
SM | 24.06.2020 | ||
TR | 24.06.2020 | ||
IE | 30.08.2020 | ||
LU | 30.08.2020 | ||
BE | 31.08.2020 | ||
BG | 24.09.2020 | ||
NO | 24.09.2020 | ||
GR | 25.09.2020 | ||
IS | 24.10.2020 | ||
PT | 26.10.2020 | ||
Former [2021/37] | AL | 24.06.2020 | |
AT | 24.06.2020 | ||
CZ | 24.06.2020 | ||
DK | 24.06.2020 | ||
EE | 24.06.2020 | ||
ES | 24.06.2020 | ||
FI | 24.06.2020 | ||
HR | 24.06.2020 | ||
LT | 24.06.2020 | ||
LV | 24.06.2020 | ||
MC | 24.06.2020 | ||
NL | 24.06.2020 | ||
PL | 24.06.2020 | ||
RO | 24.06.2020 | ||
RS | 24.06.2020 | ||
SI | 24.06.2020 | ||
SK | 24.06.2020 | ||
SM | 24.06.2020 | ||
IE | 30.08.2020 | ||
LU | 30.08.2020 | ||
BE | 31.08.2020 | ||
BG | 24.09.2020 | ||
NO | 24.09.2020 | ||
GR | 25.09.2020 | ||
IS | 24.10.2020 | ||
PT | 26.10.2020 | ||
Former [2021/36] | AL | 24.06.2020 | |
AT | 24.06.2020 | ||
CZ | 24.06.2020 | ||
DK | 24.06.2020 | ||
EE | 24.06.2020 | ||
ES | 24.06.2020 | ||
FI | 24.06.2020 | ||
HR | 24.06.2020 | ||
LT | 24.06.2020 | ||
LV | 24.06.2020 | ||
MC | 24.06.2020 | ||
NL | 24.06.2020 | ||
PL | 24.06.2020 | ||
RO | 24.06.2020 | ||
RS | 24.06.2020 | ||
SI | 24.06.2020 | ||
SK | 24.06.2020 | ||
SM | 24.06.2020 | ||
LU | 30.08.2020 | ||
BE | 31.08.2020 | ||
BG | 24.09.2020 | ||
NO | 24.09.2020 | ||
GR | 25.09.2020 | ||
IS | 24.10.2020 | ||
PT | 26.10.2020 | ||
Former [2021/20] | AL | 24.06.2020 | |
AT | 24.06.2020 | ||
CZ | 24.06.2020 | ||
DK | 24.06.2020 | ||
EE | 24.06.2020 | ||
ES | 24.06.2020 | ||
FI | 24.06.2020 | ||
HR | 24.06.2020 | ||
LT | 24.06.2020 | ||
LV | 24.06.2020 | ||
MC | 24.06.2020 | ||
NL | 24.06.2020 | ||
PL | 24.06.2020 | ||
RO | 24.06.2020 | ||
RS | 24.06.2020 | ||
SK | 24.06.2020 | ||
SM | 24.06.2020 | ||
LU | 30.08.2020 | ||
BG | 24.09.2020 | ||
NO | 24.09.2020 | ||
GR | 25.09.2020 | ||
IS | 24.10.2020 | ||
PT | 26.10.2020 | ||
Former [2021/18] | AL | 24.06.2020 | |
AT | 24.06.2020 | ||
CZ | 24.06.2020 | ||
EE | 24.06.2020 | ||
ES | 24.06.2020 | ||
FI | 24.06.2020 | ||
HR | 24.06.2020 | ||
LT | 24.06.2020 | ||
LV | 24.06.2020 | ||
MC | 24.06.2020 | ||
NL | 24.06.2020 | ||
PL | 24.06.2020 | ||
RO | 24.06.2020 | ||
RS | 24.06.2020 | ||
SK | 24.06.2020 | ||
SM | 24.06.2020 | ||
BG | 24.09.2020 | ||
NO | 24.09.2020 | ||
GR | 25.09.2020 | ||
IS | 24.10.2020 | ||
