EP3518776 - GUIDE MEMBER FOR ELECTRICAL CABLE ALIGNMENT AND ATTACHMENT AND ASSOCIATED INTRALUMINAL DEVICES [Right-click to bookmark this link] | |||
Former [2019/32] | GUIDE MEMBER FOR ELECTRICAL CABLE ALIGNMENT AND ATTACHMENT AND ASSOCIATED INTRALUMINAL DEVICES, SYSTEMS, AND METHODS | ||
[2020/25] | Status | No opposition filed within time limit Status updated on 01.10.2021 Database last updated on 26.06.2024 | |
Former | The patent has been granted Status updated on 23.10.2020 | ||
Former | Grant of patent is intended Status updated on 11.06.2020 | ||
Former | Request for examination was made Status updated on 05.07.2019 | ||
Former | The international publication has been made Status updated on 07.04.2018 | ||
Former | unknown Status updated on 18.10.2017 | Most recent event Tooltip | 03.05.2024 | Lapse of the patent in a contracting state New state(s): MK | published on 05.06.2024 [2024/23] | Applicant(s) | For all designated states Koninklijke Philips N.V. High Tech Campus 52 5656 AG Eindhoven / NL | [2020/12] |
Former [2019/32] | For all designated states Koninklijke Philips N.V. High Tech Campus 5 5656 AE Eindhoven / NL | Inventor(s) | 01 /
WROLSTAD, David, Kenneth High Tech Campus 5 5656 AE Eindhoven / NL | [2019/32] | Representative(s) | Philips Intellectual Property & Standards High Tech Campus 52 5656 AG Eindhoven / NL | [N/P] |
Former [2020/48] | Philips Intellectual Property & Standards High Tech Campus 5 5656 AE Eindhoven / NL | ||
Former [2019/32] | Steffen, Thomas Philips Intellectual Property & Standards High Tech Campus 5 5656 AE Eindhoven / NL | Application number, filing date | 17780657.7 | 22.09.2017 | [2019/32] | WO2017EP73970 | Priority number, date | US201662401671P | 29.09.2016 Original published format: US 201662401671 P | [2019/32] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2018060061 | Date: | 05.04.2018 | Language: | EN | [2018/14] | Type: | A1 Application with search report | No.: | EP3518776 | Date: | 07.08.2019 | Language: | EN | The application published by WIPO in one of the EPO official languages on 05.04.2018 takes the place of the publication of the European patent application. | [2019/32] | Type: | B1 Patent specification | No.: | EP3518776 | Date: | 25.11.2020 | Language: | EN | [2020/48] | Search report(s) | International search report - published on: | EP | 05.04.2018 | Classification | IPC: | A61B8/12, A61B8/00, B06B1/06 | [2019/32] | CPC: |
A61B8/12 (EP,US);
A61B8/445 (EP,US);
A61B8/4483 (EP);
