blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News flashes

New version of the European Patent Register - SPC information for Unitary Patents.

2024-03-06

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3513460

EP3513460 - RF CONNECTOR SYSTEM [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  01.03.2024
Database last updated on 06.07.2024
FormerThe patent has been granted
Status updated on  24.03.2023
FormerGrant of patent is intended
Status updated on  20.02.2023
FormerExamination is in progress
Status updated on  07.02.2023
FormerGrant of patent is intended
Status updated on  24.11.2022
FormerExamination is in progress
Status updated on  11.09.2020
FormerRequest for examination was made
Status updated on  21.06.2019
FormerThe international publication has been made
Status updated on  24.03.2018
Formerunknown
Status updated on  20.10.2017
Most recent event   Tooltip07.06.2024Lapse of the patent in a contracting state
New state(s): MC
published on 10.07.2024 [2024/28]
Applicant(s)For all designated states
TE Connectivity Solutions GmbH
Mühlenstrasse 26
8200 Schaffhausen / CH
[2023/39]
Former [2019/30]For all designated states
TE Connectivity Corporation
1050 Westlakes Drive
Berwyn, PA 19312 / US
Inventor(s)01 / YI, Chong Hun
1024 Tiverton Road
Mechanicsburg, Pennsylvania 17050 / US
 [2019/30]
Representative(s)Johnstone, Douglas Ian, et al
Baron Warren Redfern
1000 Great West Road
Brentford TW8 9DW / GB
[2019/30]
Application number, filing date17781187.413.09.2017
[2019/30]
WO2017IB55523
Priority number, dateUS20161526531214.09.2016         Original published format: US201615265312
[2019/30]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2018051241
Date:22.03.2018
Language:EN
[2018/12]
Type: A1 Application with search report 
No.:EP3513460
Date:24.07.2019
Language:EN
The application published by WIPO in one of the EPO official languages on 22.03.2018 takes the place of the publication of the European patent application.
[2019/30]
Type: B1 Patent specification 
No.:EP3513460
Date:26.04.2023
Language:EN
[2023/17]
Search report(s)International search report - published on:EP22.03.2018
ClassificationIPC:H01R9/05, H01R13/518, H01R24/40, H01R24/50
[2019/30]
CPC:
H01R24/50 (EP,US); H01R25/003 (US); H01R12/716 (US);
H01R13/422 (US); H01R13/518 (EP,US); H01R24/40 (EP,US);
H01R25/006 (US); H01R9/0515 (EP,US); H01R13/426 (US);
H01R13/514 (US); H01R13/659 (US); H01R2103/00 (US);
H01R24/38 (US); H01R9/05 (US); H01R9/0506 (US) (-)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2019/30]
Extension statesBANot yet paid
MENot yet paid
Validation statesMANot yet paid
MDNot yet paid
TitleGerman:HF-STECKER-SYSTEM[2019/30]
English:RF CONNECTOR SYSTEM[2019/30]
French:SYSTÈME DE CONNECTEUR RF[2019/30]
Entry into regional phase08.04.2019National basic fee paid 
08.04.2019Designation fee(s) paid 
08.04.2019Examination fee paid 
Examination procedure08.04.2019Examination requested  [2019/30]
08.04.2019Date on which the examining division has become responsible
05.11.2019Amendment by applicant (claims and/or description)
15.09.2020Despatch of a communication from the examining division (Time limit: M04)
11.01.2021Reply to a communication from the examining division
22.11.2021Despatch of a communication from the examining division (Time limit: M02)
24.01.2022Reply to a communication from the examining division
25.11.2022Communication of intention to grant the patent
06.02.2023Disapproval of the communication of intention to grant the patent by the applicant or resumption of examination proceedings by the EPO
06.02.2023Fee for grant paid
06.02.2023Fee for publishing/printing paid
