blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3526057

EP3526057 - WHEEL MADE OUT OF FIBER REINFORCED MATERIAL AND PROCEDURE TO MAKE SUCH WHEEL [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  25.03.2022
Database last updated on 19.10.2024
FormerThe patent has been granted
Status updated on  16.04.2021
FormerGrant of patent is intended
Status updated on  16.12.2020
FormerRequest for examination was made
Status updated on  19.07.2019
FormerThe international publication has been made
Status updated on  28.04.2018
Formerunknown
Status updated on  25.10.2017
Most recent event   Tooltip13.09.2024Lapse of the patent in a contracting state
New state(s): MT
published on 16.10.2024  [2024/42]
Applicant(s)For all designated states
Mubea Carbo Tech GmbH
Eugen-Müller-Strasse 16
5020 Salzburg / AT
[2019/34]
Inventor(s)01 / RENNER, Christoph
Im Wallnmoos 12
4824 Gosau / AT
 [2019/34]
Representative(s)Rentsch Partner AG
Kirchenweg 8
Postfach
8034 Zürich / CH
[N/P]
Former [2019/34]Rentsch Partner AG
Bellerivestrasse 203
Postfach
8034 Zürich / CH
Application number, filing date17784246.504.10.2017
[2019/34]
WO2017EP75219
Priority number, dateCH2016000138317.10.2016         Original published format: CH 13832016
CH2017000018517.02.2017         Original published format: CH 1852017
CH2017000032917.03.2017         Original published format: CH 3292017
[2019/34]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2018073005
Date:26.04.2018
Language:EN
[2018/17]
Type: A1 Application with search report 
No.:EP3526057
Date:21.08.2019
Language:EN
The application published by WIPO in one of the EPO official languages on 26.04.2018 takes the place of the publication of the European patent application.
[2019/34]
Type: B1 Patent specification 
No.:EP3526057
Date:19.05.2021
Language:EN
[2021/20]
Search report(s)International search report - published on:EP26.04.2018
ClassificationIPC:B60B5/02, B60B25/04
[2019/34]
CPC:
B60B5/02 (EP,US); B60B1/12 (US); B60B25/04 (EP);
B60B27/0073 (US); B29C70/28 (US); B29K2307/04 (US);
B29L2031/322 (US); B60B2310/204 (EP,US); B60B2310/318 (US);
B60B2310/52 (US); B60B2360/341 (EP,US); B60Y2200/12 (US);
Y02T10/86 (EP) (-)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2019/34]
Extension statesBANot yet paid
MENot yet paid
Validation statesMANot yet paid
MDNot yet paid
TitleGerman:AUS FASERVERSTÄRKTEM MATERIAL HERGESTELLTES RAD UND VERFAHREN ZUR HERSTELLUNG SOLCH EINES RADS[2019/34]
English:WHEEL MADE OUT OF FIBER REINFORCED MATERIAL AND PROCEDURE TO MAKE SUCH WHEEL[2019/34]
French:ROUE RÉALISÉE EN UN MATÉRIAU RENFORCÉ DE FIBRES ET PROCÉDURE POUR FABRIQUER UNE TELLE ROUE[2019/34]
Entry into regional phase05.04.2019National basic fee paid 
05.04.2019Designation fee(s) paid 
05.04.2019Examination fee paid 
Examination procedure05.04.2019Examination requested  [2019/34]
05.04.2019Date on which the examining division has become responsible
20.11.2019Amendment by applicant (claims and/or description)
17.12.2020Communication of intention to grant the patent
06.04.2021Fee for grant paid
06.04.2021Fee for publishing/printing paid
06.04.2021Receipt of the translation of the claim(s)
Divisional application(s)EP21174378.6  / EP3888934
Opposition(s)22.02.2022No opposition filed within time limit [2022/17]
Fees paidRenewal fee
30.04.2019Renewal fee patent year 03
07.10.2020Renewal fee patent year 04
