blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3541668

EP3541668 - ASSEMBLY FOR ATTACHING A TRIM ELEMENT [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  17.06.2022
Database last updated on 09.09.2024
FormerThe patent has been granted
Status updated on  09.07.2021
FormerGrant of patent is intended
Status updated on  21.02.2021
FormerExamination is in progress
Status updated on  24.04.2020
FormerRequest for examination was made
Status updated on  23.08.2019
FormerThe international publication has been made
Status updated on  25.05.2018
Formerunknown
Status updated on  06.12.2017
Most recent event   Tooltip03.05.2024Lapse of the patent in a contracting state
New state(s): MK
published on 05.06.2024  [2024/23]
Applicant(s)For all designated states
NOVARES France
361 avenue du Général De Gaulle
92140 Clamart / FR
[2019/39]
Inventor(s)01 / BACELOS, François
Immeuble Le Tonia
4bis avenue Lympia
06300 Nice / FR
 [2019/39]
Representative(s)Germain Maureau
12, rue Boileau
69006 Lyon / FR
[N/P]
Former [2019/39]Delorme, Nicolas, et al
Cabinet Germain & Maureau
BP 6153
69466 Lyon Cedex 06 / FR
Application number, filing date17804635.517.11.2017
[2019/39]
WO2017FR53148
Priority number, dateFR2016006124618.11.2016         Original published format: FR 1661246
[2019/39]
Filing languageFR
Procedural languageFR
PublicationType: A1 Application with search report
No.:WO2018091840
Date:24.05.2018
Language:FR
[2018/21]
Type: A1 Application with search report 
No.:EP3541668
Date:25.09.2019
Language:FR
The application published by WIPO in one of the EPO official languages on 24.05.2018 takes the place of the publication of the European patent application.
[2019/39]
Type: B1 Patent specification 
No.:EP3541668
Date:11.08.2021
Language:FR
[2021/32]
Search report(s)International search report - published on:EP24.05.2018
ClassificationIPC:B60R21/213, B60R13/02, B60R21/216
[2019/39]
CPC:
B60R21/213 (EP,US); B60R21/216 (US); B60R13/0206 (EP,US);
B60R13/025 (US); B60R2021/2163 (EP)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2019/39]
Extension statesBANot yet paid
MENot yet paid
Validation statesMANot yet paid
MDNot yet paid
TitleGerman:ANORDNUNG ZUR BEFESTIGUNG EINES VERKLEIDUNGSELEMENTS[2019/39]
English:ASSEMBLY FOR ATTACHING A TRIM ELEMENT[2019/39]
French:ENSEMBLE DE FIXATION D'UN ÉLÉMENT DE GARNITURE[2019/39]
Entry into regional phase14.05.2019National basic fee paid 
14.05.2019Designation fee(s) paid 
14.05.2019Examination fee paid 
Examination procedure14.05.2019Examination requested  [2019/39]
14.05.2019Date on which the examining division has become responsible
06.01.2020Amendment by applicant (claims and/or description)
29.04.2020Despatch of a communication from the examining division (Time limit: M06)
06.11.2020Reply to a communication from the examining division
22.02.2021Communication of intention to grant the patent
05.07.2021Fee for grant paid
