| EP3554772 - COLLISION MONITORING OF A ROBOT [Right-click to bookmark this link] | Status | Patent maintained as amended Status updated on 17.11.2023 Database last updated on 19.03.2026 | |
| Former | The patent has been granted Status updated on 03.04.2021 | ||
| Former | Grant of patent is intended Status updated on 03.12.2020 | ||
| Former | Examination is in progress Status updated on 06.05.2020 | ||
| Former | Request for examination was made Status updated on 20.09.2019 | ||
| Former | The international publication has been made Status updated on 23.06.2018 | ||
| Former | unknown Status updated on 29.11.2017 | Most recent event Tooltip | 19.12.2025 | Lapse of the patent in a contracting state New state(s): TR | published on 21.01.2026 [2026/04] | Applicant(s) | For all designated states KUKA Deutschland GmbH Zugspitzstraße 140 86165 Augsburg / DE | [2019/43] | Inventor(s) | 01 /
LANGGARTNER, Verena Klausstrasse 13 86167 Augsburg / DE | 02 /
QUITTKAT, Anja Beethovenstraße 1 86316 Friedberg / DE | [2019/43] | Representative(s) | Wallinger Ricker Schlotter Tostmann Patent- und Rechtsanwälte mbB Zweibrückenstraße 5-7 80331 München / DE | [2023/51] |
| Former [2019/43] | Oelke, Jochen KUKA Aktiengesellschaft Zugspitzstraße 140 86165 Augsburg / DE | Application number, filing date | 17801040.1 | 20.11.2017 | [2019/43] | WO2017EP79741 | Priority number, date | DE20161014989 | 15.12.2016 Original published format: DE102016014989 | [2019/43] | Filing language | DE | Procedural language | DE | Publication | Type: | A1 Application with search report | No.: | WO2018108457 | Date: | 21.06.2018 | Language: | DE | [2018/25] | Type: | A1 Application with search report | No.: | EP3554772 | Date: | 23.10.2019 | Language: | DE | The application published by WIPO in one of the EPO official languages on 21.06.2018 takes the place of the publication of the European patent application. | [2019/43] | Type: | B1 Patent specification | No.: | EP3554772 | Date: | 05.05.2021 | Language: | DE | [2021/18] | Type: | B2 New European patent specification | No.: | EP3554772 | Date: | 20.12.2023 | Language: | DE | [2023/51] | Search report(s) | International search report - published on: | EP | 21.06.2018 | Classification | IPC: | B25J9/16 | [2019/43] | CPC: |
B25J9/1676 (EP,US);
B25J9/163 (US);
G05B2219/39082 (EP,US);
