blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3422646

EP3422646 - METHOD AND DEVICE FOR MULTI-FLOW TRANSMISSION IN SDN NETWORK [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  12.02.2021
Database last updated on 19.10.2024
FormerThe patent has been granted
Status updated on  06.03.2020
FormerGrant of patent is intended
Status updated on  22.10.2019
FormerRequest for examination was made
Status updated on  30.11.2018
FormerThe international publication has been made
Status updated on  29.09.2017
Most recent event   Tooltip13.09.2024Lapse of the patent in a contracting state
New state(s): MT
published on 16.10.2024  [2024/42]
Applicant(s)For all designated states
Huawei Technologies Co., Ltd.
Huawei Administration Building
Bantian
Longgang District
Shenzhen, Guangdong 518129 / CN
[2019/01]
Inventor(s)01 / XU, Baolei
Huawei Administration Building
Bantian
Longgang District
Shenzhen Guangdong 518129 / CN
02 / ZHOU, Haojun
Huawei Administration Building
Bantian
Longgang District
Shenzhen Guangdong 518129 / CN
 [2019/01]
Representative(s)Pfenning, Meinig & Partner mbB
Patent- und Rechtsanwälte
Theresienhöhe 11a
80339 München / DE
[2019/01]
Application number, filing date17769259.717.02.2017
[2019/01]
WO2017CN73932
Priority number, dateCN20161017786825.03.2016         Original published format: CN201610177868
[2019/01]
Filing languageZH
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2017161982
Date:28.09.2017
Language:ZH
[2017/39]
Type: A1 Application with search report 
No.:EP3422646
Date:02.01.2019
Language:EN
[2019/01]
Type: B1 Patent specification 
No.:EP3422646
Date:08.04.2020
Language:EN
[2020/15]
Search report(s)International search report - published on:CN28.09.2017
(Supplementary) European search report - dispatched on:EP14.12.2018
ClassificationIPC:H04L12/735, H04L12/707, H04L12/715, H04L12/721
[2019/03]
CPC:
H04L45/64 (EP,US); H04W28/10 (CN); H04L43/0882 (US);
H04L41/12 (US); H04L41/122 (EP,CN); H04L43/0805 (US);
H04L45/02 (US); H04L45/036 (EP); H04L45/12 (CN);
H04L45/121 (CN); H04L45/123 (CN); H04L45/125 (CN);
H04L45/24 (EP,CN,US); H04W28/08 (CN); H04L41/342 (EP,CN);
H04L41/344 (EP,CN); H04L45/124 (EP,US) (-)
Former IPC [2019/01]H04L12/735
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2019/01]
Extension statesBANot yet paid
MENot yet paid
Validation statesMANot yet paid
MDNot yet paid
TitleGerman:VERFAHREN UND VORRICHTUNG ZUR MEHRSTROMÜBERTRAGUNG IN SDN-NETZWERK[2019/01]
English:METHOD AND DEVICE FOR MULTI-FLOW TRANSMISSION IN SDN NETWORK[2019/01]
French:PROCÉDÉ ET DISPOSITIF DE TRANSMISSION DE MULTIPLES FLUX DANS UN RÉSEAU SDN[2019/01]
Entry into regional phase25.09.2018Translation filed 
25.09.2018National basic fee paid 
25.09.2018Search fee paid 
25.09.2018Designation fee(s) paid 
25.09.2018Examination fee paid 
Examination proceduredeletedDate on which the examining division has become responsible
25.09.2018Examination requested  [2019/01]
