blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News flashes

New version of the European Patent Register - SPC information for Unitary Patents.

2024-03-06

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3529467

EP3529467 - OIL SUMP [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  27.01.2023
Database last updated on 19.07.2024
FormerThe patent has been granted
Status updated on  18.02.2022
FormerGrant of patent is intended
Status updated on  26.10.2021
FormerExamination is in progress
Status updated on  18.10.2021
FormerGrant of patent is intended
Status updated on  12.10.2021
FormerExamination is in progress
Status updated on  11.05.2020
FormerRequest for examination was made
Status updated on  26.07.2019
FormerThe international publication has been made
Status updated on  28.04.2018
Formerunknown
Status updated on  16.11.2017
Most recent event   Tooltip31.05.2024Lapse of the patent in a contracting state
New state(s): MK
published on 03.07.2024  [2024/27]
Applicant(s)For all designated states
NOVARES France
361 avenue du Général De Gaulle
92140 Clamart / FR
[2019/35]
Inventor(s)01 / LECHARTIER, Mickaël
Résidence Anaëlle - Apt C12
34 avenue de la Glissoire
62210 Avion / FR
02 / QUEVALLIER, Jean-Claude
8 Allée Norbert Segard
59810 Lesquin / FR
03 / DEMANGEOT, Jérôme
120 rue d'enfer
62350 Calonne Sur La Lys / FR
 [2019/35]
Representative(s)Germain Maureau
12, rue Boileau
69006 Lyon / FR
[2022/12]
Former [2019/35]Delorme, Nicolas, et al
Cabinet Germain & Maureau
BP 6153
69466 Lyon Cedex 06 / FR
Application number, filing date17794377.612.10.2017
[2019/35]
WO2017FR52816
Priority number, dateFR2016006010418.10.2016         Original published format: FR 1660104
[2019/35]
Filing languageFR
Procedural languageFR
PublicationType: A1 Application with search report
No.:WO2018073513
Date:26.04.2018
Language:FR
[2018/17]
Type: A1 Application with search report 
No.:EP3529467
Date:28.08.2019
Language:FR
The application published by WIPO in one of the EPO official languages on 26.04.2018 takes the place of the publication of the European patent application.
[2019/35]
Type: B1 Patent specification 
No.:EP3529467
Date:23.03.2022
Language:FR
[2022/12]
Search report(s)International search report - published on:EP26.04.2018
ClassificationIPC:F01M5/00, F01M5/02, F01M11/00
[2019/35]
CPC:
F01M5/02 (EP,US); F01M11/0004 (EP,US); F01M5/007 (EP,US);
F01M5/021 (US); F01M2005/023 (EP,US); F01M2011/0033 (EP,US);
F01M2011/0045 (EP,US); F01M2011/005 (EP,US); F01M2011/007 (EP,US) (-)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2019/35]
Validation statesMANot yet paid
MDNot yet paid
TitleGerman:ÖLWANNE[2019/35]
English:OIL SUMP[2019/35]
French:CARTER D'HUILE[2019/35]
Entry into regional phase01.04.2019National basic fee paid 
01.04.2019Designation fee(s) paid 
01.04.2019Examination fee paid 
Examination procedure01.04.2019Examination requested  [2019/35]
01.04.2019Date on which the examining division has become responsible
28.08.2019Amendment by applicant (claims and/or description)
14.05.2020Despatch of a communication from the examining division (Time limit: M04)
09.07.2020Reply to a communication from the examining division
03.11.2020Despatch of a communication from the examining division (Time limit: M04)
