EP3539326 - SYSTEM AND METHOD TO FACILITATE POWER MANAGEMENT IN A LONG RANGE RADIO NETWORK ENVIRONMENT [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 10.03.2023 Database last updated on 19.10.2024 | |
Former | The patent has been granted Status updated on 02.04.2022 | ||
Former | Grant of patent is intended Status updated on 06.12.2021 | ||
Former | Examination is in progress Status updated on 19.03.2021 | ||
Former | Request for examination was made Status updated on 16.08.2019 | ||
Former | The international publication has been made Status updated on 18.05.2018 | ||
Former | unknown Status updated on 13.12.2017 | Most recent event Tooltip | 13.09.2024 | Lapse of the patent in a contracting state New state(s): MT | published on 16.10.2024 [2024/42] | Applicant(s) | For all designated states Cisco Technology, Inc. 170 West Tasman Drive San Jose, CA 95134 / US | [2019/38] | Inventor(s) | 01 /
GANDHI, Indermeet Singh B2-108 Alpine Eco Apartments ORR Doddanekundi Bangalore 560 037 KN / IN | 02 /
GUNDAVELLI, Srinath 4081 Louvre Avenue San Jose, California 95135 / US | 03 /
MURTHY, Ramachandra Srinivasa 89/A 15th Main Nanjundeshwara Layout 5th Phase, JP Nagar Bangalore 560 078 KN / IN | [2019/38] | Representative(s) | Noble, Nicholas, et al Kilburn & Strode LLP Lacon London 84 Theobalds Road London WC1X 8NL / GB | [2019/38] | Application number, filing date | 17808661.7 | 08.11.2017 | [2019/38] | WO2017US60605 | Priority number, date | US201615347606 | 09.11.2016 Original published format: US201615347606 | [2019/38] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2018089470 | Date: | 17.05.2018 | Language: | EN | [2018/20] | Type: | A1 Application with search report | No.: | EP3539326 | Date: | 18.09.2019 | Language: | EN | The application published by WIPO in one of the EPO official languages on 17.05.2018 takes the place of the publication of the European patent application. | [2019/38] | Type: | B1 Patent specification | No.: | EP3539326 | Date: | 04.05.2022 | Language: | EN | [2022/18] | Search report(s) | International search report - published on: | EP | 17.05.2018 | Classification | IPC: | H04W52/02 | [2019/38] | CPC: |
H04W52/0216 (EP,US);
H04W4/80 (US);
H04W52/0235 (EP,US);
H04W84/042 (US);
Y02D30/70 (EP,US)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2019/38] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | MD | Not yet paid | Title | German: | SYSTEM UND VERFAHREN ZUR BEREITSTELLUNG DER LEISTUNGSVERWALTUNG IN EINER FUNKNETZWERKUMGEBUNG MIT GROSSER REICHWEITE | [2019/38] | English: | SYSTEM AND METHOD TO FACILITATE POWER MANAGEMENT IN A LONG RANGE RADIO NETWORK ENVIRONMENT | [2019/38] | French: | SYSTÈME ET PROCÉDÉ PERMETTANT DE FACILITER UNE GESTION DE