EP3512703 - APPARATUS FOR PRODUCING AN OBJECT BY MEANS OF ADDITIVE MANUFACTURING AND METHOD OF USING THE APPARATUS [Right-click to bookmark this link] | Status | The patent has been granted Status updated on 23.04.2021 Database last updated on 18.10.2024 | |
Former | Grant of patent is intended Status updated on 04.03.2021 | ||
Former | Request for examination was made Status updated on 21.06.2019 | ||
Former | The international publication has been made Status updated on 24.03.2018 | ||
Former | unknown Status updated on 20.10.2017 | Most recent event Tooltip | 13.09.2024 | Lapse of the patent in a contracting state New state(s): MT | published on 16.10.2024 [2024/42] | Applicant(s) | For all designated states Additive Industries B.V. Postbus 30160 5600 GA Eindhoven / NL | [2019/30] | Inventor(s) | 01 /
HAMERS, Martijn Robert c/o Additive Industries B.V. P.O. Box 30160 5600 GA Eindhoven / NL | 02 /
VAN HAENDEL, Rob Peter Albert c/o Additive Industries B.V. P.O. Box 30160 5600 GA Eindhoven / NL | 03 /
VAES, Mark Herman Else c/o Additive Industries B.V. P .0. Box 30160 5600 GA Eindhoven / NL | [2019/30] | Representative(s) | Algemeen Octrooi- en Merkenbureau B.V. P.O. Box 645 5600 AP Eindhoven / NL | [2019/30] | Application number, filing date | 17781572.7 | 18.09.2017 | [2019/30] | WO2017NL50609 | Priority number, date | NL20162017474 | 16.09.2016 Original published format: NL 2017474 | [2019/30] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2018052296 | Date: | 22.03.2018 | Language: | EN | [2018/12] | Type: | A1 Application with search report | No.: | EP3512703 | Date: | 24.07.2019 | Language: | EN | The application published by WIPO in one of the EPO official languages on 22.03.2018 takes the place of the publication of the European patent application. | [2019/30] | Type: | B1 Patent specification | No.: | EP3512703 | Date: | 26.05.2021 | Language: | EN | [2021/21] | Search report(s) | International search report - published on: | EP | 22.03.2018 | Classification | IPC: | B29C64/393, B29C64/20, B33Y30/00, B22F10/20, B22F12/00, // B29C64/153, B22F10/00 | [2021/11] | CPC: |
B33Y30/00 (EP,US);
B23K26/0853 (US);
B22F10/28 (EP,US);
B22F10/37 (EP,US);
B22F12/37 (EP,US);
B22F12/67 (EP,US);
B22F12/90 (EP,US);
B23K26/0006 (US);
B23K26/032 (US);
B23K26/1464 (US);
B23K26/342 (US);
B29C64/20 (EP,US);
B29C64/393 (EP);
B33Y10/00 (US);
B29C64/153 (EP,US);
Y02P10/25 (EP,US)
(-)
|