G05B2219/49143 (EP,US)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2019/43] | Title | German: | KOLLISIONSÜBERWACHUNG EINES ROBOTERS | [2019/43] | English: | COLLISION MONITORING OF A ROBOT | [2019/43] | French: | SURVEILLANCE ANTICOLLISION D'UN ROBOT | [2019/43] | Entry into regional phase | 03.07.2019 | National basic fee paid | 03.07.2019 | Designation fee(s) paid | 03.07.2019 | Examination fee paid | Examination procedure | 03.07.2019 | Examination requested [2019/43] | 03.07.2019 | Date on which the examining division has become responsible | 24.01.2020 | Amendment by applicant (claims and/or description) | 11.05.2020 | Despatch of a communication from the examining division (Time limit: M04) | 27.08.2020 | Reply to a communication from the examining division | 04.12.2020 | Communication of intention to grant the patent | 30.03.2021 | Fee for grant paid | 30.03.2021 | Fee for publishing/printing paid | 30.03.2021 | Receipt of the translation of the claim(s) | Opposition(s) | Opponent(s) | 01
27.01.2022
ABB Schweiz AG Brown Boveri Strasse 6 5400 Baden / CH Opponent's representative Hoffmann Eitle Patent- und Rechtsanwälte PartmbB Arabellastraße 30 81925 München / DE | [2022/09] | 22.02.2022 | Invitation to proprietor to file observations on the notice of opposition | 01.07.2022 | Reply of patent proprietor to notice(s) of opposition | 23.03.2023 | Legal effect of interlocutory decision in opposition | 23.03.2023 | Date of oral proceedings | 28.04.2023 | Despatch of interlocutory decision in opposition | 28.04.2023 | Despatch of minutes of oral proceedings | 18.08.2023 | Despatch of communication that the patent will be maintained as amended | 14.11.2023 | Fee for printing new specification paid | Fees paid | Renewal fee | 14.11.2019 | Renewal fee patent year 03 | 13.11.2020 | Renewal fee patent year 04 |
| Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
| Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 20.11.2017 | AL | 05.05.2021 | CY | 05.05.2021 | CZ | 05.05.2021 | DK | 05.05.2021 | EE | 05.05.2021 | ES | 05.05.2021 | FI | 05.05.2021 | HR | 05.05.2021 | IT | 05.05.2021 | LT | 05.05.2021 | LV | 05.05.2021 | MC | 05.05.2021 | MK | 05.05.2021 | MT | 05.05.2021 | NL | 05.05.2021 | PL | 05.05.2021 | RO | 05.05.2021 | RS | 05.05.2021 | SE | 05.05.2021 | SI | 05.05.2021 | SK | 05.05.2021 | SM | 05.05.2021 | TR | 05.05.2021 | BG | 05.08.2021 | NO | 05.08.2021 | GR | 06.08.2021 | IS | 05.09.2021 | PT | 06.09.2021 | IE | 20.11.2021 | LU | 20.11.2021 | BE | 30.11.2021 | AT | 20.11.2022 | [2026/04] |
| Former [2024/42] | HU | 20.11.2017 | |
| AL | 05.05.2021 | ||
| CY | 05.05.2021 | ||
| CZ | 05.05.2021 | ||
| DK | 05.05.2021 | ||
| EE | 05.05.2021 | ||
| ES | 05.05.2021 | ||
| FI | 05.05.2021 | ||
| HR | 05.05.2021 | ||
| IT | 05.05.2021 | ||
| LT | 05.05.2021 | ||
| LV | 05.05.2021 | ||
| MC | 05.05.2021 | ||
| MK | 05.05.2021 | ||
| MT | 05.05.2021 | ||
| NL | 05.05.2021 | ||
| PL | 05.05.2021 | ||
| RO | 05.05.2021 | ||
| RS | 05.05.2021 | ||
| SE | 05.05.2021 | ||
