EP3427882 - ARC WELDING SYSTEM AND WIRE-FEEDING DEVICE [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 01.10.2021 Database last updated on 29.06.2024 | |
Former | The patent has been granted Status updated on 23.10.2020 | ||
Former | Grant of patent is intended Status updated on 16.06.2020 | ||
Former | Request for examination was made Status updated on 14.12.2018 | ||
Former | The international publication has been made Status updated on 15.09.2017 | Most recent event Tooltip | 14.06.2024 | Lapse of the patent in a contracting state New state(s): TR | published on 17.07.2024 [2024/29] | Applicant(s) | For all designated states Daihen Corporation 1-11, Tagawa 2-chome Yodogawa-ku Osaka-shi, Osaka 532-8512 / JP | [2019/03] | Inventor(s) | 01 /
INOUE, Masahiro c/o DAIHEN Corporation 1-11 Tagawa 2-chome Yodogawa-ku Osaka-shi Osaka 532-8512 / JP | 02 /
MORITA, Yukiya c/o DAIHEN Corporation 1-11 Tagawa 2-chome Yodogawa-ku Osaka-shi Osaka 532-8512 / JP | 03 /
MIYAHARA, Hisao c/o DAIHEN Corporation 1-11 Tagawa 2-chome Yodogawa-ku Osaka-shi Osaka 532-8512 / JP | 04 /
KAWAI, Hirokazu c/o DAIHEN Corporation 1-11 Tagawa 2-chome Yodogawa-ku Osaka-shi Osaka 532-8512 / JP | 05 /
HOU, Songjie c/o DAIHEN Corporation 1-11 Tagawa 2-chome Yodogawa-ku Osaka-shi Osaka 532-8512 / JP | 06 /
BABA, Hayato c/o DAIHEN Corporation 1-11 Tagawa 2-chome Yodogawa-ku Osaka-shi Osaka 532-8512 / JP | 07 /
SHIOZAKI, Hideo c/o DAIHEN Corporation 1-11 Tagawa 2-chome Yodogawa-ku Osaka-shi Osaka 532-8512 / JP | 08 /
ERA, Tetsuo c/o DAIHEN Corporation 1-11 Tagawa 2-chome Yodogawa-ku Osaka-shi Osaka 532-8512 / JP | 09 /
UEYAMA, Tomoyuki c/o DAIHEN Corporation 1-11 Tagawa 2-chome Yodogawa-ku Osaka-shi Osaka 532-8512 / JP | [2019/03] | Representative(s) | Cabinet Beaumont 4, Place Robert Schuman B.P. 1529 38025 Grenoble Cedex 1 / FR | [2019/03] | Application number, filing date | 17763381.5 | 09.03.2017 | [2019/03] | WO2017JP09487 | Priority number, date | US201662307189P | 11.03.2016 Original published format: US 201662307189 P | JP20160079830 | 12.04.2016 Original published format: JP 2016079830 | [2019/03] | Filing language | JA | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2017155041 | Date: | 14.09.2017 | Language: | JA | [2017/37] | Type: | A1 Application with search report | No.: | EP3427882 | Date: | 16.01.2019 | Language: | EN | [2019/03] | Type: | B1 Patent specification | No.: | EP3427882 | Date: | 25.11.2020 | Language: | EN | [2020/48] | Search report(s) | International search report - published on: | JP | 14.09.2017 | (Supplementary) European search report - dispatched on: | EP | 19.07.2019 | Classification | IPC: | B23K9/12, B23K9/073, B23K9/133, B23K9/10, B23K9/09 | [2019/34] | CPC: |