05.07.2021Fee for publishing/printing paid
05.07.2021Receipt of the translation of the claim(s)
Opposition(s)12.05.2022No opposition filed within time limit [2022/29]
Fees paidRenewal fee
31.10.2019Renewal fee patent year 03
15.09.2020Renewal fee patent year 04
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU17.11.2017
AL11.08.2021
AT11.08.2021
CY11.08.2021
DK11.08.2021
EE11.08.2021
FI11.08.2021
HR11.08.2021
IT11.08.2021
LT11.08.2021
LV11.08.2021
MC11.08.2021
MK11.08.2021
NL11.08.2021
PL11.08.2021
RO11.08.2021
RS11.08.2021
SE11.08.2021
SI11.08.2021
SM11.08.2021
BG11.11.2021
NO11.11.2021
GR12.11.2021
GB17.11.2021
IE17.11.2021
LU17.11.2021
BE30.11.2021
CH30.11.2021
LI30.11.2021
IS11.12.2021
PT13.12.2021
[2024/23]
Former [2023/33]HU17.11.2017
AL11.08.2021
AT11.08.2021
CY11.08.2021
DK11.08.2021
EE11.08.2021
FI11.08.2021
HR11.08.2021
IT11.08.2021
LT11.08.2021
LV11.08.2021
MC11.08.2021
NL11.08.2021
PL11.08.2021
RO11.08.2021
RS11.08.2021
SE11.08.2021
SI11.08.2021
SM11.08.2021
BG11.11.2021
NO11.11.2021
GR12.11.2021
GB17.11.2021
IE17.11.2021
LU17.11.2021
BE30.11.2021
CH30.11.2021
LI30.11.2021
IS11.12.2021
PT13.12.2021
Former [2023/30]AL11.08.2021
AT11.08.2021
CY11.08.2021
DK11.08.2021
EE11.08.2021
FI11.08.2021
HR11.08.2021
IT11.08.2021
LT11.08.2021
LV11.08.2021
MC11.08.2021
NL11.08.2021
PL11.08.2021
RO11.08.2021
RS11.08.2021
SE11.08.2021
SI11.08.2021
SM11.08.2021
BG11.11.2021
NO11.11.2021
GR12.11.2021
GB17.11.2021
IE17.11.2021
LU17.11.2021
BE30.11.2021
CH30.11.2021
LI30.11.2021
IS11.12.2021
PT13.12.2021
Former [2022/48]AL11.08.2021
AT11.08.2021
DK11.08.2021
EE11.08.2021
FI11.08.2021
HR11.08.2021
IT11.08.2021
LT11.08.2021
LV11.08.2021
MC11.08.2021
NL11.08.2021
PL11.08.2021
RO11.08.2021
RS11.08.2021
SE11.08.2021
SI11.08.2021
SM11.08.2021
BG11.11.2021
NO11.11.2021
GR12.11.2021
GB17.11.2021
IE17.11.2021
LU17.11.2021
BE30.11.2021
CH30.11.2021
LI30.11.2021
IS11.12.2021
PT13.12.2021
Former [2022/47]AL11.08.2021
AT11.08.2021
DK11.08.2021
EE11.08.2021
FI11.08.2021
HR11.08.2021
IT11.08.2021
LT11.08.2021
LV11.08.2021
MC11.08.2021
NL11.08.2021
PL11.08.2021
RO11.08.2021
RS11.08.2021
SE11.08.2021
SI11.08.2021
SM11.08.2021
BG11.11.2021
NO11.11.2021
GR12.11.2021
GB17.11.2021
LU17.11.2021
BE30.11.2021
CH30.11.2021
LI30.11.2021
IS11.12.2021
PT13.12.2021
Former [2022/37]AL11.08.2021
AT11.08.2021
DK11.08.2021
EE11.08.2021
FI11.08.2021
HR11.08.2021
IT11.08.2021
LT11.08.2021
LV11.08.2021
MC11.08.2021
NL11.08.2021
PL11.08.2021
RO11.08.2021
RS11.08.2021
SE11.08.2021
SI11.08.2021
SM11.08.2021
BG11.11.2021
NO11.11.2021
GR12.11.2021
LU17.11.2021
BE30.11.2021
CH30.11.2021
LI30.11.2021
IS11.12.2021
PT13.12.2021
Former [2022/36]AL11.08.2021
AT11.08.2021
DK11.08.2021
EE11.08.2021
FI11.08.2021
HR11.08.2021
IT11.08.2021
LT11.08.2021
LV11.08.2021
MC11.08.2021
NL11.08.2021
PL11.08.2021
RO11.08.2021
RS11.08.2021
SE11.08.2021
SI11.08.2021
SM11.08.2021
BG11.11.2021
NO11.11.2021
GR12.11.2021