PT | 26.10.2020 | ||
Former [2021/10] | AL | 24.06.2020 | |
AT | 24.06.2020 | ||
CZ | 24.06.2020 | ||
EE | 24.06.2020 | ||
ES | 24.06.2020 | ||
FI | 24.06.2020 | ||
HR | 24.06.2020 | ||
LT | 24.06.2020 | ||
LV | 24.06.2020 | ||
NL | 24.06.2020 | ||
PL | 24.06.2020 | ||
RO | 24.06.2020 | ||
RS | 24.06.2020 | ||
SK | 24.06.2020 | ||
SM | 24.06.2020 | ||
BG | 24.09.2020 | ||
NO | 24.09.2020 | ||
GR | 25.09.2020 | ||
IS | 24.10.2020 | ||
PT | 26.10.2020 | ||
Former [2021/09] | AL | 24.06.2020 | |
AT | 24.06.2020 | ||
CZ | 24.06.2020 | ||
EE | 24.06.2020 | ||
ES | 24.06.2020 | ||
FI | 24.06.2020 | ||
HR | 24.06.2020 | ||
LT | 24.06.2020 | ||
LV | 24.06.2020 | ||
NL | 24.06.2020 | ||
RO | 24.06.2020 | ||
RS | 24.06.2020 | ||
SM | 24.06.2020 | ||
BG | 24.09.2020 | ||
NO | 24.09.2020 | ||
GR | 25.09.2020 | ||
PT | 26.10.2020 | ||
Former [2021/04] | AL | 24.06.2020 | |
FI | 24.06.2020 | ||
HR | 24.06.2020 | ||
LT | 24.06.2020 | ||
LV | 24.06.2020 | ||
NL | 24.06.2020 | ||
RS | 24.06.2020 | ||
BG | 24.09.2020 | ||
NO | 24.09.2020 | ||
GR | 25.09.2020 | ||
Former [2021/01] | FI | 24.06.2020 | |
HR | 24.06.2020 | ||
LT | 24.06.2020 | ||
LV | 24.06.2020 | ||
RS | 24.06.2020 | ||
BG | 24.09.2020 | ||
NO | 24.09.2020 | ||
GR | 25.09.2020 | ||
Former [2020/51] | FI | 24.06.2020 | |
HR | 24.06.2020 | ||
LT | 24.06.2020 | ||
LV | 24.06.2020 | ||
RS | 24.06.2020 | ||
NO | 24.09.2020 | ||
GR | 25.09.2020 | ||
Former [2020/50] | FI | 24.06.2020 | |
HR | 24.06.2020 | ||
LT | 24.06.2020 | ||
LV | 24.06.2020 | ||
NO | 24.09.2020 | ||
GR | 25.09.2020 | ||
Former [2020/48] | FI | 24.06.2020 | |
LT | 24.06.2020 | ||
NO | 24.09.2020 | ||
Former [2020/47] | LT | 24.06.2020 | |
NO | 24.09.2020 | Cited in | International search | [A]US4032988 (KIYOKUNI NOBUAKI) [A] 1-13 * abstract *; | [A]DE3102244 (LICENTIA GMBH [DE]) [A] 1-13 * abstract *; | [A]EP1164610 (ABB T & D TECHNOLOGY AG [CH]) [A] 1-13 * paragraphs [0012] - [0024]; figures 1-4 *; | [A]US2012299388 (GONG SAMUEL [US]) [A] 1-13* abstract *; | [A]EP2701280 (ABB TECHNOLOGY AG [CH]) [A] 1-13 * paragraphs [0021] - [0036]; figures 1-4 *; | [A]EP2993775 (SIEMENS AG [DE]) [A] 1-13 * abstract *; | [A]DE102014219088 (SIEMENS AG [DE]) [A] 1-13 * paragraphs [0028] - [0053]; figures 1-4 * | by applicant | EP1164610 |