EP3420028 - WHITE, CONFORMABLE FILMS FOR PRESSURE-SENSITIVE-LABELING APPLICATIONS [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 30.12.2022 Database last updated on 29.07.2024 | |
Former | The patent has been granted Status updated on 21.01.2022 | ||
Former | Grant of patent is intended Status updated on 26.05.2021 | ||
Former | Examination is in progress Status updated on 22.01.2021 | ||
Former | Request for examination was made Status updated on 30.11.2018 | ||
Former | The international publication has been made Status updated on 20.10.2017 | Most recent event Tooltip | 03.05.2024 | Lapse of the patent in a contracting state New state(s): MK | published on 05.06.2024 [2024/23] | Applicant(s) | For all designated states Jindal Innovation Center SRL Zoning Industriel de Latour 6761 Virton / BE | [2022/08] |
Former [2019/01] | For all designated states Jindal Films Americas LLC 411 Pegasus Parkway LaGrange, GA 30240 / US | Inventor(s) | 01 /
AMBROISE, Benoit 331 Rue de la Kwert Nobressart / BE | 02 /
HINMAN, Daniel L. 5900 Green Road Farmington, NY 14425 / US | 03 /
SHEPPARD, Robert M. Peachtree City GA 30269 / US | 04 /
CLECKNER, Michael D. 138 Tyringham Road Rochester, NY 14617 / US | [2022/06] |
Former [2019/01] | 01 /
AMBROISE, Benoit 331 Rue de la Kwert Nobressart / BE | ||
02 /
HINMAN, Daniel, L. 5900 Green Road Farmington, NY 14425 / US | |||
03 /
SHEPPARD, Robert, M. 8A Rue Dicks L-8085 Bertrange / LU | |||
04 /
CLECKNER, Michael, D. 138 Tyringham Road Rochester, NY 14617 / US | Representative(s) | Barker Brettell LLP 100 Hagley Road Edgbaston Birmingham B16 8QQ / GB | [2019/01] | Application number, filing date | 17782991.8 | 11.04.2017 | [2019/01] | WO2017US27031 | Priority number, date | US201662321049P | 11.04.2016 Original published format: US 201662321049 P | [2019/01] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2017180638 | Date: | 19.10.2017 | Language: | EN | [2017/42] | Type: | A1 Application with search report | No.: | EP3420028 | Date: | 02.01.2019 | Language: | EN | The application published by WIPO in one of the EPO official languages on 19.10.2017 takes the place of the publication of the European patent application. | [2019/01] | Type: | B1 Patent specification | No.: | EP3420028 | Date: | 23.02.2022 | Language: | EN | [2022/08] | Search report(s) | International search report - published on: | US | 19.10.2017 | (Supplementary) European search report - dispatched on: | EP | 09.10.2019 | Classification | IPC: | B32B27/20, C08L23/12, C08L23/14, B32B27/00, C08L23/08, B29L9/00, B32B37/15, B32B27/08, B32B27/16, B32B27/30, B32B27/32 | [2019/45] | CPC: |