03.07.2019Amendment by applicant (claims and/or description)
23.10.2019Communication of intention to grant the patent
15.01.2020Fee for grant paid
15.01.2020Fee for publishing/printing paid
28.02.2020Receipt of the translation of the claim(s)
Opposition(s)12.01.2021No opposition filed within time limit [2021/11]
Fees paidRenewal fee
25.09.2018Renewal fee patent year 03
27.02.2020Renewal fee patent year 04
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU17.02.2017
AL08.04.2020
AT08.04.2020
CY08.04.2020
CZ08.04.2020
EE08.04.2020
ES08.04.2020
FI08.04.2020
HR08.04.2020
IT08.04.2020
LT08.04.2020
LV08.04.2020
MC08.04.2020
MK08.04.2020
MT08.04.2020
PL08.04.2020
RO08.04.2020
RS08.04.2020
SE08.04.2020
SI08.04.2020
SK08.04.2020
SM08.04.2020
TR08.04.2020
BG08.07.2020
NO08.07.2020
GR09.07.2020
IS08.08.2020
PT17.08.2020
[2024/42]
Former [2024/29]HU17.02.2017
AL08.04.2020
AT08.04.2020
CY08.04.2020
CZ08.04.2020
EE08.04.2020
ES08.04.2020
FI08.04.2020
HR08.04.2020
IT08.04.2020
LT08.04.2020
LV08.04.2020
MC08.04.2020
MK08.04.2020
PL08.04.2020
RO08.04.2020
RS08.04.2020
SE08.04.2020
SI08.04.2020
SK08.04.2020
SM08.04.2020
TR08.04.2020
BG08.07.2020
NO08.07.2020
GR09.07.2020
IS08.08.2020
PT17.08.2020
Former [2024/23]HU17.02.2017
AL08.04.2020
AT08.04.2020
CY08.04.2020
CZ08.04.2020
EE08.04.2020
ES08.04.2020
FI08.04.2020
HR08.04.2020
IT08.04.2020
LT08.04.2020
LV08.04.2020
MC08.04.2020
MK08.04.2020
PL08.04.2020
RO08.04.2020
RS08.04.2020
SE08.04.2020
SI08.04.2020
SK08.04.2020
SM08.04.2020
BG08.07.2020
NO08.07.2020
GR09.07.2020
IS08.08.2020
PT17.08.2020
Former [2023/33]HU17.02.2017
AL08.04.2020
AT08.04.2020
CY08.04.2020
CZ08.04.2020
EE08.04.2020
ES08.04.2020
FI08.04.2020
HR08.04.2020
IT08.04.2020
LT08.04.2020
LV08.04.2020
MC08.04.2020
PL08.04.2020
RO08.04.2020
RS08.04.2020
SE08.04.2020
SI08.04.2020
SK08.04.2020
SM08.04.2020
BG08.07.2020
NO08.07.2020
GR09.07.2020
IS08.08.2020
PT17.08.2020
Former [2023/30]AL08.04.2020
AT08.04.2020
CY08.04.2020
CZ08.04.2020
EE08.04.2020
ES08.04.2020
FI08.04.2020
HR08.04.2020
IT08.04.2020
LT08.04.2020
LV08.04.2020
MC08.04.2020
PL08.04.2020
RO08.04.2020
RS08.04.2020
SE08.04.2020
SI08.04.2020
SK08.04.2020
SM08.04.2020
BG08.07.2020
NO08.07.2020
GR09.07.2020
IS08.08.2020
PT17.08.2020
Former [2021/41]AL08.04.2020
AT08.04.2020
CZ08.04.2020
EE08.04.2020
ES08.04.2020
FI08.04.2020
HR08.04.2020
IT08.04.2020
LT08.04.2020
LV08.04.2020
MC08.04.2020
PL08.04.2020
RO08.04.2020
RS08.04.2020
SE08.04.2020
SI08.04.2020
SK08.04.2020
SM08.04.2020
BG08.07.2020
NO08.07.2020
GR09.07.2020
IS08.08.2020
PT17.08.2020
Former [2021/24]AL08.04.2020
AT08.04.2020
CZ08.04.2020
EE08.04.2020
ES08.04.2020
FI08.04.2020
HR08.04.2020
IT08.04.2020
LT08.04.2020
LV08.04.2020
PL08.04.2020
RO08.04.2020
RS08.04.2020
SE08.04.2020
SI08.04.2020
SK08.04.2020
SM08.04.2020
BG08.07.2020
NO08.07.2020
GR09.07.2020
IS08.08.2020
PT17.08.2020
Former [2021/10]AL08.04.2020
AT08.04.2020
CZ08.04.2020
EE08.04.2020
