blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News flashes

New version of the European Patent Register - SPC information for Unitary Patents.

2024-03-06

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3433132

EP3433132 - FLEXIBLE PLASTIC SNAP-RECEIVING SOCKET [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  24.12.2021
Database last updated on 15.07.2024
FormerThe patent has been granted
Status updated on  15.01.2021
FormerGrant of patent is intended
Status updated on  31.08.2020
FormerRequest for examination was made
Status updated on  30.12.2018
FormerThe international publication has been made
Status updated on  29.09.2017
Most recent event   Tooltip03.05.2024Lapse of the patent in a contracting state
New state(s): MK
published on 05.06.2024  [2024/23]
Applicant(s)For all designated states
Compagnie Plastic Omnium
19 Avenue Jules Carteret
69007 Lyon / FR
For all designated states
Yanfeng Plastic Omnium Automotive Exterior Systems Co., Ltd.
No.540
Moyu Road
Jiading District
Shanghai 201805 / CN
[2019/05]
Inventor(s)01 / XIONG, Linhui
No. 540 Moyu Road
Jiading District
Shanghai 201805 / CN
02 / MA, Zhongyu
No. 540 Moyu Road
Jiading District
Shanghai 201805 / CN
03 / LI, Wufan
No. 540 Moyu Road
Jiading District
Shanghai 201805 / CN
 [2019/05]
Representative(s)LLR
2, rue Jean Lantier
75001 Paris / FR
[N/P]
Former [2021/07]LLR
11 boulevard de Sébastopol
75001 Paris / FR
Former [2019/05]LLR
11, boulevard de Sébastopol
75001 Paris / FR
Application number, filing date17769477.524.03.2017
[2019/05]
WO2017CN78033
Priority number, dateCN20161017213324.03.2016         Original published format: CN201610172133
[2019/05]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2017162200
Date:28.09.2017
Language:EN
[2017/39]
Type: A1 Application with search report 
No.:EP3433132
Date:30.01.2019
Language:EN
The application published by WIPO in one of the EPO official languages on 28.09.2017 takes the place of the publication of the European patent application.
[2019/05]
Type: B1 Patent specification 
No.:EP3433132
Date:17.02.2021
Language:EN
[2021/07]
Search report(s)International search report - published on:CN28.09.2017
(Supplementary) European search report - dispatched on:EP05.11.2019
ClassificationIPC:B60R13/02
[2019/05]
CPC:
B60R13/0206 (EP,CN,KR,US); B60R13/04 (EP,KR,US); F16B21/07 (US);
F16B21/086 (EP,KR,US); F16B5/0657 (EP,KR,US); B60Y2410/113 (KR)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2019/05]
Extension statesBANot yet paid
MENot yet paid
Validation statesMA16.10.2018
TitleGerman:FLEXIBLE EINRASTSTECKDOSE AUS KUNSTSTOFF[2019/05]
