blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3494047

EP3494047 - POWER SUPPLY NETWORK ARCHITECTURE [Right-click to bookmark this link]
Former [2019/24]ELECTRICAL POWER SUPPLY NETWORK ARCHITECTURE
[2020/02]
StatusNo opposition filed within time limit
Status updated on  30.04.2021
Database last updated on 30.10.2024
FormerThe patent has been granted
Status updated on  22.05.2020
FormerGrant of patent is intended
Status updated on  16.01.2020
FormerRequest for examination was made
Status updated on  10.05.2019
FormerThe international publication has been made
Status updated on  10.02.2018
Formerunknown
Status updated on  20.09.2017
Most recent event   Tooltip15.07.2022Lapse of the patent in a contracting state
New state(s): MK
published on 17.08.2022  [2022/33]
Applicant(s)For all designated states
Liebherr-Aerospace Toulouse SAS
408 avenue des Etats-Unis
31200 Toulouse / FR
[2019/24]
Inventor(s)01 / ABDELLI, Youcef
110A Avenue du Sers
31140 Saint Alban / FR
02 / BRODEAU, Pierre
13 Rue du Pastel
31400 Toulouse / FR
03 / DEVANNEAUX, Vincent
173 Chemin de Tournefeuille
31300 Toulouse / FR
 [2019/24]
Representative(s)Gevers & Orès
9 rue St Antoine du T
31000 Toulouse / FR
[2019/24]
Application number, filing date17764871.401.08.2017
[2019/24]
WO2017FR52163
Priority number, dateFR2016005751903.08.2016         Original published format: FR 1657519
[2019/24]
Filing languageFR
Procedural languageFR
PublicationType: A1 Application with search report
No.:WO2018024983
Date:08.02.2018
Language:FR
[2018/06]
Type: A1 Application with search report 
No.:EP3494047
Date:12.06.2019
Language:FR
The application published by WIPO in one of the EPO official languages on 08.02.2018 takes the place of the publication of the European patent application.
[2019/24]
Type: B1 Patent specification 
No.:EP3494047
Date:24.06.2020
Language:FR
[2020/26]
Search report(s)International search report - published on:EP08.02.2018
ClassificationIPC:B64D41/00, B64D13/00, H02P25/22, H02K3/28, H02J4/00, H02K19/34
[2019/24]
CPC:
B64D41/00 (EP); B64D13/00 (EP); H02J4/00 (EP);
H02K3/28 (EP); H02P25/22 (EP); H02J2310/44 (EP);
H02K2213/06 (EP) (-)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2019/24]
Extension statesBANot yet paid
MENot yet paid
Validation statesMANot yet paid
MDNot yet paid
TitleGerman:ENERGIEVERSORGUNGSNETZARCHITEKTUR[2020/02]
English:POWER SUPPLY NETWORK ARCHITECTURE[2020/02]
French:ARCHITECTURE DE RÉSEAU D'ALIMENTATION ÉLECTRIQUE[2019/24]
Former [2019/24]ARCHITEKTUR EINES STROMVERSORGUNGSNETZES
Former [2019/24]ELECTRICAL POWER SUPPLY NETWORK ARCHITECTURE
Entry into regional phase29.01.2019National basic fee paid 
29.01.2019Designation fee(s) paid 
29.01.2019Examination fee paid 
Examination procedure29.01.2019Examination requested  [2019/24]
29.01.2019Date on which the examining division has become responsible
27.05.2019Amendment by applicant (claims and/or description)
17.01.2020Communication of intention to grant the patent
15.05.2020Fee for grant paid
15.05.2020Fee for publishing/printing paid
15.05.2020Receipt of the translation of the claim(s)
Opposition(s)25.03.2021No opposition filed within time limit [2021/22]
Fees paidRenewal fee
26.08.2019Renewal fee patent year 03
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU01.08.2017
AL24.06.2020
AT24.06.2020
CY24.06.2020
CZ24.06.2020
DK24.06.2020
EE24.06.2020
FI24.06.2020
HR24.06.2020
LT24.06.2020
LV24.06.2020
MC24.06.2020
MK24.06.2020
MT24.06.2020
NL24.06.2020
PL24.06.2020