B23K9/133 (EP,KR,US);
B23K9/124 (KR);
B23K9/073 (KR);
B23K9/0732 (US);
B23K9/092 (EP,US);
B23K9/1062 (EP,US);
|
Former IPC [2019/03] | B23K9/12, B23K9/073, B23K9/133 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2019/03] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | MD | Not yet paid | Title | German: | LICHTBOGENSCHWEISSSYSTEM UND DRAHTZUFÜHRUNGSVORRICHTUNG | [2019/03] | English: | ARC WELDING SYSTEM AND WIRE-FEEDING DEVICE | [2019/03] | French: | SYSTÈME DE SOUDAGE À L'ARC ET DISPOSITIF D'AVANCEMENT DE FIL | [2019/03] | Entry into regional phase | 06.09.2018 | Translation filed | 06.09.2018 | National basic fee paid | 06.09.2018 | Search fee paid | 06.09.2018 | Designation fee(s) paid | 06.09.2018 | Examination fee paid | Examination procedure | deleted | Date on which the examining division has become responsible | 06.09.2018 | Examination requested [2019/03] | 05.02.2020 | Amendment by applicant (claims and/or description) | 17.06.2020 | Communication of intention to grant the patent | 13.10.2020 | Fee for grant paid | 13.10.2020 | Fee for publishing/printing paid | 13.10.2020 | Receipt of the translation of the claim(s) | Divisional application(s) | EP20170258.6 / EP3702084 | Opposition(s) | 26.08.2021 | No opposition filed within time limit [2021/44] | Fees paid | Renewal fee | 22.01.2019 | Renewal fee patent year 03 | 19.02.2020 | Renewal fee patent year 04 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 09.03.2017 | AL | 25.11.2020 | CY | 25.11.2020 | CZ | 25.11.2020 | DK | 25.11.2020 | EE | 25.11.2020 | ES | 25.11.2020 | FI | 25.11.2020 | HR | 25.11.2020 | IT | 25.11.2020 | LT | 25.11.2020 | LV | 25.11.2020 | MC | 25.11.2020 | MK | 25.11.2020 | NL | 25.11.2020 | PL | 25.11.2020 | RO | 25.11.2020 | RS | 25.11.2020 | SE | 25.11.2020 | SI | 25.11.2020 | SK | 25.11.2020 | SM | 25.11.2020 | TR | 25.11.2020 | BG | 25.02.2021 | NO | 25.02.2021 | GR | 26.02.2021 | IE | 09.03.2021 | LU | 09.03.2021 | IS | 25.03.2021 | PT | 25.03.2021 | BE | 31.03.2021 | CH | 31.03.2021 | FR | 31.03.2021 | LI | 31.03.2021 | [2024/29] |
Former [2024/23] | HU | 09.03.2017 | |
AL | 25.11.2020 | ||
CY | 25.11.2020 | ||
CZ | 25.11.2020 | ||
DK | 25.11.2020 | ||
EE | 25.11.2020 | ||
ES | 25.11.2020 | ||
FI | 25.11.2020 | ||
HR | 25.11.2020 | ||
IT | 25.11.2020 | ||
LT | 25.11.2020 | ||
LV | 25.11.2020 | ||
MC | 25.11.2020 | ||
MK | 25.11.2020 | ||