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU04.10.2017
AL19.05.2021
CY19.05.2021
DK19.05.2021
EE19.05.2021
ES19.05.2021
FI19.05.2021
HR19.05.2021
LT19.05.2021
LV19.05.2021
MC19.05.2021
MK19.05.2021
MT19.05.2021
NL19.05.2021
PL19.05.2021
RO19.05.2021
RS19.05.2021
SE19.05.2021
SI19.05.2021
SK19.05.2021
SM19.05.2021
TR19.05.2021
BG19.08.2021
NO19.08.2021
GR20.08.2021
IS19.09.2021
PT20.09.2021
IE04.10.2021
LU04.10.2021
BE31.10.2021
CH31.10.2021
LI31.10.2021
[2024/42]
Former [2024/29]HU04.10.2017
AL19.05.2021
CY19.05.2021
DK19.05.2021
EE19.05.2021
ES19.05.2021
FI19.05.2021
HR19.05.2021
LT19.05.2021
LV19.05.2021
MC19.05.2021
MK19.05.2021
NL19.05.2021
PL19.05.2021
RO19.05.2021
RS19.05.2021
SE19.05.2021
SI19.05.2021
SK19.05.2021
SM19.05.2021
TR19.05.2021
BG19.08.2021
NO19.08.2021
GR20.08.2021
IS19.09.2021
PT20.09.2021
IE04.10.2021
LU04.10.2021
BE31.10.2021
CH31.10.2021
LI31.10.2021
Former [2024/23]HU04.10.2017
AL19.05.2021
CY19.05.2021
DK19.05.2021
EE19.05.2021
ES19.05.2021
FI19.05.2021
HR19.05.2021
LT19.05.2021
LV19.05.2021
MC19.05.2021
MK19.05.2021
NL19.05.2021
PL19.05.2021
RO19.05.2021
RS19.05.2021
SE19.05.2021
SI19.05.2021
SK19.05.2021
SM19.05.2021
BG19.08.2021
NO19.08.2021
GR20.08.2021
IS19.09.2021
PT20.09.2021
IE04.10.2021
LU04.10.2021
BE31.10.2021
CH31.10.2021
LI31.10.2021
Former [2023/33]HU04.10.2017
AL19.05.2021
CY19.05.2021
DK19.05.2021
EE19.05.2021
ES19.05.2021
FI19.05.2021
HR19.05.2021
LT19.05.2021
LV19.05.2021
MC19.05.2021
NL19.05.2021
PL19.05.2021
RO19.05.2021
RS19.05.2021
SE19.05.2021
SI19.05.2021
SK19.05.2021
SM19.05.2021
BG19.08.2021
NO19.08.2021
GR20.08.2021
IS19.09.2021
PT20.09.2021
IE04.10.2021
LU04.10.2021
BE31.10.2021
CH31.10.2021
LI31.10.2021
Former [2023/30]AL19.05.2021
CY19.05.2021
DK19.05.2021
EE19.05.2021
ES19.05.2021
FI19.05.2021
HR19.05.2021
LT19.05.2021
LV19.05.2021
MC19.05.2021
NL19.05.2021
PL19.05.2021
RO19.05.2021
RS19.05.2021
SE19.05.2021
SI19.05.2021
SK19.05.2021
SM19.05.2021
BG19.08.2021
NO19.08.2021
GR20.08.2021
IS19.09.2021
PT20.09.2021
IE04.10.2021
LU04.10.2021
BE31.10.2021
CH31.10.2021
LI31.10.2021
Former [2022/48]AL19.05.2021
DK19.05.2021
EE19.05.2021
ES19.05.2021
FI19.05.2021
HR19.05.2021
LT19.05.2021
LV19.05.2021
MC19.05.2021
NL19.05.2021
PL19.05.2021
RO19.05.2021
RS19.05.2021
SE19.05.2021
SI19.05.2021
SK19.05.2021
SM19.05.2021
BG19.08.2021
NO19.08.2021
GR20.08.2021
IS19.09.2021
PT20.09.2021
IE04.10.2021
LU04.10.2021
BE31.10.2021
CH31.10.2021
LI31.10.2021
Former [2022/37]AL19.05.2021
DK19.05.2021
EE19.05.2021
ES19.05.2021
FI19.05.2021
HR19.05.2021
LT19.05.2021
LV19.05.2021
MC19.05.2021
NL19.05.2021
PL19.05.2021
RO19.05.2021
RS19.05.2021
SE19.05.2021
SI19.05.2021
SK19.05.2021
SM19.05.2021
BG19.08.2021
NO19.08.2021
GR20.08.2021
IS19.09.2021
PT20.09.2021
LU04.10.2021
BE31.10.2021
CH31.10.2021
LI31.10.2021
Former [2022/35]AL19.05.2021
DK19.05.2021
EE19.05.2021
ES19.05.2021
FI19.05.2021
HR19.05.2021
LT19.05.2021
LV19.05.2021
MC19.05.2021
NL19.05.2021
PL19.05.2021
RO19.05.2021
RS19.05.2021
SE19.05.2021
SI19.05.2021
SK19.05.2021
SM19.05.2021
BG19.08.2021
NO19.08.2021
GR20.08.2021
IS19.09.2021
PT20.09.2021
LU04.10.2021
BE31.10.2021
Former [2022/33]AL19.05.2021
DK19.05.2021
EE19.05.2021
ES19.05.2021
FI19.05.2021
HR19.05.2021
LT19.05.2021
LV19.05.2021
MC19.05.2021
NL19.05.2021
PL19.05.2021
RO19.05.2021
RS19.05.2021
SE19.05.2021
SI19.05.2021
