blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3529817

EP3529817 - LOW-VOLTAGE CIRCUIT BREAKER DEVICE [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  23.07.2021
Database last updated on 03.10.2024
FormerThe patent has been granted
Status updated on  14.08.2020
FormerGrant of patent is intended
Status updated on  21.04.2020
FormerRequest for examination was made
Status updated on  26.07.2019
FormerThe international publication has been made
Status updated on  28.04.2018
Formerunknown
Status updated on  12.10.2017
Most recent event   Tooltip15.07.2022Lapse of the patent in a contracting state
New state(s): MK
published on 17.08.2022  [2022/33]
Applicant(s)For all designated states
Eaton Intelligent Power Limited
30 Pembroke Road
Dublin 4 / IE
[2019/35]
Inventor(s)01 / ASKAN, Kenan
Hahngasse 15/22
Vienna 1090 / AT
 [2019/36]
Former [2019/35]01 / ASKAN, Kenan
Wurlitzergasse 55/11
1160 Wien / AT
Representative(s)Eaton IP Group EMEA
c/o Eaton Intellectual Power Limited
Eaton House
30 Pembroke Road
Dublin 4 / IE
[N/P]
Former [2019/35]Eaton IP Group EMEA
c/o Eaton Industries Manufacturing GmbH
Route de la Longeraie 7
1110 Morges / CH
Application number, filing date17777583.029.09.2017
[2019/35]
WO2017EP74910
Priority number, dateDE20161012007021.10.2016         Original published format: DE102016120070
[2019/35]
Filing languageDE
Procedural languageDE
PublicationType: A1 Application with search report
No.:WO2018072983
Date:26.04.2018
Language:DE
[2018/17]
Type: A1 Application with search report 
No.:EP3529817
Date:28.08.2019
Language:DE
The application published by WIPO in one of the EPO official languages on 26.04.2018 takes the place of the publication of the European patent application.
[2019/35]
Type: B1 Patent specification 
No.:EP3529817
Date:16.09.2020
Language:DE
[2020/38]
Search report(s)International search report - published on:EP26.04.2018
ClassificationIPC:H01H9/54, H02H3/08
[2019/35]
CPC:
H01H9/548 (EP,US); H01H9/542 (EP,US); H02H3/025 (EP,US);
H02H3/08 (EP,US); H02H7/222 (EP,US); H01H2009/543 (EP,US);
H01H2009/544 (EP,US) (-)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2019/35]
Extension statesBANot yet paid
MENot yet paid
Validation statesMANot yet paid
MDNot yet paid
TitleGerman:NIEDERSPANNUNGS-SCHUTZSCHALTGERÄT[2019/35]
English:LOW-VOLTAGE CIRCUIT BREAKER DEVICE[2019/35]
French:DISJONCTEUR BASSE TENSION[2019/35]
Entry into regional phase17.05.2019National basic fee paid 
17.05.2019Designation fee(s) paid 
17.05.2019Examination fee paid 
Examination procedure17.05.2019Examination requested  [2019/35]
17.05.2019Date on which the examining division has become responsible
03.12.2019Amendment by applicant (claims and/or description)
22.04.2020Communication of intention to grant the patent
07.08.2020Fee for grant paid
07.08.2020Fee for publishing/printing paid
07.08.2020Receipt of the translation of the claim(s)
Opposition(s)17.06.2021No opposition filed within time limit [2021/34]
Fees paidRenewal fee
19.09.2019Renewal fee patent year 03
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU29.09.2017
AL16.09.2020
CY16.09.2020
CZ16.09.2020
DK16.09.2020
EE16.09.2020
ES16.09.2020
FI16.09.2020
HR16.09.2020
LT16.09.2020
LV16.09.2020
MC16.09.2020
MK16.09.2020
MT16.09.2020
PL16.09.2020
RO16.09.2020
RS16.09.2020
SE16.09.2020
SI16.09.2020
SK16.09.2020
SM16.09.2020
TR16.09.2020
IE29.09.2020
LU29.09.2020
BE30.09.2020
CH30.09.2020
LI30.09.2020
BG16.12.2020
NO16.12.2020
GR17.12.2020
IS16.01.2021