Former IPC [2019/30] | B33Y30/00, B29C67/00, B22F3/105, B29C64/20 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2019/30] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | MD | Not yet paid | Title | German: | VORRICHTUNG ZUR HERSTELLUNG EINES OBJEKTS MITTELS GENERATIVER FERTIGUNG UND VERFAHREN ZUR VERWENDUNG DER VORRICHTUNG | [2019/30] | English: | APPARATUS FOR PRODUCING AN OBJECT BY MEANS OF ADDITIVE MANUFACTURING AND METHOD OF USING THE APPARATUS | [2019/30] | French: | APPAREIL DE PRODUCTION D'UN OBJET PAR FABRICATION ADDITIVE ET PROCÉDÉ D'UTILISATION DE L'APPAREIL | [2019/30] | Entry into regional phase | 11.03.2019 | National basic fee paid | 11.03.2019 | Designation fee(s) paid | 11.03.2019 | Examination fee paid | Examination procedure | 11.03.2019 | Examination requested [2019/30] | 11.03.2019 | Date on which the examining division has become responsible | 06.08.2019 | Amendment by applicant (claims and/or description) | 05.03.2021 | Communication of intention to grant the patent | 20.04.2021 | Fee for grant paid | 20.04.2021 | Fee for publishing/printing paid | 20.04.2021 | Receipt of the translation of the claim(s) | Opposition(s) | Opponent(s) | 01
25.02.2022
01.03.2022
ADMISSIBLE Nikon SLM Solutions AG Estlandring 4 23560 Lübeck / DE Opponent's representative Schicker, Silvia, et al, et al Wuesthoff & Wuesthoff Patentanwälte und Rechtsanwalt PartG mbB Schweigerstraße 2 81541 München / DE | [N/P] |
Former [2023/47] | |||
Opponent(s) | 01
25.02.2022
01.03.2022
ADMISSIBLE Nikon SLM Solutions AG Estlandring 4 23560 Lübeck / DE Opponent's representative Schicker, Silvia, et al, et al Wuesthoff & Wuesthoff Patentanwälte PartG mbB Schweigerstraße 2 81541 München / DE | ||
Former [2022/14] | |||
Opponent(s) | 01
25.02.2022
01.03.2022
ADMISSIBLE SLM Solutions Group AG Estlandring 4 23560 Lübeck / DE Opponent's representative Schicker, Silvia, et al, et al Wuesthoff & Wuesthoff Patentanwälte PartG mbB Schweigerstraße 2 81541 München / DE | 11.03.2022 | Invitation to proprietor to file observations on the notice of opposition | 05.07.2022 | Reply of patent proprietor to notice(s) of opposition | 28.01.2025 | Date of oral proceedings | Fees paid | Renewal fee | 24.09.2019 | Renewal fee patent year 03 | 24.09.2020 | Renewal fee patent year 04 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 18.09.2017 | AL | 26.05.2021 | AT | 26.05.2021 | CY | 26.05.2021 | CZ | 26.05.2021 | DK | 26.05.2021 | EE | 26.05.2021 | ES | 26.05.2021 | FI | 26.05.2021 | HR | 26.05.2021 | LT | 26.05.2021 | LV | 26.05.2021 | MC | 26.05.2021 | MK | 26.05.2021 | MT | 26.05.2021 | PL | 26.05.2021 | RO | 26.05.2021 | RS | 26.05.2021 | SE | 26.05.2021 | SI | 26.05.2021 | SK | 26.05.2021 | SM | 26.05.2021 | BG | 26.08.2021 | NO | 26.08.2021 | GR | 27.08.2021 | IE | 18.09.2021 | LU | 18.09.2021 | IS | 26.09.2021 | PT | 27.09.2021 | BE | 30.09.2021 | CH | 30.09.2021 | LI | 30.09.2021 | [2024/42] |
Former [2024/23] | HU | 18.09.2017 | |
AL | 26.05.2021 | ||
AT | 26.05.2021 | ||
CY | 26.05.2021 | ||
CZ | 26.05.2021 | ||
DK | 26.05.2021 | ||
EE | 26.05.2021 | ||