PUISSANCE DANS UN ENVIRONNEMENT DE RÉSEAU RADIO À LONGUE PORTÉE | [2019/38] | Entry into regional phase | 05.06.2019 | National basic fee paid | 05.06.2019 | Designation fee(s) paid | 05.06.2019 | Examination fee paid | Examination procedure | 05.06.2019 | Examination requested [2019/38] | 05.06.2019 | Date on which the examining division has become responsible | 27.12.2019 | Amendment by applicant (claims and/or description) | 22.03.2021 | Despatch of a communication from the examining division (Time limit: M04) | 26.07.2021 | Reply to a communication from the examining division | 07.12.2021 | Communication of intention to grant the patent | 24.03.2022 | Fee for grant paid | 24.03.2022 | Fee for publishing/printing paid | 24.03.2022 | Receipt of the translation of the claim(s) | Opposition(s) | 07.02.2023 | No opposition filed within time limit [2023/15] | Fees paid | Renewal fee | 27.11.2019 | Renewal fee patent year 03 | 27.11.2020 | Renewal fee patent year 04 | 29.11.2021 | Renewal fee patent year 05 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 08.11.2017 | AL | 04.05.2022 | AT | 04.05.2022 | CY | 04.05.2022 | CZ | 04.05.2022 | DK | 04.05.2022 | EE | 04.05.2022 | ES | 04.05.2022 | FI | 04.05.2022 | HR | 04.05.2022 | IT | 04.05.2022 | LT | 04.05.2022 | LV | 04.05.2022 | MC | 04.05.2022 | MK | 04.05.2022 | MT | 04.05.2022 | NL | 04.05.2022 | PL | 04.05.2022 | RO | 04.05.2022 | RS | 04.05.2022 | SE | 04.05.2022 | SI | 04.05.2022 | SK | 04.05.2022 | SM | 04.05.2022 | BG | 04.08.2022 | NO | 04.08.2022 | GR | 05.08.2022 | IS | 04.09.2022 | PT | 05.09.2022 | IE | 08.11.2022 | LU | 08.11.2022 | BE | 30.11.2022 | CH | 30.11.2022 | LI | 30.11.2022 | [2024/42] |
Former [2024/27] | HU | 08.11.2017 | |
AL | 04.05.2022 | ||
AT | 04.05.2022 | ||
CY | 04.05.2022 | ||
CZ | 04.05.2022 | ||
DK | 04.05.2022 | ||
EE | 04.05.2022 | ||
ES | 04.05.2022 | ||
FI | 04.05.2022 | ||
HR | 04.05.2022 | ||
IT | 04.05.2022 | ||
LT | 04.05.2022 | ||
LV | 04.05.2022 | ||
MC | 04.05.2022 | ||
MK | 04.05.2022 | ||
NL | 04.05.2022 | ||
PL | 04.05.2022 | ||
RO | 04.05.2022 | ||
RS | 04.05.2022 | ||
SE | 04.05.2022 | ||
SI | 04.05.2022 | ||
SK | 04.05.2022 | ||
SM | 04.05.2022 | ||
BG | 04.08.2022 | ||
NO | 04.08.2022 | ||
GR | 05.08.2022 | ||
IS | 04.09.2022 | ||
PT | 05.09.2022 | ||
IE | 08.11.2022 | ||
LU | 08.11.2022 | ||
BE | 30.11.2022 | ||
CH | 30.11.2022 | ||
LI | 30.11.2022 | ||
Former [2024/21] | HU | 08.11.2017 | |
AL | 04.05.2022 | ||
AT | 04.05.2022 | ||
CY | 04.05.2022 | ||
CZ | 04.05.2022 | ||
DK | 04.05.2022 | ||
EE | 04.05.2022 | ||
ES | 04.05.2022 | ||
FI | 04.05.2022 | ||
HR | 04.05.2022 | ||
IT | 04.05.2022 | ||
LT | 04.05.2022 | ||
LV | 04.05.2022 | ||
MC | 04.05.2022 | ||
NL | 04.05.2022 | ||
