blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3519776

EP3519776 - METHOD AND CONTROLLER FOR OPERATING AN ACTUATOR DEVICE, AND ACTUATOR SYSTEM [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  22.04.2022
Database last updated on 14.09.2024
FormerThe patent has been granted
Status updated on  14.05.2021
FormerGrant of patent is intended
Status updated on  12.01.2021
FormerRequest for examination was made
Status updated on  05.07.2019
FormerThe international publication has been made
Status updated on  07.04.2018
Formerunknown
Status updated on  26.09.2017
Most recent event   Tooltip13.09.2024Lapse of the patent in a contracting state
New state(s): MT
published on 16.10.2024 [2024/42]
Applicant(s)For all designated states
ZF Friedrichshafen AG
Löwentaler Strasse 20
88046 Friedrichshafen / DE
[2019/32]
Inventor(s)01 / TRÄNKNER, Sascha
Berliner Straße 7
49453 Rehden / DE
02 / KLIEMANNEL, Wolfgang
Carl-Storck-Weg 7
49448 Lemförde / DE
 [2019/32]
Representative(s)ZF Friedrichshafen AG
Gewerblicher Rechtsschutz
Löwentalerstraße 20
88046 Friedrichshafen / DE
[2021/24]
Application number, filing date17768052.707.09.2017
[2019/32]
WO2017EP72404
Priority number, dateDE20161021876128.09.2016         Original published format: DE102016218761
[2019/32]
Filing languageDE
Procedural languageDE
PublicationType: A1 Application with search report
No.:WO2018059899
Date:05.04.2018
Language:DE
[2018/14]
Type: A1 Application with search report 
No.:EP3519776
Date:07.08.2019
Language:DE
The application published by WIPO in one of the EPO official languages on 05.04.2018 takes the place of the publication of the European patent application.
[2019/32]
Type: B1 Patent specification 
No.:EP3519776
Date:16.06.2021
Language:DE
[2021/24]
Search report(s)International search report - published on:EP05.04.2018
ClassificationIPC:G01D5/14, H02H7/085
[2019/32]
CPC:
G01D5/145 (EP); H02P6/16 (US); G01D5/12 (US);
H02P6/006 (US)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2019/32]
Extension statesBANot yet paid
MENot yet paid
Validation statesMANot yet paid
MDNot yet paid
TitleGerman:VERFAHREN UND STEUERGERÄT ZUM BETREIBEN EINER AKTORVORRICHTUNG UND AKTORSYSTEM[2019/32]
English:METHOD AND CONTROLLER FOR OPERATING AN ACTUATOR DEVICE, AND ACTUATOR SYSTEM[2019/32]
French:PROCÉDÉ ET DISPOSITIF DE COMMANDE POUR FAIRE FONCTIONNER UN DISPOSITIF ACTIONNEUR ET SYSTÈME D'ACTIONNEMENT[2021/02]
Former [2019/32]PROCÉDÉ ET CONTRÔLEUR POUR FAIRE FONCTIONNER UN DISPOSITIF ACTIONNEUR ET SYSTÈME ACTIONNEUR
Entry into regional phase25.03.2019National basic fee paid 
25.03.2019Designation fee(s) paid 
25.03.2019Examination fee paid 
Examination procedure25.03.2019Examination requested  [2019/32]
25.03.2019Date on which the examining division has become responsible
08.11.2019Amendment by applicant (claims and/or description)
13.01.2021Communication of intention to grant the patent
10.05.2021Fee for grant paid
10.05.2021Fee for publishing/printing paid
10.05.2021Receipt of the translation of the claim(s)
Opposition(s)17.03.2022No opposition filed within time limit [2022/21]
Fees paidRenewal fee