English:FLEXIBLE PLASTIC SNAP-RECEIVING SOCKET[2019/05]
French:DOUILLE DE RÉCEPTION À ENCLIQUETAGE EN PLASTIQUE SOUPLE[2019/05]
Entry into regional phase16.10.2018National basic fee paid 
16.10.2018Search fee paid 
16.10.2018Designation fee(s) paid 
16.10.2018Examination fee paid 
Examination proceduredeletedDate on which the examining division has become responsible
16.10.2018Examination requested  [2019/05]
15.05.2020Amendment by applicant (claims and/or description)
01.09.2020Communication of intention to grant the patent
29.12.2020Fee for grant paid
29.12.2020Fee for publishing/printing paid
29.12.2020Receipt of the translation of the claim(s)
Opposition(s)18.11.2021No opposition filed within time limit [2022/04]
Fees paidRenewal fee
20.08.2019Renewal fee patent year 03
31.03.2020Renewal fee patent year 04
Penalty fee
Additional fee for renewal fee
31.03.201903   M06   Fee paid on   20.08.2019
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU24.03.2017
AL17.02.2021
AT17.02.2021
CY17.02.2021
CZ17.02.2021
DK17.02.2021
EE17.02.2021
ES17.02.2021
FI17.02.2021
HR17.02.2021
IT17.02.2021
LT17.02.2021
LV17.02.2021
MC17.02.2021
MK17.02.2021
NL17.02.2021
PL17.02.2021
RO17.02.2021
RS17.02.2021
SE17.02.2021
SI17.02.2021
SK17.02.2021
SM17.02.2021
IE24.03.2021
LU24.03.2021
BE31.03.2021
CH31.03.2021
LI31.03.2021
BG17.05.2021
GB17.05.2021
NO17.05.2021
GR18.05.2021
IS17.06.2021
PT17.06.2021
[2024/23]
Former [2023/33]HU24.03.2017
AL17.02.2021
AT17.02.2021
CY17.02.2021
CZ17.02.2021
DK17.02.2021
EE17.02.2021
ES17.02.2021
FI17.02.2021
HR17.02.2021
IT17.02.2021
LT17.02.2021
LV17.02.2021
MC17.02.2021
NL17.02.2021
PL17.02.2021
RO17.02.2021
RS17.02.2021
SE17.02.2021
SI17.02.2021
SK17.02.2021
SM17.02.2021
IE24.03.2021
LU24.03.2021
BE31.03.2021
CH31.03.2021
LI31.03.2021
BG17.05.2021
GB17.05.2021
NO17.05.2021
GR18.05.2021
IS17.06.2021
PT17.06.2021
Former [2023/30]AL17.02.2021
AT17.02.2021
CY17.02.2021
CZ17.02.2021
DK17.02.2021
EE17.02.2021
ES17.02.2021
FI17.02.2021
HR17.02.2021
IT17.02.2021
LT17.02.2021
LV17.02.2021
MC17.02.2021
NL17.02.2021
PL17.02.2021
RO17.02.2021
RS17.02.2021
SE17.02.2021
SI17.02.2021
SK17.02.2021
SM17.02.2021
IE24.03.2021
LU24.03.2021
BE31.03.2021
CH31.03.2021
LI31.03.2021
BG17.05.2021
GB17.05.2021
NO17.05.2021
GR18.05.2021
IS17.06.2021
PT17.06.2021
Former [2022/34]AL17.02.2021
AT17.02.2021
CZ17.02.2021
DK17.02.2021
EE17.02.2021
ES17.02.2021
FI17.02.2021
HR17.02.2021
IT17.02.2021
LT17.02.2021
LV17.02.2021
MC17.02.2021
NL17.02.2021
PL17.02.2021
RO17.02.2021
RS17.02.2021
SE17.02.2021
SI17.02.2021
SK17.02.2021
SM17.02.2021
IE24.03.2021
LU24.03.2021
BE31.03.2021
CH31.03.2021
LI31.03.2021
