blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3529128

EP3529128 - STEERING COLUMN COMPRISING AN ADAPTIVE ENERGY ABSORPTION DEVICE FOR A MOTOR VEHICLE [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  31.12.2021
Database last updated on 07.10.2024
FormerThe patent has been granted
Status updated on  22.01.2021
FormerGrant of patent is intended
Status updated on  12.10.2020
FormerRequest for examination was made
Status updated on  26.07.2019
FormerThe international publication has been made
Status updated on  28.04.2018
Formerunknown
Status updated on  08.11.2017
Most recent event   Tooltip13.09.2024Lapse of the patent in a contracting state
New state(s): MT
published on 16.10.2024 [2024/42]
Applicant(s)For all designated states
thyssenkrupp Presta AG
Essanestrasse 10
9492 Eschen / LI
For all designated states
thyssenkrupp AG
ThyssenKrupp Allee 1
45143 Essen / DE
[2021/08]
Former [2020/17]For all designated states
thyssenkrupp Presta AG
Essanestrasse 10
9492 Eschen / LI
For all designated states
Thyssenkrupp AG
Thyssenkrupp Allee 1
45143 Essen / DE
Former [2019/35]For all designated states
ThyssenKrupp Presta AG
Essanestrasse 10
9492 Eschen / LI
For all designated states
Thyssenkrupp AG
Thyssenkrupp Allee 1
45143 Essen / DE
Inventor(s)01 / DOMIG, Markus
Fangesweg 4
6781 Bartholomäberg / AT
 [2019/35]
Representative(s)thyssenkrupp Intellectual Property GmbH
ThyssenKrupp Allee 1
45143 Essen / DE
[2019/35]
Application number, filing date17791324.118.10.2017
[2019/35]
WO2017EP76612
Priority number, dateDE20161022053119.10.2016         Original published format: DE102016220531
[2019/35]
Filing languageDE
Procedural languageDE
PublicationType: A1 Application with search report
No.:WO2018073304
Date:26.04.2018
Language:DE
[2018/17]
Type: A1 Application with search report 
No.:EP3529128
Date:28.08.2019
Language:DE
The application published by WIPO in one of the EPO official languages on 26.04.2018 takes the place of the publication of the European patent application.
[2019/35]
Type: B1 Patent specification 
No.:EP3529128
Date:24.02.2021
Language:DE
[2021/08]
Search report(s)International search report - published on:EP26.04.2018
ClassificationIPC:B62D1/19
[2019/35]
CPC:
B62D1/195 (EP,US); B62D1/184 (US); B62D1/185 (US);
B62D1/192 (EP,US)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2019/35]
Extension statesBANot yet paid
MENot yet paid
Validation statesMANot yet paid
MDNot yet paid
TitleGerman:LENKSÄULE MIT ADAPTIVER ENERGIEABSORPTIONSVORRICHTUNG FÜR EIN KRAFTFAHRZEUG[2019/35]
English:STEERING COLUMN COMPRISING AN ADAPTIVE ENERGY ABSORPTION DEVICE FOR A MOTOR VEHICLE[2019/35]
French:COLONNE DE DIRECTION À DISPOSITIF D'ABSORPTION D'ÉNERGIE ADAPTATIF POUR UN VÉHICULE À MOTEUR[2019/35]
Entry into regional phase20.05.2019National basic fee paid 
20.05.2019Designation fee(s) paid 
20.05.2019Examination fee paid 
Examination procedure20.05.2019Examination requested  [2019/35]
20.05.2019Date on which the examining division has become responsible
05.11.2019Amendment by applicant (claims and/or description)
13.10.2020Communication of intention to grant the patent
19.01.2021Fee for grant paid
19.01.2021Fee for publishing/printing paid
19.01.2021Receipt of the translation of the claim(s)
Opposition(s)25.11.2021No opposition filed within time limit [2022/05]
