blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3526497

EP3526497 - METHOD FOR PREPARING EXTRUDED MATERIAL FOR PROCESSING TO FORM SEALINGS AND EXTRUDED MATERIAL [Right-click to bookmark this link]
Former [2019/34]METHOD FOR PREPARING EXTRUDED MATERIAL FOR PROCESSING TO FORM SEALINGS
[2020/20]
StatusNo opposition filed within time limit
Status updated on  02.07.2021
Database last updated on 14.09.2024
FormerThe patent has been granted
Status updated on  24.07.2020
FormerGrant of patent is intended
Status updated on  14.04.2020
FormerRequest for examination was made
Status updated on  19.07.2019
FormerThe international publication has been made
Status updated on  20.04.2018
Formerunknown
Status updated on  08.11.2017
Most recent event   Tooltip15.07.2022Lapse of the patent in a contracting state
New state(s): MK
published on 17.08.2022  [2022/33]
Applicant(s)For all designated states
CQLT SaarGummi Technologies S.à.r.l.
9, Op der Kopp
5544 Remich / LU
For all designated states
BMW AG
Petuelring 130
80809 München / DE
For all designated states
AyTec Automation GmbH
Römerstraße 2
93098 Mintraching / DE
[2020/20]
Former [2019/34]For all designated states
CQLT SaarGummi Technologies S.à.r.l.
9, Op der Kopp
5544 Remich / LU
For all designated states
BMW AG
Petuelring 130
80788 München / DE
For all designated states
AyTec Automation GmbH
Römerstraße 2
93098 Mintraching / DE
Inventor(s)01 / KAST, Christian
Zur Grünstadt 8
66683 Merzig-Brotdorf / DE
02 / HINZ, Andreas
Wendelsteinstraße 14
82140 Olching / DE
03 / RUHLAND, Christian
Zeilerstraße 11
93161 Sinzing / DE
 [2019/34]
Representative(s)Patentanwälte Bernhardt / Wolff Partnerschaft mbB
Europaallee 17
66113 Saarbrücken / DE
[2019/34]
Application number, filing date17791300.111.10.2017
[2019/34]
WO2017EP75889
Priority number, dateDE20161011952013.10.2016         Original published format: DE102016119520
[2019/34]
Filing languageDE
Procedural languageDE
PublicationType: A1 Application with search report
No.:WO2018069371
Date:19.04.2018
Language:DE
[2018/16]
Type: A1 Application with search report 
No.:EP3526497
Date:21.08.2019
Language:DE
The application published by WIPO in one of the EPO official languages on 19.04.2018 takes the place of the publication of the European patent application.
[2019/34]
Type: B1 Patent specification 
No.:EP3526497
Date:26.08.2020
Language:DE
[2020/35]
Search report(s)International search report - published on:EP19.04.2018
ClassificationIPC:F16J15/328, B23P19/04
[2019/34]
CPC:
F16J15/328 (EP,US); B23P19/047 (EP,US)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2019/34]
Extension statesBANot yet paid
MENot yet paid
Validation statesMANot yet paid
MDNot yet paid
TitleGerman:VERFAHREN ZUR HERRICHTUNG VON STRANGMATERIAL FÜR DIE VERARBEITUNG ZU DICHTUNGEN UND STRANGMATERIAL[2020/20]
English:METHOD FOR PREPARING EXTRUDED MATERIAL FOR PROCESSING TO FORM SEALINGS AND EXTRUDED MATERIAL[2020/20]
