EP3417954 - METHOD FOR RECOVERING PULP FIBERS FROM USED ABSORBENT ARTICLES [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 29.10.2021 Database last updated on 15.06.2024 | |
Former | The patent has been granted Status updated on 20.11.2020 | ||
Former | Grant of patent is intended Status updated on 27.07.2020 | ||
Former | Examination is in progress Status updated on 17.12.2019 | ||
Former | Request for examination was made Status updated on 23.11.2018 | ||
Former | The international publication has been made Status updated on 20.10.2017 | Most recent event Tooltip | 03.05.2024 | Lapse of the patent in a contracting state New state(s): MK | published on 05.06.2024 [2024/23] | Applicant(s) | For all designated states Unicharm Corporation 182 Shimobun Kinsei-cho Shikokuchuo-shi Ehime 799-0111 / JP | [2018/52] | Inventor(s) | 01 /
KONISHI, Takayoshi c/o UNICHARM CORPORATION Technical Center 1531-7 Wadahama Toyohama-cho Kanonji-shi Kagawa 769-1602 / JP | 02 /
HIRAOKA, Toshio c/o UNICHARM CORPORATION Technical Center 1531-7 Wadahama Toyohama-cho Kanonji-shi Kagawa 769-1602 / JP | 03 /
YAMAKI, Koichi c/o UNICHARM CORPORATION Technical Center 1531-7 Wadahama Toyohama-cho Kanonji-shi Kagawa 769-1602 / JP | 04 /
KAMEDA, Noritomo c/o UNICHARM CORPORATION Technical Center 1531-7 Wadahama Toyohama-cho Kanonji-shi Kagawa 769-1602 / JP | [2018/52] | Representative(s) | Dolleymores 9 Rickmansworth Road Watford, Hertfordshire WD18 0JU / GB | [2018/52] | Application number, filing date | 17782071.9 | 12.01.2017 | [2018/52] | WO2017JP00862 | Priority number, date | JP20160079179 | 11.04.2016 Original published format: JP 2016079179 | [2018/52] | Filing language | JA | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2017179252 | Date: | 19.10.2017 | Language: | JA | [2017/42] | Type: | A1 Application with search report | No.: | EP3417954 | Date: | 26.12.2018 | Language: | EN | [2018/52] | Type: | B1 Patent specification | No.: | EP3417954 | Date: | 23.12.2020 | Language: | EN | [2020/52] | Search report(s) | International search report - published on: | JP | 19.10.2017 | (Supplementary) European search report - dispatched on: | EP | 06.03.2019 | Classification | IPC: | B09B5/00, A61L2/03, A61L2/04, A61L2/10, A61L2/18, A61L2/20, B09B3/00, C02F1/58, C02F3/34, H01M8/16 | [2018/52] | CPC: |
A61L2/03 (EP,US);
B09B3/80 (US);
A61L15/60 (US);
A61L2/18 (US);
B09B3/00 (EP,US);
B09B5/00 (EP,US);
B29B17/02 (US);
C02F1/58 (EP,US);
C02F3/34 (EP,US);
H01M8/16 (EP,US);
A61L2/04 (EP,US);
A61L2/10 (EP,US);
A61L2/202 (EP,US);
B29B2017/0262 (US);
B29B2017/0289 (US);
B29K2033/08 (US);
B29K2401/08 (US);