Fees paidRenewal fee
25.10.2019Renewal fee patent year 03
23.10.2020Renewal fee patent year 04
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU18.10.2017
AL24.02.2021
CY24.02.2021
DK24.02.2021
EE24.02.2021
FI24.02.2021
HR24.02.2021
LT24.02.2021
LV24.02.2021
MC24.02.2021
MK24.02.2021
MT24.02.2021
NL24.02.2021
RO24.02.2021
RS24.02.2021
SE24.02.2021
SI24.02.2021
SK24.02.2021
SM24.02.2021
TR24.02.2021
BG24.05.2021
NO24.05.2021
GR25.05.2021
IS24.06.2021
PT24.06.2021
IE18.10.2021
LU18.10.2021
BE31.10.2021
CH31.10.2021
LI31.10.2021
[2024/42]
Former [2024/29]HU18.10.2017
AL24.02.2021
CY24.02.2021
DK24.02.2021
EE24.02.2021
FI24.02.2021
HR24.02.2021
LT24.02.2021
LV24.02.2021
MC24.02.2021
MK24.02.2021
NL24.02.2021
RO24.02.2021
RS24.02.2021
SE24.02.2021
SI24.02.2021
SK24.02.2021
SM24.02.2021
TR24.02.2021
BG24.05.2021
NO24.05.2021
GR25.05.2021
IS24.06.2021
PT24.06.2021
IE18.10.2021
LU18.10.2021
BE31.10.2021
CH31.10.2021
LI31.10.2021
Former [2024/23]HU18.10.2017
AL24.02.2021
CY24.02.2021
DK24.02.2021
EE24.02.2021
FI24.02.2021
HR24.02.2021
LT24.02.2021
LV24.02.2021
MC24.02.2021
MK24.02.2021
NL24.02.2021
RO24.02.2021
RS24.02.2021
SE24.02.2021
SI24.02.2021
SK24.02.2021
SM24.02.2021
BG24.05.2021
NO24.05.2021
GR25.05.2021
IS24.06.2021
PT24.06.2021
IE18.10.2021
LU18.10.2021
BE31.10.2021
CH31.10.2021
LI31.10.2021
Former [2023/33]HU18.10.2017
AL24.02.2021
CY24.02.2021
DK24.02.2021
EE24.02.2021
FI24.02.2021
HR24.02.2021
LT24.02.2021
LV24.02.2021
MC24.02.2021
NL24.02.2021
RO24.02.2021
RS24.02.2021
SE24.02.2021
SI24.02.2021
SK24.02.2021
SM24.02.2021
BG24.05.2021
NO24.05.2021
GR25.05.2021
IS24.06.2021
PT24.06.2021
IE18.10.2021
LU18.10.2021
BE31.10.2021
CH31.10.2021
LI31.10.2021
Former [2023/30]AL24.02.2021
CY24.02.2021
DK24.02.2021
EE24.02.2021
FI24.02.2021
HR24.02.2021
LT24.02.2021
LV24.02.2021
MC24.02.2021
NL24.02.2021
RO24.02.2021
RS24.02.2021
SE24.02.2021
SI24.02.2021
SK24.02.2021
SM24.02.2021
BG24.05.2021
NO24.05.2021
GR25.05.2021
IS24.06.2021
PT24.06.2021
IE18.10.2021
LU18.10.2021
BE31.10.2021
CH31.10.2021
LI31.10.2021
Former [2022/48]AL24.02.2021
DK24.02.2021
EE24.02.2021
FI24.02.2021
HR24.02.2021
LT24.02.2021
LV24.02.2021
MC24.02.2021
NL24.02.2021
RO24.02.2021
RS24.02.2021
SE24.02.2021
SI24.02.2021
SK24.02.2021
SM24.02.2021
BG24.05.2021
NO24.05.2021
GR25.05.2021
IS24.06.2021
PT24.06.2021
IE18.10.2021
LU18.10.2021
BE31.10.2021
CH31.10.2021
LI31.10.2021
Former [2022/37]AL24.02.2021
DK24.02.2021
EE24.02.2021
FI24.02.2021
HR24.02.2021
LT24.02.2021
LV24.02.2021
MC24.02.2021
NL24.02.2021
RO24.02.2021
RS24.02.2021
SE24.02.2021
SI24.02.2021
SK24.02.2021
SM24.02.2021
BG24.05.2021
NO24.05.2021
GR25.05.2021
IS24.06.2021
PT24.06.2021
LU18.10.2021
BE31.10.2021
CH31.10.2021
LI31.10.2021
Former [2022/35]AL24.02.2021
DK24.02.2021
EE24.02.2021
FI24.02.2021
HR24.02.2021
LT24.02.2021
LV24.02.2021
MC24.02.2021
NL24.02.2021
RO24.02.2021
RS24.02.2021
SE24.02.2021
SI24.02.2021
SK24.02.2021
SM24.02.2021
BG24.05.2021
NO24.05.2021
GR25.05.2021
IS24.06.2021
PT24.06.2021
LU18.10.2021
BE31.10.2021
Former [2022/33]AL24.02.2021
DK24.02.2021
EE24.02.2021
FI24.02.2021
HR24.02.2021
LT24.02.2021
LV24.02.2021
MC24.02.2021
NL24.02.2021
RO24.02.2021
RS24.02.2021
SE24.02.2021
SI24.02.2021
SK24.02.2021
SM24.02.2021
BG24.05.2021
NO24.05.2021
GR25.05.2021
IS24.06.2021