NL | 25.11.2020 | ||
PL | 25.11.2020 | ||
RO | 25.11.2020 | ||
RS | 25.11.2020 | ||
SE | 25.11.2020 | ||
SI | 25.11.2020 | ||
SK | 25.11.2020 | ||
SM | 25.11.2020 | ||
BG | 25.02.2021 | ||
NO | 25.02.2021 | ||
GR | 26.02.2021 | ||
IE | 09.03.2021 | ||
LU | 09.03.2021 | ||
IS | 25.03.2021 | ||
PT | 25.03.2021 | ||
BE | 31.03.2021 | ||
CH | 31.03.2021 | ||
FR | 31.03.2021 | ||
LI | 31.03.2021 | ||
Former [2023/33] | HU | 09.03.2017 | |
AL | 25.11.2020 | ||
CY | 25.11.2020 | ||
CZ | 25.11.2020 | ||
DK | 25.11.2020 | ||
EE | 25.11.2020 | ||
ES | 25.11.2020 | ||
FI | 25.11.2020 | ||
HR | 25.11.2020 | ||
IT | 25.11.2020 | ||
LT | 25.11.2020 | ||
LV | 25.11.2020 | ||
MC | 25.11.2020 | ||
NL | 25.11.2020 | ||
PL | 25.11.2020 | ||
RO | 25.11.2020 | ||
RS | 25.11.2020 | ||
SE | 25.11.2020 | ||
SI | 25.11.2020 | ||
SK | 25.11.2020 | ||
SM | 25.11.2020 | ||
BG | 25.02.2021 | ||
NO | 25.02.2021 | ||
GR | 26.02.2021 | ||
IE | 09.03.2021 | ||
LU | 09.03.2021 | ||
IS | 25.03.2021 | ||
PT | 25.03.2021 | ||
BE | 31.03.2021 | ||
CH | 31.03.2021 | ||
FR | 31.03.2021 | ||
LI | 31.03.2021 | ||
Former [2023/30] | AL | 25.11.2020 | |
CY | 25.11.2020 | ||
CZ | 25.11.2020 | ||
DK | 25.11.2020 | ||
EE | 25.11.2020 | ||
ES | 25.11.2020 | ||
FI | 25.11.2020 | ||
HR | 25.11.2020 | ||
IT | 25.11.2020 | ||
LT | 25.11.2020 | ||
LV | 25.11.2020 | ||
MC | 25.11.2020 | ||
NL | 25.11.2020 | ||
PL | 25.11.2020 | ||
RO | 25.11.2020 | ||
RS | 25.11.2020 | ||
SE | 25.11.2020 | ||
SI | 25.11.2020 | ||
SK | 25.11.2020 | ||
SM | 25.11.2020 | ||
BG | 25.02.2021 | ||
NO | 25.02.2021 | ||
GR | 26.02.2021 | ||
IE | 09.03.2021 | ||
LU | 09.03.2021 | ||
IS | 25.03.2021 | ||
PT | 25.03.2021 | ||
BE | 31.03.2021 | ||
CH | 31.03.2021 | ||
FR | 31.03.2021 | ||
LI | 31.03.2021 | ||
Former [2022/34] | AL | 25.11.2020 | |
CZ | 25.11.2020 | ||
DK | 25.11.2020 | ||
EE | 25.11.2020 | ||
ES | 25.11.2020 | ||
FI | 25.11.2020 | ||
HR | 25.11.2020 | ||
IT | 25.11.2020 | ||
LT | 25.11.2020 | ||
LV | 25.11.2020 | ||
MC | 25.11.2020 | ||
NL | 25.11.2020 | ||
PL | 25.11.2020 | ||
RO | 25.11.2020 | ||
RS | 25.11.2020 | ||
SE | 25.11.2020 | ||
SI | 25.11.2020 | ||
SK | 25.11.2020 | ||
SM | 25.11.2020 | ||
BG | 25.02.2021 | ||
NO | 25.02.2021 | ||
GR | 26.02.2021 | ||
IE | 09.03.2021 | ||
LU | 09.03.2021 | ||
IS | 25.03.2021 | ||
PT | 25.03.2021 | ||
BE | 31.03.2021 | ||
CH | 31.03.2021 | ||
FR | 31.03.2021 | ||
LI | 31.03.2021 | ||
Former [2022/23] | AL | 25.11.2020 | |
CZ | 25.11.2020 | ||
DK | 25.11.2020 | ||
EE | 25.11.2020 | ||
ES | 25.11.2020 | ||
FI | 25.11.2020 | ||