ES | 26.05.2021 | ||
FI | 26.05.2021 | ||
HR | 26.05.2021 | ||
LT | 26.05.2021 | ||
LV | 26.05.2021 | ||
MC | 26.05.2021 | ||
MK | 26.05.2021 | ||
PL | 26.05.2021 | ||
RO | 26.05.2021 | ||
RS | 26.05.2021 | ||
SE | 26.05.2021 | ||
SI | 26.05.2021 | ||
SK | 26.05.2021 | ||
SM | 26.05.2021 | ||
BG | 26.08.2021 | ||
NO | 26.08.2021 | ||
GR | 27.08.2021 | ||
IE | 18.09.2021 | ||
LU | 18.09.2021 | ||
IS | 26.09.2021 | ||
PT | 27.09.2021 | ||
BE | 30.09.2021 | ||
CH | 30.09.2021 | ||
LI | 30.09.2021 | ||
Former [2023/33] | HU | 18.09.2017 | |
AL | 26.05.2021 | ||
AT | 26.05.2021 | ||
CY | 26.05.2021 | ||
CZ | 26.05.2021 | ||
DK | 26.05.2021 | ||
EE | 26.05.2021 | ||
ES | 26.05.2021 | ||
FI | 26.05.2021 | ||
HR | 26.05.2021 | ||
LT | 26.05.2021 | ||
LV | 26.05.2021 | ||
MC | 26.05.2021 | ||
PL | 26.05.2021 | ||
RO | 26.05.2021 | ||
RS | 26.05.2021 | ||
SE | 26.05.2021 | ||
SI | 26.05.2021 | ||
SK | 26.05.2021 | ||
SM | 26.05.2021 | ||
BG | 26.08.2021 | ||
NO | 26.08.2021 | ||
GR | 27.08.2021 | ||
IE | 18.09.2021 | ||
LU | 18.09.2021 | ||
IS | 26.09.2021 | ||
PT | 27.09.2021 | ||
BE | 30.09.2021 | ||
CH | 30.09.2021 | ||
LI | 30.09.2021 | ||
Former [2023/30] | AL | 26.05.2021 | |
AT | 26.05.2021 | ||
CY | 26.05.2021 | ||
CZ | 26.05.2021 | ||
DK | 26.05.2021 | ||
EE | 26.05.2021 | ||
ES | 26.05.2021 | ||
FI | 26.05.2021 | ||
HR | 26.05.2021 | ||
LT | 26.05.2021 | ||
LV | 26.05.2021 | ||
MC | 26.05.2021 | ||
PL | 26.05.2021 | ||
RO | 26.05.2021 | ||
RS | 26.05.2021 | ||
SE | 26.05.2021 | ||
SI | 26.05.2021 | ||
SK | 26.05.2021 | ||
SM | 26.05.2021 | ||
BG | 26.08.2021 | ||
NO | 26.08.2021 | ||
GR | 27.08.2021 | ||
IE | 18.09.2021 | ||
LU | 18.09.2021 | ||
IS | 26.09.2021 | ||
PT | 27.09.2021 | ||
BE | 30.09.2021 | ||
CH | 30.09.2021 | ||
LI | 30.09.2021 | ||
Former [2022/37] | AL | 26.05.2021 | |
AT | 26.05.2021 | ||
CZ | 26.05.2021 | ||
DK | 26.05.2021 | ||
EE | 26.05.2021 | ||
ES | 26.05.2021 | ||
FI | 26.05.2021 | ||
HR | 26.05.2021 | ||
LT | 26.05.2021 | ||
LV | 26.05.2021 | ||
MC | 26.05.2021 | ||
PL | 26.05.2021 | ||
RO | 26.05.2021 | ||
RS | 26.05.2021 | ||
SE | 26.05.2021 | ||
SI | 26.05.2021 | ||
SK | 26.05.2021 | ||
SM | 26.05.2021 | ||
BG | 26.08.2021 | ||
NO | 26.08.2021 | ||
GR | 27.08.2021 | ||
IE | 18.09.2021 | ||
LU | 18.09.2021 | ||
IS | 26.09.2021 | ||
PT | 27.09.2021 | ||
BE | 30.09.2021 | ||
CH | 30.09.2021 | ||
LI | 30.09.2021 | ||
Former [2022/35] | AL | 26.05.2021 | |
AT | 26.05.2021 | ||
CZ | 26.05.2021 | ||
DK | 26.05.2021 | ||
EE | 26.05.2021 | ||
ES | 26.05.2021 | ||
FI | 26.05.2021 | ||
HR | 26.05.2021 | ||
LT | 26.05.2021 | ||
LV | 26.05.2021 | ||
MC | 26.05.2021 | ||
PL | 26.05.2021 | ||
RO | 26.05.2021 | ||
RS | 26.05.2021 | ||
SE | 26.05.2021 | ||
SI | 26.05.2021 | ||