B06B1/0633 (EP,US)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2019/32] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | MD | Not yet paid | Title | German: | FÜHRUNGSELEMENT FÜR DIE AUSRICHTUNG UND BEFESTIGUNG ELEKTRISCHER KABEL UND ZUGEHÖRIGE INTRALUMINALE VORRICHTUNGEN | [2020/25] | English: | GUIDE MEMBER FOR ELECTRICAL CABLE ALIGNMENT AND ATTACHMENT AND ASSOCIATED INTRALUMINAL DEVICES | [2020/25] | French: | ÉLÉMENT DE GUIDAGE POUR ALIGNEMENT ET FIXATION DE CÂBLE ÉLECTRIQUE AINSI QUE DISPOSITIFS | [2020/25] |
Former [2019/32] | FÜHRUNGSELEMENT FÜR DIE AUSRICHTUNG UND BEFESTIGUNG ELEKTRISCHER KABEL UND ZUGEHÖRIGE INTRALUMINALE VORRICHTUNGEN, SYSTEME UND VERFAHREN | ||
Former [2019/32] | GUIDE MEMBER FOR ELECTRICAL CABLE ALIGNMENT AND ATTACHMENT AND ASSOCIATED INTRALUMINAL DEVICES, SYSTEMS, AND METHODS | ||
Former [2019/32] | ÉLÉMENT DE GUIDAGE POUR ALIGNEMENT ET FIXATION DE CÂBLE ÉLECTRIQUE AINSI QUE DISPOSITIFS, SYSTÈMES ET PROCÉDÉS INTRALUMINAUX ASSOCIÉS | Entry into regional phase | 29.04.2019 | National basic fee paid | 29.04.2019 | Designation fee(s) paid | 29.04.2019 | Examination fee paid | Examination procedure | 29.04.2019 | Examination requested [2019/32] | 29.04.2019 | Date on which the examining division has become responsible | 12.09.2019 | Amendment by applicant (claims and/or description) | 12.06.2020 | Communication of intention to grant the patent | 14.10.2020 | Fee for grant paid | 14.10.2020 | Fee for publishing/printing paid | 14.10.2020 | Receipt of the translation of the claim(s) | Opposition(s) | 26.08.2021 | No opposition filed within time limit [2021/44] | Fees paid | Renewal fee | 30.09.2019 | Renewal fee patent year 03 | 30.09.2020 | Renewal fee patent year 04 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 22.09.2017 | AL | 25.11.2020 | AT | 25.11.2020 | CY | 25.11.2020 | CZ | 25.11.2020 | DK | 25.11.2020 | EE | 25.11.2020 | ES | 25.11.2020 | FI | 25.11.2020 | HR | 25.11.2020 | IT | 25.11.2020 | LT | 25.11.2020 | LV | 25.11.2020 | MC | 25.11.2020 | MK | 25.11.2020 | NL | 25.11.2020 | PL | 25.11.2020 | RO | 25.11.2020 | RS | 25.11.2020 | SE | 25.11.2020 | SI | 25.11.2020 | SK | 25.11.2020 | SM | 25.11.2020 | BG | 25.02.2021 | NO | 25.02.2021 | GR | 26.02.2021 | IS | 25.03.2021 | PT | 25.03.2021 | [2024/23] |
Former [2023/33] | HU | 22.09.2017 | |
AL | 25.11.2020 | ||
AT | 25.11.2020 | ||
CY | 25.11.2020 | ||
CZ | 25.11.2020 | ||
DK | 25.11.2020 | ||
EE | 25.11.2020 | ||
ES | 25.11.2020 | ||
FI | 25.11.2020 | ||
HR | 25.11.2020 | ||
IT | 25.11.2020 | ||
LT | 25.11.2020 | ||
LV | 25.11.2020 | ||
MC | 25.11.2020 | ||
NL | 25.11.2020 | ||
PL | 25.11.2020 | ||
RO | 25.11.2020 | ||
RS | 25.11.2020 | ||
SE | 25.11.2020 | ||
SI | 25.11.2020 | ||
SK | 25.11.2020 | ||