BG17.05.2021
GB17.05.2021
NO17.05.2021
GR18.05.2021
IS17.06.2021
PT17.06.2021
Former [2022/23]AL17.02.2021
AT17.02.2021
CZ17.02.2021
DK17.02.2021
EE17.02.2021
ES17.02.2021
FI17.02.2021
HR17.02.2021
IT17.02.2021
LT17.02.2021
LV17.02.2021
MC17.02.2021
NL17.02.2021
PL17.02.2021
RO17.02.2021
RS17.02.2021
SE17.02.2021
SI17.02.2021
SK17.02.2021
SM17.02.2021
IE24.03.2021
LU24.03.2021
CH31.03.2021
LI31.03.2021
BG17.05.2021
GB17.05.2021
NO17.05.2021
GR18.05.2021
IS17.06.2021
PT17.06.2021
Former [2022/22]AL17.02.2021
AT17.02.2021
CZ17.02.2021
DK17.02.2021
EE17.02.2021
ES17.02.2021
FI17.02.2021
HR17.02.2021
LT17.02.2021
LV17.02.2021
MC17.02.2021
NL17.02.2021
PL17.02.2021
RO17.02.2021
RS17.02.2021
SE17.02.2021
SI17.02.2021
SK17.02.2021
SM17.02.2021
IE24.03.2021
LU24.03.2021
CH31.03.2021
LI31.03.2021
BG17.05.2021
GB17.05.2021
NO17.05.2021
GR18.05.2021
PT17.06.2021
Former [2022/11]AL17.02.2021
AT17.02.2021
CZ17.02.2021
DK17.02.2021
EE17.02.2021
ES17.02.2021
FI17.02.2021
HR17.02.2021
LT17.02.2021
LV17.02.2021
MC17.02.2021
NL17.02.2021
PL17.02.2021
RO17.02.2021
RS17.02.2021
SE17.02.2021
SI17.02.2021
SK17.02.2021
SM17.02.2021
IE24.03.2021
LU24.03.2021
CH31.03.2021
LI31.03.2021
BG17.05.2021
NO17.05.2021
GR18.05.2021
PT17.06.2021
Former [2022/10]AL17.02.2021
AT17.02.2021
CZ17.02.2021
DK17.02.2021
EE17.02.2021
ES17.02.2021
FI17.02.2021
HR17.02.2021
LT17.02.2021
LV17.02.2021
MC17.02.2021
NL17.02.2021
PL17.02.2021
RO17.02.2021
RS17.02.2021
SE17.02.2021
SK17.02.2021
SM17.02.2021
IE24.03.2021
LU24.03.2021
CH31.03.2021
LI31.03.2021
BG17.05.2021
NO17.05.2021
GR18.05.2021
PT17.06.2021
Former [2022/08]AL17.02.2021
AT17.02.2021
CZ17.02.2021
DK17.02.2021
EE17.02.2021
ES17.02.2021
FI17.02.2021
HR17.02.2021
LT17.02.2021
LV17.02.2021
MC17.02.2021
NL17.02.2021
PL17.02.2021
RO17.02.2021
RS17.02.2021
SE17.02.2021
SK17.02.2021
SM17.02.2021
IE24.03.2021
LU24.03.2021
BG17.05.2021
NO17.05.2021
GR18.05.2021
IS17.06.2021
PT17.06.2021
Former [2022/07]AL17.02.2021
AT17.02.2021
CZ17.02.2021
DK17.02.2021
EE17.02.2021
FI17.02.2021
HR17.02.2021
LT17.02.2021
LV17.02.2021
MC17.02.2021
NL17.02.2021
PL17.02.2021
RO17.02.2021
RS17.02.2021
SE17.02.2021
SK17.02.2021
SM17.02.2021
IE24.03.2021
BG17.05.2021
NO17.05.2021
GR18.05.2021
IS17.06.2021
PT17.06.2021
Former [2021/50]AT17.02.2021
CZ17.02.2021
DK17.02.2021
EE17.02.2021
FI17.02.2021
HR17.02.2021
LT17.02.2021
LV17.02.2021
MC17.02.2021
NL17.02.2021
PL17.02.2021
RO17.02.2021
RS17.02.2021
SE17.02.2021
SK17.02.2021
SM17.02.2021
BG17.05.2021
NO17.05.2021
GR18.05.2021
IS17.06.2021
PT17.06.2021
Former [2021/49]AT17.02.2021
CZ17.02.2021
DK17.02.2021
EE17.02.2021
FI17.02.2021
HR17.02.2021
