blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3538803

EP3538803 - CONNECTION BODY, FITTINGS AND HYDRAULIC SYSTEM FOR THE PASSAGE OF A FLUID BETWEEN TWO HYDRAULIC CIRCUITS, ASSOCIATED METHOD AND MOUNTING [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  06.01.2023
Database last updated on 11.09.2024
FormerThe patent has been granted
Status updated on  28.01.2022
FormerGrant of patent is intended
Status updated on  09.09.2021
FormerExamination is in progress
Status updated on  11.09.2020
FormerRequest for examination was made
Status updated on  16.08.2019
FormerThe international publication has been made
Status updated on  18.05.2018
Formerunknown
Status updated on  13.12.2017
Most recent event   Tooltip31.05.2024Lapse of the patent in a contracting state
New state(s): MK
published on 03.07.2024  [2024/27]
Applicant(s)For all designated states
Permaswage
5, Rue des Dames
78340 Les-Clayes-sous-Bois / FR
[2021/40]
Former [2019/38]For all designated states
Permaswage
5 ru des des Dames
78340 Les-Clayes-sous-Bois / FR
Inventor(s)01 / DUMONT, Mickaël
13 Avenue Arletty
78390 Bois d'Arcy / FR
02 / DESNOEL, Fabien
4 Chemin des Sablons
78650 Saulx Marchais / FR
03 / HERAUD, Stéphane
6 Rue de l'Ecole Polytechnique
75005 Paris / FR
 [2019/38]
Representative(s)Cabinet Camus Lebkiri
25 rue de Maubeuge
75009 Paris / FR
[2019/38]
Application number, filing date17808334.108.11.2017
[2019/38]
WO2017EP78570
Priority number, dateFR2016006083809.11.2016         Original published format: FR 1660838
[2019/38]
Filing languageFR
Procedural languageFR
PublicationType: A1 Application with search report
No.:WO2018087127
Date:17.05.2018
Language:FR
[2018/20]
Type: A1 Application with search report 
No.:EP3538803
Date:18.09.2019
Language:FR
The application published by WIPO in one of the EPO official languages on 17.05.2018 takes the place of the publication of the European patent application.
[2019/38]
Type: B1 Patent specification 
No.:EP3538803
Date:02.03.2022
Language:FR
[2022/09]
Search report(s)International search report - published on:EP17.05.2018
ClassificationIPC:F16L9/12, F16L13/14, F16L25/02
[2019/38]
CPC:
F16L9/125 (EP,RU,US); F16L25/02 (US); F16L13/141 (EP,RU,US);
F16L25/01 (US); F16L25/021 (US); F16L25/025 (US)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2019/38]
Extension statesBANot yet paid
MENot yet paid
Validation statesMANot yet paid
MDNot yet paid
TitleGerman:VERBINDUNGSKÖRPER, VERSCHRAUBUNGEN UND HYDRAULISCHES SYSTEM FÜR DEN DURCHGANG EINER FLÜSSIGKEIT ZWISCHEN ZWEI HYDRAULISCHEN KREISLÄUFEN, ZUGEHÖRIGES VERFAHREN UND MONTAGE[2019/38]
English:CONNECTION BODY, FITTINGS AND HYDRAULIC SYSTEM FOR THE PASSAGE OF A FLUID BETWEEN TWO HYDRAULIC CIRCUITS, ASSOCIATED METHOD AND MOUNTING[2019/38]
French:CORPS DE JONCTION, RACCORDS, SYSTEME HYDRAULIQUE POUR LE PASSAGE D'UN FLUIDE ENTRE DEUX CIRCUITS HYDRAULIQUES, PROCEDE DE MONTAGE ASSOCIES[2019/38]
Entry into regional phase09.08.2019National basic fee paid 
07.06.2019Designation fee(s) paid 
07.06.2019Examination fee paid 
Examination proceduredeletedDeletion: Application deemed to be withdrawn, date of legal effect  [2019/38]
07.06.2019Examination requested  [2019/38]
07.06.2019Date on which the examining division has become responsible
27.06.2019Despatch of communication that the application is deemed to be withdrawn, reason: filing fee / search fee not paid in time  [2019/38]