13.09.2019Renewal fee patent year 03
14.09.2020Renewal fee patent year 04
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU07.09.2017
AL16.06.2021
CY16.06.2021
CZ16.06.2021
DK16.06.2021
EE16.06.2021
FI16.06.2021
HR16.06.2021
IT16.06.2021
LT16.06.2021
LV16.06.2021
MC16.06.2021
MK16.06.2021
MT16.06.2021
NL16.06.2021
PL16.06.2021
RO16.06.2021
RS16.06.2021
SE16.06.2021
SI16.06.2021
SK16.06.2021
SM16.06.2021
TR16.06.2021
IE07.09.2021
LU07.09.2021
BG16.09.2021
GB16.09.2021
NO16.09.2021
GR17.09.2021
BE30.09.2021
CH30.09.2021
LI30.09.2021
IS16.10.2021
PT18.10.2021
[2024/42]
Former [2024/29]HU07.09.2017
AL16.06.2021
CY16.06.2021
CZ16.06.2021
DK16.06.2021
EE16.06.2021
FI16.06.2021
HR16.06.2021
IT16.06.2021
LT16.06.2021
LV16.06.2021
MC16.06.2021
MK16.06.2021
NL16.06.2021
PL16.06.2021
RO16.06.2021
RS16.06.2021
SE16.06.2021
SI16.06.2021
SK16.06.2021
SM16.06.2021
TR16.06.2021
IE07.09.2021
LU07.09.2021
BG16.09.2021
GB16.09.2021
NO16.09.2021
GR17.09.2021
BE30.09.2021
CH30.09.2021
LI30.09.2021
IS16.10.2021
PT18.10.2021
Former [2024/23]HU07.09.2017
AL16.06.2021
CY16.06.2021
CZ16.06.2021
DK16.06.2021
EE16.06.2021
FI16.06.2021
HR16.06.2021
IT16.06.2021
LT16.06.2021
LV16.06.2021
MC16.06.2021
MK16.06.2021
NL16.06.2021
PL16.06.2021
RO16.06.2021
RS16.06.2021
SE16.06.2021
SI16.06.2021
SK16.06.2021
SM16.06.2021
IE07.09.2021
LU07.09.2021
BG16.09.2021
GB16.09.2021
NO16.09.2021
GR17.09.2021
BE30.09.2021
CH30.09.2021
LI30.09.2021
IS16.10.2021
PT18.10.2021
Former [2023/33]HU07.09.2017
AL16.06.2021
CY16.06.2021
CZ16.06.2021
DK16.06.2021
EE16.06.2021
FI16.06.2021
HR16.06.2021
IT16.06.2021
LT16.06.2021
LV16.06.2021
MC16.06.2021
NL16.06.2021
PL16.06.2021
RO16.06.2021
RS16.06.2021
SE16.06.2021
SI16.06.2021
SK16.06.2021
SM16.06.2021
IE07.09.2021
LU07.09.2021
BG16.09.2021
GB16.09.2021
NO16.09.2021
GR17.09.2021
BE30.09.2021
CH30.09.2021
LI30.09.2021
IS16.10.2021
PT18.10.2021
Former [2023/30]AL16.06.2021
CY16.06.2021
CZ16.06.2021
DK16.06.2021
EE16.06.2021
FI16.06.2021
HR16.06.2021
IT16.06.2021
LT16.06.2021
LV16.06.2021
MC16.06.2021
NL16.06.2021
PL16.06.2021
RO16.06.2021
RS16.06.2021
SE16.06.2021
SI16.06.2021
SK16.06.2021
SM16.06.2021
IE07.09.2021
LU07.09.2021
BG16.09.2021
GB16.09.2021
NO16.09.2021
GR17.09.2021
BE30.09.2021
CH30.09.2021
LI30.09.2021
IS16.10.2021
PT18.10.2021
Former [2022/37]AL16.06.2021
CZ16.06.2021
DK16.06.2021
EE16.06.2021
FI16.06.2021
HR16.06.2021
IT16.06.2021
LT16.06.2021
LV16.06.2021
MC16.06.2021
NL16.06.2021
PL16.06.2021
RO16.06.2021
RS16.06.2021
SE16.06.2021
SI16.06.2021
SK16.06.2021
SM16.06.2021
IE07.09.2021
LU07.09.2021
BG16.09.2021
GB16.09.2021
NO16.09.2021
GR17.09.2021
BE30.09.2021
CH30.09.2021
LI30.09.2021
IS16.10.2021
PT18.10.2021
Former [2022/36]AL16.06.2021
CZ16.06.2021
DK16.06.2021
EE16.06.2021
FI16.06.2021
HR16.06.2021
IT16.06.2021
LT16.06.2021
LV16.06.2021
MC16.06.2021
NL16.06.2021
PL16.06.2021
RO16.06.2021
RS16.06.2021
SE16.06.2021
SI16.06.2021
SK16.06.2021
SM16.06.2021
IE07.09.2021
LU07.09.2021
BG16.09.2021
GB16.09.2021
NO16.09.2021
GR17.09.2021
BE30.09.2021
IS16.10.2021
PT18.10.2021
Former [2022/35]AL16.06.2021
CZ16.06.2021
DK16.06.2021
EE16.06.2021
FI16.06.2021
