| EP3551878 - A WIND TURBINE BLADE HAVING A TRUNCATED TRAILING EDGE [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 16.09.2022 Database last updated on 21.03.2026 | |
| Former | The patent has been granted Status updated on 08.10.2021 | ||
| Former | Grant of patent is intended Status updated on 03.06.2021 | ||
| Former | Request for examination was made Status updated on 13.09.2019 | ||
| Former | The international publication has been made Status updated on 16.06.2018 | ||
| Former | unknown Status updated on 21.12.2017 | Most recent event Tooltip | 19.12.2025 | Lapse of the patent in a contracting state New state(s): TR | published on 21.01.2026 [2026/04] | Applicant(s) | For all designated states Vestas Wind Systems A/S Hedeager 42 8200 Aarhus N / DK | [2019/42] | Inventor(s) | 01 /
GUPTA, Anurag 3707 Quiet Falls Drive Manvel, Texas 77578 / US | [2019/42] | Representative(s) | Vestas Patents Department Hedeager 42 8200 Aarhus N / DK | [2019/42] | Application number, filing date | 17811842.8 | 05.12.2017 | [2019/42] | WO2017DK50408 | Priority number, date | US201662430404P | 06.12.2016 Original published format: US 201662430404 P | DK2016PA71032 | 22.12.2016 Original published format: DK PA201671032 | [2019/42] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2018103803 | Date: | 14.06.2018 | Language: | EN | [2018/24] | Type: | A1 Application with search report | No.: | EP3551878 | Date: | 16.10.2019 | Language: | EN | The application published by WIPO in one of the EPO official languages on 14.06.2018 takes the place of the publication of the European patent application. | [2019/42] | Type: | B1 Patent specification | No.: | EP3551878 | Date: | 10.11.2021 | Language: | EN | [2021/45] | Search report(s) | International search report - published on: | EP | 14.06.2018 | Classification | IPC: | F03D1/06 | [2019/42] | CPC: |
F03D1/0675 (EP);
F05B2250/611 (EP);
Y02E10/72 (EP)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2019/42] | Title | German: | ROTORBLATT EINER WINDTURBINE MIT ABGESCHNITTENER HINTERKANTE | [2021/22] | English: | A WIND TURBINE BLADE HAVING A TRUNCATED TRAILING EDGE | [2019/42] | French: | UNE PALE D'ÉOLIENNE AYANT UN BORD DE FUITE TRONQUÉ | [2021/22] |
| Former [2019/42] | WINDTURBINENBLATT MIT GEKÜRZTER HINTERKANTE | ||
| Former [2019/42] | PALE D'ÉOLIENNE AYANT UN BORD DE FUITE TRONQUÉ | Entry into regional phase | 05.07.2019 | National basic fee paid | 05.07.2019 | Designation fee(s) paid | 05.07.2019 | Examination fee paid | Examination procedure | 05.07.2019 | Examination requested [2019/42] | 05.07.2019 | Date on which the examining division has become responsible | 24.01.2020 | Amendment by applicant (claims and/or description) | 04.06.2021 | Communication of intention to grant the patent | 01.10.2021 | Fee for grant paid | 01.10.2021 | Fee for publishing/printing paid | 01.10.2021 | Receipt of the translation of the claim(s) | Opposition(s) | 11.08.2022 | No opposition filed within time limit [2022/42] | Fees paid | Renewal fee | 26.12.2019 | Renewal fee patent year 03 | 24.12.2020 | Renewal fee patent year 04 |
| Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
| Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 05.12.2017 | AL | 10.11.2021 | AT | 10.11.2021 | CY | 10.11.2021 | CZ | 10.11.2021 | DK | 10.11.2021 | EE | 10.11.2021 | ES | 10.11.2021 | FI | 10.11.2021 | HR | 10.11.2021 | IT | 10.11.2021 | LT | 10.11.2021 | LV | 10.11.2021 | MC | 10.11.2021 | MK | 10.11.2021 | MT | 10.11.2021 | NL | 10.11.2021 | PL | 10.11.2021 | RO | 10.11.2021 | RS | 10.11.2021 | SE | 10.11.2021 | SI | 10.11.2021 | SK | 10.11.2021 | SM | 10.11.2021 | TR | 10.11.2021 | IE | 05.12.2021 | LU | 05.12.2021 | BE | 31.12.2021 | CH | 31.12.2021 | LI | 31.12.2021 | BG | 10.02.2022 | NO | 10.02.2022 | GR | 11.02.2022 | IS | 10.03.2022 | PT | 10.03.2022 | [2026/04] |
| Former [2024/42] | HU | 05.12.2017 | |
| AL | 10.11.2021 | ||
| AT | 10.11.2021 | ||
| CY | 10.11.2021 | ||
| CZ | 10.11.2021 | ||
| DK | 10.11.2021 | ||
| EE | 10.11.2021 | ||
| ES | 10.11.2021 | ||
| FI | 10.11.2021 | ||
| HR | 10.11.2021 | ||
| IT | 10.11.2021 | ||
| LT | 10.11.2021 | ||
| LV | 10.11.2021 | ||
| MC | 10.11.2021 | ||
| MK | 10.11.2021 | ||
| MT | 10.11.2021 | ||
| NL | 10.11.2021 | ||
| PL | 10.11.2021 | ||
| RO | 10.11.2021 | ||
| RS | 10.11.2021 | ||
| SE | 10.11.2021 | ||
| SI | 10.11.2021 | ||
| SK | 10.11.2021 | ||
| SM | 10.11.2021 | ||
| IE | 05.12.2021 | ||
| LU | 05.12.2021 | ||
| BE | 31.12.2021 | ||
| CH | 31.12.2021 | ||
| LI | 31.12.2021 | ||
| BG | 10.02.2022 | ||
| NO | 10.02.2022 | ||
| GR | 11.02.2022 | ||
| IS | 10.03.2022 | ||
| PT | 10.03.2022 | ||
| Former [2024/23] | HU | 05.12.2017 | |
| AL | 10.11.2021 | ||
| AT | 10.11.2021 | ||
| CY | 10.11.2021 | ||
| CZ | 10.11.2021 | ||
| DK | 10.11.2021 | ||
| EE | 10.11.2021 | ||
| ES | 10.11.2021 | ||
| FI | 10.11.2021 | ||
| HR | 10.11.2021 | ||
| IT | 10.11.2021 | ||
| LT | 10.11.2021 | ||
| LV | 10.11.2021 | ||
| MC | 10.11.2021 | ||
| MK | 10.11.2021 | ||
| NL | 10.11.2021 | ||
| PL | 10.11.2021 | ||
| RO | 10.11.2021 | ||
| RS | 10.11.2021 | ||
| SE | 10.11.2021 | ||
| SI | 10.11.2021 | ||
| SK | 10.11.2021 | ||
| SM | 10.11.2021 | ||
| IE | 05.12.2021 | ||
| LU | 05.12.2021 | ||
| BE | 31.12.2021 | ||
| CH | 31.12.2021 | ||
| LI | 31.12.2021 | ||
| BG | 10.02.2022 | ||
| NO | 10.02.2022 | ||
| GR | 11.02.2022 | ||
| IS | 10.03.2022 | ||
| PT | 10.03.2022 | ||
| Former [2023/33] | HU | 05.12.2017 | |
| AL | 10.11.2021 | ||
| AT | 10.11.2021 | ||
| CY | 10.11.2021 | ||
| CZ | 10.11.2021 | ||
| DK | 10.11.2021 | ||
| EE | 10.11.2021 | ||