PL | 04.05.2022 | ||
RO | 04.05.2022 | ||
RS | 04.05.2022 | ||
SE | 04.05.2022 | ||
SI | 04.05.2022 | ||
SK | 04.05.2022 | ||
SM | 04.05.2022 | ||
BG | 04.08.2022 | ||
NO | 04.08.2022 | ||
GR | 05.08.2022 | ||
IS | 04.09.2022 | ||
PT | 05.09.2022 | ||
IE | 08.11.2022 | ||
LU | 08.11.2022 | ||
BE | 30.11.2022 | ||
CH | 30.11.2022 | ||
LI | 30.11.2022 | ||
Former [2024/18] | HU | 08.11.2017 | |
AL | 04.05.2022 | ||
AT | 04.05.2022 | ||
CZ | 04.05.2022 | ||
DK | 04.05.2022 | ||
EE | 04.05.2022 | ||
ES | 04.05.2022 | ||
FI | 04.05.2022 | ||
HR | 04.05.2022 | ||
IT | 04.05.2022 | ||
LT | 04.05.2022 | ||
LV | 04.05.2022 | ||
MC | 04.05.2022 | ||
NL | 04.05.2022 | ||
PL | 04.05.2022 | ||
RO | 04.05.2022 | ||
RS | 04.05.2022 | ||
SE | 04.05.2022 | ||
SI | 04.05.2022 | ||
SK | 04.05.2022 | ||
SM | 04.05.2022 | ||
BG | 04.08.2022 | ||
NO | 04.08.2022 | ||
GR | 05.08.2022 | ||
IS | 04.09.2022 | ||
PT | 05.09.2022 | ||
IE | 08.11.2022 | ||
LU | 08.11.2022 | ||
BE | 30.11.2022 | ||
CH | 30.11.2022 | ||
LI | 30.11.2022 | ||
Former [2024/11] | AL | 04.05.2022 | |
AT | 04.05.2022 | ||
CZ | 04.05.2022 | ||
DK | 04.05.2022 | ||
EE | 04.05.2022 | ||
ES | 04.05.2022 | ||
FI | 04.05.2022 | ||
HR | 04.05.2022 | ||
IT | 04.05.2022 | ||
LT | 04.05.2022 | ||
LV | 04.05.2022 | ||
MC | 04.05.2022 | ||
NL | 04.05.2022 | ||
PL | 04.05.2022 | ||
RO | 04.05.2022 | ||
RS | 04.05.2022 | ||
SE | 04.05.2022 | ||
SI | 04.05.2022 | ||
SK | 04.05.2022 | ||
SM | 04.05.2022 | ||
BG | 04.08.2022 | ||
NO | 04.08.2022 | ||
GR | 05.08.2022 | ||
IS | 04.09.2022 | ||
PT | 05.09.2022 | ||
IE | 08.11.2022 | ||
LU | 08.11.2022 | ||
BE | 30.11.2022 | ||
CH | 30.11.2022 | ||
LI | 30.11.2022 | ||
Former [2023/49] | AL | 04.05.2022 | |
AT | 04.05.2022 | ||
CZ | 04.05.2022 | ||
DK | 04.05.2022 | ||
EE | 04.05.2022 | ||
ES | 04.05.2022 | ||
FI | 04.05.2022 | ||
HR | 04.05.2022 | ||
LT | 04.05.2022 | ||
LV | 04.05.2022 | ||
MC | 04.05.2022 | ||
NL | 04.05.2022 | ||
PL | 04.05.2022 | ||
RO | 04.05.2022 | ||
RS | 04.05.2022 | ||
SE | 04.05.2022 | ||
SI | 04.05.2022 | ||
SK | 04.05.2022 | ||
SM | 04.05.2022 | ||
BG | 04.08.2022 | ||
NO | 04.08.2022 | ||
GR | 05.08.2022 | ||
IS | 04.09.2022 | ||
PT | 05.09.2022 | ||
IE | 08.11.2022 | ||
LU | 08.11.2022 | ||
BE | 30.11.2022 | ||
CH | 30.11.2022 | ||
LI | 30.11.2022 | ||
Former [2023/48] | AL | 04.05.2022 | |
AT | 04.05.2022 | ||
CZ | 04.05.2022 | ||
DK | 04.05.2022 | ||
EE | 04.05.2022 | ||
ES | 04.05.2022 | ||
FI | 04.05.2022 | ||
HR | 04.05.2022 | ||
LT | 04.05.2022 | ||
LV | 04.05.2022 | ||
MC | 04.05.2022 | ||
NL | 04.05.2022 | ||
PL | 04.05.2022 | ||
RO | 04.05.2022 | ||
RS | 04.05.2022 | ||
SE | 04.05.2022 | ||
SI | 04.05.2022 | ||
SK | 04.05.2022 | ||
SM | 04.05.2022 | ||
BG | 04.08.2022 | ||