B32B27/32 (EP,US);
B32B27/08 (EP,US);
B32B27/16 (EP,US);
B32B27/20 (US);
B32B27/205 (EP,US);
B32B27/306 (EP,US);
B32B27/308 (EP,US);
B32B7/12 (EP,US);
C08L23/10 (EP,US);
C08L23/12 (EP,US);
B32B2250/05 (EP,US);
B32B2250/242 (EP,US);
B32B2255/10 (EP,US);
B32B2255/205 (EP,US);
B32B2255/24 (EP,US);
B32B2255/26 (EP,US);
B32B2255/28 (EP,US);
B32B2264/0285 (EP,US);
B32B2264/10 (EP,US);
B32B2264/102 (EP,US);
B32B2264/108 (EP,US);
B32B2274/00 (EP,US);
B32B2307/21 (EP,US);
B32B2307/30 (EP,US);
B32B2307/4026 (EP,US);
B32B2307/41 (EP,US);
B32B2307/516 (EP,US);
B32B2307/518 (US);
B32B2307/52 (EP,US);
B32B2307/58 (EP,US);
B32B2307/72 (EP,US);
B32B2307/7244 (EP,US);
B32B2307/7246 (EP,US);
B32B2307/732 (EP,US);
B32B2307/744 (EP,US);
B32B2307/746 (EP,US);
B32B2307/748 (EP,US);
B32B2405/00 (EP,US);
B32B2519/00 (EP,US);
| C-Set: |
C08L23/10, C08L23/16 (EP,US);
C08L23/12, C08L23/16, C08K3/26 (US,EP) |
Former IPC [2019/01] | C08L23/12, C08L23/14, B32B27/00, C08L23/08, B29L9/00, B32B37/15 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2019/01] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | MD | Not yet paid | Title | German: | WEISSE ANPASSBARE FOLIEN FÜR HAFTETIKETTANWENDUNGEN | [2019/01] | English: | WHITE, CONFORMABLE FILMS FOR PRESSURE-SENSITIVE-LABELING APPLICATIONS | [2019/01] | French: | FILMS BLANCS CONFORMABLES POUR DES APPLICATIONS D'ÉTIQUETAGE SENSIBLE À LA PRESSION | [2019/01] | Entry into regional phase | 24.09.2018 | National basic fee paid | 24.09.2018 | Search fee paid | 24.09.2018 | Designation fee(s) paid | 24.09.2018 | Examination fee paid | Examination procedure | deleted | Date on which the examining division has become responsible | 24.09.2018 | Examination requested [2019/01] | 27.04.2020 | Amendment by applicant (claims and/or description) | 26.01.2021 | Despatch of a communication from the examining division (Time limit: M02) | 29.01.2021 | Reply to a communication from the examining division | 27.05.2021 | Communication of intention to grant the patent | 28.10.2021 | Despatch of communication that the application is deemed to be withdrawn, reason: fee for grant / fee for printing not paid in time | 06.01.2022 | Fee for grant paid | 06.01.2022 | Fee for publishing/printing paid | 06.01.2022 | Receipt of the translation of the claim(s) | Opposition(s) | 24.11.2022 | No opposition filed within time limit [2023/05] | Request for further processing for: | The application is deemed to be withdrawn due to failure to fulfill