RO24.06.2020
RS24.06.2020
SE24.06.2020
SI24.06.2020
SK24.06.2020
SM24.06.2020
TR24.06.2020
IE01.08.2020
LU01.08.2020
BE31.08.2020
CH31.08.2020
LI31.08.2020
BG24.09.2020
NO24.09.2020
GR25.09.2020
IS24.10.2020
PT26.10.2020
[2022/33]
Former [2022/27]HU01.08.2017
AL24.06.2020
AT24.06.2020
CY24.06.2020
CZ24.06.2020
DK24.06.2020
EE24.06.2020
FI24.06.2020
HR24.06.2020
LT24.06.2020
LV24.06.2020
MC24.06.2020
MT24.06.2020
NL24.06.2020
PL24.06.2020
RO24.06.2020
RS24.06.2020
SE24.06.2020
SI24.06.2020
SK24.06.2020
SM24.06.2020
TR24.06.2020
IE01.08.2020
LU01.08.2020
BE31.08.2020
CH31.08.2020
LI31.08.2020
BG24.09.2020
NO24.09.2020
GR25.09.2020
IS24.10.2020
PT26.10.2020
Former [2021/37]AL24.06.2020
AT24.06.2020
CZ24.06.2020
DK24.06.2020
EE24.06.2020
FI24.06.2020
HR24.06.2020
LT24.06.2020
LV24.06.2020
MC24.06.2020
NL24.06.2020
PL24.06.2020
RO24.06.2020
RS24.06.2020
SE24.06.2020
SI24.06.2020
SK24.06.2020
SM24.06.2020
IE01.08.2020
LU01.08.2020
BE31.08.2020
CH31.08.2020
LI31.08.2020
BG24.09.2020
NO24.09.2020
GR25.09.2020
IS24.10.2020
PT26.10.2020
Former [2021/36]AL24.06.2020
AT24.06.2020
CZ24.06.2020
DK24.06.2020
EE24.06.2020
FI24.06.2020
HR24.06.2020
LT24.06.2020
LV24.06.2020
MC24.06.2020
NL24.06.2020
PL24.06.2020
RO24.06.2020
RS24.06.2020
SE24.06.2020
SI24.06.2020
SK24.06.2020
SM24.06.2020
LU01.08.2020
BE31.08.2020
CH31.08.2020
LI31.08.2020
BG24.09.2020
NO24.09.2020
GR25.09.2020
IS24.10.2020
PT26.10.2020
Former [2021/20]AL24.06.2020
AT24.06.2020
CZ24.06.2020
DK24.06.2020
EE24.06.2020
FI24.06.2020
HR24.06.2020
LT24.06.2020
LV24.06.2020
MC24.06.2020
NL24.06.2020
PL24.06.2020
RO24.06.2020
RS24.06.2020
SE24.06.2020
SK24.06.2020
SM24.06.2020
LU01.08.2020
CH31.08.2020
LI31.08.2020
BG24.09.2020
NO24.09.2020
GR25.09.2020
IS24.10.2020
PT26.10.2020
Former [2021/18]AL24.06.2020
AT24.06.2020
CZ24.06.2020
EE24.06.2020
FI24.06.2020
HR24.06.2020
LT24.06.2020
LV24.06.2020
MC24.06.2020
NL24.06.2020
PL24.06.2020
RO24.06.2020
RS24.06.2020
SE24.06.2020
SK24.06.2020
SM24.06.2020
BG24.09.2020
NO24.09.2020
GR25.09.2020
IS24.10.2020
PT26.10.2020
Former [2021/10]AL24.06.2020
AT24.06.2020
CZ24.06.2020
EE24.06.2020
FI24.06.2020
HR24.06.2020
LT24.06.2020
LV24.06.2020
NL24.06.2020
PL24.06.2020
RO24.06.2020
RS24.06.2020
SE24.06.2020
SK24.06.2020
SM24.06.2020
BG24.09.2020
NO24.09.2020
GR25.09.2020
IS24.10.2020
PT26.10.2020
Former [2021/09]AL24.06.2020
AT24.06.2020
CZ24.06.2020
EE24.06.2020
FI24.06.2020
HR24.06.2020
LT24.06.2020
LV24.06.2020
NL24.06.2020
RO24.06.2020
RS24.06.2020
SE24.06.2020
SM24.06.2020
BG24.09.2020
NO24.09.2020
GR25.09.2020
PT26.10.2020
Former [2021/04]AL24.06.2020
FI24.06.2020
HR24.06.2020
LT24.06.2020
LV24.06.2020
NL24.06.2020
RS24.06.2020
SE24.06.2020
BG24.09.2020
NO24.09.2020
GR25.09.2020
Former [2021/01]FI24.06.2020
HR24.06.2020
LT24.06.2020
LV24.06.2020
RS24.06.2020
SE24.06.2020
BG24.09.2020
NO24.09.2020
GR25.09.2020
Former [2020/51]FI24.06.2020
HR24.06.2020
LT24.06.2020
LV24.06.2020
RS24.06.2020
SE24.06.2020
NO24.09.2020
GR25.09.2020
Former [2020/50]FI24.06.2020
HR24.06.2020
LT24.06.2020
LV24.06.2020
SE24.06.2020
NO24.09.2020
GR25.09.2020
Former [2020/48]FI24.06.2020
LT24.06.2020
SE24.06.2020
NO24.09.2020
Former [2020/47]LT24.06.2020
NO24.09.2020
Cited inInternational search[YD]WO2010067021  (LIEBHERR AEROSPACE TOULOUSE SA [FR], et al) [YD] 1-8* page 7, line 8 - page 16, line 8; figure - *;
 [Y]US2010270858  (FOCH ETIENNE [FR], et al) [Y] 1-8 * the whole document *
by applicantWO2010067021
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.