blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News flashes

New version of the European Patent Register - SPC information for Unitary Patents.

2024-03-06

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3560044

EP3560044 - TRANSMITTER HOUSING HAVING CONNECTING ELEMENT INSERTED THEREIN [Right-click to bookmark this link]
Former [2019/44]CONNECTING ELEMENT, TRANSMITTER HOUSING HAVING CONNECTING ELEMENT INSERTED THEREIN, AND METHOD FOR PRODUCING SAID CONNECTING ELEMENT
[2020/46]
StatusNo opposition filed within time limit
Status updated on  04.02.2022
Database last updated on 28.05.2024
FormerThe patent has been granted
Status updated on  19.02.2021
FormerGrant of patent is intended
Status updated on  10.11.2020
FormerRequest for examination was made
Status updated on  27.09.2019
FormerThe international publication has been made
Status updated on  30.06.2018
Formerunknown
Status updated on  06.12.2017
Most recent event   Tooltip03.05.2024Lapse of the patent in a contracting state
New state(s): MK
published on 05.06.2024 [2024/23]
Applicant(s)For all designated states
Endress+Hauser SE+Co. KG
Hauptstrasse 1
79689 Maulburg / DE
[2019/44]
Inventor(s)01 / TANNER, Jürgen
Hebelstraße 21
79400 Kandern / DE
02 / LAIS, Michael
Hauptstraße 5
79677 Wembach / DE
03 / REICHERT, Philipp
Im Rebgarten 14
79585 Steinen-Hägelberg / DE
 [2019/44]
Representative(s)Andres, Angelika Maria
Endress+Hauser Group Services
(Deutschland) AG+Co. KG
Colmarer Straße 6
79576 Weil am Rhein / DE
[2021/12]
Former [2019/44]Andres, Angelika Maria
Endress+Hauser (Deutschland) AG+Co. KG
PatServe
Colmarer Strasse 6
79576 Weil am Rhein / DE
Application number, filing date17804527.422.11.2017
[2019/44]
WO2017EP80076
Priority number, dateDE20161012535022.12.2016         Original published format: DE102016125350
[2019/44]
Filing languageDE
Procedural languageDE
PublicationType: A1 Application with search report
No.:WO2018114196
Date:28.06.2018
Language:DE
[2018/26]
Type: A1 Application with search report 
No.:EP3560044
Date:30.10.2019
Language:DE
The application published by WIPO in one of the EPO official languages on 28.06.2018 takes the place of the publication of the European patent application.
[2019/44]
Type: B1 Patent specification 
No.:EP3560044
Date:24.03.2021
Language:DE
[2021/12]
Search report(s)International search report - published on:EP28.06.2018
ClassificationIPC:H01R12/73, H01R13/24, H01R13/504, H01R13/52, H01R43/18, H01R13/405, H01R43/24, H01R13/53, H01R107/00, G01D11/24, H01B17/30
[2019/44]
CPC:
H01R12/73 (EP); G01D11/24 (US); H01R13/2421 (EP);
H01R13/405 (EP,US); H01R13/504 (EP,US); H01R13/5202 (EP,US);