| ES | 10.11.2021 | ||
| FI | 10.11.2021 | ||
| HR | 10.11.2021 | ||
| IT | 10.11.2021 | ||
| LT | 10.11.2021 | ||
| LV | 10.11.2021 | ||
| MC | 10.11.2021 | ||
| NL | 10.11.2021 | ||
| PL | 10.11.2021 | ||
| RO | 10.11.2021 | ||
| RS | 10.11.2021 | ||
| SE | 10.11.2021 | ||
| SI | 10.11.2021 | ||
| SK | 10.11.2021 | ||
| SM | 10.11.2021 | ||
| IE | 05.12.2021 | ||
| LU | 05.12.2021 | ||
| BE | 31.12.2021 | ||
| CH | 31.12.2021 | ||
| LI | 31.12.2021 | ||
| BG | 10.02.2022 | ||
| NO | 10.02.2022 | ||
| GR | 11.02.2022 | ||
| IS | 10.03.2022 | ||
| PT | 10.03.2022 | ||
| Former [2023/30] | AL | 10.11.2021 | |
| AT | 10.11.2021 | ||
| CY | 10.11.2021 | ||
| CZ | 10.11.2021 | ||
| DK | 10.11.2021 | ||
| EE | 10.11.2021 | ||
| ES | 10.11.2021 | ||
| FI | 10.11.2021 | ||
| HR | 10.11.2021 | ||
| IT | 10.11.2021 | ||
| LT | 10.11.2021 | ||
| LV | 10.11.2021 | ||
| MC | 10.11.2021 | ||
| NL | 10.11.2021 | ||
| PL | 10.11.2021 | ||
| RO | 10.11.2021 | ||
| RS | 10.11.2021 | ||
| SE | 10.11.2021 | ||
| SI | 10.11.2021 | ||
| SK | 10.11.2021 | ||
| SM | 10.11.2021 | ||
| IE | 05.12.2021 | ||
| LU | 05.12.2021 | ||
| BE | 31.12.2021 | ||
| CH | 31.12.2021 | ||
| LI | 31.12.2021 | ||
| BG | 10.02.2022 | ||
| NO | 10.02.2022 | ||
| GR | 11.02.2022 | ||
| IS | 10.03.2022 | ||
| PT | 10.03.2022 | ||
| Former [2023/27] | AL | 10.11.2021 | |
| AT | 10.11.2021 | ||
| CZ | 10.11.2021 | ||
| DK | 10.11.2021 | ||
| EE | 10.11.2021 | ||
| ES | 10.11.2021 | ||
| FI | 10.11.2021 | ||
| HR | 10.11.2021 | ||
| IT | 10.11.2021 | ||
| LT | 10.11.2021 | ||
| LV | 10.11.2021 | ||
| MC | 10.11.2021 | ||
| NL | 10.11.2021 | ||
| PL | 10.11.2021 | ||
| RO | 10.11.2021 | ||
| RS | 10.11.2021 | ||
| SE | 10.11.2021 | ||
| SI | 10.11.2021 | ||
| SK | 10.11.2021 | ||
| SM | 10.11.2021 | ||
| IE | 05.12.2021 | ||
| LU | 05.12.2021 | ||
| BE | 31.12.2021 | ||
| CH | 31.12.2021 | ||
| LI | 31.12.2021 | ||
| BG | 10.02.2022 | ||
| NO | 10.02.2022 | ||
| GR | 11.02.2022 | ||
| IS | 10.03.2022 | ||
| PT | 10.03.2022 | ||
| Former [2023/03] | AL | 10.11.2021 | |
| AT | 10.11.2021 | ||
| CZ | 10.11.2021 | ||
| DK | 10.11.2021 | ||
| EE | 10.11.2021 | ||
| ES | 10.11.2021 | ||
| FI | 10.11.2021 | ||
| HR | 10.11.2021 | ||
| LT | 10.11.2021 | ||
| LV | 10.11.2021 | ||
| MC | 10.11.2021 | ||
| NL | 10.11.2021 | ||
| PL | 10.11.2021 | ||
| RO | 10.11.2021 | ||
| RS | 10.11.2021 | ||
| SE | 10.11.2021 | ||
| SI | 10.11.2021 | ||
| SK | 10.11.2021 | ||
| SM | 10.11.2021 | ||
| IE | 05.12.2021 | ||
| LU | 05.12.2021 | ||
| BE | 31.12.2021 | ||
| CH | 31.12.2021 | ||
| LI | 31.12.2021 | ||
| BG | 10.02.2022 | ||
| NO | 10.02.2022 | ||
| GR | 11.02.2022 | ||
| IS | 10.03.2022 | ||
| PT | 10.03.2022 | ||
| Former [2023/01] | AL | 10.11.2021 | |
| AT | 10.11.2021 | ||
| CZ | 10.11.2021 | ||
| DK | 10.11.2021 | ||