B29K2711/12 (US);
B29L2031/4878 (US);
D21C9/002 (US);
Y02E50/10 (EP,US);
Y02E50/30 (EP,US);
Y02E60/50 (EP,US);
Y02W10/30 (EP,US);
Y02W30/20 (US)
(-)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2018/52] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | MD | Not yet paid | Title | German: | VERFAHREN ZUR RÜCKGEWINNUNG VON ZELLSTOFFFASERN AUS GEBRAUCHTEN ABSORBIERENDEN ARTIKELN | [2018/52] | English: | METHOD FOR RECOVERING PULP FIBERS FROM USED ABSORBENT ARTICLES | [2018/52] | French: | PROCÉDÉ DE RÉCUPÉRATION DES FIBRES DE PÂTE À PARTIR D'ARTICLES ABSORBANTS USAGÉS | [2018/52] | Entry into regional phase | 19.09.2018 | Translation filed | 19.09.2018 | National basic fee paid | 19.09.2018 | Search fee paid | 19.09.2018 | Designation fee(s) paid | 19.09.2018 | Examination fee paid | Examination procedure | deleted | Date on which the examining division has become responsible | 19.09.2018 | Examination requested [2018/52] | 13.09.2019 | Amendment by applicant (claims and/or description) | 20.12.2019 | Despatch of a communication from the examining division (Time limit: M04) | 29.04.2020 | Reply to a communication from the examining division | 28.07.2020 | Communication of intention to grant the patent | 16.11.2020 | Fee for grant paid | 16.11.2020 | Fee for publishing/printing paid | 16.11.2020 | Receipt of the translation of the claim(s) | Opposition(s) | 24.09.2021 | No opposition filed within time limit [2021/48] | Fees paid | Renewal fee | 19.09.2018 | Renewal fee patent year 03 | 14.01.2020 | Renewal fee patent year 04 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 12.01.2017 | AL | 23.12.2020 | AT | 23.12.2020 | CY | 23.12.2020 | CZ | 23.12.2020 | DK | 23.12.2020 | EE | 23.12.2020 | ES | 23.12.2020 | FI | 23.12.2020 | HR | 23.12.2020 | LT | 23.12.2020 | LV | 23.12.2020 | MC | 23.12.2020 | MK | 23.12.2020 | PL | 23.12.2020 | RO | 23.12.2020 | RS | 23.12.2020 | SI | 23.12.2020 | SK | 23.12.2020 | SM | 23.12.2020 | IE | 12.01.2021 | LU | 12.01.2021 | BE | 31.01.2021 | CH | 31.01.2021 | LI | 31.01.2021 | BG | 23.03.2021 | NO | 23.03.2021 | GR | 24.03.2021 | IS | 23.04.2021 | PT | 23.04.2021 | [2024/23] |
Former [2023/33] | HU | 12.01.2017 | |
AL | 23.12.2020 | ||
AT | 23.12.2020 | ||
CY | 23.12.2020 | ||
CZ | 23.12.2020 | ||
DK | 23.12.2020 | ||
EE | 23.12.2020 | ||
ES | 23.12.2020 | ||
FI | 23.12.2020 | ||
HR | 23.12.2020 | ||
LT | 23.12.2020 | ||
LV | 23.12.2020 | ||
MC | 23.12.2020 | ||
PL | 23.12.2020 | ||
RO | 23.12.2020 | ||
RS | 23.12.2020 | ||
SI | 23.12.2020 | ||
SK | 23.12.2020 | ||
SM | 23.12.2020 | ||
IE | 12.01.2021 | ||
LU | 12.01.2021 | ||