NO | 04.08.2022 | ||
GR | 05.08.2022 | ||
IS | 04.09.2022 | ||
PT | 05.09.2022 | ||
IE | 08.11.2022 | ||
LU | 08.11.2022 | ||
CH | 30.11.2022 | ||
LI | 30.11.2022 | ||
Former [2023/37] | AL | 04.05.2022 | |
AT | 04.05.2022 | ||
CZ | 04.05.2022 | ||
DK | 04.05.2022 | ||
EE | 04.05.2022 | ||
ES | 04.05.2022 | ||
FI | 04.05.2022 | ||
HR | 04.05.2022 | ||
LT | 04.05.2022 | ||
LV | 04.05.2022 | ||
MC | 04.05.2022 | ||
NL | 04.05.2022 | ||
PL | 04.05.2022 | ||
RO | 04.05.2022 | ||
RS | 04.05.2022 | ||
SE | 04.05.2022 | ||
SI | 04.05.2022 | ||
SK | 04.05.2022 | ||
SM | 04.05.2022 | ||
BG | 04.08.2022 | ||
NO | 04.08.2022 | ||
GR | 05.08.2022 | ||
IS | 04.09.2022 | ||
PT | 05.09.2022 | ||
LU | 08.11.2022 | ||
CH | 30.11.2022 | ||
LI | 30.11.2022 | ||
Former [2023/35] | AL | 04.05.2022 | |
AT | 04.05.2022 | ||
CZ | 04.05.2022 | ||
DK | 04.05.2022 | ||
EE | 04.05.2022 | ||
ES | 04.05.2022 | ||
FI | 04.05.2022 | ||
HR | 04.05.2022 | ||
LT | 04.05.2022 | ||
LV | 04.05.2022 | ||
MC | 04.05.2022 | ||
NL | 04.05.2022 | ||
PL | 04.05.2022 | ||
RO | 04.05.2022 | ||
RS | 04.05.2022 | ||
SE | 04.05.2022 | ||
SI | 04.05.2022 | ||
SK | 04.05.2022 | ||
SM | 04.05.2022 | ||
BG | 04.08.2022 | ||
NO | 04.08.2022 | ||
GR | 05.08.2022 | ||
IS | 04.09.2022 | ||
PT | 05.09.2022 | ||
CH | 30.11.2022 | ||
LI | 30.11.2022 | ||
Former [2023/31] | AL | 04.05.2022 | |
AT | 04.05.2022 | ||
CZ | 04.05.2022 | ||
DK | 04.05.2022 | ||
EE | 04.05.2022 | ||
ES | 04.05.2022 | ||
FI | 04.05.2022 | ||
HR | 04.05.2022 | ||
LT | 04.05.2022 | ||
LV | 04.05.2022 | ||
MC | 04.05.2022 | ||
NL | 04.05.2022 | ||
PL | 04.05.2022 | ||
RO | 04.05.2022 | ||
RS | 04.05.2022 | ||
SE | 04.05.2022 | ||
SI | 04.05.2022 | ||
SK | 04.05.2022 | ||
SM | 04.05.2022 | ||
BG | 04.08.2022 | ||
NO | 04.08.2022 | ||
GR | 05.08.2022 | ||
IS | 04.09.2022 | ||
PT | 05.09.2022 | ||
Former [2023/25] | AL | 04.05.2022 | |
AT | 04.05.2022 | ||
CZ | 04.05.2022 | ||
DK | 04.05.2022 | ||
EE | 04.05.2022 | ||
ES | 04.05.2022 | ||
FI | 04.05.2022 | ||
HR | 04.05.2022 | ||
LT | 04.05.2022 | ||
LV | 04.05.2022 | ||
NL | 04.05.2022 | ||
PL | 04.05.2022 | ||
RO | 04.05.2022 | ||
RS | 04.05.2022 | ||
SE | 04.05.2022 | ||
SI | 04.05.2022 | ||
SK | 04.05.2022 | ||
SM | 04.05.2022 | ||
BG | 04.08.2022 | ||
NO | 04.08.2022 | ||
GR | 05.08.2022 | ||
IS | 04.09.2022 | ||
PT | 05.09.2022 | ||
Former [2023/17] | AL | 04.05.2022 | |
AT | 04.05.2022 | ||
CZ | 04.05.2022 | ||
DK | 04.05.2022 | ||
EE | 04.05.2022 | ||
ES | 04.05.2022 | ||
FI | 04.05.2022 | ||
HR | 04.05.2022 | ||
LT | 04.05.2022 | ||
LV | 04.05.2022 | ||
NL | 04.05.2022 | ||
PL | 04.05.2022 | ||
RO | 04.05.2022 | ||
RS | 04.05.2022 | ||
SE | 04.05.2022 | ||
SK | 04.05.2022 | ||
SM | 04.05.2022 | ||
BG | 04.08.2022 | ||
