EP3481656 - AIR CONDITIONING RECHARGING MACHINE FOR VEHICLE AIR-CONDITIONING SYSTEM [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 30.10.2020 Database last updated on 27.07.2024 | |
Former | The patent has been granted Status updated on 22.11.2019 | ||
Former | Grant of patent is intended Status updated on 04.07.2019 | ||
Former | Request for examination was made Status updated on 12.04.2019 | ||
Former | The international publication has been made Status updated on 10.02.2018 | ||
Former | unknown Status updated on 13.09.2017 | Most recent event Tooltip | 15.07.2022 | Lapse of the patent in a contracting state New state(s): MK | published on 17.08.2022 [2022/33] | Applicant(s) | For all designated states Texa S.p.A. Via 1 Maggio, 9 31050 Monastier di Treviso (TV) / IT | [N/P] |
Former [2019/20] | For all designated states Texa S.p.A. Via 1 Maggio, 9 31050 Monastier di Treviso / IT | Inventor(s) | 01 /
VIANELLO, Bruno Via San Rocco 58 31056 Roncade / IT | 02 /
MENEGHEL, Stefano c/o TEXA S.P.A. Via 1 Maggio 9 31050 Monastier di Treviso / IT | [2019/20] | Representative(s) | Zamprogno, Bruno, et al STUDIO TORTA S.p.A. Via Viotti, 9 10121 Torino / IT | [2019/20] | Application number, filing date | 17761590.3 | 02.08.2017 | [2019/20] | WO2017IB54730 | Priority number, date | IT20160081272 | 02.08.2016 Original published format: IT201600081272 | [2019/20] | Filing language | IT | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2018025200 | Date: | 08.02.2018 | Language: | EN | [2018/06] | Type: | A1 Application with search report | No.: | EP3481656 | Date: | 15.05.2019 | Language: | EN | The application published by WIPO in one of the EPO official languages on 08.02.2018 takes the place of the publication of the European patent application. | [2019/20] | Type: | B1 Patent specification | No.: | EP3481656 | Date: | 25.12.2019 | Language: | EN | [2019/52] | Search report(s) | International search report - published on: | EP | 08.02.2018 | Classification | IPC: | B60H1/00, F25B45/00 | [2019/20] | CPC: |
B60H1/00585 (EP,US);
F25B45/00 (EP,US);
F25B2345/001 (EP,US);
F25B2345/002 (US);
F25B2345/0052 (EP,US);
F25B2345/006 (US)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2019/20] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | MD | Not yet paid | Title | German: | KLIMATISIERUNGSWIEDERAUFLADEMASCHINE FÜR FAHRZEUGKLIMATISIERUNGSSYSTEM | [2019/20] | English: | AIR CONDITIONING RECHARGING MACHINE FOR VEHICLE AIR-CONDITIONING SYSTEM | [2019/20] | French: | MACHINE DE RECHARGEMENT DE CLIMATISATION DESTINÉE À UN SYSTÈME DE CLIMATISATION DE VÉHICULE | [2019/20] | Entry into regional phase | 11.02.2019 | National basic fee paid | 11.02.2019 | Designation fee(s) paid | 11.02.2019 | Examination fee paid | Examination procedure | 11.02.2019 | Examination requested [2019/20] | 11.02.2019 | Date on which the examining division has become responsible | 05.07.2019 | Communication of intention to grant the patent | 13.11.2019 | Fee for grant paid | 13.11.2019 | Fee for publishing/printing paid | 13.11.2019 | Receipt of the translation of the claim(s) | Opposition(s) | 28.09.2020 | No opposition filed within time limit [2020/49] | Fees paid | Renewal fee | 09.08.2019 | Renewal fee patent year 03 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 02.08.2017 | AL | 25.12.2019 | AT | 25.12.2019 | CY | 25.12.2019 | CZ | 25.12.2019 | DK | 25.12.2019 | EE | 25.12.2019 | ES | 25.12.2019 | FI | 25.12.2019 | HR | 25.12.2019 | LT | 25.12.2019 | LV | 25.12.2019 | MC | 25.12.2019 | MK | 25.12.2019 | MT | 25.12.2019 | NL | 25.12.2019 | PL | 25.12.2019 | RO | 25.12.2019 | RS | 25.12.2019 | SE | 25.12.2019 | SI | 25.12.2019 | SK | 25.12.2019 | SM | 25.12.2019 | TR | 25.12.2019 | BG | 25.03.2020 | NO | 25.03.2020 | GR | 26.03.2020 | IS | 25.04.2020 | PT | 20.05.2020 | IE | 02.08.2020 | LU | 02.08.2020 | BE | 31.08.2020 | CH | 31.08.2020 | LI | 31.08.2020 | [2022/33] |
Former [2022/27] | HU | 02.08.2017 | |
AL | 25.12.2019 | ||
AT | 25.12.2019 | ||
CY | 25.12.2019 | ||
CZ | 25.12.2019 | ||
DK | 25.12.2019 | ||
EE | 25.12.2019 | ||
ES | 25.12.2019 | ||
FI | 25.12.2019 | ||
HR | 25.12.2019 | ||
LT | 25.12.2019 | ||
LV | 25.12.2019 | ||
MC | 25.12.2019 | ||
MT | 25.12.2019 | ||
NL | 25.12.2019 | ||
PL | 25.12.2019 | ||
RO | 25.12.2019 | ||
RS | 25.12.2019 | ||
SE | 25.12.2019 | ||
SI | 25.12.2019 | ||
SK | 25.12.2019 | ||
SM | 25.12.2019 | ||
TR | 25.12.2019 | ||
BG | 25.03.2020 | ||
NO | 25.03.2020 | ||
GR | 26.03.2020 | ||
IS | 25.04.2020 | ||
PT | 20.05.2020 | ||
IE | 02.08.2020 | ||
LU | 02.08.2020 | ||
BE | 31.08.2020 | ||
CH | 31.08.2020 | ||
LI | 31.08.2020 | ||
Former [2021/37] | AL | 25.12.2019 | |
AT | 25.12.2019 | ||
CZ | 25.12.2019 | ||
DK | 25.12.2019 | ||
EE | 25.12.2019 | ||
ES | 25.12.2019 | ||
FI | 25.12.2019 | ||
HR | 25.12.2019 | ||
LT | 25.12.2019 | ||
LV | 25.12.2019 | ||
MC | 25.12.2019 | ||
NL | 25.12.2019 | ||
PL | 25.12.2019 | ||
RO | 25.12.2019 | ||
RS | 25.12.2019 | ||
SE | 25.12.2019 | ||
SI | 25.12.2019 | ||
SK | 25.12.2019 | ||
SM | 25.12.2019 | ||
BG | 25.03.2020 | ||
NO | 25.03.2020 | ||
GR | 26.03.2020 | ||
IS | 25.04.2020 | ||
PT | 20.05.2020 | ||
IE | 02.08.2020 | ||
LU | 02.08.2020 | ||
BE | 31.08.2020 | ||
