EP3459192 - APPARATUS AND METHODS FOR ERROR DETECTION CODING [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 10.06.2022 Database last updated on 07.06.2024 | |
Former | The patent has been granted Status updated on 02.07.2021 | ||
Former | Grant of patent is intended Status updated on 02.02.2021 | ||
Former | Examination is in progress Status updated on 24.04.2020 | ||
Former | Request for examination was made Status updated on 22.02.2019 | ||
Former | The international publication has been made Status updated on 28.12.2017 | Most recent event Tooltip | 03.05.2024 | Lapse of the patent in a contracting state New state(s): MK | published on 05.06.2024 [2024/23] | Applicant(s) | For all designated states Huawei Technologies Co., Ltd. Huawei Administration Building Bantian Longgang District Shenzhen, Guangdong 518129 / CN | [2019/13] | Inventor(s) | 01 /
GE, Yiqun 944 Fletcher Circle Kanata, Ontario K2T 0B7 / CA | 02 /
ZHANG, Ran 505 Pepperville Crescent Kanata, Ontario K2M 0E3 / CA | 03 /
CHENG, Nan 111 Solaris Drive Kanata, Ontario K2M 0M1 / CA | 04 /
SHI, Wuxian 944 Fletcher Circle Kanata, Ontario K2T 0B7 / CA | [2019/13] | Representative(s) | Pfenning, Meinig & Partner mbB Patent- und Rechtsanwälte Theresienhöhe 11a 80339 München / DE | [2019/13] | Application number, filing date | 17812597.7 | 06.06.2017 | [2019/13] | WO2017CN87255 | Priority number, date | US201662351460P | 17.06.2016 Original published format: US 201662351460 P | US201762442648P | 05.01.2017 Original published format: US 201762442648 P | US201715611201 | 01.06.2017 Original published format: US201715611201 | [2019/13] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2017215486 | Date: | 21.12.2017 | Language: | EN | [2017/51] | Type: | A1 Application with search report | No.: | EP3459192 | Date: | 27.03.2019 | Language: | EN | The application published by WIPO in one of the EPO official languages on 21.12.2017 takes the place of the publication of the European patent application. | [2019/13] | Type: | B1 Patent specification | No.: | EP3459192 | Date: | 04.08.2021 | Language: | EN | [2021/31] | Search report(s) | International search report - published on: | CN | 21.12.2017 | (Supplementary) European search report - dispatched on: | EP | 14.05.2019 | Classification | IPC: | H04L1/00, H03M13/13, H03M13/09, G06F11/14 | [2019/24] | CPC: |
H03M13/09 (EP,US);
H03M13/091 (US);
G06F11/1004 (EP);
G06F11/1479 (US);
H03M13/13 (EP,US);
H04L1/0041 (EP,US);
H04L1/0045 (US);
H04L1/0053 (EP,US);
H04L1/0054 (EP,US);
|