| SI | 05.05.2021 | ||
| SK | 05.05.2021 | ||
| SM | 05.05.2021 | ||
| BG | 05.08.2021 | ||
| NO | 05.08.2021 | ||
| GR | 06.08.2021 | ||
| IS | 05.09.2021 | ||
| PT | 06.09.2021 | ||
| IE | 20.11.2021 | ||
| LU | 20.11.2021 | ||
| BE | 30.11.2021 | ||
| AT | 20.11.2022 | ||
| Former [2024/23] | HU | 20.11.2017 | |
| AL | 05.05.2021 | ||
| CY | 05.05.2021 | ||
| CZ | 05.05.2021 | ||
| DK | 05.05.2021 | ||
| EE | 05.05.2021 | ||
| ES | 05.05.2021 | ||
| FI | 05.05.2021 | ||
| HR | 05.05.2021 | ||
| IT | 05.05.2021 | ||
| LT | 05.05.2021 | ||
| LV | 05.05.2021 | ||
| MC | 05.05.2021 | ||
| MK | 05.05.2021 | ||
| NL | 05.05.2021 | ||
| PL | 05.05.2021 | ||
| RO | 05.05.2021 | ||
| RS | 05.05.2021 | ||
| SE | 05.05.2021 | ||
| SI | 05.05.2021 | ||
| SK | 05.05.2021 | ||
| SM | 05.05.2021 | ||
| BG | 05.08.2021 | ||
| NO | 05.08.2021 | ||
| GR | 06.08.2021 | ||
| IS | 05.09.2021 | ||
| PT | 06.09.2021 | ||
| IE | 20.11.2021 | ||
| LU | 20.11.2021 | ||
| BE | 30.11.2021 | ||
| AT | 20.11.2022 | ||
| Former [2024/09] | HU | 20.11.2017 | |
| AL | 05.05.2021 | ||
| CY | 05.05.2021 | ||
| CZ | 05.05.2021 | ||
| DK | 05.05.2021 | ||
| EE | 05.05.2021 | ||
| ES | 05.05.2021 | ||
| FI | 05.05.2021 | ||
| HR | 05.05.2021 | ||
| IT | 05.05.2021 | ||
| LT | 05.05.2021 | ||
| LV | 05.05.2021 | ||
| MC | 05.05.2021 | ||
| NL | 05.05.2021 | ||
| PL | 05.05.2021 | ||
| RO | 05.05.2021 | ||
| RS | 05.05.2021 | ||
| SE | 05.05.2021 | ||
| SI | 05.05.2021 | ||
| SK | 05.05.2021 | ||
| SM | 05.05.2021 | ||
| BG | 05.08.2021 | ||
| NO | 05.08.2021 | ||
| GR | 06.08.2021 | ||
| IS | 05.09.2021 | ||
| PT | 06.09.2021 | ||
| IE | 20.11.2021 | ||
| LU | 20.11.2021 | ||
| BE | 30.11.2021 | ||
| AT | 20.11.2022 | ||
| Former [2023/33] | HU | 20.11.2017 | |
| AL | 05.05.2021 | ||
| CY | 05.05.2021 | ||
| CZ | 05.05.2021 | ||
| DK | 05.05.2021 | ||
| EE | 05.05.2021 | ||
| ES | 05.05.2021 | ||
| FI | 05.05.2021 | ||
| HR | 05.05.2021 | ||
| IT | 05.05.2021 | ||
| LT | 05.05.2021 | ||
| LV | 05.05.2021 | ||
| MC | 05.05.2021 | ||
| NL | 05.05.2021 | ||
| PL | 05.05.2021 | ||
| RO | 05.05.2021 | ||
| RS | 05.05.2021 | ||
| SE | 05.05.2021 | ||
| SI | 05.05.2021 | ||
| SK | 05.05.2021 | ||
| SM | 05.05.2021 | ||
| BG | 05.08.2021 | ||
| NO | 05.08.2021 | ||
| GR | 06.08.2021 | ||
| IS | 05.09.2021 | ||
| PT | 06.09.2021 | ||
| IE | 20.11.2021 | ||
| LU | 20.11.2021 | ||
| BE | 30.11.2021 | ||
| Former [2023/30] | AL | 05.05.2021 | |
| CY | 05.05.2021 | ||
| CZ | 05.05.2021 | ||
| DK | 05.05.2021 | ||
| EE | 05.05.2021 | ||
| ES | 05.05.2021 | ||
| FI | 05.05.2021 | ||
| HR | 05.05.2021 | ||
| IT | 05.05.2021 | ||
| LT | 05.05.2021 | ||
| LV | 05.05.2021 | ||
| MC | 05.05.2021 | ||