SK19.05.2021
SM19.05.2021
BG19.08.2021
NO19.08.2021
GR20.08.2021
IS19.09.2021
PT20.09.2021
BE31.10.2021
Former [2022/29]AL19.05.2021
DK19.05.2021
EE19.05.2021
ES19.05.2021
FI19.05.2021
HR19.05.2021
LT19.05.2021
LV19.05.2021
NL19.05.2021
PL19.05.2021
RO19.05.2021
RS19.05.2021
SE19.05.2021
SI19.05.2021
SK19.05.2021
SM19.05.2021
BG19.08.2021
NO19.08.2021
GR20.08.2021
IS19.09.2021
PT20.09.2021
Former [2022/26]AL19.05.2021
DK19.05.2021
EE19.05.2021
ES19.05.2021
FI19.05.2021
HR19.05.2021
LT19.05.2021
LV19.05.2021
NL19.05.2021
PL19.05.2021
RO19.05.2021
RS19.05.2021
SE19.05.2021
SK19.05.2021
SM19.05.2021
BG19.08.2021
NO19.08.2021
GR20.08.2021
IS19.09.2021
PT20.09.2021
Former [2022/23]DK19.05.2021
EE19.05.2021
ES19.05.2021
FI19.05.2021
HR19.05.2021
LT19.05.2021
LV19.05.2021
NL19.05.2021
PL19.05.2021
RO19.05.2021
RS19.05.2021
SE19.05.2021
SK19.05.2021
SM19.05.2021
BG19.08.2021
NO19.08.2021
GR20.08.2021
IS19.09.2021
PT20.09.2021
Former [2022/10]DK19.05.2021
EE19.05.2021
ES19.05.2021
FI19.05.2021
HR19.05.2021
LT19.05.2021
LV19.05.2021
NL19.05.2021
PL19.05.2021
RO19.05.2021
RS19.05.2021
SE19.05.2021
SK19.05.2021
SM19.05.2021
BG19.08.2021
NO19.08.2021
GR20.08.2021
PT20.09.2021
IS22.12.2021
Former [2022/08]DK19.05.2021
ES19.05.2021
FI19.05.2021
HR19.05.2021
LT19.05.2021
LV19.05.2021
NL19.05.2021
PL19.05.2021
RS19.05.2021
SE19.05.2021
SM19.05.2021
BG19.08.2021
NO19.08.2021
GR20.08.2021
IS19.09.2021
PT20.09.2021
Former [2022/07]FI19.05.2021
HR19.05.2021
LT19.05.2021
LV19.05.2021
NL19.05.2021
PL19.05.2021
RS19.05.2021
SE19.05.2021
SM19.05.2021
BG19.08.2021
NO19.08.2021
GR20.08.2021
IS19.09.2021
PT20.09.2021
Former [2022/04]FI19.05.2021
HR19.05.2021
LT19.05.2021
LV19.05.2021
NL19.05.2021
PL19.05.2021
RS19.05.2021
SE19.05.2021
BG19.08.2021
NO19.08.2021
GR20.08.2021
IS19.09.2021
PT20.09.2021
Former [2021/52]FI19.05.2021
HR19.05.2021
LT19.05.2021
LV19.05.2021
PL19.05.2021
RS19.05.2021
SE19.05.2021
BG19.08.2021
NO19.08.2021
GR20.08.2021
IS19.09.2021
PT20.09.2021
Former [2021/51]FI19.05.2021
HR19.05.2021
LT19.05.2021
LV19.05.2021
RS19.05.2021
SE19.05.2021
BG19.08.2021
NO19.08.2021
GR20.08.2021
IS19.09.2021
PT20.09.2021
Former [2021/50]FI19.05.2021
HR19.05.2021
LT19.05.2021
LV19.05.2021
SE19.05.2021
BG19.08.2021
NO19.08.2021
GR20.08.2021
PT20.09.2021
Former [2021/49]FI19.05.2021
HR19.05.2021
LT19.05.2021
LV19.05.2021
SE19.05.2021
BG19.08.2021
NO19.08.2021
GR20.08.2021
Former [2021/47]FI19.05.2021
LT19.05.2021
BG19.08.2021
Former [2021/46]FI19.05.2021
LT19.05.2021
Cited inInternational search[Y]DE3536308  (LAFLOER LOTHAR GMBH & CO [DE]) [Y] 16-18 * column 3, lines 22-37; figures 2,3 *;
 [Y]DE3637214  (BAYERISCHE MOTOREN WERKE AG [DE]) [Y] 9 * abstract *;
 [XAI]EP0381558  (MESSIER HISPANO SA [FR], et al) [X] 1-4,10-15 * column 3, lines 31-39; figure . * [A] 16-18 [I] 5;
 [Y]US5246275  (ARREDONDO JR RENE N [US]) [Y] 16-18 * column 9, lines 1-7; figure 1 * * column 12, line 18 - column 13, line 5; figures 9,10 *;
 [A]US2008303337  (KRANTZ GREGORY MICHAEL [US]) [A] 1-15* figure - *;
 [XDYI]TW201141720  (CHANG YU-CHENG [TW]) [XD] 1-4,10-12 * abstract * [Y] 9,16-18 [I] 5-8;
 [XAYI]EP2848426  (RÖDER PRÄZISION GMBH [DE], et al) [X] 1-4,6,10,11 * paragraph [0026]; figures 1,4 * [A] 16-18 [Y] 9 [I] 5,8
by applicantTW201141720
 WO2013083729
 WO2013083500
 WO2015028337
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.