BE | 31.01.2021 | ||
CH | 31.01.2021 | ||
LI | 31.01.2021 | ||
BG | 23.03.2021 | ||
NO | 23.03.2021 | ||
GR | 24.03.2021 | ||
IS | 23.04.2021 | ||
PT | 23.04.2021 | ||
Former [2023/30] | AL | 23.12.2020 | |
AT | 23.12.2020 | ||
CY | 23.12.2020 | ||
CZ | 23.12.2020 | ||
DK | 23.12.2020 | ||
EE | 23.12.2020 | ||
ES | 23.12.2020 | ||
FI | 23.12.2020 | ||
HR | 23.12.2020 | ||
LT | 23.12.2020 | ||
LV | 23.12.2020 | ||
MC | 23.12.2020 | ||
PL | 23.12.2020 | ||
RO | 23.12.2020 | ||
RS | 23.12.2020 | ||
SI | 23.12.2020 | ||
SK | 23.12.2020 | ||
SM | 23.12.2020 | ||
IE | 12.01.2021 | ||
LU | 12.01.2021 | ||
BE | 31.01.2021 | ||
CH | 31.01.2021 | ||
LI | 31.01.2021 | ||
BG | 23.03.2021 | ||
NO | 23.03.2021 | ||
GR | 24.03.2021 | ||
IS | 23.04.2021 | ||
PT | 23.04.2021 | ||
Former [2022/34] | AL | 23.12.2020 | |
AT | 23.12.2020 | ||
CZ | 23.12.2020 | ||
DK | 23.12.2020 | ||
EE | 23.12.2020 | ||
ES | 23.12.2020 | ||
FI | 23.12.2020 | ||
HR | 23.12.2020 | ||
LT | 23.12.2020 | ||
LV | 23.12.2020 | ||
MC | 23.12.2020 | ||
PL | 23.12.2020 | ||
RO | 23.12.2020 | ||
RS | 23.12.2020 | ||
SI | 23.12.2020 | ||
SK | 23.12.2020 | ||
SM | 23.12.2020 | ||
IE | 12.01.2021 | ||
LU | 12.01.2021 | ||
BE | 31.01.2021 | ||
CH | 31.01.2021 | ||
LI | 31.01.2021 | ||
BG | 23.03.2021 | ||
NO | 23.03.2021 | ||
GR | 24.03.2021 | ||
IS | 23.04.2021 | ||
PT | 23.04.2021 | ||
Former [2022/23] | AL | 23.12.2020 | |
AT | 23.12.2020 | ||
CZ | 23.12.2020 | ||
DK | 23.12.2020 | ||
EE | 23.12.2020 | ||
ES | 23.12.2020 | ||
FI | 23.12.2020 | ||
HR | 23.12.2020 | ||
LT | 23.12.2020 | ||
LV | 23.12.2020 | ||
MC | 23.12.2020 | ||
PL | 23.12.2020 | ||
RO | 23.12.2020 | ||
RS | 23.12.2020 | ||
SI | 23.12.2020 | ||
SK | 23.12.2020 | ||
SM | 23.12.2020 | ||
IE | 12.01.2021 | ||
LU | 12.01.2021 | ||
CH | 31.01.2021 | ||
LI | 31.01.2021 | ||
BG | 23.03.2021 | ||
NO | 23.03.2021 | ||
GR | 24.03.2021 | ||
IS | 23.04.2021 | ||
PT | 23.04.2021 | ||
Former [2022/13] | AL | 23.12.2020 | |
AT | 23.12.2020 | ||
CZ | 23.12.2020 | ||
DK | 23.12.2020 | ||
EE | 23.12.2020 | ||
ES | 23.12.2020 | ||
FI | 23.12.2020 | ||
HR | 23.12.2020 | ||
LT | 23.12.2020 | ||
LV | 23.12.2020 | ||
MC | 23.12.2020 | ||
PL | 23.12.2020 | ||
RO | 23.12.2020 | ||
RS | 23.12.2020 | ||
SI | 23.12.2020 | ||
SK | 23.12.2020 | ||
SM | 23.12.2020 | ||
IE | 12.01.2021 | ||
LU | 12.01.2021 | ||
CH | 31.01.2021 | ||
LI | 31.01.2021 | ||
BG | 23.03.2021 | ||
NO | 23.03.2021 | ||
GR | 24.03.2021 | ||
PT | 23.04.2021 | ||
Former [2022/10] | AL | 23.12.2020 | |
AT | 23.12.2020 | ||
CZ | 23.12.2020 | ||
DK | 23.12.2020 | ||
EE | 23.12.2020 | ||
ES | 23.12.2020 | ||
FI | 23.12.2020 | ||