18.02.2020Amendment by applicant (claims and/or description)
11.09.2020Despatch of a communication from the examining division (Time limit: M06)
19.11.2020Reply to a communication from the examining division
26.03.2021Despatch of a communication from the examining division (Time limit: M06)
12.05.2021Reply to a communication from the examining division
10.09.2021Communication of intention to grant the patent
17.01.2022Fee for grant paid
17.01.2022Fee for publishing/printing paid
17.01.2022Receipt of the translation of the claim(s)
Opposition(s)05.12.2022No opposition filed within time limit [2023/06]
Request for further processing for:The application is deemed to be withdrawn due to non-payment of the filing fee
09.08.2019Request for further processing filed
09.08.2019Full payment received (date of receipt of payment)
Request granted
22.08.2019Decision despatched
Fees paidRenewal fee
20.11.2019Renewal fee patent year 03
19.11.2020Renewal fee patent year 04
18.11.2021Renewal fee patent year 05
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU08.11.2017
AL02.03.2022
AT02.03.2022
CY02.03.2022
CZ02.03.2022
DK02.03.2022
EE02.03.2022
FI02.03.2022
HR02.03.2022
LT02.03.2022
LV02.03.2022
MC02.03.2022
MK02.03.2022
NL02.03.2022
PL02.03.2022
RO02.03.2022
RS02.03.2022
SE02.03.2022
SI02.03.2022
SK02.03.2022
SM02.03.2022
BG02.06.2022
NO02.06.2022
GR03.06.2022
IS02.07.2022
PT04.07.2022
IE08.11.2022
LU08.11.2022
BE30.11.2022
CH30.11.2022
LI30.11.2022
[2024/27]
Former [2024/21]HU08.11.2017
AL02.03.2022
AT02.03.2022
CY02.03.2022
CZ02.03.2022
DK02.03.2022
EE02.03.2022
FI02.03.2022
HR02.03.2022
LT02.03.2022
LV02.03.2022
MC02.03.2022
NL02.03.2022
PL02.03.2022
RO02.03.2022
RS02.03.2022
SE02.03.2022
SI02.03.2022
SK02.03.2022
SM02.03.2022
BG02.06.2022
NO02.06.2022
GR03.06.2022
IS02.07.2022
PT04.07.2022
IE08.11.2022
LU08.11.2022
BE30.11.2022
CH30.11.2022
LI30.11.2022
Former [2024/18]HU08.11.2017
AL02.03.2022
AT02.03.2022
CZ02.03.2022
DK02.03.2022
EE02.03.2022
FI02.03.2022
HR02.03.2022
LT02.03.2022
LV02.03.2022
MC02.03.2022
NL02.03.2022
PL02.03.2022
RO02.03.2022
RS02.03.2022
SE02.03.2022
SI02.03.2022
SK02.03.2022
SM02.03.2022
BG02.06.2022
NO02.06.2022
GR03.06.2022
IS02.07.2022
PT04.07.2022
IE08.11.2022
LU08.11.2022
BE30.11.2022
CH30.11.2022
LI30.11.2022
Former [2023/49]AL02.03.2022
AT02.03.2022
CZ02.03.2022
DK02.03.2022
EE02.03.2022
FI02.03.2022
HR02.03.2022
LT02.03.2022
LV02.03.2022
MC02.03.2022
NL02.03.2022
PL02.03.2022
RO02.03.2022
RS02.03.2022
SE02.03.2022
SI02.03.2022
SK02.03.2022
SM02.03.2022
BG02.06.2022
NO02.06.2022
GR03.06.2022
IS02.07.2022
PT04.07.2022
IE08.11.2022
LU08.11.2022
BE30.11.2022
CH30.11.2022
LI30.11.2022
Former [2023/48]AL02.03.2022
AT02.03.2022
CZ02.03.2022
DK02.03.2022
EE02.03.2022
FI02.03.2022
HR02.03.2022
LT02.03.2022
LV02.03.2022
MC02.03.2022
NL02.03.2022
PL02.03.2022
RO02.03.2022
RS02.03.2022
SE02.03.2022
SI02.03.2022
SK02.03.2022
SM02.03.2022
BG02.06.2022
NO02.06.2022
GR03.06.2022
IS02.07.2022
PT04.07.2022
IE08.11.2022
LU08.11.2022
CH30.11.2022
LI30.11.2022
Former [2023/37]AL02.03.2022
AT02.03.2022
CZ02.03.2022
DK02.03.2022
EE02.03.2022
FI02.03.2022
HR02.03.2022
LT02.03.2022
LV02.03.2022
MC02.03.2022
NL02.03.2022
PL02.03.2022
RO02.03.2022
RS02.03.2022
SE02.03.2022
SI02.03.2022
SK02.03.2022
SM02.03.2022
BG02.06.2022
NO02.06.2022
GR03.06.2022
IS02.07.2022
PT04.07.2022
LU08.11.2022
CH30.11.2022
LI30.11.2022
Former [2023/35]AL02.03.2022
AT02.03.2022
CZ02.03.2022
DK02.03.2022