Former IPC [2019/13] | H04L1/00 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2019/13] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | MD | Not yet paid | Title | German: | VORRICHTUNG UND VERFAHREN ZUR FEHLERERKENNUNGSCODIERUNG | [2019/13] | English: | APPARATUS AND METHODS FOR ERROR DETECTION CODING | [2019/13] | French: | APPAREIL ET PROCÉDÉS DE CODAGE DE DÉTECTION D'ERREUR | [2019/13] | Entry into regional phase | 19.12.2018 | National basic fee paid | 19.12.2018 | Search fee paid | 19.12.2018 | Designation fee(s) paid | 19.12.2018 | Examination fee paid | Examination procedure | deleted | Date on which the examining division has become responsible | 19.12.2018 | Examination requested [2019/13] | 09.12.2019 | Amendment by applicant (claims and/or description) | 29.04.2020 | Despatch of a communication from the examining division (Time limit: M04) | 07.08.2020 | Reply to a communication from the examining division | 03.02.2021 | Communication of intention to grant the patent | 14.05.2021 | Receipt of the translation of the claim(s) | 23.05.2021 | Fee for grant paid | 23.05.2021 | Fee for publishing/printing paid | Opposition(s) | 06.05.2022 | No opposition filed within time limit [2022/28] | Fees paid | Renewal fee | 27.06.2019 | Renewal fee patent year 03 | 31.03.2020 | Renewal fee patent year 04 | 29.06.2021 | Renewal fee patent year 05 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 06.06.2017 | AL | 04.08.2021 | AT | 04.08.2021 | CY | 04.08.2021 | CZ | 04.08.2021 | DK | 04.08.2021 | EE | 04.08.2021 | ES | 04.08.2021 | FI | 04.08.2021 | HR | 04.08.2021 | IT | 04.08.2021 | LT | 04.08.2021 | LV | 04.08.2021 | MC | 04.08.2021 | MK | 04.08.2021 | NL | 04.08.2021 | PL | 04.08.2021 | RO | 04.08.2021 | RS | 04.08.2021 | SE | 04.08.2021 | SI | 04.08.2021 | SK | 04.08.2021 | SM | 04.08.2021 | BG | 04.11.2021 | NO | 04.11.2021 | GR | 05.11.2021 | IS | 04.12.2021 | PT | 06.12.2021 | [2024/23] |
Former [2024/20] | HU | 06.06.2017 | |
AL | 04.08.2021 | ||
AT | 04.08.2021 | ||
CY | 04.08.2021 | ||
CZ | 04.08.2021 | ||
DK | 04.08.2021 | ||
EE | 04.08.2021 | ||
ES | 04.08.2021 | ||
FI | 04.08.2021 | ||
HR | 04.08.2021 | ||
IT | 04.08.2021 | ||
LT | 04.08.2021 | ||
LV | 04.08.2021 | ||
MC | 04.08.2021 | ||
NL | 04.08.2021 | ||
PL | 04.08.2021 | ||
RO | 04.08.2021 | ||
RS | 04.08.2021 | ||
SE | 04.08.2021 | ||
SI | 04.08.2021 | ||
SK | 04.08.2021 | ||
SM | 04.08.2021 | ||
BG | 04.11.2021 | ||
NO | 04.11.2021 | ||
GR | 05.11.2021 | ||
IS | 04.12.2021 | ||
PT | 06.12.2021 | ||
Former [2024/18] | HU | 06.06.2017 | |
AL | 04.08.2021 | ||
AT | 04.08.2021 | ||
CZ | 04.08.2021 | ||
DK | 04.08.2021 | ||
EE | 04.08.2021 | ||
ES | 04.08.2021 | ||
FI | 04.08.2021 | ||
HR | 04.08.2021 | ||
IT | 04.08.2021 | ||
LT | 04.08.2021 | ||
LV | 04.08.2021 | ||
MC | 04.08.2021 | ||
NL | 04.08.2021 | ||
PL | 04.08.2021 | ||
RO | 04.08.2021 | ||
RS | 04.08.2021 | ||
SE | 04.08.2021 | ||
SI | 04.08.2021 | ||
SK | 04.08.2021 | ||
SM | 04.08.2021 | ||
BG | 04.11.2021 | ||
NO | 04.11.2021 | ||
GR | 05.11.2021 | ||
IS | 04.12.2021 | ||
PT | 06.12.2021 | ||
Former [2023/08] | AL | 04.08.2021 | |
AT | 04.08.2021 | ||
CZ | 04.08.2021 | ||
DK | 04.08.2021 | ||