French:PROCÉDÉ POUR PRODUIRE UN MATÉRIAU EN BANDE CONTINUE DESTINÉ À LA RÉALISATION DE JOINTS D'ÉTANCHÉITÉ ET BANDE CONTINUE[2020/20]
Former [2019/34]VERFAHREN ZUR HERRICHTUNG VON STRANGMATERIAL FÜR DIE VERARBEITUNG ZU DICHTUNGEN
Former [2019/34]METHOD FOR PREPARING EXTRUDED MATERIAL FOR PROCESSING TO FORM SEALINGS
Former [2019/34]PROCÉDÉ POUR PRODUIRE UN MATÉRIAU EN BANDE CONTINUE DESTINÉ À LA RÉALISATION DE JOINTS D'ÉTANCHÉITÉ
Entry into regional phase29.04.2019National basic fee paid 
29.04.2019Designation fee(s) paid 
29.04.2019Examination fee paid 
Examination procedure29.04.2019Examination requested  [2019/34]
29.04.2019Date on which the examining division has become responsible
26.11.2019Amendment by applicant (claims and/or description)
15.04.2020Communication of intention to grant the patent
14.07.2020Fee for grant paid
14.07.2020Fee for publishing/printing paid
14.07.2020Receipt of the translation of the claim(s)
Opposition(s)27.05.2021No opposition filed within time limit [2021/31]
Fees paidRenewal fee
25.10.2019Renewal fee patent year 03
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU11.10.2017
AL26.08.2020
CY26.08.2020
CZ26.08.2020
DK26.08.2020
EE26.08.2020
ES26.08.2020
FI26.08.2020
HR26.08.2020
IT26.08.2020
LT26.08.2020
LV26.08.2020
MC26.08.2020
MK26.08.2020
MT26.08.2020
NL26.08.2020
PL26.08.2020
RO26.08.2020
RS26.08.2020
SE26.08.2020
SI26.08.2020
SK26.08.2020
SM26.08.2020
TR26.08.2020
IE11.10.2020
LU11.10.2020
BE31.10.2020
CH31.10.2020
LI31.10.2020
BG26.11.2020
NO26.11.2020
GR27.11.2020
IS26.12.2020
PT28.12.2020
[2022/33]
Former [2022/27]HU11.10.2017
AL26.08.2020
CY26.08.2020
CZ26.08.2020
DK26.08.2020
EE26.08.2020
ES26.08.2020
FI26.08.2020
HR26.08.2020
IT26.08.2020
LT26.08.2020
LV26.08.2020
MC26.08.2020
MT26.08.2020
NL26.08.2020
PL26.08.2020
RO26.08.2020
RS26.08.2020
SE26.08.2020
SI26.08.2020
SK26.08.2020
SM26.08.2020
TR26.08.2020
IE11.10.2020
LU11.10.2020
BE31.10.2020
CH31.10.2020
LI31.10.2020
BG26.11.2020
NO26.11.2020
GR27.11.2020
IS26.12.2020
PT28.12.2020
Former [2021/46]AL26.08.2020
CZ26.08.2020
DK26.08.2020
EE26.08.2020
ES26.08.2020
FI26.08.2020
HR26.08.2020
IT26.08.2020
LT26.08.2020
LV26.08.2020
MC26.08.2020
NL26.08.2020
PL26.08.2020
RO26.08.2020
RS26.08.2020
SE26.08.2020
SI26.08.2020
SK26.08.2020
SM26.08.2020
IE11.10.2020
LU11.10.2020
BE31.10.2020
CH31.10.2020
LI31.10.2020
BG26.11.2020
NO26.11.2020
GR27.11.2020
IS26.12.2020
PT28.12.2020
Former [2021/37]AL26.08.2020
CZ26.08.2020
DK26.08.2020
EE26.08.2020
ES26.08.2020
FI26.08.2020
HR26.08.2020
IT26.08.2020
LT26.08.2020
LV26.08.2020
MC26.08.2020
NL26.08.2020
PL26.08.2020
RO26.08.2020
RS26.08.2020
SE26.08.2020
SI26.08.2020
SK26.08.2020
SM26.08.2020
LU11.10.2020
BE31.10.2020
CH31.10.2020
LI31.10.2020
BG26.11.2020
NO26.11.2020
GR27.11.2020
IS26.12.2020
PT28.12.2020
Former [2021/36]AL26.08.2020
CZ26.08.2020
DK26.08.2020
EE26.08.2020
ES26.08.2020
FI26.08.2020
HR26.08.2020
IT26.08.2020