05.01.2021Reply to a communication from the examining division
13.09.2021Cancellation of oral proceeding that was planned for 01.10.2021
01.10.2021Date of oral proceedings (cancelled)
26.10.2021Communication of intention to grant the patent
15.02.2022Fee for grant paid
15.02.2022Fee for publishing/printing paid
15.02.2022Receipt of the translation of the claim(s)
Opposition(s)02.01.2023No opposition filed within time limit [2023/09]
Fees paidRenewal fee
16.08.2019Renewal fee patent year 03
15.09.2020Renewal fee patent year 04
30.09.2021Renewal fee patent year 05
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU12.10.2017
AL23.03.2022
AT23.03.2022
CY23.03.2022
DK23.03.2022
EE23.03.2022
FI23.03.2022
HR23.03.2022
IT23.03.2022
LT23.03.2022
LV23.03.2022
MC23.03.2022
MK23.03.2022
NL23.03.2022
PL23.03.2022
RO23.03.2022
RS23.03.2022
SE23.03.2022
SI23.03.2022
SK23.03.2022
SM23.03.2022
BG23.06.2022
NO23.06.2022
GR24.06.2022
IS23.07.2022
PT25.07.2022
GB12.10.2022
IE12.10.2022
LU12.10.2022
BE31.10.2022
CH31.10.2022
LI31.10.2022
[2024/27]
Former [2024/21]HU12.10.2017
AL23.03.2022
AT23.03.2022
CY23.03.2022
DK23.03.2022
EE23.03.2022
FI23.03.2022
HR23.03.2022
IT23.03.2022
LT23.03.2022
LV23.03.2022
MC23.03.2022
NL23.03.2022
PL23.03.2022
RO23.03.2022
RS23.03.2022
SE23.03.2022
SI23.03.2022
SK23.03.2022
SM23.03.2022
BG23.06.2022
NO23.06.2022
GR24.06.2022
IS23.07.2022
PT25.07.2022
GB12.10.2022
IE12.10.2022
LU12.10.2022
BE31.10.2022
CH31.10.2022
LI31.10.2022
Former [2024/18]HU12.10.2017
AL23.03.2022
AT23.03.2022
DK23.03.2022
EE23.03.2022
FI23.03.2022
HR23.03.2022
IT23.03.2022
LT23.03.2022
LV23.03.2022
MC23.03.2022
NL23.03.2022
PL23.03.2022
RO23.03.2022
RS23.03.2022
SE23.03.2022
SI23.03.2022
SK23.03.2022
SM23.03.2022
BG23.06.2022
NO23.06.2022
GR24.06.2022
IS23.07.2022
PT25.07.2022
GB12.10.2022
IE12.10.2022
LU12.10.2022
BE31.10.2022
CH31.10.2022
LI31.10.2022
Former [2023/48]AL23.03.2022
AT23.03.2022
DK23.03.2022
EE23.03.2022
FI23.03.2022
HR23.03.2022
IT23.03.2022
LT23.03.2022
LV23.03.2022
MC23.03.2022
NL23.03.2022
PL23.03.2022
RO23.03.2022
RS23.03.2022
SE23.03.2022
SI23.03.2022
SK23.03.2022
SM23.03.2022
BG23.06.2022
NO23.06.2022
GR24.06.2022
IS23.07.2022
PT25.07.2022
GB12.10.2022
IE12.10.2022
LU12.10.2022
BE31.10.2022
CH31.10.2022
LI31.10.2022
Former [2023/47]AL23.03.2022
AT23.03.2022
DK23.03.2022
EE23.03.2022
FI23.03.2022
HR23.03.2022
IT23.03.2022
LT23.03.2022
LV23.03.2022
MC23.03.2022
NL23.03.2022
PL23.03.2022
RO23.03.2022
RS23.03.2022
SE23.03.2022
SI23.03.2022
SK23.03.2022
SM23.03.2022
BG23.06.2022
NO23.06.2022
GR24.06.2022
IS23.07.2022
PT25.07.2022
GB12.10.2022
LU12.10.2022
BE31.10.2022
CH31.10.2022
LI31.10.2022
Former [2023/42]AL23.03.2022
AT23.03.2022
DK23.03.2022
EE23.03.2022
FI23.03.2022
HR23.03.2022
IT23.03.2022
LT23.03.2022
LV23.03.2022
MC23.03.2022
NL23.03.2022
PL23.03.2022
RO23.03.2022
RS23.03.2022
SE23.03.2022
SI23.03.2022
SK23.03.2022
SM23.03.2022
BG23.06.2022
NO23.06.2022
GR24.06.2022
IS23.07.2022
PT25.07.2022
LU12.10.2022
BE31.10.2022
CH31.10.2022
LI31.10.2022
Former [2023/35]AL23.03.2022
AT23.03.2022
DK23.03.2022
EE23.03.2022
FI23.03.2022
HR23.03.2022
IT23.03.2022
LT23.03.2022
LV23.03.2022
MC23.03.2022
NL23.03.2022
PL23.03.2022
RO23.03.2022
RS23.03.2022
SE23.03.2022
SI23.03.2022
SK23.03.2022
SM23.03.2022
BG23.06.2022
NO23.06.2022
GR24.06.2022
IS23.07.2022