SM | 25.11.2020 | ||
BG | 25.02.2021 | ||
NO | 25.02.2021 | ||
GR | 26.02.2021 | ||
IS | 25.03.2021 | ||
PT | 25.03.2021 | ||
Former [2023/30] | AL | 25.11.2020 | |
AT | 25.11.2020 | ||
CY | 25.11.2020 | ||
CZ | 25.11.2020 | ||
DK | 25.11.2020 | ||
EE | 25.11.2020 | ||
ES | 25.11.2020 | ||
FI | 25.11.2020 | ||
HR | 25.11.2020 | ||
IT | 25.11.2020 | ||
LT | 25.11.2020 | ||
LV | 25.11.2020 | ||
MC | 25.11.2020 | ||
NL | 25.11.2020 | ||
PL | 25.11.2020 | ||
RO | 25.11.2020 | ||
RS | 25.11.2020 | ||
SE | 25.11.2020 | ||
SI | 25.11.2020 | ||
SK | 25.11.2020 | ||
SM | 25.11.2020 | ||
BG | 25.02.2021 | ||
NO | 25.02.2021 | ||
GR | 26.02.2021 | ||
IS | 25.03.2021 | ||
PT | 25.03.2021 | ||
Former [2022/25] | AL | 25.11.2020 | |
AT | 25.11.2020 | ||
CZ | 25.11.2020 | ||
DK | 25.11.2020 | ||
EE | 25.11.2020 | ||
ES | 25.11.2020 | ||
FI | 25.11.2020 | ||
HR | 25.11.2020 | ||
IT | 25.11.2020 | ||
LT | 25.11.2020 | ||
LV | 25.11.2020 | ||
MC | 25.11.2020 | ||
NL | 25.11.2020 | ||
PL | 25.11.2020 | ||
RO | 25.11.2020 | ||
RS | 25.11.2020 | ||
SE | 25.11.2020 | ||
SI | 25.11.2020 | ||
SK | 25.11.2020 | ||
SM | 25.11.2020 | ||
BG | 25.02.2021 | ||
NO | 25.02.2021 | ||
GR | 26.02.2021 | ||
IS | 25.03.2021 | ||
PT | 25.03.2021 | ||
Former [2022/23] | AL | 25.11.2020 | |
AT | 25.11.2020 | ||
CZ | 25.11.2020 | ||
DK | 25.11.2020 | ||
EE | 25.11.2020 | ||
ES | 25.11.2020 | ||
FI | 25.11.2020 | ||
HR | 25.11.2020 | ||
IT | 25.11.2020 | ||
LT | 25.11.2020 | ||
LV | 25.11.2020 | ||
NL | 25.11.2020 | ||
PL | 25.11.2020 | ||
RO | 25.11.2020 | ||
RS | 25.11.2020 | ||
SE | 25.11.2020 | ||
SI | 25.11.2020 | ||
SK | 25.11.2020 | ||
SM | 25.11.2020 | ||
BG | 25.02.2021 | ||
NO | 25.02.2021 | ||
GR | 26.02.2021 | ||
IS | 25.03.2021 | ||
PT | 25.03.2021 | ||
Former [2022/10] | AL | 25.11.2020 | |
AT | 25.11.2020 | ||
CZ | 25.11.2020 | ||
DK | 25.11.2020 | ||
EE | 25.11.2020 | ||
ES | 25.11.2020 | ||
FI | 25.11.2020 | ||
HR | 25.11.2020 | ||
IT | 25.11.2020 | ||
LT | 25.11.2020 | ||
LV | 25.11.2020 | ||
NL | 25.11.2020 | ||
PL | 25.11.2020 | ||
RO | 25.11.2020 | ||
RS | 25.11.2020 | ||
SE | 25.11.2020 | ||
SI | 25.11.2020 | ||
SK | 25.11.2020 | ||
SM | 25.11.2020 | ||
BG | 25.02.2021 | ||
NO | 25.02.2021 | ||
GR | 26.02.2021 | ||
PT | 25.03.2021 | ||
Former [2022/08] | AL | 25.11.2020 | |
AT | 25.11.2020 | ||
CZ | 25.11.2020 | ||
DK | 25.11.2020 | ||
EE | 25.11.2020 | ||
ES | 25.11.2020 | ||
FI | 25.11.2020 | ||
HR | 25.11.2020 | ||
IT | 25.11.2020 | ||
LT | 25.11.2020 | ||
LV | 25.11.2020 | ||
NL | 25.11.2020 | ||
PL | 25.11.2020 | ||
RO | 25.11.2020 | ||
RS | 25.11.2020 | ||
SE | 25.11.2020 | ||