actions required for granting the patent | 06.01.2022 | Request for further processing filed | 06.01.2022 | Full payment received (date of receipt of payment) Request granted | 14.01.2022 | Decision despatched | Fees paid | Renewal fee | 26.02.2019 | Renewal fee patent year 03 | 27.02.2020 | Renewal fee patent year 04 | 23.02.2021 | Renewal fee patent year 05 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 11.04.2017 | AL | 23.02.2022 | AT | 23.02.2022 | CY | 23.02.2022 | CZ | 23.02.2022 | DK | 23.02.2022 | EE | 23.02.2022 | ES | 23.02.2022 | FI | 23.02.2022 | HR | 23.02.2022 | LT | 23.02.2022 | LV | 23.02.2022 | MC | 23.02.2022 | MK | 23.02.2022 | NL | 23.02.2022 | PL | 23.02.2022 | RO | 23.02.2022 | RS | 23.02.2022 | SE | 23.02.2022 | SI | 23.02.2022 | SK | 23.02.2022 | SM | 23.02.2022 | IE | 11.04.2022 | LU | 11.04.2022 | BE | 30.04.2022 | CH | 30.04.2022 | LI | 30.04.2022 | BG | 23.05.2022 | NO | 23.05.2022 | GR | 24.05.2022 | IS | 23.06.2022 | PT | 23.06.2022 | [2024/23] |
Former [2024/20] | HU | 11.04.2017 | |
AL | 23.02.2022 | ||
AT | 23.02.2022 | ||
CY | 23.02.2022 | ||
CZ | 23.02.2022 | ||
DK | 23.02.2022 | ||
EE | 23.02.2022 | ||
ES | 23.02.2022 | ||
FI | 23.02.2022 | ||
HR | 23.02.2022 | ||
LT | 23.02.2022 | ||
LV | 23.02.2022 | ||
MC | 23.02.2022 | ||
NL | 23.02.2022 | ||
PL | 23.02.2022 | ||
RO | 23.02.2022 | ||
RS | 23.02.2022 | ||
SE | 23.02.2022 | ||
SI | 23.02.2022 | ||
SK | 23.02.2022 | ||
SM | 23.02.2022 | ||
IE | 11.04.2022 | ||
LU | 11.04.2022 | ||
BE | 30.04.2022 | ||
CH | 30.04.2022 | ||
LI | 30.04.2022 | ||
BG | 23.05.2022 | ||
NO | 23.05.2022 | ||
GR | 24.05.2022 | ||
IS | 23.06.2022 | ||
PT | 23.06.2022 | ||
Former [2024/18] | HU | 11.04.2017 | |
AL | 23.02.2022 | ||
AT | 23.02.2022 | ||
CZ | 23.02.2022 | ||
DK | 23.02.2022 | ||
EE | 23.02.2022 | ||
ES | 23.02.2022 | ||
FI | 23.02.2022 | ||
HR | 23.02.2022 | ||
LT | 23.02.2022 | ||
LV | 23.02.2022 | ||
MC | 23.02.2022 | ||
NL | 23.02.2022 | ||
PL | 23.02.2022 | ||
RO | 23.02.2022 | ||
RS | 23.02.2022 | ||
SE | 23.02.2022 | ||
SI | 23.02.2022 | ||
SK | 23.02.2022 | ||
SM | 23.02.2022 | ||
IE | 11.04.2022 | ||
LU | 11.04.2022 | ||
BE | 30.04.2022 | ||
CH | 30.04.2022 | ||
LI | 30.04.2022 | ||
BG | 23.05.2022 | ||
NO | 23.05.2022 | ||
GR | 24.05.2022 | ||
IS | 23.06.2022 | ||
PT | 23.06.2022 | ||
Former [2023/20] | AL | 23.02.2022 | |
AT | 23.02.2022 | ||
CZ | 23.02.2022 | ||
DK | 23.02.2022 | ||
EE | 23.02.2022 | ||
ES | 23.02.2022 | ||
FI | 23.02.2022 | ||
HR | 23.02.2022 | ||
LT | 23.02.2022 | ||
LV | 23.02.2022 | ||
MC | 23.02.2022 | ||