NO | 04.08.2022 | ||
GR | 05.08.2022 | ||
IS | 04.09.2022 | ||
PT | 05.09.2022 | ||
Former [2023/09] | AT | 04.05.2022 | |
CZ | 04.05.2022 | ||
DK | 04.05.2022 | ||
EE | 04.05.2022 | ||
ES | 04.05.2022 | ||
FI | 04.05.2022 | ||
HR | 04.05.2022 | ||
LT | 04.05.2022 | ||
LV | 04.05.2022 | ||
NL | 04.05.2022 | ||
PL | 04.05.2022 | ||
RO | 04.05.2022 | ||
RS | 04.05.2022 | ||
SE | 04.05.2022 | ||
SK | 04.05.2022 | ||
SM | 04.05.2022 | ||
BG | 04.08.2022 | ||
NO | 04.08.2022 | ||
GR | 05.08.2022 | ||
IS | 04.09.2022 | ||
PT | 05.09.2022 | ||
Former [2023/07] | AT | 04.05.2022 | |
DK | 04.05.2022 | ||
ES | 04.05.2022 | ||
FI | 04.05.2022 | ||
HR | 04.05.2022 | ||
LT | 04.05.2022 | ||
LV | 04.05.2022 | ||
NL | 04.05.2022 | ||
PL | 04.05.2022 | ||
RS | 04.05.2022 | ||
SE | 04.05.2022 | ||
BG | 04.08.2022 | ||
NO | 04.08.2022 | ||
GR | 05.08.2022 | ||
IS | 04.09.2022 | ||
PT | 05.09.2022 | ||
Former [2022/51] | AT | 04.05.2022 | |
ES | 04.05.2022 | ||
FI | 04.05.2022 | ||
HR | 04.05.2022 | ||
LT | 04.05.2022 | ||
LV | 04.05.2022 | ||
NL | 04.05.2022 | ||
PL | 04.05.2022 | ||
RS | 04.05.2022 | ||
SE | 04.05.2022 | ||
BG | 04.08.2022 | ||
NO | 04.08.2022 | ||
GR | 05.08.2022 | ||
IS | 04.09.2022 | ||
PT | 05.09.2022 | ||
Former [2022/50] | AT | 04.05.2022 | |
ES | 04.05.2022 | ||
FI | 04.05.2022 | ||
HR | 04.05.2022 | ||
LT | 04.05.2022 | ||
LV | 04.05.2022 | ||
NL | 04.05.2022 | ||
PL | 04.05.2022 | ||
RS | 04.05.2022 | ||
SE | 04.05.2022 | ||
BG | 04.08.2022 | ||
NO | 04.08.2022 | ||
GR | 05.08.2022 | ||
PT | 05.09.2022 | ||
Former [2022/49] | AT | 04.05.2022 | |
ES | 04.05.2022 | ||
FI | 04.05.2022 | ||
HR | 04.05.2022 | ||
LT | 04.05.2022 | ||
LV | 04.05.2022 | ||
NL | 04.05.2022 | ||
SE | 04.05.2022 | ||
BG | 04.08.2022 | ||
NO | 04.08.2022 | ||
GR | 05.08.2022 | ||
PT | 05.09.2022 | ||
Former [2022/48] | AT | 04.05.2022 | |
ES | 04.05.2022 | ||
FI | 04.05.2022 | ||
LT | 04.05.2022 | ||
NL | 04.05.2022 | ||
SE | 04.05.2022 | ||
NO | 04.08.2022 | ||
PT | 05.09.2022 | ||
Former [2022/47] | AT | 04.05.2022 | |
ES | 04.05.2022 | ||
FI | 04.05.2022 | ||
LT | 04.05.2022 | ||
SE | 04.05.2022 | ||
NO | 04.08.2022 | ||
PT | 05.09.2022 | Cited in | International search | [XI]US2014153512 (KOSKELA TIMO KALEVI [FI], et al) [X] 1,10,16-18 * paragraphs [0010] , [0043] , [0044]; figure 4 * [I] 2,3,11,12; | [A] - In No Sornin ET AL, "2015 LoRa(TM) Alliance", SPECIAL OR 25 EXEMPLARY, INCIDENTIAL, PUNITIVE OR CONSEQUENTIAL DAMAGES OF ANY KIND, IN CONTRACT OR 26 IN TORT, IN CONNECTION WITH THIS DOCUMENT OR THE INFORMATION CONTAINED HEREIN, EVEN IF, (20150131), pages 1 - 82, URL: https://www.lora-alliance.org/portals/0/specs/LoRaWAN Specification 1R0.pdf, (20170428), XP055368264 [A] 1-20 * page 61, paragraph 14.3 * |