PT24.06.2021
BE31.10.2021
Former [2022/23]AL24.02.2021
DK24.02.2021
EE24.02.2021
FI24.02.2021
HR24.02.2021
LT24.02.2021
LV24.02.2021
NL24.02.2021
RO24.02.2021
RS24.02.2021
SE24.02.2021
SI24.02.2021
SK24.02.2021
SM24.02.2021
BG24.05.2021
NO24.05.2021
GR25.05.2021
IS24.06.2021
PT24.06.2021
Former [2022/13]AL24.02.2021
DK24.02.2021
EE24.02.2021
FI24.02.2021
HR24.02.2021
LT24.02.2021
LV24.02.2021
NL24.02.2021
RO24.02.2021
RS24.02.2021
SE24.02.2021
SI24.02.2021
SK24.02.2021
SM24.02.2021
BG24.05.2021
NO24.05.2021
GR25.05.2021
PT24.06.2021
Former [2022/10]AL24.02.2021
DK24.02.2021
EE24.02.2021
FI24.02.2021
HR24.02.2021
LT24.02.2021
LV24.02.2021
NL24.02.2021
RO24.02.2021
RS24.02.2021
SE24.02.2021
SK24.02.2021
SM24.02.2021
BG24.05.2021
NO24.05.2021
GR25.05.2021
PT24.06.2021
Former [2022/07]AL24.02.2021
DK24.02.2021
EE24.02.2021
FI24.02.2021
HR24.02.2021
LT24.02.2021
LV24.02.2021
NL24.02.2021
RO24.02.2021
RS24.02.2021
SE24.02.2021
SK24.02.2021
SM24.02.2021
BG24.05.2021
NO24.05.2021
GR25.05.2021
IS24.06.2021
PT24.06.2021
Former [2021/50]DK24.02.2021
EE24.02.2021
FI24.02.2021
HR24.02.2021
LT24.02.2021
LV24.02.2021
NL24.02.2021
RO24.02.2021
RS24.02.2021
SE24.02.2021
SK24.02.2021
SM24.02.2021
BG24.05.2021
NO24.05.2021
GR25.05.2021
IS24.06.2021
PT24.06.2021
Former [2021/49]DK24.02.2021
EE24.02.2021
FI24.02.2021
HR24.02.2021
LT24.02.2021
LV24.02.2021
NL24.02.2021
RS24.02.2021
SE24.02.2021
SM24.02.2021
BG24.05.2021
NO24.05.2021
GR25.05.2021
IS24.06.2021
PT24.06.2021
Former [2021/48]EE24.02.2021
FI24.02.2021
HR24.02.2021
LT24.02.2021
LV24.02.2021
NL24.02.2021
RS24.02.2021
SE24.02.2021
SM24.02.2021
BG24.05.2021
NO24.05.2021
GR25.05.2021
IS24.06.2021
PT24.06.2021
Former [2021/46]FI24.02.2021
HR24.02.2021
LT24.02.2021
LV24.02.2021
NL24.02.2021
RS24.02.2021
SE24.02.2021
SM24.02.2021
BG24.05.2021
NO24.05.2021
GR25.05.2021
IS24.06.2021
PT24.06.2021
Former [2021/42]FI24.02.2021
HR24.02.2021
LT24.02.2021
LV24.02.2021
NL24.02.2021
RS24.02.2021
SE24.02.2021
BG24.05.2021
NO24.05.2021
GR25.05.2021
IS24.06.2021
PT24.06.2021
Former [2021/38]FI24.02.2021
HR24.02.2021
LT24.02.2021
LV24.02.2021
NL24.02.2021
RS24.02.2021
SE24.02.2021
BG24.05.2021
NO24.05.2021
GR25.05.2021
PT24.06.2021
Former [2021/37]FI24.02.2021
HR24.02.2021
LT24.02.2021
LV24.02.2021
RS24.02.2021
BG24.05.2021
NO24.05.2021
GR25.05.2021
PT24.06.2021
Former [2021/36]FI24.02.2021
HR24.02.2021
LT24.02.2021
BG24.05.2021
NO24.05.2021
GR25.05.2021
PT24.06.2021
Former [2021/35]FI24.02.2021
HR24.02.2021
LT24.02.2021
NO24.05.2021
PT24.06.2021
Former [2021/33]FI24.02.2021
LT24.02.2021
NO24.05.2021
PT24.06.2021
Cited inInternational search[A]DE102011015140  (PROGRESS WERK OBERKIRCH AG [DE]) [A] 1-8* paragraphs [0013] , [0024] , [0026] , [0034] , [0035] , [0053] , [0054] , [0057] , [0060] - [0069]; figures 1-7; claims 1,3-8 *;
 [A]EP2900540  (THYSSENKRUPP PRESTA AG [LI]) [A] 1-8 * paragraphs [0005] - [0007] - [0012] , [0021] - [0024]; figures 5-13 *;
 [A]WO2016142482  (THYSSENKRUPP PRESTA AG [LI], et al) [A] 1-8 * page 3, lines 21-24,32-37 * * page 4, lines 4-34 * * page 5, lines 30-37 * * page 7, lines 11-24 * * page 9, lines 31-35 * * page 11, line 15 - page 12, line 24 * * page 13, line 6 - page 14, line 12; figures 1-10; claims 1-5 *
by applicantDE102011015140
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.