HR | 23.12.2020 | ||
LT | 23.12.2020 | ||
LV | 23.12.2020 | ||
MC | 23.12.2020 | ||
PL | 23.12.2020 | ||
RO | 23.12.2020 | ||
RS | 23.12.2020 | ||
SK | 23.12.2020 | ||
SM | 23.12.2020 | ||
IE | 12.01.2021 | ||
LU | 12.01.2021 | ||
CH | 31.01.2021 | ||
LI | 31.01.2021 | ||
BG | 23.03.2021 | ||
NO | 23.03.2021 | ||
GR | 24.03.2021 | ||
PT | 23.04.2021 | ||
Former [2022/08] | AL | 23.12.2020 | |
AT | 23.12.2020 | ||
CZ | 23.12.2020 | ||
DK | 23.12.2020 | ||
EE | 23.12.2020 | ||
ES | 23.12.2020 | ||
FI | 23.12.2020 | ||
HR | 23.12.2020 | ||
LT | 23.12.2020 | ||
LV | 23.12.2020 | ||
MC | 23.12.2020 | ||
PL | 23.12.2020 | ||
RO | 23.12.2020 | ||
RS | 23.12.2020 | ||
SK | 23.12.2020 | ||
SM | 23.12.2020 | ||
IE | 12.01.2021 | ||
LU | 12.01.2021 | ||
CH | 31.01.2021 | ||
LI | 31.01.2021 | ||
BG | 23.03.2021 | ||
NO | 23.03.2021 | ||
GR | 24.03.2021 | ||
IS | 23.04.2021 | ||
PT | 23.04.2021 | ||
Former [2022/07] | AL | 23.12.2020 | |
AT | 23.12.2020 | ||
CZ | 23.12.2020 | ||
DK | 23.12.2020 | ||
EE | 23.12.2020 | ||
FI | 23.12.2020 | ||
HR | 23.12.2020 | ||
LT | 23.12.2020 | ||
LV | 23.12.2020 | ||
MC | 23.12.2020 | ||
PL | 23.12.2020 | ||
RO | 23.12.2020 | ||
RS | 23.12.2020 | ||
SK | 23.12.2020 | ||
SM | 23.12.2020 | ||
IE | 12.01.2021 | ||
LU | 12.01.2021 | ||
CH | 31.01.2021 | ||
LI | 31.01.2021 | ||
BG | 23.03.2021 | ||
NO | 23.03.2021 | ||
GR | 24.03.2021 | ||
IS | 23.04.2021 | ||
PT | 23.04.2021 | ||
Former [2021/52] | AL | 23.12.2020 | |
AT | 23.12.2020 | ||
CZ | 23.12.2020 | ||
DK | 23.12.2020 | ||
EE | 23.12.2020 | ||
FI | 23.12.2020 | ||
HR | 23.12.2020 | ||
LT | 23.12.2020 | ||
LV | 23.12.2020 | ||
MC | 23.12.2020 | ||
PL | 23.12.2020 | ||
RO | 23.12.2020 | ||
RS | 23.12.2020 | ||
SK | 23.12.2020 | ||
SM | 23.12.2020 | ||
LU | 12.01.2021 | ||
CH | 31.01.2021 | ||
LI | 31.01.2021 | ||
BG | 23.03.2021 | ||
NO | 23.03.2021 | ||
GR | 24.03.2021 | ||
IS | 23.04.2021 | ||
PT | 23.04.2021 | ||
Former [2021/49] | AL | 23.12.2020 | |
AT | 23.12.2020 | ||
CZ | 23.12.2020 | ||
DK | 23.12.2020 | ||
EE | 23.12.2020 | ||
FI | 23.12.2020 | ||
HR | 23.12.2020 | ||
LT | 23.12.2020 | ||
LV | 23.12.2020 | ||
MC | 23.12.2020 | ||
PL | 23.12.2020 | ||
RO | 23.12.2020 | ||
RS | 23.12.2020 | ||
SK | 23.12.2020 | ||
SM | 23.12.2020 | ||
LU | 12.01.2021 | ||
BG | 23.03.2021 | ||
NO | 23.03.2021 | ||
GR | 24.03.2021 | ||
IS | 23.04.2021 | ||
PT | 23.04.2021 | ||
Former [2021/45] | AL | 23.12.2020 | |
AT | 23.12.2020 | ||
CZ | 23.12.2020 | ||
EE | 23.12.2020 | ||
FI | 23.12.2020 | ||
HR | 23.12.2020 | ||
LT | 23.12.2020 | ||
LV | 23.12.2020 | ||
MC | 23.12.2020 | ||
PL | 23.12.2020 | ||