LT26.08.2020
LV26.08.2020
MC26.08.2020
NL26.08.2020
PL26.08.2020
RO26.08.2020
RS26.08.2020
SE26.08.2020
SI26.08.2020
SK26.08.2020
SM26.08.2020
LU11.10.2020
BE31.10.2020
BG26.11.2020
NO26.11.2020
GR27.11.2020
IS26.12.2020
PT28.12.2020
Former [2021/34]AL26.08.2020
CZ26.08.2020
DK26.08.2020
EE26.08.2020
ES26.08.2020
FI26.08.2020
HR26.08.2020
IT26.08.2020
LT26.08.2020
LV26.08.2020
MC26.08.2020
NL26.08.2020
PL26.08.2020
RO26.08.2020
RS26.08.2020
SE26.08.2020
SK26.08.2020
SM26.08.2020
LU11.10.2020
BG26.11.2020
NO26.11.2020
GR27.11.2020
IS26.12.2020
PT28.12.2020
Former [2021/31]AL26.08.2020
CZ26.08.2020
DK26.08.2020
EE26.08.2020
ES26.08.2020
FI26.08.2020
HR26.08.2020
LT26.08.2020
LV26.08.2020
MC26.08.2020
NL26.08.2020
PL26.08.2020
RO26.08.2020
RS26.08.2020
SE26.08.2020
SK26.08.2020
SM26.08.2020
LU11.10.2020
BG26.11.2020
NO26.11.2020
GR27.11.2020
IS26.12.2020
PT28.12.2020
Former [2021/28]AL26.08.2020
CZ26.08.2020
DK26.08.2020
EE26.08.2020
ES26.08.2020
FI26.08.2020
HR26.08.2020
LT26.08.2020
LV26.08.2020
NL26.08.2020
PL26.08.2020
RO26.08.2020
RS26.08.2020
SE26.08.2020
SK26.08.2020
SM26.08.2020
BG26.11.2020
NO26.11.2020
GR27.11.2020
IS26.12.2020
PT28.12.2020
Former [2021/25]AL26.08.2020
CZ26.08.2020
DK26.08.2020
EE26.08.2020
ES26.08.2020
FI26.08.2020
HR26.08.2020
LT26.08.2020
LV26.08.2020
NL26.08.2020
PL26.08.2020
RO26.08.2020
RS26.08.2020
SE26.08.2020
SM26.08.2020
BG26.11.2020
NO26.11.2020
GR27.11.2020
IS26.12.2020
PT28.12.2020
Former [2021/22]CZ26.08.2020
DK26.08.2020
EE26.08.2020
FI26.08.2020
HR26.08.2020
LT26.08.2020
LV26.08.2020
NL26.08.2020
PL26.08.2020
RO26.08.2020
RS26.08.2020
SE26.08.2020
SM26.08.2020
BG26.11.2020
NO26.11.2020
GR27.11.2020
IS26.12.2020
PT28.12.2020
Former [2021/21]DK26.08.2020
FI26.08.2020
HR26.08.2020
LT26.08.2020
LV26.08.2020
NL26.08.2020
PL26.08.2020
RS26.08.2020
SE26.08.2020
BG26.11.2020
NO26.11.2020
GR27.11.2020
IS26.12.2020
PT28.12.2020
Former [2021/12]FI26.08.2020
HR26.08.2020
LT26.08.2020
LV26.08.2020
NL26.08.2020
PL26.08.2020
RS26.08.2020
SE26.08.2020
BG26.11.2020
NO26.11.2020
GR27.11.2020
IS26.12.2020
PT28.12.2020
Former [2021/10]FI26.08.2020
HR26.08.2020
LT26.08.2020
LV26.08.2020
PL26.08.2020
RS26.08.2020
SE26.08.2020
BG26.11.2020
NO26.11.2020
GR27.11.2020
IS26.12.2020
PT28.12.2020
Former [2021/09]FI26.08.2020
LT26.08.2020
SE26.08.2020
BG26.11.2020
NO26.11.2020
GR27.11.2020
PT28.12.2020
Former [2021/08]FI26.08.2020
LT26.08.2020
SE26.08.2020
BG26.11.2020
NO26.11.2020
PT28.12.2020
Former [2021/07]FI26.08.2020
LT26.08.2020
NO26.11.2020
Cited inInternational search[A]DE102005028069  (SG TECHNOLOGIES GMBH [DE]) [A] 1-14 * abstract *;
 [AD]EP1733839  (SG TECHNOLOGIES GMBH [DE]) [AD] 1-14;
 [A]WO2013167257  (CQLT SAARGUMMI TECHNOLOGIES S A R L [LU]) [A] 1-14* abstract *;
 [A]DE102014110541  (CQLT SAARGUMMI TECHNOLOGIES S À R L [LU]) [A] 1-14 * the whole document *
by applicantEP1733839
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.