HR | 25.11.2020 | ||
IT | 25.11.2020 | ||
LT | 25.11.2020 | ||
LV | 25.11.2020 | ||
MC | 25.11.2020 | ||
NL | 25.11.2020 | ||
PL | 25.11.2020 | ||
RO | 25.11.2020 | ||
RS | 25.11.2020 | ||
SE | 25.11.2020 | ||
SI | 25.11.2020 | ||
SK | 25.11.2020 | ||
SM | 25.11.2020 | ||
BG | 25.02.2021 | ||
NO | 25.02.2021 | ||
GR | 26.02.2021 | ||
IE | 09.03.2021 | ||
LU | 09.03.2021 | ||
IS | 25.03.2021 | ||
PT | 25.03.2021 | ||
CH | 31.03.2021 | ||
FR | 31.03.2021 | ||
LI | 31.03.2021 | ||
Former [2022/10] | AL | 25.11.2020 | |
CZ | 25.11.2020 | ||
DK | 25.11.2020 | ||
EE | 25.11.2020 | ||
ES | 25.11.2020 | ||
FI | 25.11.2020 | ||
HR | 25.11.2020 | ||
IT | 25.11.2020 | ||
LT | 25.11.2020 | ||
LV | 25.11.2020 | ||
MC | 25.11.2020 | ||
NL | 25.11.2020 | ||
PL | 25.11.2020 | ||
RO | 25.11.2020 | ||
RS | 25.11.2020 | ||
SE | 25.11.2020 | ||
SI | 25.11.2020 | ||
SK | 25.11.2020 | ||
SM | 25.11.2020 | ||
BG | 25.02.2021 | ||
NO | 25.02.2021 | ||
GR | 26.02.2021 | ||
IE | 09.03.2021 | ||
LU | 09.03.2021 | ||
PT | 25.03.2021 | ||
CH | 31.03.2021 | ||
FR | 31.03.2021 | ||
LI | 31.03.2021 | ||
Former [2022/08] | AL | 25.11.2020 | |
CZ | 25.11.2020 | ||
DK | 25.11.2020 | ||
EE | 25.11.2020 | ||
ES | 25.11.2020 | ||
FI | 25.11.2020 | ||
HR | 25.11.2020 | ||
IT | 25.11.2020 | ||
LT | 25.11.2020 | ||
LV | 25.11.2020 | ||
MC | 25.11.2020 | ||
NL | 25.11.2020 | ||
PL | 25.11.2020 | ||
RO | 25.11.2020 | ||
RS | 25.11.2020 | ||
SE | 25.11.2020 | ||
SI | 25.11.2020 | ||
SK | 25.11.2020 | ||
SM | 25.11.2020 | ||
BG | 25.02.2021 | ||
NO | 25.02.2021 | ||
GR | 26.02.2021 | ||
IE | 09.03.2021 | ||
LU | 09.03.2021 | ||
IS | 25.03.2021 | ||
PT | 25.03.2021 | ||
FR | 31.03.2021 | ||
Former [2022/07] | AL | 25.11.2020 | |
CZ | 25.11.2020 | ||
DK | 25.11.2020 | ||
EE | 25.11.2020 | ||
FI | 25.11.2020 | ||
HR | 25.11.2020 | ||
IT | 25.11.2020 | ||
LT | 25.11.2020 | ||
LV | 25.11.2020 | ||
MC | 25.11.2020 | ||
NL | 25.11.2020 | ||
PL | 25.11.2020 | ||
RO | 25.11.2020 | ||
RS | 25.11.2020 | ||
SE | 25.11.2020 | ||
SI | 25.11.2020 | ||
SK | 25.11.2020 | ||
SM | 25.11.2020 | ||
BG | 25.02.2021 | ||
NO | 25.02.2021 | ||
GR | 26.02.2021 | ||
IE | 09.03.2021 | ||
IS | 25.03.2021 | ||
PT | 25.03.2021 | ||
Former [2021/50] | AL | 25.11.2020 | |
CZ | 25.11.2020 | ||
DK | 25.11.2020 | ||
EE | 25.11.2020 | ||
FI | 25.11.2020 | ||
HR | 25.11.2020 | ||
IT | 25.11.2020 | ||
LT | 25.11.2020 | ||
LV | 25.11.2020 | ||
MC | 25.11.2020 | ||
NL | 25.11.2020 | ||
PL | 25.11.2020 | ||
RO | 25.11.2020 | ||
RS | 25.11.2020 | ||
SE | 25.11.2020 | ||
SI | 25.11.2020 | ||