| NL | 05.05.2021 | ||
| PL | 05.05.2021 | ||
| RO | 05.05.2021 | ||
| RS | 05.05.2021 | ||
| SE | 05.05.2021 | ||
| SI | 05.05.2021 | ||
| SK | 05.05.2021 | ||
| SM | 05.05.2021 | ||
| BG | 05.08.2021 | ||
| NO | 05.08.2021 | ||
| GR | 06.08.2021 | ||
| IS | 05.09.2021 | ||
| PT | 06.09.2021 | ||
| IE | 20.11.2021 | ||
| LU | 20.11.2021 | ||
| BE | 30.11.2021 | ||
| Former [2022/48] | AL | 05.05.2021 | |
| CZ | 05.05.2021 | ||
| DK | 05.05.2021 | ||
| EE | 05.05.2021 | ||
| ES | 05.05.2021 | ||
| FI | 05.05.2021 | ||
| HR | 05.05.2021 | ||
| IT | 05.05.2021 | ||
| LT | 05.05.2021 | ||
| LV | 05.05.2021 | ||
| MC | 05.05.2021 | ||
| NL | 05.05.2021 | ||
| PL | 05.05.2021 | ||
| RO | 05.05.2021 | ||
| RS | 05.05.2021 | ||
| SE | 05.05.2021 | ||
| SI | 05.05.2021 | ||
| SK | 05.05.2021 | ||
| SM | 05.05.2021 | ||
| BG | 05.08.2021 | ||
| NO | 05.08.2021 | ||
| GR | 06.08.2021 | ||
| IS | 05.09.2021 | ||
| PT | 06.09.2021 | ||
| IE | 20.11.2021 | ||
| LU | 20.11.2021 | ||
| BE | 30.11.2021 | ||
| Former [2022/36] | AL | 05.05.2021 | |
| CZ | 05.05.2021 | ||
| DK | 05.05.2021 | ||
| EE | 05.05.2021 | ||
| ES | 05.05.2021 | ||
| FI | 05.05.2021 | ||
| HR | 05.05.2021 | ||
| IT | 05.05.2021 | ||
| LT | 05.05.2021 | ||
| LV | 05.05.2021 | ||
| MC | 05.05.2021 | ||
| NL | 05.05.2021 | ||
| PL | 05.05.2021 | ||
| RO | 05.05.2021 | ||
| RS | 05.05.2021 | ||
| SE | 05.05.2021 | ||
| SI | 05.05.2021 | ||
| SK | 05.05.2021 | ||
| SM | 05.05.2021 | ||
| BG | 05.08.2021 | ||
| NO | 05.08.2021 | ||
| GR | 06.08.2021 | ||
| IS | 05.09.2021 | ||
| PT | 06.09.2021 | ||
| LU | 20.11.2021 | ||
| BE | 30.11.2021 | ||
| Former [2022/34] | AL | 05.05.2021 | |
| CZ | 05.05.2021 | ||
| DK | 05.05.2021 | ||
| EE | 05.05.2021 | ||
| ES | 05.05.2021 | ||
| FI | 05.05.2021 | ||
| HR | 05.05.2021 | ||
| LT | 05.05.2021 | ||
| LV | 05.05.2021 | ||
| MC | 05.05.2021 | ||
| NL | 05.05.2021 | ||
| PL | 05.05.2021 | ||
| RO | 05.05.2021 | ||
| RS | 05.05.2021 | ||
| SE | 05.05.2021 | ||
| SI | 05.05.2021 | ||
| SK | 05.05.2021 | ||
| SM | 05.05.2021 | ||
| BG | 05.08.2021 | ||
| NO | 05.08.2021 | ||
| GR | 06.08.2021 | ||
| IS | 05.09.2021 | ||
| PT | 06.09.2021 | ||
| LU | 20.11.2021 | ||
| BE | 30.11.2021 | ||
| Former [2022/33] | AL | 05.05.2021 | |
| CZ | 05.05.2021 | ||
| DK | 05.05.2021 | ||
| EE | 05.05.2021 | ||
| ES | 05.05.2021 | ||
| FI | 05.05.2021 | ||
| HR | 05.05.2021 | ||
| LT | 05.05.2021 | ||
| LV | 05.05.2021 | ||
| MC | 05.05.2021 | ||
| NL | 05.05.2021 | ||
| PL | 05.05.2021 | ||
| RO | 05.05.2021 | ||
| RS | 05.05.2021 | ||
| SE | 05.05.2021 | ||
| SI | 05.05.2021 | ||
| SK | 05.05.2021 | ||
| SM | 05.05.2021 | ||
| BG | 05.08.2021 | ||
| NO | 05.08.2021 | ||