EE | 04.08.2021 | ||
ES | 04.08.2021 | ||
FI | 04.08.2021 | ||
HR | 04.08.2021 | ||
IT | 04.08.2021 | ||
LT | 04.08.2021 | ||
LV | 04.08.2021 | ||
MC | 04.08.2021 | ||
NL | 04.08.2021 | ||
PL | 04.08.2021 | ||
RO | 04.08.2021 | ||
RS | 04.08.2021 | ||
SE | 04.08.2021 | ||
SI | 04.08.2021 | ||
SK | 04.08.2021 | ||
SM | 04.08.2021 | ||
BG | 04.11.2021 | ||
NO | 04.11.2021 | ||
GR | 05.11.2021 | ||
IS | 04.12.2021 | ||
PT | 06.12.2021 | ||
Former [2022/36] | AL | 04.08.2021 | |
AT | 04.08.2021 | ||
CZ | 04.08.2021 | ||
DK | 04.08.2021 | ||
EE | 04.08.2021 | ||
ES | 04.08.2021 | ||
FI | 04.08.2021 | ||
HR | 04.08.2021 | ||
IT | 04.08.2021 | ||
LT | 04.08.2021 | ||
LV | 04.08.2021 | ||
NL | 04.08.2021 | ||
PL | 04.08.2021 | ||
RO | 04.08.2021 | ||
RS | 04.08.2021 | ||
SE | 04.08.2021 | ||
SI | 04.08.2021 | ||
SK | 04.08.2021 | ||
SM | 04.08.2021 | ||
BG | 04.11.2021 | ||
NO | 04.11.2021 | ||
GR | 05.11.2021 | ||
IS | 04.12.2021 | ||
PT | 06.12.2021 | ||
Former [2022/29] | AL | 04.08.2021 | |
AT | 04.08.2021 | ||
CZ | 04.08.2021 | ||
DK | 04.08.2021 | ||
EE | 04.08.2021 | ||
ES | 04.08.2021 | ||
FI | 04.08.2021 | ||
HR | 04.08.2021 | ||
LT | 04.08.2021 | ||
LV | 04.08.2021 | ||
NL | 04.08.2021 | ||
PL | 04.08.2021 | ||
RO | 04.08.2021 | ||
RS | 04.08.2021 | ||
SE | 04.08.2021 | ||
SK | 04.08.2021 | ||
SM | 04.08.2021 | ||
BG | 04.11.2021 | ||
NO | 04.11.2021 | ||
GR | 05.11.2021 | ||
IS | 04.12.2021 | ||
PT | 06.12.2021 | ||
Former [2022/25] | AT | 04.08.2021 | |
CZ | 04.08.2021 | ||
DK | 04.08.2021 | ||
EE | 04.08.2021 | ||
ES | 04.08.2021 | ||
FI | 04.08.2021 | ||
HR | 04.08.2021 | ||
LT | 04.08.2021 | ||
LV | 04.08.2021 | ||
NL | 04.08.2021 | ||
PL | 04.08.2021 | ||
RO | 04.08.2021 | ||
RS | 04.08.2021 | ||
SE | 04.08.2021 | ||
SK | 04.08.2021 | ||
SM | 04.08.2021 | ||
BG | 04.11.2021 | ||
NO | 04.11.2021 | ||
GR | 05.11.2021 | ||
IS | 04.12.2021 | ||
PT | 06.12.2021 | ||
Former [2022/24] | AT | 04.08.2021 | |
CZ | 04.08.2021 | ||
DK | 04.08.2021 | ||
EE | 04.08.2021 | ||
ES | 04.08.2021 | ||
FI | 04.08.2021 | ||
HR | 04.08.2021 | ||
LT | 04.08.2021 | ||
LV | 04.08.2021 | ||
NL | 04.08.2021 | ||
PL | 04.08.2021 | ||
RO | 04.08.2021 | ||
RS | 04.08.2021 | ||
SE | 04.08.2021 | ||
SK | 04.08.2021 | ||
BG | 04.11.2021 | ||
NO | 04.11.2021 | ||
GR | 05.11.2021 | ||
IS | 04.12.2021 | ||
PT | 06.12.2021 | ||
Former [2022/21] | AT | 04.08.2021 | |
DK | 04.08.2021 | ||
ES | 04.08.2021 | ||
FI | 04.08.2021 | ||
HR | 04.08.2021 | ||
LT | 04.08.2021 | ||
LV | 04.08.2021 | ||
NL | 04.08.2021 | ||
PL | 04.08.2021 | ||
RS | 04.08.2021 | ||
SE | 04.08.2021 | ||
BG | 04.11.2021 | ||
NO | 04.11.2021 | ||
GR | 05.11.2021 | ||
IS | 04.12.2021 | ||
PT | 06.12.2021 | ||
Former [2022/16] | AT | 04.08.2021 | |
ES | 04.08.2021 | ||
FI | 04.08.2021 | ||
HR | 04.08.2021 | ||
LT | 04.08.2021 | ||
LV | 04.08.2021 | ||
NL | 04.08.2021 | ||
PL | 04.08.2021 | ||