SK | 25.11.2020 | ||
SM | 25.11.2020 | ||
BG | 25.02.2021 | ||
NO | 25.02.2021 | ||
GR | 26.02.2021 | ||
IS | 25.03.2021 | ||
PT | 25.03.2021 | ||
Former [2021/48] | AL | 25.11.2020 | |
CZ | 25.11.2020 | ||
DK | 25.11.2020 | ||
EE | 25.11.2020 | ||
FI | 25.11.2020 | ||
HR | 25.11.2020 | ||
IT | 25.11.2020 | ||
LT | 25.11.2020 | ||
LV | 25.11.2020 | ||
MC | 25.11.2020 | ||
NL | 25.11.2020 | ||
PL | 25.11.2020 | ||
RO | 25.11.2020 | ||
RS | 25.11.2020 | ||
SE | 25.11.2020 | ||
SK | 25.11.2020 | ||
SM | 25.11.2020 | ||
BG | 25.02.2021 | ||
NO | 25.02.2021 | ||
GR | 26.02.2021 | ||
IS | 25.03.2021 | ||
PT | 25.03.2021 | ||
Former [2021/46] | AL | 25.11.2020 | |
CZ | 25.11.2020 | ||
DK | 25.11.2020 | ||
EE | 25.11.2020 | ||
FI | 25.11.2020 | ||
HR | 25.11.2020 | ||
LT | 25.11.2020 | ||
LV | 25.11.2020 | ||
MC | 25.11.2020 | ||
NL | 25.11.2020 | ||
PL | 25.11.2020 | ||
RO | 25.11.2020 | ||
RS | 25.11.2020 | ||
SE | 25.11.2020 | ||
SK | 25.11.2020 | ||
SM | 25.11.2020 | ||
BG | 25.02.2021 | ||
NO | 25.02.2021 | ||
GR | 26.02.2021 | ||
IS | 25.03.2021 | ||
PT | 25.03.2021 | ||
Former [2021/45] | AL | 25.11.2020 | |
CZ | 25.11.2020 | ||
DK | 25.11.2020 | ||
EE | 25.11.2020 | ||
FI | 25.11.2020 | ||
HR | 25.11.2020 | ||
LT | 25.11.2020 | ||
LV | 25.11.2020 | ||
MC | 25.11.2020 | ||
PL | 25.11.2020 | ||
RO | 25.11.2020 | ||
RS | 25.11.2020 | ||
SE | 25.11.2020 | ||
SK | 25.11.2020 | ||
SM | 25.11.2020 | ||
BG | 25.02.2021 | ||
NO | 25.02.2021 | ||
GR | 26.02.2021 | ||
IS | 25.03.2021 | ||
PT | 25.03.2021 | ||
Former [2021/37] | CZ | 25.11.2020 | |
DK | 25.11.2020 | ||
EE | 25.11.2020 | ||
FI | 25.11.2020 | ||
HR | 25.11.2020 | ||
LT | 25.11.2020 | ||
LV | 25.11.2020 | ||
PL | 25.11.2020 | ||
RO | 25.11.2020 | ||
RS | 25.11.2020 | ||
SE | 25.11.2020 | ||
SK | 25.11.2020 | ||
SM | 25.11.2020 | ||
BG | 25.02.2021 | ||
NO | 25.02.2021 | ||
GR | 26.02.2021 | ||
IS | 25.03.2021 | ||
PT | 25.03.2021 | ||
Former [2021/36] | CZ | 25.11.2020 | |
EE | 25.11.2020 | ||
FI | 25.11.2020 | ||
HR | 25.11.2020 | ||
LT | 25.11.2020 | ||
LV | 25.11.2020 | ||
PL | 25.11.2020 | ||
RO | 25.11.2020 | ||
RS | 25.11.2020 | ||
SE | 25.11.2020 | ||
SK | 25.11.2020 | ||
SM | 25.11.2020 | ||
BG | 25.02.2021 | ||
NO | 25.02.2021 | ||
GR | 26.02.2021 | ||
IS | 25.03.2021 | ||
PT | 25.03.2021 | ||
Former [2021/35] | CZ | 25.11.2020 | |
FI | 25.11.2020 | ||
HR | 25.11.2020 | ||
LT | 25.11.2020 | ||
LV | 25.11.2020 | ||
PL | 25.11.2020 | ||
RO | 25.11.2020 | ||
RS | 25.11.2020 | ||
SE | 25.11.2020 | ||
SK | 25.11.2020 | ||
SM | 25.11.2020 | ||