LU17.11.2021
BE30.11.2021
IS11.12.2021
PT13.12.2021
Former [2022/34]AL11.08.2021
AT11.08.2021
DK11.08.2021
EE11.08.2021
FI11.08.2021
HR11.08.2021
LT11.08.2021
LV11.08.2021
MC11.08.2021
NL11.08.2021
PL11.08.2021
RO11.08.2021
RS11.08.2021
SE11.08.2021
SM11.08.2021
BG11.11.2021
NO11.11.2021
GR12.11.2021
LU17.11.2021
BE30.11.2021
IS11.12.2021
PT13.12.2021
Former [2022/33]AL11.08.2021
AT11.08.2021
DK11.08.2021
EE11.08.2021
FI11.08.2021
HR11.08.2021
LT11.08.2021
LV11.08.2021
MC11.08.2021
NL11.08.2021
PL11.08.2021
RO11.08.2021
RS11.08.2021
SE11.08.2021
SM11.08.2021
BG11.11.2021
NO11.11.2021
GR12.11.2021
BE30.11.2021
IS11.12.2021
PT13.12.2021
Former [2022/29]AL11.08.2021
AT11.08.2021
DK11.08.2021
EE11.08.2021
FI11.08.2021
HR11.08.2021
LT11.08.2021
LV11.08.2021
NL11.08.2021
PL11.08.2021
RO11.08.2021
RS11.08.2021
SE11.08.2021
SM11.08.2021
BG11.11.2021
NO11.11.2021
GR12.11.2021
IS11.12.2021
PT13.12.2021
Former [2022/26]AT11.08.2021
DK11.08.2021
EE11.08.2021
FI11.08.2021
HR11.08.2021
LT11.08.2021
LV11.08.2021
NL11.08.2021
PL11.08.2021
RO11.08.2021
RS11.08.2021
SE11.08.2021
SM11.08.2021
BG11.11.2021
NO11.11.2021
GR12.11.2021
IS11.12.2021
PT13.12.2021
Former [2022/24]AT11.08.2021
DK11.08.2021
EE11.08.2021
FI11.08.2021
HR11.08.2021
LT11.08.2021
LV11.08.2021
NL11.08.2021
PL11.08.2021
RO11.08.2021
RS11.08.2021
SE11.08.2021
BG11.11.2021
NO11.11.2021
GR12.11.2021
IS11.12.2021
PT13.12.2021
Former [2022/21]AT11.08.2021
DK11.08.2021
FI11.08.2021
HR11.08.2021
LT11.08.2021
LV11.08.2021
NL11.08.2021
PL11.08.2021
RS11.08.2021
SE11.08.2021
BG11.11.2021
NO11.11.2021
GR12.11.2021
IS11.12.2021
PT13.12.2021
Former [2022/16]AT11.08.2021
FI11.08.2021
HR11.08.2021
LT11.08.2021
LV11.08.2021
NL11.08.2021
PL11.08.2021
RS11.08.2021
SE11.08.2021
BG11.11.2021
NO11.11.2021
GR12.11.2021
IS11.12.2021
PT13.12.2021
Former [2022/10]AT11.08.2021
FI11.08.2021
HR11.08.2021
LT11.08.2021
LV11.08.2021
PL11.08.2021
RS11.08.2021
SE11.08.2021
BG11.11.2021
NO11.11.2021
GR12.11.2021
IS11.12.2021
PT13.12.2021
Former [2022/09]AT11.08.2021
FI11.08.2021
LT11.08.2021
RS11.08.2021
SE11.08.2021
BG11.11.2021
NO11.11.2021
PT13.12.2021
Former [2022/08]AT11.08.2021
FI11.08.2021
LT11.08.2021
SE11.08.2021
BG11.11.2021
NO11.11.2021
Former [2022/07]AT11.08.2021
LT11.08.2021
NO11.11.2021
Cited inInternational search[Y]DE19910594  (VOLKSWAGEN AG [DE]) [Y] 1-3,7,8 * abstract * * column 2, line 64 - column 3, line 35 * * claim 1 * * figures 2,3 *;
 [A]US6431585  (RICKABUS TED R [US], et al) [A] 1 * abstract ** column 3, line 9 - line 19; figures 2,3 *;
 [A]EP1769979  (INOUE MTP KK [JP]) [A] 1 * abstract * * paragraph [0009] * * figure 1 *;
 [YDA]EP2514639  (MECAPLAST SA [MC]) [YD] 1-3,7,8 * abstract * * paragraph [0013] * * paragraph [0046] - paragraph [0048] * * paragraph [0071] - paragraph [0072] * * claims 1,10-14 * * figures 3-5 * [A] 4-6
by applicantEP2514639
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.