SK | 26.05.2021 | ||
SM | 26.05.2021 | ||
BG | 26.08.2021 | ||
NO | 26.08.2021 | ||
GR | 27.08.2021 | ||
IE | 18.09.2021 | ||
LU | 18.09.2021 | ||
IS | 26.09.2021 | ||
PT | 27.09.2021 | ||
BE | 30.09.2021 | ||
Former [2022/34] | AL | 26.05.2021 | |
AT | 26.05.2021 | ||
CZ | 26.05.2021 | ||
DK | 26.05.2021 | ||
EE | 26.05.2021 | ||
ES | 26.05.2021 | ||
FI | 26.05.2021 | ||
HR | 26.05.2021 | ||
LT | 26.05.2021 | ||
LV | 26.05.2021 | ||
MC | 26.05.2021 | ||
PL | 26.05.2021 | ||
RO | 26.05.2021 | ||
RS | 26.05.2021 | ||
SE | 26.05.2021 | ||
SI | 26.05.2021 | ||
SK | 26.05.2021 | ||
SM | 26.05.2021 | ||
BG | 26.08.2021 | ||
NO | 26.08.2021 | ||
GR | 27.08.2021 | ||
LU | 18.09.2021 | ||
IS | 26.09.2021 | ||
PT | 27.09.2021 | ||
BE | 30.09.2021 | ||
Former [2022/29] | AL | 26.05.2021 | |
AT | 26.05.2021 | ||
CZ | 26.05.2021 | ||
DK | 26.05.2021 | ||
EE | 26.05.2021 | ||
ES | 26.05.2021 | ||
FI | 26.05.2021 | ||
HR | 26.05.2021 | ||
LT | 26.05.2021 | ||
LV | 26.05.2021 | ||
MC | 26.05.2021 | ||
PL | 26.05.2021 | ||
RO | 26.05.2021 | ||
RS | 26.05.2021 | ||
SE | 26.05.2021 | ||
SI | 26.05.2021 | ||
SK | 26.05.2021 | ||
SM | 26.05.2021 | ||
BG | 26.08.2021 | ||
NO | 26.08.2021 | ||
GR | 27.08.2021 | ||
IS | 26.09.2021 | ||
PT | 27.09.2021 | ||
Former [2022/25] | AL | 26.05.2021 | |
AT | 26.05.2021 | ||
CZ | 26.05.2021 | ||
DK | 26.05.2021 | ||
EE | 26.05.2021 | ||
ES | 26.05.2021 | ||
FI | 26.05.2021 | ||
HR | 26.05.2021 | ||
LT | 26.05.2021 | ||
LV | 26.05.2021 | ||
MC | 26.05.2021 | ||
PL | 26.05.2021 | ||
RO | 26.05.2021 | ||
RS | 26.05.2021 | ||
SE | 26.05.2021 | ||
SK | 26.05.2021 | ||
SM | 26.05.2021 | ||
BG | 26.08.2021 | ||
NO | 26.08.2021 | ||
GR | 27.08.2021 | ||
IS | 26.09.2021 | ||
PT | 27.09.2021 | ||
Former [2022/23] | AT | 26.05.2021 | |
CZ | 26.05.2021 | ||
DK | 26.05.2021 | ||
EE | 26.05.2021 | ||
ES | 26.05.2021 | ||
FI | 26.05.2021 | ||
HR | 26.05.2021 | ||
LT | 26.05.2021 | ||
LV | 26.05.2021 | ||
PL | 26.05.2021 | ||
RO | 26.05.2021 | ||
RS | 26.05.2021 | ||
SE | 26.05.2021 | ||
SK | 26.05.2021 | ||
SM | 26.05.2021 | ||
BG | 26.08.2021 | ||
NO | 26.08.2021 | ||
GR | 27.08.2021 | ||
IS | 26.09.2021 | ||
PT | 27.09.2021 | ||
Former [2022/10] | AT | 26.05.2021 | |
CZ | 26.05.2021 | ||
DK | 26.05.2021 | ||
EE | 26.05.2021 | ||
ES | 26.05.2021 | ||
FI | 26.05.2021 | ||
HR | 26.05.2021 | ||
LT | 26.05.2021 | ||
LV | 26.05.2021 | ||
PL | 26.05.2021 | ||
RO | 26.05.2021 | ||
RS | 26.05.2021 | ||
SE | 26.05.2021 | ||
SK | 26.05.2021 | ||
SM | 26.05.2021 | ||
BG | 26.08.2021 | ||
NO | 26.08.2021 | ||
GR | 27.08.2021 | ||
PT | 27.09.2021 | ||
IS | 22.12.2021 | ||
Former [2022/09] | AT | 26.05.2021 | |
CZ | 26.05.2021 | ||
DK | 26.05.2021 | ||
ES | 26.05.2021 | ||
FI | 26.05.2021 | ||
HR | 26.05.2021 | ||