NL | 23.02.2022 | ||
PL | 23.02.2022 | ||
RO | 23.02.2022 | ||
RS | 23.02.2022 | ||
SE | 23.02.2022 | ||
SI | 23.02.2022 | ||
SK | 23.02.2022 | ||
SM | 23.02.2022 | ||
IE | 11.04.2022 | ||
LU | 11.04.2022 | ||
BE | 30.04.2022 | ||
CH | 30.04.2022 | ||
LI | 30.04.2022 | ||
BG | 23.05.2022 | ||
NO | 23.05.2022 | ||
GR | 24.05.2022 | ||
IS | 23.06.2022 | ||
PT | 23.06.2022 | ||
Former [2023/10] | AL | 23.02.2022 | |
AT | 23.02.2022 | ||
CZ | 23.02.2022 | ||
DK | 23.02.2022 | ||
EE | 23.02.2022 | ||
ES | 23.02.2022 | ||
FI | 23.02.2022 | ||
HR | 23.02.2022 | ||
LT | 23.02.2022 | ||
LV | 23.02.2022 | ||
MC | 23.02.2022 | ||
NL | 23.02.2022 | ||
PL | 23.02.2022 | ||
RO | 23.02.2022 | ||
RS | 23.02.2022 | ||
SE | 23.02.2022 | ||
SI | 23.02.2022 | ||
SK | 23.02.2022 | ||
SM | 23.02.2022 | ||
LU | 11.04.2022 | ||
BE | 30.04.2022 | ||
CH | 30.04.2022 | ||
LI | 30.04.2022 | ||
BG | 23.05.2022 | ||
NO | 23.05.2022 | ||
GR | 24.05.2022 | ||
IS | 23.06.2022 | ||
PT | 23.06.2022 | ||
Former [2023/09] | AL | 23.02.2022 | |
AT | 23.02.2022 | ||
CZ | 23.02.2022 | ||
DK | 23.02.2022 | ||
EE | 23.02.2022 | ||
ES | 23.02.2022 | ||
FI | 23.02.2022 | ||
HR | 23.02.2022 | ||
LT | 23.02.2022 | ||
LV | 23.02.2022 | ||
MC | 23.02.2022 | ||
NL | 23.02.2022 | ||
PL | 23.02.2022 | ||
RO | 23.02.2022 | ||
RS | 23.02.2022 | ||
SE | 23.02.2022 | ||
SK | 23.02.2022 | ||
SM | 23.02.2022 | ||
LU | 11.04.2022 | ||
CH | 30.04.2022 | ||
LI | 30.04.2022 | ||
BG | 23.05.2022 | ||
NO | 23.05.2022 | ||
GR | 24.05.2022 | ||
IS | 23.06.2022 | ||
PT | 23.06.2022 | ||
Former [2023/08] | AL | 23.02.2022 | |
AT | 23.02.2022 | ||
CZ | 23.02.2022 | ||
DK | 23.02.2022 | ||
EE | 23.02.2022 | ||
ES | 23.02.2022 | ||
FI | 23.02.2022 | ||
HR | 23.02.2022 | ||
LT | 23.02.2022 | ||
LV | 23.02.2022 | ||
MC | 23.02.2022 | ||
NL | 23.02.2022 | ||
PL | 23.02.2022 | ||
RO | 23.02.2022 | ||
RS | 23.02.2022 | ||
SE | 23.02.2022 | ||
SK | 23.02.2022 | ||
SM | 23.02.2022 | ||
LU | 11.04.2022 | ||
BG | 23.05.2022 | ||
NO | 23.05.2022 | ||
GR | 24.05.2022 | ||
IS | 23.06.2022 | ||
PT | 23.06.2022 | ||
Former [2023/06] | AL | 23.02.2022 | |
AT | 23.02.2022 | ||
CZ | 23.02.2022 | ||
DK | 23.02.2022 | ||
EE | 23.02.2022 | ||
ES | 23.02.2022 | ||
FI | 23.02.2022 | ||
HR | 23.02.2022 | ||
LT | 23.02.2022 | ||
LV | 23.02.2022 | ||
MC | 23.02.2022 | ||
NL | 23.02.2022 | ||
PL | 23.02.2022 | ||
RO | 23.02.2022 | ||
RS | 23.02.2022 | ||
SE | 23.02.2022 | ||
SK | 23.02.2022 | ||
SM | 23.02.2022 | ||
BG | 23.05.2022 | ||
NO | 23.05.2022 | ||
GR | 24.05.2022 | ||
IS | 23.06.2022 | ||