H01R13/5208 (EP); H01R13/5216 (EP); H01R43/24 (EP);
H01R13/53 (EP); H01R2107/00 (EP); H01R2201/20 (EP) (-)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2019/44]
Extension statesBANot yet paid
MENot yet paid
Validation statesMANot yet paid
MDNot yet paid
TitleGerman:TRANSMITTERGEHÄUSE MIT DARIN EINGESETZTEN VERBINDUNGSELEMENT[2020/46]
English:TRANSMITTER HOUSING HAVING CONNECTING ELEMENT INSERTED THEREIN[2020/46]
French:BOÎTIER ÉMETTEUR MUNI D'UN L'ÉLÉMENT DE CONNEXION INSÉRÉ DEDANS[2020/46]
Former [2019/44]VERBINDUNGSELEMENT, TRANSMITTERGEHÄUSE MIT DARIN EINGESETZTEN VERBINDUNGSELEMENT UND VERFAHREN ZUR HERSTELLUNG DIESES VERBINDUNGSELEMENT
Former [2019/44]CONNECTING ELEMENT, TRANSMITTER HOUSING HAVING CONNECTING ELEMENT INSERTED THEREIN, AND METHOD FOR PRODUCING SAID CONNECTING ELEMENT
Former [2019/44]ÉLÉMENT DE CONNEXION, BOÎTIER ÉMETTEUR MUNI DE L'ÉLÉMENT DE CONNEXION INSÉRÉ DEDANS ET PROCÉDÉ DE PRODUCTION DUDIT ÉLÉMENT DE CONNEXION
Entry into regional phase10.05.2019National basic fee paid 
10.05.2019Designation fee(s) paid 
10.05.2019Examination fee paid 
Examination procedure10.05.2019Examination requested  [2019/44]
10.05.2019Date on which the examining division has become responsible
24.01.2020Amendment by applicant (claims and/or description)
11.11.2020Communication of intention to grant the patent
11.02.2021Fee for grant paid
11.02.2021Fee for publishing/printing paid
11.02.2021Receipt of the translation of the claim(s)
Opposition(s)04.01.2022No opposition filed within time limit [2022/10]
Fees paidRenewal fee
26.11.2019Renewal fee patent year 03
20.11.2020Renewal fee patent year 04
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU22.11.2017
AL24.03.2021
CY24.03.2021
CZ24.03.2021
DK24.03.2021
EE24.03.2021
ES24.03.2021
FI24.03.2021
HR24.03.2021
LT24.03.2021
LV24.03.2021
MC24.03.2021
MK24.03.2021
NL24.03.2021
PL24.03.2021
RO24.03.2021
RS24.03.2021
SE24.03.2021
SI24.03.2021
SK24.03.2021
SM24.03.2021
BG24.06.2021
NO24.06.2021
GR25.06.2021
IS24.07.2021
PT26.07.2021
GB22.11.2021
IE22.11.2021
LU22.11.2021
BE30.11.2021
[2024/23]
Former [2023/33]HU22.11.2017
AL24.03.2021
CY24.03.2021
CZ24.03.2021
DK24.03.2021
EE24.03.2021
ES24.03.2021
FI24.03.2021
HR24.03.2021
LT24.03.2021
LV24.03.2021
MC24.03.2021
NL24.03.2021
PL24.03.2021
RO24.03.2021
RS24.03.2021
SE24.03.2021
SI24.03.2021
SK24.03.2021
SM24.03.2021
BG24.06.2021
NO24.06.2021
GR25.06.2021
IS24.07.2021
PT26.07.2021
GB22.11.2021
IE22.11.2021
LU22.11.2021
BE30.11.2021
Former [2023/30]AL24.03.2021
CY24.03.2021
CZ24.03.2021
DK24.03.2021
EE24.03.2021
ES24.03.2021
FI24.03.2021
HR24.03.2021
LT24.03.2021
LV24.03.2021
MC24.03.2021
NL24.03.2021