28.02.2023Communication of intention to grant the patent
15.03.2023Receipt of the translation of the claim(s)
Opposition(s)29.01.2024No opposition filed within time limit [2024/14]
Fees paidRenewal fee
13.09.2019Renewal fee patent year 03
14.09.2020Renewal fee patent year 04
15.09.2021Renewal fee patent year 05
11.08.2022Renewal fee patent year 06
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipAT26.04.2023
CZ26.04.2023
DK26.04.2023
EE26.04.2023
ES26.04.2023
FI26.04.2023
HR26.04.2023
IT26.04.2023
LT26.04.2023
LV26.04.2023
MC26.04.2023
NL26.04.2023
PL26.04.2023
RO26.04.2023
RS26.04.2023
SE26.04.2023
SI26.04.2023
SK26.04.2023
SM26.04.2023
NO26.07.2023
GR27.07.2023
IS26.08.2023
PT28.08.2023
LU13.09.2023
[2024/28]
Former [2024/26]AT26.04.2023
CZ26.04.2023
DK26.04.2023
EE26.04.2023
ES26.04.2023
FI26.04.2023
HR26.04.2023
IT26.04.2023
LT26.04.2023
LV26.04.2023
NL26.04.2023
PL26.04.2023
RO26.04.2023
RS26.04.2023
SE26.04.2023
SI26.04.2023
SK26.04.2023
SM26.04.2023
NO26.07.2023
GR27.07.2023
IS26.08.2023
PT28.08.2023
LU13.09.2023
Former [2024/25]AT26.04.2023
CZ26.04.2023
DK26.04.2023
EE26.04.2023
ES26.04.2023
FI26.04.2023
HR26.04.2023
LT26.04.2023
LV26.04.2023
NL26.04.2023
PL26.04.2023
RO26.04.2023
RS26.04.2023
SE26.04.2023
SI26.04.2023
SK26.04.2023
SM26.04.2023
NO26.07.2023
GR27.07.2023
IS26.08.2023
PT28.08.2023
LU13.09.2023
Former [2024/24]AT26.04.2023
CZ26.04.2023
DK26.04.2023
EE26.04.2023
ES26.04.2023
FI26.04.2023
HR26.04.2023
LT26.04.2023
LV26.04.2023
NL26.04.2023
PL26.04.2023
RO26.04.2023
RS26.04.2023
SE26.04.2023
SI26.04.2023
SK26.04.2023
SM26.04.2023
NO26.07.2023
GR27.07.2023
IS26.08.2023
PT28.08.2023
Former [2024/10]AT26.04.2023
CZ26.04.2023
DK26.04.2023
EE26.04.2023
ES26.04.2023
FI26.04.2023
HR26.04.2023
LT26.04.2023
LV26.04.2023
NL26.04.2023
PL26.04.2023
RO26.04.2023
RS26.04.2023
SE26.04.2023
SK26.04.2023
SM26.04.2023
NO26.07.2023
GR27.07.2023
IS26.08.2023
PT28.08.2023
Former [2024/08]AT26.04.2023
ES26.04.2023
FI26.04.2023
HR26.04.2023
LT26.04.2023
LV26.04.2023
NL26.04.2023
PL26.04.2023
RS26.04.2023
SE26.04.2023
SK26.04.2023
SM26.04.2023
NO26.07.2023
GR27.07.2023
IS26.08.2023
PT28.08.2023
Former [2024/03]AT26.04.2023
ES26.04.2023
FI26.04.2023
HR26.04.2023
LT26.04.2023
LV26.04.2023
NL26.04.2023
PL26.04.2023
RS26.04.2023
SE26.04.2023
NO26.07.2023
GR27.07.2023
IS26.08.2023
PT28.08.2023
Former [2024/01]AT26.04.2023
ES26.04.2023
HR26.04.2023
LT26.04.2023
LV26.04.2023
NL26.04.2023
PL26.04.2023
RS26.04.2023
SE26.04.2023
NO26.07.2023
GR27.07.2023
IS26.08.2023
PT28.08.2023
Former [2023/51]AT26.04.2023
ES26.04.2023
HR26.04.2023
NL26.04.2023
PL26.04.2023
RS26.04.2023
SE26.04.2023
NO26.07.2023
GR27.07.2023
IS26.08.2023
PT28.08.2023
Former [2023/50]AT26.04.2023
ES26.04.2023
NL26.04.2023
PL26.04.2023
SE26.04.2023
NO26.07.2023
GR27.07.2023
IS26.08.2023
PT28.08.2023
Former [2023/48]AT26.04.2023
ES26.04.2023
NL26.04.2023
SE26.04.2023
NO26.07.2023
PT28.08.2023
Former [2023/46]ES26.04.2023
NL26.04.2023
PT28.08.2023
Former [2023/43]NL26.04.2023
Cited inInternational search[Y]US5405267  (KOEGEL KEITH S [US], et al) [Y] 1-17 * see column 2, lines 8-11, 40-51, column 3, lines 27-40, 64-68, column 4, lines 1-20;; figures 1-4 *;
 [Y]US5906511  (BOZZER DIETER [DE], et al) [Y] 17 * the whole document *;
 [Y]US2004029406  (LOVELESS RICHARD WHITCOMB [US]) [Y] 1-17 * paragraphs [0036] - [0049]; figures 1-5 *;
 [A]US2009029589  (CONNER TROY EVERETTE [US], et al) [A] 1-17 * the whole document *;
 [Y]JP2010092811  (I PEX CO LTD) [Y] 6 * paragraph [0043]; figure 7 *;
 [A]JP2016100190  (DAIICHI SEIKO CO LTD) [A] 1-17* the whole document *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.