RS | 04.08.2021 | ||
SE | 04.08.2021 | ||
BG | 04.11.2021 | ||
NO | 04.11.2021 | ||
GR | 05.11.2021 | ||
IS | 04.12.2021 | ||
PT | 06.12.2021 | ||
Former [2022/10] | AT | 04.08.2021 | |
ES | 04.08.2021 | ||
FI | 04.08.2021 | ||
HR | 04.08.2021 | ||
LT | 04.08.2021 | ||
LV | 04.08.2021 | ||
PL | 04.08.2021 | ||
RS | 04.08.2021 | ||
SE | 04.08.2021 | ||
BG | 04.11.2021 | ||
NO | 04.11.2021 | ||
GR | 05.11.2021 | ||
IS | 04.12.2021 | ||
PT | 06.12.2021 | ||
Former [2022/09] | AT | 04.08.2021 | |
ES | 04.08.2021 | ||
FI | 04.08.2021 | ||
LT | 04.08.2021 | ||
RS | 04.08.2021 | ||
SE | 04.08.2021 | ||
BG | 04.11.2021 | ||
NO | 04.11.2021 | ||
PT | 06.12.2021 | ||
Former [2022/08] | AT | 04.08.2021 | |
ES | 04.08.2021 | ||
FI | 04.08.2021 | ||
LT | 04.08.2021 | ||
SE | 04.08.2021 | ||
BG | 04.11.2021 | ||
NO | 04.11.2021 | ||
Former [2022/07] | AT | 04.08.2021 | |
LT | 04.08.2021 | ||
NO | 04.11.2021 | Documents cited: | Search | [Y]WO2015026148 (LG ELECTRONICS INC [KR]) [Y] 1-14 * abstract * * paragraph [0121] - paragraph [0122] *; | [E]US2018331693 (LOU HUANG [US], et al) [E] 1-14 * abstract * * paragraph [0138] - paragraph [0153] ** figure 5 *; | [Y] - ZHOU HUAYI ET AL, "Segmented CRC-Aided SC List Polar Decoding", 2016 IEEE 83RD VEHICULAR TECHNOLOGY CONFERENCE (VTC SPRING), IEEE, (20160515), doi:10.1109/VTCSPRING.2016.7504469, pages 1 - 5, XP032918751 [Y] 1-14 * abstract * * sections II, III * * figure 7 * DOI: http://dx.doi.org/10.1109/VTCSpring.2016.7504469 | [XPI] - HUAWEI ET AL, "Polar Coding Design for Control Channel", vol. RAN WG1, no. Spokane, USA; 20170403 - 20170407, (20170402), 3GPP DRAFT; R1-1704247, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, URL: http://www.3gpp.org/ftp/Meetings_3GPP_SYNC/RAN1/Docs/, (20170402), XP051242399 [XP] 1,11-14 * section 5 * [I] 2-10 | [XPI] - HUAWEI ET AL, "On latency, power consumption and implementation complexity for polar codes", vol. RAN WG1, no. Spokane, USA; 20170116 - 20170120, (20170110), 3GPP DRAFT; R1-1700090 ON LATENCY, POWER CONSUMPTION AND IMPLEMENTATION COMPLEXITY FOR POLAR CODES, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06, URL: http://www.3gpp.org/ftp/tsg_ran/WG1_RL1/TSGR1_AH/NR_AH_1701/Docs/, (20170110), XP051202599 [XP] 1,11-14 * section 2.4.1 * [I] 2-10 | International search | [A]CN102957494 (HUAWEI TECH CO LTD) [A] 1-23* the whole document *; | [Y]US2013148623 (NISHIO AKIHIKO [JP], et al) [Y] 1-23 * description, paragraphs [0004], [0196] *; | [A]CN105227189 (UNIV ELECTRONIC SCIENCE & TECH) [A] 1-23 * the whole document *; | [Y]CN105337696 (UNIV SOUTHEAST) [Y] 1-23 * description, paragraph [0022] * | by applicant | - E. ARIKAN, "Channel polarization: A method for constructing capacity-achieving codes for symmetric binary-input memoryless channels", IEEE Trans. Inf. Theory, (20090000), vol. 55, no. 7, pages 3051 - 3073, XP011262510 |