RO | 23.12.2020 | ||
RS | 23.12.2020 | ||
SK | 23.12.2020 | ||
SM | 23.12.2020 | ||
LU | 12.01.2021 | ||
BG | 23.03.2021 | ||
NO | 23.03.2021 | ||
GR | 24.03.2021 | ||
IS | 23.04.2021 | ||
PT | 23.04.2021 | ||
Former [2021/43] | AT | 23.12.2020 | |
CZ | 23.12.2020 | ||
EE | 23.12.2020 | ||
FI | 23.12.2020 | ||
HR | 23.12.2020 | ||
LT | 23.12.2020 | ||
LV | 23.12.2020 | ||
MC | 23.12.2020 | ||
PL | 23.12.2020 | ||
RO | 23.12.2020 | ||
RS | 23.12.2020 | ||
SK | 23.12.2020 | ||
SM | 23.12.2020 | ||
LU | 12.01.2021 | ||
BG | 23.03.2021 | ||
NO | 23.03.2021 | ||
GR | 24.03.2021 | ||
IS | 23.04.2021 | ||
PT | 23.04.2021 | ||
Former [2021/42] | AT | 23.12.2020 | |
CZ | 23.12.2020 | ||
EE | 23.12.2020 | ||
FI | 23.12.2020 | ||
HR | 23.12.2020 | ||
LT | 23.12.2020 | ||
LV | 23.12.2020 | ||
MC | 23.12.2020 | ||
PL | 23.12.2020 | ||
RO | 23.12.2020 | ||
RS | 23.12.2020 | ||
SK | 23.12.2020 | ||
SM | 23.12.2020 | ||
BG | 23.03.2021 | ||
NO | 23.03.2021 | ||
GR | 24.03.2021 | ||
IS | 23.04.2021 | ||
PT | 23.04.2021 | ||
Former [2021/41] | AT | 23.12.2020 | |
CZ | 23.12.2020 | ||
EE | 23.12.2020 | ||
FI | 23.12.2020 | ||
HR | 23.12.2020 | ||
LT | 23.12.2020 | ||
LV | 23.12.2020 | ||
MC | 23.12.2020 | ||
PL | 23.12.2020 | ||
RO | 23.12.2020 | ||
RS | 23.12.2020 | ||
SK | 23.12.2020 | ||
SM | 23.12.2020 | ||
BG | 23.03.2021 | ||
NO | 23.03.2021 | ||
GR | 24.03.2021 | ||
PT | 23.04.2021 | ||
Former [2021/39] | AT | 23.12.2020 | |
CZ | 23.12.2020 | ||
EE | 23.12.2020 | ||
FI | 23.12.2020 | ||
HR | 23.12.2020 | ||
LT | 23.12.2020 | ||
LV | 23.12.2020 | ||
PL | 23.12.2020 | ||
RO | 23.12.2020 | ||
RS | 23.12.2020 | ||
SK | 23.12.2020 | ||
SM | 23.12.2020 | ||
BG | 23.03.2021 | ||
NO | 23.03.2021 | ||
GR | 24.03.2021 | ||
PT | 23.04.2021 | ||
Former [2021/37] | AT | 23.12.2020 | |
CZ | 23.12.2020 | ||
EE | 23.12.2020 | ||
FI | 23.12.2020 | ||
HR | 23.12.2020 | ||
LT | 23.12.2020 | ||
LV | 23.12.2020 | ||
RO | 23.12.2020 | ||
RS | 23.12.2020 | ||
SK | 23.12.2020 | ||
SM | 23.12.2020 | ||
BG | 23.03.2021 | ||
NO | 23.03.2021 | ||
GR | 24.03.2021 | ||
PT | 23.04.2021 | ||
Former [2021/36] | CZ | 23.12.2020 | |
EE | 23.12.2020 | ||
FI | 23.12.2020 | ||
HR | 23.12.2020 | ||
LT | 23.12.2020 | ||
LV | 23.12.2020 | ||
RO | 23.12.2020 | ||
RS | 23.12.2020 | ||
SK | 23.12.2020 | ||
SM | 23.12.2020 | ||
BG | 23.03.2021 | ||
NO | 23.03.2021 | ||
GR | 24.03.2021 | ||
PT | 23.04.2021 | ||
Former [2021/35] | CZ | 23.12.2020 | |
FI | 23.12.2020 | ||
HR | 23.12.2020 | ||
LT | 23.12.2020 | ||
LV | 23.12.2020 | ||
RO | 23.12.2020 | ||
RS | 23.12.2020 | ||
SK | 23.12.2020 | ||
SM | 23.12.2020 | ||
BG | 23.03.2021 | ||