EE02.03.2022
FI02.03.2022
HR02.03.2022
LT02.03.2022
LV02.03.2022
MC02.03.2022
NL02.03.2022
PL02.03.2022
RO02.03.2022
RS02.03.2022
SE02.03.2022
SI02.03.2022
SK02.03.2022
SM02.03.2022
BG02.06.2022
NO02.06.2022
GR03.06.2022
IS02.07.2022
PT04.07.2022
CH30.11.2022
LI30.11.2022
Former [2023/31]AL02.03.2022
AT02.03.2022
CZ02.03.2022
DK02.03.2022
EE02.03.2022
FI02.03.2022
HR02.03.2022
LT02.03.2022
LV02.03.2022
MC02.03.2022
NL02.03.2022
PL02.03.2022
RO02.03.2022
RS02.03.2022
SE02.03.2022
SI02.03.2022
SK02.03.2022
SM02.03.2022
BG02.06.2022
NO02.06.2022
GR03.06.2022
IS02.07.2022
PT04.07.2022
Former [2023/10]AL02.03.2022
AT02.03.2022
CZ02.03.2022
DK02.03.2022
EE02.03.2022
FI02.03.2022
HR02.03.2022
LT02.03.2022
LV02.03.2022
NL02.03.2022
PL02.03.2022
RO02.03.2022
RS02.03.2022
SE02.03.2022
SI02.03.2022
SK02.03.2022
SM02.03.2022
BG02.06.2022
NO02.06.2022
GR03.06.2022
IS02.07.2022
PT04.07.2022
Former [2023/07]AL02.03.2022
AT02.03.2022
CZ02.03.2022
DK02.03.2022
EE02.03.2022
FI02.03.2022
HR02.03.2022
LT02.03.2022
LV02.03.2022
NL02.03.2022
PL02.03.2022
RO02.03.2022
RS02.03.2022
SE02.03.2022
SK02.03.2022
SM02.03.2022
BG02.06.2022
NO02.06.2022
GR03.06.2022
IS02.07.2022
PT04.07.2022
Former [2023/01]AL02.03.2022
AT02.03.2022
CZ02.03.2022
EE02.03.2022
FI02.03.2022
HR02.03.2022
LT02.03.2022
LV02.03.2022
NL02.03.2022
PL02.03.2022
RO02.03.2022
RS02.03.2022
SE02.03.2022
SK02.03.2022
SM02.03.2022
BG02.06.2022
NO02.06.2022
GR03.06.2022
IS02.07.2022
PT04.07.2022
Former [2022/51]AT02.03.2022
CZ02.03.2022
EE02.03.2022
FI02.03.2022
HR02.03.2022
LT02.03.2022
LV02.03.2022
NL02.03.2022
PL02.03.2022
RO02.03.2022
RS02.03.2022
SE02.03.2022
SK02.03.2022
SM02.03.2022
BG02.06.2022
NO02.06.2022
GR03.06.2022
IS02.07.2022
PT04.07.2022
Former [2022/49]AT02.03.2022
CZ02.03.2022
EE02.03.2022
FI02.03.2022
HR02.03.2022
LT02.03.2022
LV02.03.2022
NL02.03.2022
PL02.03.2022
RO02.03.2022
RS02.03.2022
SE02.03.2022
SK02.03.2022
SM02.03.2022
BG02.06.2022
NO02.06.2022
GR03.06.2022
PT04.07.2022
Former [2022/48]AT02.03.2022
CZ02.03.2022
EE02.03.2022
FI02.03.2022
HR02.03.2022
LT02.03.2022
LV02.03.2022
NL02.03.2022
PL02.03.2022
RO02.03.2022
RS02.03.2022
SE02.03.2022
SM02.03.2022
BG02.06.2022
NO02.06.2022
GR03.06.2022
PT04.07.2022
Former [2022/47]AT02.03.2022
FI02.03.2022
HR02.03.2022
LT02.03.2022
LV02.03.2022
NL02.03.2022
PL02.03.2022
RO02.03.2022
RS02.03.2022
SE02.03.2022
SM02.03.2022
BG02.06.2022
NO02.06.2022
GR03.06.2022
PT04.07.2022
Former [2022/44]FI02.03.2022
HR02.03.2022
LT02.03.2022
LV02.03.2022
NL02.03.2022
PL02.03.2022
RS02.03.2022
SE02.03.2022
BG02.06.2022
NO02.06.2022
GR03.06.2022
Former [2022/39]FI02.03.2022
HR02.03.2022
LT02.03.2022
LV02.03.2022
PL02.03.2022
RS02.03.2022
SE02.03.2022
BG02.06.2022
NO02.06.2022
GR03.06.2022
Former [2022/36]HR02.03.2022
LT02.03.2022
LV02.03.2022
PL02.03.2022
RS02.03.2022
SE02.03.2022
BG02.06.2022
NO02.06.2022
GR03.06.2022
Former [2022/35]HR02.03.2022
LT02.03.2022
RS02.03.2022
SE02.03.2022
BG02.06.2022
NO02.06.2022
Former [2022/33]LT02.03.2022
NO02.06.2022
Cited inInternational search[X]GB1596242  (SUPPERFLEXIT SOC) [X] 1* figure 1 *;
 [XAI]US5234033  (STOLL KURT [DE], et al) [X] 1,2,5-7 * claim 1 * [A] 8-16 [I] 3,4;
 [XAI]US5452948  (COOPER RALPH M [US], et al) [X] 1,2,5-7 * claims 1, 17 * [A] 8-16 [I] 3,4;
 [XAI]WO9628664  (BAXTER INT [US], et al) [X] 1,2,5-7 * figure 3; claim 1 * [A] 8-16 [I] 3,4
by applicantFR2947609
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.