HR16.06.2021
LT16.06.2021
LV16.06.2021
MC16.06.2021
NL16.06.2021
PL16.06.2021
RO16.06.2021
RS16.06.2021
SE16.06.2021
SI16.06.2021
SK16.06.2021
SM16.06.2021
IE07.09.2021
LU07.09.2021
BG16.09.2021
GB16.09.2021
NO16.09.2021
GR17.09.2021
BE30.09.2021
IS16.10.2021
PT18.10.2021
Former [2022/34]AL16.06.2021
CZ16.06.2021
DK16.06.2021
EE16.06.2021
FI16.06.2021
HR16.06.2021
LT16.06.2021
LV16.06.2021
MC16.06.2021
NL16.06.2021
PL16.06.2021
RO16.06.2021
RS16.06.2021
SE16.06.2021
SI16.06.2021
SK16.06.2021
SM16.06.2021
LU07.09.2021
BG16.09.2021
NO16.09.2021
GR17.09.2021
BE30.09.2021
IS16.10.2021
PT18.10.2021
Former [2022/29]AL16.06.2021
CZ16.06.2021
DK16.06.2021
EE16.06.2021
FI16.06.2021
HR16.06.2021
LT16.06.2021
LV16.06.2021
MC16.06.2021
NL16.06.2021
PL16.06.2021
RO16.06.2021
RS16.06.2021
SE16.06.2021
SI16.06.2021
SK16.06.2021
SM16.06.2021
BG16.09.2021
NO16.09.2021
GR17.09.2021
IS16.10.2021
PT18.10.2021
Former [2022/25]AL16.06.2021
CZ16.06.2021
DK16.06.2021
EE16.06.2021
FI16.06.2021
HR16.06.2021
LT16.06.2021
LV16.06.2021
MC16.06.2021
NL16.06.2021
PL16.06.2021
RO16.06.2021
RS16.06.2021
SE16.06.2021
SK16.06.2021
SM16.06.2021
BG16.09.2021
NO16.09.2021
GR17.09.2021
IS16.10.2021
PT18.10.2021
Former [2022/21]CZ16.06.2021
DK16.06.2021
EE16.06.2021
FI16.06.2021
HR16.06.2021
LT16.06.2021
LV16.06.2021
NL16.06.2021
PL16.06.2021
RO16.06.2021
RS16.06.2021
SE16.06.2021
SK16.06.2021
SM16.06.2021
BG16.09.2021
NO16.09.2021
GR17.09.2021
IS16.10.2021
PT18.10.2021
Former [2022/10]CZ16.06.2021
EE16.06.2021
FI16.06.2021
HR16.06.2021
LT16.06.2021
LV16.06.2021
NL16.06.2021
PL16.06.2021
RO16.06.2021
RS16.06.2021
SE16.06.2021
SK16.06.2021
SM16.06.2021
BG16.09.2021
NO16.09.2021
GR17.09.2021
IS16.10.2021
PT18.10.2021
Former [2022/09]CZ16.06.2021
FI16.06.2021
HR16.06.2021
LT16.06.2021
LV16.06.2021
NL16.06.2021
RO16.06.2021
RS16.06.2021
SE16.06.2021
SK16.06.2021
SM16.06.2021
BG16.09.2021
NO16.09.2021
GR17.09.2021
PT18.10.2021
Former [2022/07]FI16.06.2021
HR16.06.2021
LT16.06.2021
LV16.06.2021
NL16.06.2021
RS16.06.2021
SE16.06.2021
SM16.06.2021
BG16.09.2021
NO16.09.2021
GR17.09.2021
Former [2021/51]FI16.06.2021
HR16.06.2021
LT16.06.2021
LV16.06.2021
RS16.06.2021
SE16.06.2021
BG16.09.2021
NO16.09.2021
GR17.09.2021
Former [2021/49]FI16.06.2021
HR16.06.2021
LT16.06.2021
LV16.06.2021
SE16.06.2021
BG16.09.2021
NO16.09.2021
GR17.09.2021
Former [2021/47]FI16.06.2021
LT16.06.2021
BG16.09.2021
Former [2021/46]FI16.06.2021
LT16.06.2021
Cited inInternational search[A]DE4444762  (BOSCH GMBH ROBERT [DE]) [A] 1-15 * abstract * * column 4, line 30 - column 5, line 42; figure 1 * * column 10, line 4 - line 42 *;
 [A]DE19533193  (KIEKERT AG [DE]) [A] 1,2,5,9-11,14,15 * abstract * * column 3, line 22 - line 42 ** column 5, line 52 - column 6, line 11; figure 1 *;
 [A]DE19800194  (BOSCH GMBH ROBERT [DE]) [A] 1-15 * column 3, line 35 - column 4, line 3; figure 1 * * column 5, line 20 - line 37 * * column 5, line 53 - column 6, line 9 *;
 [A]DE102014113500  (ETO MAGNETIC GMBH [DE]) [A] 1,2,5,9-12,14,15 * abstract * * paragraph [0029] - paragraph [0033]; figures 1,8 *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.