PT | 23.06.2022 | ||
Former [2023/01] | AL | 23.02.2022 | |
AT | 23.02.2022 | ||
CZ | 23.02.2022 | ||
DK | 23.02.2022 | ||
EE | 23.02.2022 | ||
ES | 23.02.2022 | ||
FI | 23.02.2022 | ||
HR | 23.02.2022 | ||
LT | 23.02.2022 | ||
LV | 23.02.2022 | ||
NL | 23.02.2022 | ||
PL | 23.02.2022 | ||
RO | 23.02.2022 | ||
RS | 23.02.2022 | ||
SE | 23.02.2022 | ||
SK | 23.02.2022 | ||
SM | 23.02.2022 | ||
BG | 23.05.2022 | ||
NO | 23.05.2022 | ||
GR | 24.05.2022 | ||
IS | 23.06.2022 | ||
PT | 23.06.2022 | ||
Former [2022/49] | AT | 23.02.2022 | |
CZ | 23.02.2022 | ||
DK | 23.02.2022 | ||
EE | 23.02.2022 | ||
ES | 23.02.2022 | ||
FI | 23.02.2022 | ||
HR | 23.02.2022 | ||
LT | 23.02.2022 | ||
LV | 23.02.2022 | ||
NL | 23.02.2022 | ||
PL | 23.02.2022 | ||
RO | 23.02.2022 | ||
RS | 23.02.2022 | ||
SE | 23.02.2022 | ||
SK | 23.02.2022 | ||
SM | 23.02.2022 | ||
BG | 23.05.2022 | ||
NO | 23.05.2022 | ||
GR | 24.05.2022 | ||
IS | 23.06.2022 | ||
PT | 23.06.2022 | ||
Former [2022/48] | AT | 23.02.2022 | |
CZ | 23.02.2022 | ||
DK | 23.02.2022 | ||
EE | 23.02.2022 | ||
ES | 23.02.2022 | ||
FI | 23.02.2022 | ||
HR | 23.02.2022 | ||
LT | 23.02.2022 | ||
LV | 23.02.2022 | ||
NL | 23.02.2022 | ||
PL | 23.02.2022 | ||
RO | 23.02.2022 | ||
RS | 23.02.2022 | ||
SE | 23.02.2022 | ||
SM | 23.02.2022 | ||
BG | 23.05.2022 | ||
NO | 23.05.2022 | ||
GR | 24.05.2022 | ||
IS | 23.06.2022 | ||
PT | 23.06.2022 | ||
Former [2022/47] | AT | 23.02.2022 | |
DK | 23.02.2022 | ||
ES | 23.02.2022 | ||
FI | 23.02.2022 | ||
HR | 23.02.2022 | ||
LT | 23.02.2022 | ||
LV | 23.02.2022 | ||
NL | 23.02.2022 | ||
PL | 23.02.2022 | ||
RO | 23.02.2022 | ||
RS | 23.02.2022 | ||
SE | 23.02.2022 | ||
SM | 23.02.2022 | ||
BG | 23.05.2022 | ||
NO | 23.05.2022 | ||
GR | 24.05.2022 | ||
IS | 23.06.2022 | ||
PT | 23.06.2022 | ||
Former [2022/46] | AT | 23.02.2022 | |
DK | 23.02.2022 | ||
ES | 23.02.2022 | ||
FI | 23.02.2022 | ||
HR | 23.02.2022 | ||
LT | 23.02.2022 | ||
LV | 23.02.2022 | ||
NL | 23.02.2022 | ||
PL | 23.02.2022 | ||
RS | 23.02.2022 | ||
SE | 23.02.2022 | ||
BG | 23.05.2022 | ||
NO | 23.05.2022 | ||
GR | 24.05.2022 | ||
IS | 23.06.2022 | ||
PT | 23.06.2022 | ||
Former [2022/42] | AT | 23.02.2022 | |
ES | 23.02.2022 | ||
FI | 23.02.2022 | ||
HR | 23.02.2022 | ||
LT | 23.02.2022 | ||
LV | 23.02.2022 | ||
NL | 23.02.2022 | ||
PL | 23.02.2022 | ||
RS | 23.02.2022 | ||
SE | 23.02.2022 | ||
BG | 23.05.2022 | ||
NO | 23.05.2022 | ||
GR | 24.05.2022 | ||
IS | 23.06.2022 | ||
PT | 23.06.2022 | ||
Former [2022/39] | AT | 23.02.2022 | |
ES | 23.02.2022 | ||
FI | 23.02.2022 | ||