ES08.04.2020
FI08.04.2020
HR08.04.2020
IT08.04.2020
LT08.04.2020
LV08.04.2020
PL08.04.2020
RO08.04.2020
RS08.04.2020
SE08.04.2020
SK08.04.2020
SM08.04.2020
BG08.07.2020
NO08.07.2020
GR09.07.2020
IS08.08.2020
PT17.08.2020
Former [2021/09]AL08.04.2020
AT08.04.2020
CZ08.04.2020
EE08.04.2020
ES08.04.2020
FI08.04.2020
HR08.04.2020
IT08.04.2020
LT08.04.2020
LV08.04.2020
RO08.04.2020
RS08.04.2020
SE08.04.2020
SM08.04.2020
BG08.07.2020
NO08.07.2020
GR09.07.2020
IS08.08.2020
PT17.08.2020
Former [2021/04]AL08.04.2020
FI08.04.2020
HR08.04.2020
LT08.04.2020
LV08.04.2020
RS08.04.2020
SE08.04.2020
BG08.07.2020
NO08.07.2020
GR09.07.2020
IS08.08.2020
PT17.08.2020
Former [2021/01]FI08.04.2020
HR08.04.2020
LT08.04.2020
LV08.04.2020
RS08.04.2020
SE08.04.2020
BG08.07.2020
NO08.07.2020
GR09.07.2020
IS08.08.2020
PT17.08.2020
Former [2020/51]FI08.04.2020
HR08.04.2020
LT08.04.2020
LV08.04.2020
RS08.04.2020
SE08.04.2020
NO08.07.2020
GR09.07.2020
IS08.08.2020
PT17.08.2020
Former [2020/50]FI08.04.2020
HR08.04.2020
LT08.04.2020
LV08.04.2020
SE08.04.2020
NO08.07.2020
GR09.07.2020
IS08.08.2020
PT17.08.2020
Former [2020/48]FI08.04.2020
LT08.04.2020
SE08.04.2020
NO08.07.2020
IS08.08.2020
PT17.08.2020
Former [2020/47]LT08.04.2020
NO08.07.2020
IS08.08.2020
Former [2020/46]IS08.08.2020
Documents cited:Search[X]  - SANDRI MARCUS ET AL, "On the Benefits of Using Multipath TCP and Openflow in Shared Bottlenecks", 2014 IEEE 28TH INTERNATIONAL CONFERENCE ON ADVANCED INFORMATION NETWORKING AND APPLICATIONS, IEEE, doi:10.1109/AINA.2015.159, ISSN 1550-445X, (20150324), pages 9 - 16, (20150429), XP032771816 [X] 1,3,5,6,8,10-12,14 * paragraph [Section I "Introduction"] * * paragraph [Section III "Multiflow Approach"] * * paragraph [Section V "Conclusion and future work"] *

DOI:   http://dx.doi.org/10.1109/AINA.2015.159
 [A]  - SANA HABIB ET AL, "The Past, Present, and Future of Transport-Layer Multipath", ARXIV.ORG, CORNELL UNIVERSITY LIBRARY, 201 OLIN LIBRARY CORNELL UNIVERSITY ITHACA, NY 14853, (20160122), XP080679858 [A] 1-14 * paragraph [Section III "Multipath layers transport protocols"] *
International search[A]CN104468636  (LI ZHONG) [A] 1-14 * , the whole document *;
 [A]CN105282169  (41ST INST CHINA ELECTRONICS TECHNOLOGY GROUP CORP) [A] 1-14 * , the whole document *;
 [A]CN105337857  (UNIV BEIJING POSTS & TELECOMM) [A] 1-14 * , the whole document *;
 [A]US2016065476  (REDDY K TIRUMALESWAR [IN], et al) [A] 1-14* , the whole document *;
 [X]  - XIA, ZHUOQUN et al., "Study and Design of Adaptive Network Coding MPTCP in Wireless Mesh Networks", COMPUTER SCIENCE, (20100430), vol. 37, no. 4, ISSN 2333-9721, XP009508459 [X] 1, 3, 5, 6, 8, 10-12, 14 * , chapters 1.2 and 2.2 *
 [A]  - DUAN, JINGPU et al., "Responsive Multipath TCP in SDN-based Datacenters", IEEE ICC 2015-Next Generation Networking Symposium, (20150612), XP 033199268 [A] 1-14 * , lines 5296-5301 *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.