PT18.01.2021
[2022/33]
Former [2022/27]HU29.09.2017
AL16.09.2020
CY16.09.2020
CZ16.09.2020
DK16.09.2020
EE16.09.2020
ES16.09.2020
FI16.09.2020
HR16.09.2020
LT16.09.2020
LV16.09.2020
MC16.09.2020
MT16.09.2020
PL16.09.2020
RO16.09.2020
RS16.09.2020
SE16.09.2020
SI16.09.2020
SK16.09.2020
SM16.09.2020
TR16.09.2020
IE29.09.2020
LU29.09.2020
BE30.09.2020
CH30.09.2020
LI30.09.2020
BG16.12.2020
NO16.12.2020
GR17.12.2020
IS16.01.2021
PT18.01.2021
Former [2021/37]AL16.09.2020
CZ16.09.2020
DK16.09.2020
EE16.09.2020
ES16.09.2020
FI16.09.2020
HR16.09.2020
LT16.09.2020
LV16.09.2020
MC16.09.2020
PL16.09.2020
RO16.09.2020
RS16.09.2020
SE16.09.2020
SI16.09.2020
SK16.09.2020
SM16.09.2020
IE29.09.2020
LU29.09.2020
BE30.09.2020
CH30.09.2020
LI30.09.2020
BG16.12.2020
NO16.12.2020
GR17.12.2020
IS16.01.2021
PT18.01.2021
Former [2021/36]AL16.09.2020
CZ16.09.2020
EE16.09.2020
ES16.09.2020
FI16.09.2020
HR16.09.2020
LT16.09.2020
LV16.09.2020
MC16.09.2020
PL16.09.2020
RO16.09.2020
RS16.09.2020
SE16.09.2020
SI16.09.2020
SK16.09.2020
SM16.09.2020
LU29.09.2020
BE30.09.2020
BG16.12.2020
NO16.12.2020
GR17.12.2020
IS16.01.2021
PT18.01.2021
Former [2021/31]AL16.09.2020
CZ16.09.2020
EE16.09.2020
ES16.09.2020
FI16.09.2020
HR16.09.2020
LT16.09.2020
LV16.09.2020
MC16.09.2020
PL16.09.2020
RO16.09.2020
RS16.09.2020
SE16.09.2020
SK16.09.2020
SM16.09.2020
LU29.09.2020
BG16.12.2020
NO16.12.2020
GR17.12.2020
IS16.01.2021
PT18.01.2021
Former [2021/28]AL16.09.2020
CZ16.09.2020
EE16.09.2020
ES16.09.2020
FI16.09.2020
HR16.09.2020
LT16.09.2020
LV16.09.2020
PL16.09.2020
RO16.09.2020
RS16.09.2020
SE16.09.2020
SK16.09.2020
SM16.09.2020
LU29.09.2020
BG16.12.2020
NO16.12.2020
GR17.12.2020
IS16.01.2021
PT18.01.2021
Former [2021/27]AL16.09.2020
CZ16.09.2020
EE16.09.2020
ES16.09.2020
FI16.09.2020
HR16.09.2020
LT16.09.2020
LV16.09.2020
PL16.09.2020
RO16.09.2020
RS16.09.2020
SE16.09.2020
SM16.09.2020
LU29.09.2020
BG16.12.2020
NO16.12.2020
GR17.12.2020
IS16.01.2021
PT18.01.2021
Former [2021/25]AL16.09.2020
CZ16.09.2020
EE16.09.2020
ES16.09.2020
FI16.09.2020
HR16.09.2020
LT16.09.2020
LV16.09.2020
PL16.09.2020
RO16.09.2020
RS16.09.2020
SE16.09.2020
SM16.09.2020
BG16.12.2020
NO16.12.2020
GR17.12.2020
IS16.01.2021
PT18.01.2021
Former [2021/22]CZ16.09.2020
EE16.09.2020
FI16.09.2020
HR16.09.2020
LT16.09.2020
LV16.09.2020
RO16.09.2020
RS16.09.2020
SE16.09.2020
SM16.09.2020
BG16.12.2020
NO16.12.2020
GR17.12.2020
PT18.01.2021
Former [2021/21]FI16.09.2020
HR16.09.2020
LT16.09.2020
LV16.09.2020
RS16.09.2020
SE16.09.2020
BG16.12.2020
NO16.12.2020
GR17.12.2020
PT18.01.2021
Former [2021/20]FI16.09.2020
HR16.09.2020
LT16.09.2020
LV16.09.2020
RS16.09.2020
SE16.09.2020
BG16.12.2020
NO16.12.2020
GR17.12.2020
Former [2021/10]FI16.09.2020
HR16.09.2020
LV16.09.2020
RS16.09.2020
SE16.09.2020
BG16.12.2020
NO16.12.2020
GR17.12.2020
Former [2021/09]FI16.09.2020
SE16.09.2020
BG16.12.2020
NO16.12.2020
GR17.12.2020
Former [2021/08]FI16.09.2020
SE16.09.2020
BG16.12.2020
NO16.12.2020
Former [2021/07]FI16.09.2020
NO16.12.2020
Cited inInternational search[IA]EP2523204  (ABB TECHNOLOGY AG [CH]) [I] 1-6 * paragraphs [0023] - [0032]; figure 1 * [A] 10-15;
 [I]US2015022928  (MOHADDES KHORASSANI MOJTABA [CA]) [I] 1* paragraph [0055]; figure 11 *;
 [I]EP3010030  (LSIS CO LTD [KR]) [I] 1,7-9 * paragraphs [0030] - [0058]; figure 3 *;
 [I]US9634476  (CAO DONGMING [CN], et al) [I] 1 * column 7, line 9 - column 10, line 41; figure 2 *
by applicantWO2015028634
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.