| GR | 06.08.2021 | ||
| IS | 05.09.2021 | ||
| PT | 06.09.2021 | ||
| BE | 30.11.2021 | ||
| Former [2022/29] | AL | 05.05.2021 | |
| CZ | 05.05.2021 | ||
| DK | 05.05.2021 | ||
| EE | 05.05.2021 | ||
| ES | 05.05.2021 | ||
| FI | 05.05.2021 | ||
| HR | 05.05.2021 | ||
| LT | 05.05.2021 | ||
| LV | 05.05.2021 | ||
| NL | 05.05.2021 | ||
| PL | 05.05.2021 | ||
| RO | 05.05.2021 | ||
| RS | 05.05.2021 | ||
| SE | 05.05.2021 | ||
| SI | 05.05.2021 | ||
| SK | 05.05.2021 | ||
| SM | 05.05.2021 | ||
| BG | 05.08.2021 | ||
| NO | 05.08.2021 | ||
| GR | 06.08.2021 | ||
| IS | 05.09.2021 | ||
| PT | 06.09.2021 | ||
| Former [2022/26] | AL | 05.05.2021 | |
| CZ | 05.05.2021 | ||
| DK | 05.05.2021 | ||
| EE | 05.05.2021 | ||
| ES | 05.05.2021 | ||
| FI | 05.05.2021 | ||
| HR | 05.05.2021 | ||
| LT | 05.05.2021 | ||
| LV | 05.05.2021 | ||
| NL | 05.05.2021 | ||
| PL | 05.05.2021 | ||
| RO | 05.05.2021 | ||
| RS | 05.05.2021 | ||
| SE | 05.05.2021 | ||
| SK | 05.05.2021 | ||
| SM | 05.05.2021 | ||
| BG | 05.08.2021 | ||
| NO | 05.08.2021 | ||
| GR | 06.08.2021 | ||
| IS | 05.09.2021 | ||
| PT | 06.09.2021 | ||
| Former [2022/23] | CZ | 05.05.2021 | |
| DK | 05.05.2021 | ||
| EE | 05.05.2021 | ||
| ES | 05.05.2021 | ||
| FI | 05.05.2021 | ||
| HR | 05.05.2021 | ||
| LT | 05.05.2021 | ||
| LV | 05.05.2021 | ||
| NL | 05.05.2021 | ||
| PL | 05.05.2021 | ||
| RO | 05.05.2021 | ||
| RS | 05.05.2021 | ||
| SE | 05.05.2021 | ||
| SK | 05.05.2021 | ||
| SM | 05.05.2021 | ||
| BG | 05.08.2021 | ||
| NO | 05.08.2021 | ||
| GR | 06.08.2021 | ||
| IS | 05.09.2021 | ||
| PT | 06.09.2021 | ||
| Former [2022/10] | CZ | 05.05.2021 | |
| DK | 05.05.2021 | ||
| EE | 05.05.2021 | ||
| ES | 05.05.2021 | ||
| FI | 05.05.2021 | ||
| HR | 05.05.2021 | ||
| LT | 05.05.2021 | ||
| LV | 05.05.2021 | ||
| NL | 05.05.2021 | ||
| PL | 05.05.2021 | ||
| RO | 05.05.2021 | ||
| RS | 05.05.2021 | ||
| SE | 05.05.2021 | ||
| SK | 05.05.2021 | ||
| SM | 05.05.2021 | ||
| BG | 05.08.2021 | ||
| NO | 05.08.2021 | ||
| GR | 06.08.2021 | ||
| PT | 06.09.2021 | ||
| IS | 22.12.2021 | ||
| Former [2022/09] | CZ | 05.05.2021 | |
| DK | 05.05.2021 | ||
| ES | 05.05.2021 | ||
| FI | 05.05.2021 | ||
| HR | 05.05.2021 | ||
| LT | 05.05.2021 | ||
| LV | 05.05.2021 | ||
| NL | 05.05.2021 | ||
| PL | 05.05.2021 | ||
| RO | 05.05.2021 | ||
| RS | 05.05.2021 | ||
| SE | 05.05.2021 | ||
| SK | 05.05.2021 | ||
| SM | 05.05.2021 | ||
| BG | 05.08.2021 | ||
| NO | 05.08.2021 | ||
| GR | 06.08.2021 | ||
| IS | 05.09.2021 | ||
| PT | 06.09.2021 | ||
| Former [2022/08] | CZ | 05.05.2021 | |
| DK | 05.05.2021 | ||
| ES | 05.05.2021 | ||
| FI | 05.05.2021 | ||
| HR | 05.05.2021 | ||
| LT | 05.05.2021 | ||