HR | 23.02.2022 | ||
LT | 23.02.2022 | ||
LV | 23.02.2022 | ||
NL | 23.02.2022 | ||
PL | 23.02.2022 | ||
RS | 23.02.2022 | ||
SE | 23.02.2022 | ||
BG | 23.05.2022 | ||
NO | 23.05.2022 | ||
GR | 24.05.2022 | ||
PT | 23.06.2022 | ||
Former [2022/36] | AT | 23.02.2022 | |
ES | 23.02.2022 | ||
HR | 23.02.2022 | ||
LT | 23.02.2022 | ||
LV | 23.02.2022 | ||
NL | 23.02.2022 | ||
PL | 23.02.2022 | ||
RS | 23.02.2022 | ||
SE | 23.02.2022 | ||
BG | 23.05.2022 | ||
NO | 23.05.2022 | ||
GR | 24.05.2022 | ||
PT | 23.06.2022 | ||
Former [2022/35] | ES | 23.02.2022 | |
HR | 23.02.2022 | ||
LT | 23.02.2022 | ||
NL | 23.02.2022 | ||
RS | 23.02.2022 | ||
SE | 23.02.2022 | ||
BG | 23.05.2022 | ||
NO | 23.05.2022 | ||
PT | 23.06.2022 | ||
Former [2022/34] | ES | 23.02.2022 | |
LT | 23.02.2022 | ||
NL | 23.02.2022 | ||
NO | 23.05.2022 | ||
PT | 23.06.2022 | ||
Former [2022/33] | LT | 23.02.2022 | |
NO | 23.05.2022 | Documents cited: | Search | [ ] - No further relevant documents disclosed | International search | [A]US5492757 (SCHUHMANN DETLEF E [DE], et al) [A] 1-20* entire document *; | [X]US2009081474 (KEUNG JAY K [US]) [X] 1, 4-5, 8 * para [0003], [0023]-[0024], [0027]-[0028], [0050]-[0051], [0054], [0056], [0062], [0065]-[0066], [0075], [0083], [0090], [0093], [0100] -[0101], [0112], [0134]-[0137], [0143]-[0147], [0155]-[0158] *; | [X]US7537829 (PELLINGRA JR SALVATORE J [US], et al) [X] 1-3, 6-7, 9-20 * col 1, In 18-22; col 3, In 5-8, 38-65; col 4, In 4-49, 65-67; col 5, In 1-12, 43-48, 57-67; col 6, In 1-3, 37-67; col 7, In 10-16, 53-67; col 8, In 3-6, 12-19, 23-37; col 9, In 38-67; col 10, In 1-2, 11-26, 37-39, 47-62; col 11, In 8 -10, 16-45, 60-67; col 12, In 44-46, 64-67; col 13, In 1-10, 14-23; col 14, In 30-35, 65-67; col 15, In 1-3; col 18, In 16-52; claim 1, 13 *; | [A]US8202623 (DABADIE THIERRY JEAN-LUC [LU], et al) [A] 1-20 * entire document *; | [A]US2013212983 (BENDER ERIC W [US], et al) [A] 1-20 * entire document *; | [A]US8663810 (AMBROISE BENOIT [BE], et al) [A] 1-20 * entire document *; | [A]US9080082 (THAI HAO C [US], et al) [A] 1-20 * entire document *; | [A] - RUBEN J. HERNANDEZ, "Food Packaging Materials, Barrier Properties, and Selection", RUBEN J. HERNANDEZ, Enrique Rotstein, R. Paul Singh, and Kenneth J. Valentas., Handbook of Food Enggineering Practice, Boca Raton, New York, CRC Press, (19970000), pages 296 - 365, 8, ISBN 0-8493-8694-2, XP055600812 [A] 5 * section 8.2.2 * | by applicant | US3753769 | US4058645 | US4214039 | US4439493 | US4447494 | US4961992 | US5019447 | US5057177 | US5230963 | US8080294 |