LT | 26.05.2021 | ||
LV | 26.05.2021 | ||
PL | 26.05.2021 | ||
RO | 26.05.2021 | ||
RS | 26.05.2021 | ||
SE | 26.05.2021 | ||
SK | 26.05.2021 | ||
SM | 26.05.2021 | ||
BG | 26.08.2021 | ||
NO | 26.08.2021 | ||
GR | 27.08.2021 | ||
IS | 26.09.2021 | ||
PT | 27.09.2021 | ||
Former [2022/08] | AT | 26.05.2021 | |
CZ | 26.05.2021 | ||
DK | 26.05.2021 | ||
ES | 26.05.2021 | ||
FI | 26.05.2021 | ||
HR | 26.05.2021 | ||
LT | 26.05.2021 | ||
LV | 26.05.2021 | ||
PL | 26.05.2021 | ||
RS | 26.05.2021 | ||
SE | 26.05.2021 | ||
SM | 26.05.2021 | ||
BG | 26.08.2021 | ||
NO | 26.08.2021 | ||
GR | 27.08.2021 | ||
IS | 26.09.2021 | ||
PT | 27.09.2021 | ||
Former [2022/07] | AT | 26.05.2021 | |
FI | 26.05.2021 | ||
HR | 26.05.2021 | ||
LT | 26.05.2021 | ||
LV | 26.05.2021 | ||
PL | 26.05.2021 | ||
RS | 26.05.2021 | ||
SE | 26.05.2021 | ||
SM | 26.05.2021 | ||
BG | 26.08.2021 | ||
NO | 26.08.2021 | ||
GR | 27.08.2021 | ||
IS | 26.09.2021 | ||
PT | 27.09.2021 | ||
Former [2021/52] | AT | 26.05.2021 | |
FI | 26.05.2021 | ||
HR | 26.05.2021 | ||
LT | 26.05.2021 | ||
LV | 26.05.2021 | ||
PL | 26.05.2021 | ||
RS | 26.05.2021 | ||
SE | 26.05.2021 | ||
BG | 26.08.2021 | ||
NO | 26.08.2021 | ||
GR | 27.08.2021 | ||
IS | 26.09.2021 | ||
PT | 27.09.2021 | ||
Former [2021/51] | AT | 26.05.2021 | |
FI | 26.05.2021 | ||
HR | 26.05.2021 | ||
LT | 26.05.2021 | ||
LV | 26.05.2021 | ||
RS | 26.05.2021 | ||
SE | 26.05.2021 | ||
BG | 26.08.2021 | ||
NO | 26.08.2021 | ||
GR | 27.08.2021 | ||
IS | 26.09.2021 | ||
PT | 27.09.2021 | ||
Former [2021/50] | AT | 26.05.2021 | |
FI | 26.05.2021 | ||
HR | 26.05.2021 | ||
LT | 26.05.2021 | ||
LV | 26.05.2021 | ||
SE | 26.05.2021 | ||
BG | 26.08.2021 | ||
NO | 26.08.2021 | ||
GR | 27.08.2021 | ||
PT | 27.09.2021 | ||
Former [2021/49] | AT | 26.05.2021 | |
FI | 26.05.2021 | ||
HR | 26.05.2021 | ||
LT | 26.05.2021 | ||
LV | 26.05.2021 | ||
SE | 26.05.2021 | ||
BG | 26.08.2021 | ||
NO | 26.08.2021 | ||
GR | 27.08.2021 | ||
Former [2021/47] | AT | 26.05.2021 | |
FI | 26.05.2021 | ||
LT | 26.05.2021 | ||
BG | 26.08.2021 | ||
Former [2021/46] | AT | 26.05.2021 | |
FI | 26.05.2021 | ||
LT | 26.05.2021 | Cited in | International search | [XY]US2007037509 (RENZ BERND [DE], et al) [X] 1,2,5,6 * claim 1 * * paragraphs [0005] , [0007] * * paragraphs [0011] , [0015] * [Y] 3,4,7; | [Y]WO2015077195 (BIBAS CHARLES [US]) [Y] 3,4,7 * paragraphs [0017] - [0018] * * paragraph [0143] ** figure - *; | [Y]US2015231831 (EL-SIBLANI ALI [US]) [Y] 3,7 * paragraphs [0115] - [0116] * * paragraph [0141] * * paragraph [0222] * * claim 1 * * figure - *; | [Y]CN205033598U (GUANGDONG HANBANG 3D TECHNOLOGY CO LTD, et al) [Y] 3,7 * claim 1 * * paragraph [0032] * * paragraph [0039] * * figure - * | Opposition | US2007037509 | DE102014014888 |