NO | 23.03.2021 | ||
GR | 24.03.2021 | ||
PT | 23.04.2021 | ||
Former [2021/33] | FI | 23.12.2020 | |
HR | 23.12.2020 | ||
LT | 23.12.2020 | ||
LV | 23.12.2020 | ||
RS | 23.12.2020 | ||
SM | 23.12.2020 | ||
BG | 23.03.2021 | ||
NO | 23.03.2021 | ||
GR | 24.03.2021 | ||
PT | 23.04.2021 | ||
Former [2021/32] | FI | 23.12.2020 | |
HR | 23.12.2020 | ||
LV | 23.12.2020 | ||
RS | 23.12.2020 | ||
SM | 23.12.2020 | ||
BG | 23.03.2021 | ||
NO | 23.03.2021 | ||
GR | 24.03.2021 | ||
Former [2021/28] | FI | 23.12.2020 | |
HR | 23.12.2020 | ||
LV | 23.12.2020 | ||
RS | 23.12.2020 | ||
BG | 23.03.2021 | ||
NO | 23.03.2021 | ||
GR | 24.03.2021 | ||
Former [2021/24] | FI | 23.12.2020 | |
LV | 23.12.2020 | ||
RS | 23.12.2020 | ||
BG | 23.03.2021 | ||
NO | 23.03.2021 | ||
GR | 24.03.2021 | ||
Former [2021/23] | FI | 23.12.2020 | |
LV | 23.12.2020 | ||
RS | 23.12.2020 | ||
NO | 23.03.2021 | ||
GR | 24.03.2021 | ||
Former [2021/22] | FI | 23.12.2020 | |
RS | 23.12.2020 | ||
NO | 23.03.2021 | ||
Former [2021/20] | FI | 23.12.2020 | Documents cited: | Search | [A]JP2015134845 (NPO HIROSHIMA JUNKANGATA SHAKAI SUISHIN KIKO) [A] 1-15 * paragraph: [0005], [0010] *; | [IA]WO2015190140 (UNICHARM CORP [JP]) [I] 1-9,11-15 * page 3: line 34-36; page 5: line 1-16; page 6: line 26-29 * [A] 10; | [A] - HANAA GADALLAH ET AL, "Study of Electro De-swelling Properties of Super Absorbents Polymers 1", AUSTRALIAN JOURNAL OF BASIC AND APPLIED SCIENCES, (20120101), vol. 6, pages 282 - 291, XP055555771 [A] 1-15 * page: 282 * | International search | [A]JP2010084031 (SAMUZU KK) [A] 1-15* , claim 1; paragraphs [0003], [0016] to [0021] (Family: none) *; | [A]JP2013197047 (UNI CHARM CORP, et al) [A] 1-15 * , claim 1; paragraphs [0027] to [0091]; fig. 1, 3 & US 2015/0050567 A1 fig. 1, 3; paragraphs [0040] to [0112]; claim 1 & WO 2013/141382 A1 & EP 2830138 A1 & CN 104205459 A *; | [YA]JP2015134845 (NPO HIROSHIMA JUNKANGATA SHAKAI SUISHIN KIKO) [Y] 1-3, 5-6, 8-10, 12-15 * , claim 1; paragraphs [0006] to [0007], [0020] to [0022], [0030] to [0031], [0036] to [0040]; fig. 2, 3 (Family: none) * [A] 4, 7, 11; | [YA]JP2015182246 (UNI CHARM CORP, et al) [Y] 1-3, 5-6, 8-10, 12-15 * , claims 1, 6, 8; paragraphs [0011] to [0012], [0017], [0019], [0026] to [0027], [0035] to [0036] (Family: none) * [A] 4, 7, 11 | Examination | - Zohuriaan-Mehr ET AL, "Superabsorbent Polymer Materials: A Review", Iranian Polymer Journal, (20080101), vol. 17, no. 6, pages 451 - 477, XP055058280 | - Auda Braihi, "Super absorbent Polymers", (20161201), URL: https://www.researchgate.net/publication/312021797_Super_absorbent_Polymers, (20191212), XP055652338 |