| EE | 10.11.2021 | ||
| ES | 10.11.2021 | ||
| FI | 10.11.2021 | ||
| HR | 10.11.2021 | ||
| LT | 10.11.2021 | ||
| LV | 10.11.2021 | ||
| MC | 10.11.2021 | ||
| NL | 10.11.2021 | ||
| PL | 10.11.2021 | ||
| RO | 10.11.2021 | ||
| RS | 10.11.2021 | ||
| SE | 10.11.2021 | ||
| SI | 10.11.2021 | ||
| SK | 10.11.2021 | ||
| SM | 10.11.2021 | ||
| IE | 05.12.2021 | ||
| LU | 05.12.2021 | ||
| BE | 31.12.2021 | ||
| BG | 10.02.2022 | ||
| NO | 10.02.2022 | ||
| GR | 11.02.2022 | ||
| IS | 10.03.2022 | ||
| PT | 10.03.2022 | ||
| Former [2022/49] | AL | 10.11.2021 | |
| AT | 10.11.2021 | ||
| CZ | 10.11.2021 | ||
| DK | 10.11.2021 | ||
| EE | 10.11.2021 | ||
| ES | 10.11.2021 | ||
| FI | 10.11.2021 | ||
| HR | 10.11.2021 | ||
| LT | 10.11.2021 | ||
| LV | 10.11.2021 | ||
| MC | 10.11.2021 | ||
| NL | 10.11.2021 | ||
| PL | 10.11.2021 | ||
| RO | 10.11.2021 | ||
| RS | 10.11.2021 | ||
| SE | 10.11.2021 | ||
| SK | 10.11.2021 | ||
| SM | 10.11.2021 | ||
| IE | 05.12.2021 | ||
| LU | 05.12.2021 | ||
| BG | 10.02.2022 | ||
| NO | 10.02.2022 | ||
| GR | 11.02.2022 | ||
| IS | 10.03.2022 | ||
| PT | 10.03.2022 | ||
| Former [2022/48] | AT | 10.11.2021 | |
| CZ | 10.11.2021 | ||
| DK | 10.11.2021 | ||
| EE | 10.11.2021 | ||
| ES | 10.11.2021 | ||
| FI | 10.11.2021 | ||
| HR | 10.11.2021 | ||
| LT | 10.11.2021 | ||
| LV | 10.11.2021 | ||
| MC | 10.11.2021 | ||
| NL | 10.11.2021 | ||
| PL | 10.11.2021 | ||
| RO | 10.11.2021 | ||
| RS | 10.11.2021 | ||
| SE | 10.11.2021 | ||
| SK | 10.11.2021 | ||
| SM | 10.11.2021 | ||
| IE | 05.12.2021 | ||
| LU | 05.12.2021 | ||
| BG | 10.02.2022 | ||
| NO | 10.02.2022 | ||
| GR | 11.02.2022 | ||
| IS | 10.03.2022 | ||
| PT | 10.03.2022 | ||
| Former [2022/46] | AT | 10.11.2021 | |
| CZ | 10.11.2021 | ||
| DK | 10.11.2021 | ||
| EE | 10.11.2021 | ||
| ES | 10.11.2021 | ||
| FI | 10.11.2021 | ||
| HR | 10.11.2021 | ||
| LT | 10.11.2021 | ||
| LV | 10.11.2021 | ||
| MC | 10.11.2021 | ||
| NL | 10.11.2021 | ||
| PL | 10.11.2021 | ||
| RO | 10.11.2021 | ||
| RS | 10.11.2021 | ||
| SE | 10.11.2021 | ||
| SK | 10.11.2021 | ||
| SM | 10.11.2021 | ||
| LU | 05.12.2021 | ||
| BG | 10.02.2022 | ||
| NO | 10.02.2022 | ||
| GR | 11.02.2022 | ||
| IS | 10.03.2022 | ||
| PT | 10.03.2022 | ||
| Former [2022/39] | AT | 10.11.2021 | |
| CZ | 10.11.2021 | ||
| DK | 10.11.2021 | ||
| EE | 10.11.2021 | ||
| ES | 10.11.2021 | ||
| FI | 10.11.2021 | ||
| HR | 10.11.2021 | ||
| LT | 10.11.2021 | ||
| LV | 10.11.2021 | ||
| MC | 10.11.2021 | ||
| NL | 10.11.2021 | ||
| PL | 10.11.2021 | ||
| RO | 10.11.2021 | ||
| RS | 10.11.2021 | ||
| SE | 10.11.2021 | ||
| SK | 10.11.2021 | ||
| SM | 10.11.2021 | ||
| BG | 10.02.2022 | ||
| NO | 10.02.2022 | ||
| GR | 11.02.2022 | ||
| IS | 10.03.2022 | ||
| PT | 10.03.2022 | ||
| Former [2022/35] | AT | 10.11.2021 | |