PL24.03.2021
RO24.03.2021
RS24.03.2021
SE24.03.2021
SI24.03.2021
SK24.03.2021
SM24.03.2021
BG24.06.2021
NO24.06.2021
GR25.06.2021
IS24.07.2021
PT26.07.2021
GB22.11.2021
IE22.11.2021
LU22.11.2021
BE30.11.2021
Former [2022/48]AL24.03.2021
CZ24.03.2021
DK24.03.2021
EE24.03.2021
ES24.03.2021
FI24.03.2021
HR24.03.2021
LT24.03.2021
LV24.03.2021
MC24.03.2021
NL24.03.2021
PL24.03.2021
RO24.03.2021
RS24.03.2021
SE24.03.2021
SI24.03.2021
SK24.03.2021
SM24.03.2021
BG24.06.2021
NO24.06.2021
GR25.06.2021
IS24.07.2021
PT26.07.2021
GB22.11.2021
IE22.11.2021
LU22.11.2021
BE30.11.2021
Former [2022/47]AL24.03.2021
CZ24.03.2021
DK24.03.2021
EE24.03.2021
ES24.03.2021
FI24.03.2021
HR24.03.2021
LT24.03.2021
LV24.03.2021
MC24.03.2021
NL24.03.2021
PL24.03.2021
RO24.03.2021
RS24.03.2021
SE24.03.2021
SI24.03.2021
SK24.03.2021
SM24.03.2021
BG24.06.2021
NO24.06.2021
GR25.06.2021
IS24.07.2021
PT26.07.2021
GB22.11.2021
LU22.11.2021
BE30.11.2021
Former [2022/34]AL24.03.2021
CZ24.03.2021
DK24.03.2021
EE24.03.2021
ES24.03.2021
FI24.03.2021
HR24.03.2021
LT24.03.2021
LV24.03.2021
MC24.03.2021
NL24.03.2021
PL24.03.2021
RO24.03.2021
RS24.03.2021
SE24.03.2021
SI24.03.2021
SK24.03.2021
SM24.03.2021
BG24.06.2021
NO24.06.2021
GR25.06.2021
IS24.07.2021
PT26.07.2021
LU22.11.2021
BE30.11.2021
Former [2022/33]AL24.03.2021
CZ24.03.2021
DK24.03.2021
EE24.03.2021
ES24.03.2021
FI24.03.2021
HR24.03.2021
LT24.03.2021
LV24.03.2021
MC24.03.2021
NL24.03.2021
PL24.03.2021
RO24.03.2021
RS24.03.2021
SE24.03.2021
SI24.03.2021
SK24.03.2021
SM24.03.2021
BG24.06.2021
NO24.06.2021
GR25.06.2021
IS24.07.2021
PT26.07.2021
BE30.11.2021
Former [2022/23]AL24.03.2021
CZ24.03.2021
DK24.03.2021
EE24.03.2021
ES24.03.2021
FI24.03.2021
HR24.03.2021
LT24.03.2021
LV24.03.2021
NL24.03.2021
PL24.03.2021
RO24.03.2021
RS24.03.2021
SE24.03.2021
SI24.03.2021
SK24.03.2021
SM24.03.2021
BG24.06.2021
NO24.06.2021
GR25.06.2021
IS24.07.2021
PT26.07.2021
Former [2022/13]AL24.03.2021
CZ24.03.2021
DK24.03.2021
EE24.03.2021
ES24.03.2021
FI24.03.2021
HR24.03.2021
LT24.03.2021
LV24.03.2021
NL24.03.2021
PL24.03.2021
RO24.03.2021
RS24.03.2021
SE24.03.2021
SI24.03.2021
SK24.03.2021
SM24.03.2021
BG24.06.2021
NO24.06.2021
GR25.06.2021
PT26.07.2021
IS24.12.2021
Former [2022/10]AL24.03.2021
CZ24.03.2021
DK24.03.2021
EE24.03.2021
ES24.03.2021
FI24.03.2021
HR24.03.2021
LT24.03.2021
LV24.03.2021
NL24.03.2021
PL24.03.2021
RO24.03.2021
RS24.03.2021
SE24.03.2021
SK24.03.2021
SM24.03.2021
BG24.06.2021
NO24.06.2021
GR25.06.2021
PT26.07.2021
IS24.12.2021
Former [2022/08]AL24.03.2021
CZ24.03.2021
DK24.03.2021
EE24.03.2021
ES24.03.2021
FI24.03.2021
HR24.03.2021
LT24.03.2021
LV24.03.2021
NL24.03.2021