SI | 25.11.2020 | ||
SK | 25.11.2020 | ||
SM | 25.11.2020 | ||
BG | 25.02.2021 | ||
NO | 25.02.2021 | ||
GR | 26.02.2021 | ||
IS | 25.03.2021 | ||
PT | 25.03.2021 | ||
Former [2021/50] | AL | 25.11.2020 | |
AT | 25.11.2020 | ||
CZ | 25.11.2020 | ||
DK | 25.11.2020 | ||
EE | 25.11.2020 | ||
FI | 25.11.2020 | ||
HR | 25.11.2020 | ||
IT | 25.11.2020 | ||
LT | 25.11.2020 | ||
LV | 25.11.2020 | ||
NL | 25.11.2020 | ||
PL | 25.11.2020 | ||
RO | 25.11.2020 | ||
RS | 25.11.2020 | ||
SE | 25.11.2020 | ||
SI | 25.11.2020 | ||
SK | 25.11.2020 | ||
SM | 25.11.2020 | ||
BG | 25.02.2021 | ||
NO | 25.02.2021 | ||
GR | 26.02.2021 | ||
IS | 25.03.2021 | ||
PT | 25.03.2021 | ||
Former [2021/48] | AL | 25.11.2020 | |
AT | 25.11.2020 | ||
CZ | 25.11.2020 | ||
DK | 25.11.2020 | ||
EE | 25.11.2020 | ||
FI | 25.11.2020 | ||
HR | 25.11.2020 | ||
IT | 25.11.2020 | ||
LT | 25.11.2020 | ||
LV | 25.11.2020 | ||
NL | 25.11.2020 | ||
PL | 25.11.2020 | ||
RO | 25.11.2020 | ||
RS | 25.11.2020 | ||
SE | 25.11.2020 | ||
SK | 25.11.2020 | ||
SM | 25.11.2020 | ||
BG | 25.02.2021 | ||
NO | 25.02.2021 | ||
GR | 26.02.2021 | ||
IS | 25.03.2021 | ||
PT | 25.03.2021 | ||
Former [2021/46] | AL | 25.11.2020 | |
AT | 25.11.2020 | ||
CZ | 25.11.2020 | ||
DK | 25.11.2020 | ||
EE | 25.11.2020 | ||
FI | 25.11.2020 | ||
HR | 25.11.2020 | ||
LT | 25.11.2020 | ||
LV | 25.11.2020 | ||
NL | 25.11.2020 | ||
PL | 25.11.2020 | ||
RO | 25.11.2020 | ||
RS | 25.11.2020 | ||
SE | 25.11.2020 | ||
SK | 25.11.2020 | ||
SM | 25.11.2020 | ||
BG | 25.02.2021 | ||
NO | 25.02.2021 | ||
GR | 26.02.2021 | ||
IS | 25.03.2021 | ||
PT | 25.03.2021 | ||
Former [2021/45] | AL | 25.11.2020 | |
AT | 25.11.2020 | ||
CZ | 25.11.2020 | ||
DK | 25.11.2020 | ||
EE | 25.11.2020 | ||
FI | 25.11.2020 | ||
HR | 25.11.2020 | ||
LT | 25.11.2020 | ||
LV | 25.11.2020 | ||
PL | 25.11.2020 | ||
RO | 25.11.2020 | ||
RS | 25.11.2020 | ||
SE | 25.11.2020 | ||
SK | 25.11.2020 | ||
SM | 25.11.2020 | ||
BG | 25.02.2021 | ||
NO | 25.02.2021 | ||
GR | 26.02.2021 | ||
IS | 25.03.2021 | ||
PT | 25.03.2021 | ||
Former [2021/37] | AT | 25.11.2020 | |
CZ | 25.11.2020 | ||
DK | 25.11.2020 | ||
EE | 25.11.2020 | ||
FI | 25.11.2020 | ||
HR | 25.11.2020 | ||
LT | 25.11.2020 | ||
LV | 25.11.2020 | ||
PL | 25.11.2020 | ||
RO | 25.11.2020 | ||
RS | 25.11.2020 | ||
SE | 25.11.2020 | ||
SK | 25.11.2020 | ||
SM | 25.11.2020 | ||
BG | 25.02.2021 | ||
NO | 25.02.2021 | ||
GR | 26.02.2021 | ||
IS | 25.03.2021 | ||
PT | 25.03.2021 | ||
Former [2021/36] | AT | 25.11.2020 | |
CZ | 25.11.2020 | ||
EE | 25.11.2020 | ||
FI | 25.11.2020 | ||
HR | 25.11.2020 | ||
LT | 25.11.2020 | ||
LV | 25.11.2020 | ||