BG | 25.02.2021 | ||
NO | 25.02.2021 | ||
GR | 26.02.2021 | ||
IS | 25.03.2021 | ||
PT | 25.03.2021 | ||
Former [2021/33] | FI | 25.11.2020 | |
HR | 25.11.2020 | ||
LT | 25.11.2020 | ||
LV | 25.11.2020 | ||
PL | 25.11.2020 | ||
RS | 25.11.2020 | ||
SE | 25.11.2020 | ||
SM | 25.11.2020 | ||
BG | 25.02.2021 | ||
NO | 25.02.2021 | ||
GR | 26.02.2021 | ||
IS | 25.03.2021 | ||
PT | 25.03.2021 | ||
Former [2021/32] | FI | 25.11.2020 | |
HR | 25.11.2020 | ||
LV | 25.11.2020 | ||
PL | 25.11.2020 | ||
RS | 25.11.2020 | ||
SE | 25.11.2020 | ||
SM | 25.11.2020 | ||
BG | 25.02.2021 | ||
NO | 25.02.2021 | ||
GR | 26.02.2021 | ||
IS | 25.03.2021 | ||
PT | 25.03.2021 | ||
Former [2021/28] | FI | 25.11.2020 | |
HR | 25.11.2020 | ||
LV | 25.11.2020 | ||
PL | 25.11.2020 | ||
RS | 25.11.2020 | ||
SE | 25.11.2020 | ||
BG | 25.02.2021 | ||
NO | 25.02.2021 | ||
GR | 26.02.2021 | ||
IS | 25.03.2021 | ||
PT | 25.03.2021 | ||
Former [2021/25] | FI | 25.11.2020 | |
LV | 25.11.2020 | ||
PL | 25.11.2020 | ||
RS | 25.11.2020 | ||
SE | 25.11.2020 | ||
BG | 25.02.2021 | ||
NO | 25.02.2021 | ||
GR | 26.02.2021 | ||
IS | 25.03.2021 | ||
PT | 25.03.2021 | ||
Former [2021/23] | FI | 25.11.2020 | |
LV | 25.11.2020 | ||
RS | 25.11.2020 | ||
SE | 25.11.2020 | ||
BG | 25.02.2021 | ||
NO | 25.02.2021 | ||
GR | 26.02.2021 | ||
PT | 25.03.2021 | ||
Former [2021/22] | FI | 25.11.2020 | |
RS | 25.11.2020 | ||
NO | 25.02.2021 | ||
PT | 25.03.2021 | ||
Former [2021/21] | FI | 25.11.2020 | |
PT | 25.03.2021 | ||
Former [2021/20] | FI | 25.11.2020 | Documents cited: | Search | [XYI]DE19732379 (KUKA SCHWEISSANLAGEN GMBH [DE]) [X] 1,2,4-8,13 * columns 2,4; figure 1 * [Y] 9 [I] 3; | [Y]JPH1190627 (DAIHEN CORP) [Y] 9* paragraph [0002]; figure 8 *; | [XY]US2012305532 (HARRIS TENNYSON [CA]) [X] 1,2,4-8,12,13 * paragraph [0067]; figure 1; table B * [Y] 9; | [XAYI]EP2949416 (AWDS TECHNOLOGIES SRL [IT]) [X] 1,2,4-8,13 * paragraphs [0034] - [0045]; figure 1 * [A] 10 [Y] 9 [I] 11 | International search | [XYA]JPS60184470 (MITSUBISHI ELECTRIC CORP) [X] 1-7, 13 * , page 1, lower left column, lines 5 to 9; lower right column, lines 11 to 15; page 2, upper right column, lines 2 to 9, 12 to 15; upper right column, line 18 to lower right column, line 5; page 3, upper left column, line 6 to upper right column, line 4; fig. 2 (Family: none) * [Y] 8-9, 11-12 [A] 10; | [Y]JPH1190627 (DAIHEN CORP) [Y] 9, 11-12* , paragraph [0002]; fig. 8 (Family: none) *; | [Y]JP2006326679 (YASKAWA ELECTRIC CORP) [Y] 8-9, 11-12 * , paragraphs [0014] to [0015]; fig. 1 (Family: none) * |