| CZ | 10.11.2021 | ||
| DK | 10.11.2021 | ||
| EE | 10.11.2021 | ||
| ES | 10.11.2021 | ||
| FI | 10.11.2021 | ||
| HR | 10.11.2021 | ||
| LT | 10.11.2021 | ||
| LV | 10.11.2021 | ||
| NL | 10.11.2021 | ||
| PL | 10.11.2021 | ||
| RO | 10.11.2021 | ||
| RS | 10.11.2021 | ||
| SE | 10.11.2021 | ||
| SK | 10.11.2021 | ||
| SM | 10.11.2021 | ||
| BG | 10.02.2022 | ||
| NO | 10.02.2022 | ||
| GR | 11.02.2022 | ||
| IS | 10.03.2022 | ||
| PT | 10.03.2022 | ||
| Former [2022/34] | AT | 10.11.2021 | |
| EE | 10.11.2021 | ||
| ES | 10.11.2021 | ||
| FI | 10.11.2021 | ||
| HR | 10.11.2021 | ||
| LT | 10.11.2021 | ||
| LV | 10.11.2021 | ||
| NL | 10.11.2021 | ||
| PL | 10.11.2021 | ||
| RO | 10.11.2021 | ||
| RS | 10.11.2021 | ||
| SE | 10.11.2021 | ||
| SM | 10.11.2021 | ||
| BG | 10.02.2022 | ||
| NO | 10.02.2022 | ||
| GR | 11.02.2022 | ||
| IS | 10.03.2022 | ||
| PT | 10.03.2022 | ||
| Former [2022/33] | AT | 10.11.2021 | |
| ES | 10.11.2021 | ||
| FI | 10.11.2021 | ||
| HR | 10.11.2021 | ||
| LT | 10.11.2021 | ||
| LV | 10.11.2021 | ||
| NL | 10.11.2021 | ||
| PL | 10.11.2021 | ||
| RS | 10.11.2021 | ||
| SE | 10.11.2021 | ||
| SM | 10.11.2021 | ||
| BG | 10.02.2022 | ||
| NO | 10.02.2022 | ||
| GR | 11.02.2022 | ||
| IS | 10.03.2022 | ||
| PT | 10.03.2022 | ||
| Former [2022/25] | AT | 10.11.2021 | |
| ES | 10.11.2021 | ||
| FI | 10.11.2021 | ||
| HR | 10.11.2021 | ||
| LT | 10.11.2021 | ||
| LV | 10.11.2021 | ||
| NL | 10.11.2021 | ||
| PL | 10.11.2021 | ||
| RS | 10.11.2021 | ||
| SE | 10.11.2021 | ||
| BG | 10.02.2022 | ||
| NO | 10.02.2022 | ||
| GR | 11.02.2022 | ||
| IS | 10.03.2022 | ||
| PT | 10.03.2022 | ||
| Former [2022/24] | AT | 10.11.2021 | |
| ES | 10.11.2021 | ||
| FI | 10.11.2021 | ||
| HR | 10.11.2021 | ||
| LT | 10.11.2021 | ||
| LV | 10.11.2021 | ||
| NL | 10.11.2021 | ||
| PL | 10.11.2021 | ||
| RS | 10.11.2021 | ||
| SE | 10.11.2021 | ||
| BG | 10.02.2022 | ||
| GR | 11.02.2022 | ||
| IS | 10.03.2022 | ||
| PT | 10.03.2022 | ||
| Former [2022/23] | AT | 10.11.2021 | |
| ES | 10.11.2021 | ||
| FI | 10.11.2021 | ||
| HR | 10.11.2021 | ||
| LT | 10.11.2021 | ||
| LV | 10.11.2021 | ||
| PL | 10.11.2021 | ||
| RS | 10.11.2021 | ||
| BG | 10.02.2022 | ||
| PT | 10.03.2022 | ||
| Former [2022/22] | AT | 10.11.2021 | |
| FI | 10.11.2021 | ||
| LT | 10.11.2021 | ||
| RS | 10.11.2021 | ||
| BG | 10.02.2022 | ||
| Former [2022/21] | AT | 10.11.2021 | |
| RS | 10.11.2021 | ||
| BG | 10.02.2022 | ||
| Former [2022/19] | BG | 10.02.2022 | Cited in | International search | [X] US2016177922 (ZAMORA RODRIGUEZ ALONSO O et al.) [X] 1-11 * figures 3-5 * | [X] EP2806156 (SIEMENS AG et al.) [X] 1-11 * figures 3,4,8,9 * | [X] GB2497739 (ROLLS ROYCE PLC et al.) [X] 1,4-8 * figure 6c * | [X] EP2921697 (SIEMENS AG et al.) [X] 1-3,5-8 * figures 2,3 * |