PL | 25.11.2020 | ||
RO | 25.11.2020 | ||
RS | 25.11.2020 | ||
SE | 25.11.2020 | ||
SK | 25.11.2020 | ||
SM | 25.11.2020 | ||
BG | 25.02.2021 | ||
NO | 25.02.2021 | ||
GR | 26.02.2021 | ||
IS | 25.03.2021 | ||
PT | 25.03.2021 | ||
Former [2021/35] | AT | 25.11.2020 | |
CZ | 25.11.2020 | ||
FI | 25.11.2020 | ||
HR | 25.11.2020 | ||
LT | 25.11.2020 | ||
LV | 25.11.2020 | ||
PL | 25.11.2020 | ||
RO | 25.11.2020 | ||
RS | 25.11.2020 | ||
SE | 25.11.2020 | ||
SK | 25.11.2020 | ||
SM | 25.11.2020 | ||
BG | 25.02.2021 | ||
NO | 25.02.2021 | ||
GR | 26.02.2021 | ||
IS | 25.03.2021 | ||
PT | 25.03.2021 | ||
Former [2021/33] | AT | 25.11.2020 | |
FI | 25.11.2020 | ||
HR | 25.11.2020 | ||
LT | 25.11.2020 | ||
LV | 25.11.2020 | ||
PL | 25.11.2020 | ||
RS | 25.11.2020 | ||
SE | 25.11.2020 | ||
SM | 25.11.2020 | ||
BG | 25.02.2021 | ||
NO | 25.02.2021 | ||
GR | 26.02.2021 | ||
IS | 25.03.2021 | ||
PT | 25.03.2021 | ||
Former [2021/32] | AT | 25.11.2020 | |
FI | 25.11.2020 | ||
HR | 25.11.2020 | ||
LV | 25.11.2020 | ||
PL | 25.11.2020 | ||
RS | 25.11.2020 | ||
SE | 25.11.2020 | ||
SM | 25.11.2020 | ||
BG | 25.02.2021 | ||
NO | 25.02.2021 | ||
GR | 26.02.2021 | ||
IS | 25.03.2021 | ||
PT | 25.03.2021 | ||
Former [2021/28] | AT | 25.11.2020 | |
FI | 25.11.2020 | ||
HR | 25.11.2020 | ||
LV | 25.11.2020 | ||
PL | 25.11.2020 | ||
RS | 25.11.2020 | ||
SE | 25.11.2020 | ||
BG | 25.02.2021 | ||
NO | 25.02.2021 | ||
GR | 26.02.2021 | ||
IS | 25.03.2021 | ||
PT | 25.03.2021 | ||
Former [2021/25] | AT | 25.11.2020 | |
FI | 25.11.2020 | ||
LV | 25.11.2020 | ||
PL | 25.11.2020 | ||
RS | 25.11.2020 | ||
SE | 25.11.2020 | ||
BG | 25.02.2021 | ||
NO | 25.02.2021 | ||
GR | 26.02.2021 | ||
IS | 25.03.2021 | ||
PT | 25.03.2021 | ||
Former [2021/23] | AT | 25.11.2020 | |
FI | 25.11.2020 | ||
LV | 25.11.2020 | ||
RS | 25.11.2020 | ||
SE | 25.11.2020 | ||
BG | 25.02.2021 | ||
NO | 25.02.2021 | ||
GR | 26.02.2021 | ||
PT | 25.03.2021 | ||
Former [2021/22] | FI | 25.11.2020 | |
RS | 25.11.2020 | ||
NO | 25.02.2021 | ||
PT | 25.03.2021 | ||
Former [2021/21] | FI | 25.11.2020 | |
PT | 25.03.2021 | ||
Former [2021/20] | FI | 25.11.2020 | Cited in | International search | [X]GB2315020 (INTRAVASCULAR RES LTD [GB]) [X] 1 * page 9, paragraph last - page 10, paragraph 1 ** figure 9 *; | [X]US5947905 (HADJICOSTIS ANDREAS [US], et al) [X] 1 * column 5, lines 11-25 * * figures 2,3A *; | [XI]US2016007962 (ESBECK THOMAS [US]) [X] 1,5,8-15 * paragraphs [0042] , [0044] , [0080] , [0081] , [0082] , [0084] * * figures 1,2,18-21 * * claim 1 * [I] 2-4,6,7,16-20 | by applicant | US6641540 | US6776763 | US7226417 | US7846101 |