PT25.07.2022
LU12.10.2022
CH31.10.2022
LI31.10.2022
Former [2023/30]AL23.03.2022
AT23.03.2022
DK23.03.2022
EE23.03.2022
FI23.03.2022
HR23.03.2022
LT23.03.2022
LV23.03.2022
MC23.03.2022
NL23.03.2022
PL23.03.2022
RO23.03.2022
RS23.03.2022
SE23.03.2022
SI23.03.2022
SK23.03.2022
SM23.03.2022
BG23.06.2022
NO23.06.2022
GR24.06.2022
IS23.07.2022
PT25.07.2022
LU12.10.2022
Former [2023/25]AL23.03.2022
AT23.03.2022
DK23.03.2022
EE23.03.2022
FI23.03.2022
HR23.03.2022
LT23.03.2022
LV23.03.2022
MC23.03.2022
NL23.03.2022
PL23.03.2022
RO23.03.2022
RS23.03.2022
SE23.03.2022
SI23.03.2022
SK23.03.2022
SM23.03.2022
BG23.06.2022
NO23.06.2022
GR24.06.2022
IS23.07.2022
PT25.07.2022
Former [2023/07]AL23.03.2022
AT23.03.2022
DK23.03.2022
EE23.03.2022
FI23.03.2022
HR23.03.2022
LT23.03.2022
LV23.03.2022
NL23.03.2022
PL23.03.2022
RO23.03.2022
RS23.03.2022
SE23.03.2022
SK23.03.2022
SM23.03.2022
BG23.06.2022
NO23.06.2022
GR24.06.2022
IS23.07.2022
PT25.07.2022
Former [2023/01]AL23.03.2022
AT23.03.2022
EE23.03.2022
FI23.03.2022
HR23.03.2022
LT23.03.2022
LV23.03.2022
NL23.03.2022
PL23.03.2022
RO23.03.2022
RS23.03.2022
SE23.03.2022
SK23.03.2022
SM23.03.2022
BG23.06.2022
NO23.06.2022
GR24.06.2022
IS23.07.2022
PT25.07.2022
Former [2022/51]AT23.03.2022
EE23.03.2022
FI23.03.2022
HR23.03.2022
LT23.03.2022
LV23.03.2022
NL23.03.2022
PL23.03.2022
RO23.03.2022
RS23.03.2022
SE23.03.2022
SK23.03.2022
SM23.03.2022
BG23.06.2022
NO23.06.2022
GR24.06.2022
IS23.07.2022
PT25.07.2022
Former [2022/50]AT23.03.2022
EE23.03.2022
FI23.03.2022
HR23.03.2022
LT23.03.2022
LV23.03.2022
NL23.03.2022
PL23.03.2022
RO23.03.2022
RS23.03.2022
SE23.03.2022
SK23.03.2022
SM23.03.2022
BG23.06.2022
NO23.06.2022
GR24.06.2022
PT25.07.2022
Former [2022/49]AT23.03.2022
EE23.03.2022
FI23.03.2022
HR23.03.2022
LT23.03.2022
LV23.03.2022
NL23.03.2022
RO23.03.2022
RS23.03.2022
SE23.03.2022
SK23.03.2022
SM23.03.2022
BG23.06.2022
NO23.06.2022
GR24.06.2022
PT25.07.2022
Former [2022/48]AT23.03.2022
EE23.03.2022
FI23.03.2022
HR23.03.2022
LT23.03.2022
LV23.03.2022
NL23.03.2022
RO23.03.2022
RS23.03.2022
SE23.03.2022
SM23.03.2022
BG23.06.2022
NO23.06.2022
GR24.06.2022
PT25.07.2022
Former [2022/47]AT23.03.2022
FI23.03.2022
HR23.03.2022
LT23.03.2022
LV23.03.2022
NL23.03.2022
RO23.03.2022
RS23.03.2022
SE23.03.2022
SM23.03.2022
BG23.06.2022
NO23.06.2022
GR24.06.2022
PT25.07.2022
Former [2022/44]FI23.03.2022
HR23.03.2022
LT23.03.2022
LV23.03.2022
NL23.03.2022
RS23.03.2022
SE23.03.2022
BG23.06.2022
NO23.06.2022
GR24.06.2022
Former [2022/39]FI23.03.2022
HR23.03.2022
LT23.03.2022
LV23.03.2022
RS23.03.2022
SE23.03.2022
BG23.06.2022
NO23.06.2022
GR24.06.2022
Former [2022/36]HR23.03.2022
LT23.03.2022
LV23.03.2022
RS23.03.2022
SE23.03.2022
BG23.06.2022
NO23.06.2022
GR24.06.2022
Former [2022/35]HR23.03.2022
LT23.03.2022
RS23.03.2022
SE23.03.2022
BG23.06.2022
NO23.06.2022
Former [2022/33]LT23.03.2022
NO23.06.2022
Cited inInternational search[A]DE2852854  (DAIMLER BENZ AG) [A] 1-5* figures 1-7 *;
 [XYI]US2009145695  (HIRAMATSU CHIAKI [JP]) [X] 1 * paragraphs [0067] - [0068]; figures 1-5 * [Y] 9,10 [I] 8;
 [XY]JP2011231662  (DAIKYONISHIKAWA CORP) [X] 1-4,10,11 * abstract * [Y] 9,10;
 [XI]JP2014139423  (DAIKYONISHIKAWA CORP) [X] 1,2,5 * figures 1-18 * [I] 6,7
ExaminationDE19912327
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.