PL24.03.2021
RO24.03.2021
RS24.03.2021
SE24.03.2021
SK24.03.2021
SM24.03.2021
BG24.06.2021
NO24.06.2021
GR25.06.2021
IS24.07.2021
PT26.07.2021
Former [2022/07]AL24.03.2021
CZ24.03.2021
EE24.03.2021
FI24.03.2021
HR24.03.2021
LT24.03.2021
LV24.03.2021
NL24.03.2021
PL24.03.2021
RO24.03.2021
RS24.03.2021
SE24.03.2021
SK24.03.2021
SM24.03.2021
BG24.06.2021
NO24.06.2021
GR25.06.2021
IS24.07.2021
PT26.07.2021
Former [2021/52]CZ24.03.2021
EE24.03.2021
FI24.03.2021
HR24.03.2021
LT24.03.2021
LV24.03.2021
NL24.03.2021
PL24.03.2021
RO24.03.2021
RS24.03.2021
SE24.03.2021
SK24.03.2021
SM24.03.2021
BG24.06.2021
NO24.06.2021
GR25.06.2021
IS24.07.2021
PT26.07.2021
Former [2021/51]CZ24.03.2021
EE24.03.2021
FI24.03.2021
HR24.03.2021
LT24.03.2021
LV24.03.2021
NL24.03.2021
RO24.03.2021
RS24.03.2021
SE24.03.2021
SK24.03.2021
SM24.03.2021
BG24.06.2021
NO24.06.2021
GR25.06.2021
IS24.07.2021
PT26.07.2021
Former [2021/50]CZ24.03.2021
EE24.03.2021
FI24.03.2021
HR24.03.2021
LT24.03.2021
LV24.03.2021
NL24.03.2021
RO24.03.2021
RS24.03.2021
SE24.03.2021
SK24.03.2021
SM24.03.2021
BG24.06.2021
NO24.06.2021
GR25.06.2021
PT26.07.2021
Former [2021/48]CZ24.03.2021
EE24.03.2021
FI24.03.2021
HR24.03.2021
LT24.03.2021
LV24.03.2021
NL24.03.2021
RS24.03.2021
SE24.03.2021
SM24.03.2021
BG24.06.2021
NO24.06.2021
GR25.06.2021
Former [2021/46]FI24.03.2021
HR24.03.2021
LT24.03.2021
LV24.03.2021
NL24.03.2021
RS24.03.2021
SE24.03.2021
SM24.03.2021
BG24.06.2021
NO24.06.2021
GR25.06.2021
Former [2021/43]FI24.03.2021
HR24.03.2021
LV24.03.2021
NL24.03.2021
RS24.03.2021
SE24.03.2021
BG24.06.2021
NO24.06.2021
GR25.06.2021
Former [2021/38]FI24.03.2021
HR24.03.2021
LV24.03.2021
RS24.03.2021
SE24.03.2021
BG24.06.2021
NO24.06.2021
GR25.06.2021
Former [2021/37]FI24.03.2021
HR24.03.2021
LV24.03.2021
RS24.03.2021
BG24.06.2021
NO24.06.2021
GR25.06.2021
Former [2021/36]FI24.03.2021
HR24.03.2021
BG24.06.2021
NO24.06.2021
GR25.06.2021
Former [2021/35]FI24.03.2021
HR24.03.2021
NO24.06.2021
Former [2021/33]FI24.03.2021
NO24.06.2021
Cited inInternational search[XYI]JPH1064616  (SUMITOMO WIRING SYSTEMS) [X] 1,6-8 * abstract * [Y] 9-11 [I] 2-5;
 [XYI]JP2000133370  (SUMITOMO WIRING SYSTEMS) [X] 1,7,14 * abstract * [Y] 9,10 [I] 2-6,8,15;
 [A]FR2930683  (SOURIAU SOC PAR ACTIONS SIMPLI [FR]) [A] 1,12* figure 1 *;
 [XYI]JP2014032784  (YAZAKI CORP) [X] 1,7,14 * abstract * [Y] 9-11 [I] 2-6,8,15;
 [YD]DE102012108415  (FLOWTEC AG [CH]) [YD] 10,11 * figures 1-2 *;
 [XYI]DE112014002233T  (YAZAKI CORP [JP]) [X] 1,7,8,14 * figures 2-6 * [Y] 9,10 [I] 2-6,15
ExaminationDE102012005638
by applicantEP1130363
 DE102012108415
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.