| LV | 05.05.2021 | ||
| NL | 05.05.2021 | ||
| PL | 05.05.2021 | ||
| RS | 05.05.2021 | ||
| SE | 05.05.2021 | ||
| SM | 05.05.2021 | ||
| BG | 05.08.2021 | ||
| NO | 05.08.2021 | ||
| GR | 06.08.2021 | ||
| IS | 05.09.2021 | ||
| PT | 06.09.2021 | ||
| Former [2022/07] | FI | 05.05.2021 | |
| HR | 05.05.2021 | ||
| LT | 05.05.2021 | ||
| LV | 05.05.2021 | ||
| NL | 05.05.2021 | ||
| PL | 05.05.2021 | ||
| RS | 05.05.2021 | ||
| SE | 05.05.2021 | ||
| SM | 05.05.2021 | ||
| BG | 05.08.2021 | ||
| NO | 05.08.2021 | ||
| GR | 06.08.2021 | ||
| IS | 05.09.2021 | ||
| PT | 06.09.2021 | ||
| Former [2022/04] | FI | 05.05.2021 | |
| HR | 05.05.2021 | ||
| LT | 05.05.2021 | ||
| LV | 05.05.2021 | ||
| NL | 05.05.2021 | ||
| PL | 05.05.2021 | ||
| RS | 05.05.2021 | ||
| SE | 05.05.2021 | ||
| BG | 05.08.2021 | ||
| NO | 05.08.2021 | ||
| GR | 06.08.2021 | ||
| IS | 05.09.2021 | ||
| PT | 06.09.2021 | ||
| Former [2021/52] | FI | 05.05.2021 | |
| HR | 05.05.2021 | ||
| LT | 05.05.2021 | ||
| LV | 05.05.2021 | ||
| PL | 05.05.2021 | ||
| RS | 05.05.2021 | ||
| SE | 05.05.2021 | ||
| BG | 05.08.2021 | ||
| NO | 05.08.2021 | ||
| GR | 06.08.2021 | ||
| IS | 05.09.2021 | ||
| PT | 06.09.2021 | ||
| Former [2021/51] | FI | 05.05.2021 | |
| HR | 05.05.2021 | ||
| LT | 05.05.2021 | ||
| LV | 05.05.2021 | ||
| RS | 05.05.2021 | ||
| SE | 05.05.2021 | ||
| BG | 05.08.2021 | ||
| NO | 05.08.2021 | ||
| GR | 06.08.2021 | ||
| IS | 05.09.2021 | ||
| PT | 06.09.2021 | ||
| Former [2021/50] | FI | 05.05.2021 | |
| HR | 05.05.2021 | ||
| LT | 05.05.2021 | ||
| LV | 05.05.2021 | ||
| SE | 05.05.2021 | ||
| BG | 05.08.2021 | ||
| NO | 05.08.2021 | ||
| GR | 06.08.2021 | ||
| PT | 06.09.2021 | ||
| Former [2021/49] | FI | 05.05.2021 | |
| HR | 05.05.2021 | ||
| LT | 05.05.2021 | ||
| LV | 05.05.2021 | ||
| SE | 05.05.2021 | ||
| BG | 05.08.2021 | ||
| NO | 05.08.2021 | ||
| GR | 06.08.2021 | ||
| Former [2021/47] | FI | 05.05.2021 | |
| LT | 05.05.2021 | ||
| BG | 05.08.2021 | ||
| Former [2021/46] | FI | 05.05.2021 | |
| LT | 05.05.2021 | Cited in | International search | [Y] EP2839934 (KUKA LAB GMBH et al.) [Y] 1-3,5,7-12 * paragraph [0033] - paragraph [0035] * * paragraph [0041] - paragraph [0005]; figures 1,2 * | [Y] EP2482156 (DECKEL MAHO PFRONTEN GMBH et al.) [Y] 1-3,5,7-12 * paragraph [0040] - paragraph [0043] * * paragraph [0057] * * paragraph [0070] - paragraph [0116]; figures 1-4 * | [YA] DE102013016878 (DAIMLER AG et al.) [Y] 2 * paragraph [0020] - paragraph [0034]; figures 1,2 *[A] 1,10,12 | [YA] US2016001446 (CALDAS ALEX et al.) [Y] 5 * paragraph [0052] - paragraph [0121]; figures 1-4 *[A] 1-4,6-12 | Opposition | US2016001446 | DE102013016878 | EP2839934 |