CH | 31.08.2020 | ||
LI | 31.08.2020 | ||
Former [2021/36] | AL | 25.12.2019 | |
AT | 25.12.2019 | ||
CZ | 25.12.2019 | ||
DK | 25.12.2019 | ||
EE | 25.12.2019 | ||
ES | 25.12.2019 | ||
FI | 25.12.2019 | ||
HR | 25.12.2019 | ||
LT | 25.12.2019 | ||
LV | 25.12.2019 | ||
MC | 25.12.2019 | ||
NL | 25.12.2019 | ||
PL | 25.12.2019 | ||
RO | 25.12.2019 | ||
RS | 25.12.2019 | ||
SE | 25.12.2019 | ||
SI | 25.12.2019 | ||
SK | 25.12.2019 | ||
SM | 25.12.2019 | ||
BG | 25.03.2020 | ||
NO | 25.03.2020 | ||
GR | 26.03.2020 | ||
IS | 25.04.2020 | ||
PT | 20.05.2020 | ||
LU | 02.08.2020 | ||
BE | 31.08.2020 | ||
CH | 31.08.2020 | ||
LI | 31.08.2020 | ||
Former [2021/20] | AL | 25.12.2019 | |
AT | 25.12.2019 | ||
CZ | 25.12.2019 | ||
DK | 25.12.2019 | ||
EE | 25.12.2019 | ||
ES | 25.12.2019 | ||
FI | 25.12.2019 | ||
HR | 25.12.2019 | ||
LT | 25.12.2019 | ||
LV | 25.12.2019 | ||
MC | 25.12.2019 | ||
NL | 25.12.2019 | ||
PL | 25.12.2019 | ||
RO | 25.12.2019 | ||
RS | 25.12.2019 | ||
SE | 25.12.2019 | ||
SI | 25.12.2019 | ||
SK | 25.12.2019 | ||
SM | 25.12.2019 | ||
BG | 25.03.2020 | ||
NO | 25.03.2020 | ||
GR | 26.03.2020 | ||
IS | 25.04.2020 | ||
PT | 20.05.2020 | ||
LU | 02.08.2020 | ||
CH | 31.08.2020 | ||
LI | 31.08.2020 | ||
Former [2021/18] | AL | 25.12.2019 | |
AT | 25.12.2019 | ||
CZ | 25.12.2019 | ||
DK | 25.12.2019 | ||
EE | 25.12.2019 | ||
ES | 25.12.2019 | ||
FI | 25.12.2019 | ||
HR | 25.12.2019 | ||
LT | 25.12.2019 | ||
LV | 25.12.2019 | ||
MC | 25.12.2019 | ||
NL | 25.12.2019 | ||
PL | 25.12.2019 | ||
RO | 25.12.2019 | ||
RS | 25.12.2019 | ||
SE | 25.12.2019 | ||
SI | 25.12.2019 | ||
SK | 25.12.2019 | ||
SM | 25.12.2019 | ||
BG | 25.03.2020 | ||
NO | 25.03.2020 | ||
GR | 26.03.2020 | ||
IS | 25.04.2020 | ||
PT | 20.05.2020 | ||
Former [2021/11] | AL | 25.12.2019 | |
AT | 25.12.2019 | ||
CZ | 25.12.2019 | ||
DK | 25.12.2019 | ||
EE | 25.12.2019 | ||
ES | 25.12.2019 | ||
FI | 25.12.2019 | ||
HR | 25.12.2019 | ||
LT | 25.12.2019 | ||
LV | 25.12.2019 | ||
NL | 25.12.2019 | ||
PL | 25.12.2019 | ||
RO | 25.12.2019 | ||
RS | 25.12.2019 | ||
SE | 25.12.2019 | ||
SI | 25.12.2019 | ||
SK | 25.12.2019 | ||
SM | 25.12.2019 | ||
BG | 25.03.2020 | ||
NO | 25.03.2020 | ||
GR | 26.03.2020 | ||
IS | 25.04.2020 | ||
PT | 20.05.2020 | ||
Former [2020/47] | AL | 25.12.2019 | |
CZ | 25.12.2019 | ||
DK | 25.12.2019 | ||
EE | 25.12.2019 | ||
ES | 25.12.2019 | ||
FI | 25.12.2019 | ||
HR | 25.12.2019 | ||
LT | 25.12.2019 | ||
LV | 25.12.2019 | ||
NL | 25.12.2019 | ||
RO | 25.12.2019 | ||
RS | 25.12.2019 | ||
SE | 25.12.2019 | ||
SK | 25.12.2019 | ||
SM | 25.12.2019 | ||
BG | 25.03.2020 | ||