LT17.02.2021
LV17.02.2021
NL17.02.2021
PL17.02.2021
RS17.02.2021
SE17.02.2021
SM17.02.2021
BG17.05.2021
NO17.05.2021
GR18.05.2021
IS17.06.2021
PT17.06.2021
Former [2021/48]AT17.02.2021
CZ17.02.2021
EE17.02.2021
FI17.02.2021
HR17.02.2021
LT17.02.2021
LV17.02.2021
NL17.02.2021
PL17.02.2021
RS17.02.2021
SE17.02.2021
SM17.02.2021
BG17.05.2021
NO17.05.2021
GR18.05.2021
IS17.06.2021
PT17.06.2021
Former [2021/46]AT17.02.2021
FI17.02.2021
HR17.02.2021
LT17.02.2021
LV17.02.2021
NL17.02.2021
PL17.02.2021
RS17.02.2021
SE17.02.2021
SM17.02.2021
BG17.05.2021
NO17.05.2021
GR18.05.2021
IS17.06.2021
PT17.06.2021
Former [2021/42]FI17.02.2021
HR17.02.2021
LT17.02.2021
LV17.02.2021
NL17.02.2021
PL17.02.2021
RS17.02.2021
SE17.02.2021
BG17.05.2021
NO17.05.2021
GR18.05.2021
IS17.06.2021
PT17.06.2021
Former [2021/39]FI17.02.2021
HR17.02.2021
LT17.02.2021
LV17.02.2021
NL17.02.2021
PL17.02.2021
RS17.02.2021
SE17.02.2021
BG17.05.2021
NO17.05.2021
GR18.05.2021
PT17.06.2021
Former [2021/38]FI17.02.2021
HR17.02.2021
LT17.02.2021
LV17.02.2021
NL17.02.2021
RS17.02.2021
SE17.02.2021
BG17.05.2021
NO17.05.2021
GR18.05.2021
PT17.06.2021
Former [2021/37]FI17.02.2021
HR17.02.2021
LT17.02.2021
LV17.02.2021
RS17.02.2021
BG17.05.2021
NO17.05.2021
GR18.05.2021
PT17.06.2021
Former [2021/36]FI17.02.2021
HR17.02.2021
LT17.02.2021
BG17.05.2021
NO17.05.2021
GR18.05.2021
PT17.06.2021
Former [2021/35]FI17.02.2021
HR17.02.2021
LT17.02.2021
NO17.05.2021
PT17.06.2021
Former [2021/33]FI17.02.2021
LT17.02.2021
NO17.05.2021
PT17.06.2021
Documents cited:Search[XAI]US6276109  (HINGORANI ARUN G [US], et al) [X] 1-3,6,7,10 * column 2, line 26 - column 4, line 5; figures 1-6 * [A] 5,8,9 [I] 4,11-14;
 [A]CN202187983U  (SAIC MOTOR CORP LTD) [A] 1-14* the whole document *;
 [A]US2014191526  (LAUXEN HORST [DE], et al) [A] 1-14;
 [A]CN105370677  (CHERY COMMERCIAL VEHICLE (ANHUI) CO LTD) [A] 1-14 * the whole document *
International search[A]DE4211072  (VOLKSWAGEN AG [DE]) [A] 1-14 * the whole document *;
 [X]CN101312853  (ITW AUTOMOTIVE ITALIA S R L CO [IT]) [X] 1-14 * description, page 2 line 1 to page 6 line 3 and figures 1, 5 *;
 [A]CN202187983U  (SAIC MOTOR CORP LTD) [A] 1-14* the whole document *;
 [A]CN204340912U  (JIANGYIN XIETONG AUTOMOBILE ACCESSORY CO LTD) [A] 1-14 * the whole document *;
 [PX]CN105691324  (YANFENG PLASTIC OMNIUM AUTOMOTIVE EXTERIOR SYSTEMS CO LTD) [PX] 1-14 * description, paragraphs [0024]-[0026] and figures 1-8 *;
 [PX]CN205417438U  (YANFENG PLASTIC OMNIUM AUTOMOTIVE EXTERIOR SYSTEMS CO LTD) [PX] 1-14 * description, paragraphs [0024]-[0026] and figures 1-8 *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.