NO | 25.03.2020 | ||
GR | 26.03.2020 | ||
IS | 25.04.2020 | ||
PT | 20.05.2020 | ||
Former [2020/40] | AL | 25.12.2019 | |
CZ | 25.12.2019 | ||
EE | 25.12.2019 | ||
FI | 25.12.2019 | ||
HR | 25.12.2019 | ||
LT | 25.12.2019 | ||
LV | 25.12.2019 | ||
NL | 25.12.2019 | ||
RO | 25.12.2019 | ||
RS | 25.12.2019 | ||
SE | 25.12.2019 | ||
SK | 25.12.2019 | ||
SM | 25.12.2019 | ||
BG | 25.03.2020 | ||
NO | 25.03.2020 | ||
GR | 26.03.2020 | ||
IS | 25.04.2020 | ||
PT | 20.05.2020 | ||
Former [2020/37] | AL | 25.12.2019 | |
CZ | 25.12.2019 | ||
EE | 25.12.2019 | ||
FI | 25.12.2019 | ||
HR | 25.12.2019 | ||
LT | 25.12.2019 | ||
LV | 25.12.2019 | ||
NL | 25.12.2019 | ||
RO | 25.12.2019 | ||
RS | 25.12.2019 | ||
SE | 25.12.2019 | ||
SK | 25.12.2019 | ||
SM | 25.12.2019 | ||
BG | 25.03.2020 | ||
NO | 25.03.2020 | ||
GR | 26.03.2020 | ||
PT | 20.05.2020 | ||
Former [2020/36] | AL | 25.12.2019 | |
CZ | 25.12.2019 | ||
EE | 25.12.2019 | ||
FI | 25.12.2019 | ||
HR | 25.12.2019 | ||
LT | 25.12.2019 | ||
LV | 25.12.2019 | ||
NL | 25.12.2019 | ||
RO | 25.12.2019 | ||
RS | 25.12.2019 | ||
SE | 25.12.2019 | ||
BG | 25.03.2020 | ||
NO | 25.03.2020 | ||
GR | 26.03.2020 | ||
PT | 20.05.2020 | ||
Former [2020/35] | AL | 25.12.2019 | |
CZ | 25.12.2019 | ||
FI | 25.12.2019 | ||
HR | 25.12.2019 | ||
LT | 25.12.2019 | ||
LV | 25.12.2019 | ||
NL | 25.12.2019 | ||
RO | 25.12.2019 | ||
RS | 25.12.2019 | ||
SE | 25.12.2019 | ||
BG | 25.03.2020 | ||
NO | 25.03.2020 | ||
GR | 26.03.2020 | ||
Former [2020/32] | AL | 25.12.2019 | |
FI | 25.12.2019 | ||
HR | 25.12.2019 | ||
LT | 25.12.2019 | ||
LV | 25.12.2019 | ||
NL | 25.12.2019 | ||
RS | 25.12.2019 | ||
SE | 25.12.2019 | ||
BG | 25.03.2020 | ||
NO | 25.03.2020 | ||
GR | 26.03.2020 | ||
Former [2020/25] | FI | 25.12.2019 | |
HR | 25.12.2019 | ||
LT | 25.12.2019 | ||
LV | 25.12.2019 | ||
RS | 25.12.2019 | ||
SE | 25.12.2019 | ||
BG | 25.03.2020 | ||
NO | 25.03.2020 | ||
GR | 26.03.2020 | ||
Former [2020/23] | FI | 25.12.2019 | |
LT | 25.12.2019 | ||
LV | 25.12.2019 | ||
SE | 25.12.2019 | ||
BG | 25.03.2020 | ||
NO | 25.03.2020 | ||
GR | 26.03.2020 | ||
Former [2020/22] | FI | 25.12.2019 | |
LT | 25.12.2019 | ||
SE | 25.12.2019 | ||
BG | 25.03.2020 | ||
NO | 25.03.2020 | ||
Former [2020/21] | NO | 25.03.2020 | Cited in | International search | [A]US2004020233 (RAMACHANDRAN AJIT [US], et al) [A] 1-9* paragraph [0049] - paragraph [0120]; figure - *; | [A]US7841363 (SUHARNO ANWAR [US]) [A] 1-9 * column 2, line 64 - column 5, line 45; figure - *; | [A]EP2360040 (TEXA SPA [IT]) [A] 1-9 * abstract *; | [A]EP2365261 (TEXA SPA [IT]) [A] 1-9 * abstract * |