EP3473467 - ERRONEOUS REFUELING PREVENTION DEVICE [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 06.05.2022 Database last updated on 19.10.2024 | |
Former | The patent has been granted Status updated on 28.05.2021 | ||
Former | Grant of patent is intended Status updated on 02.02.2021 | ||
Former | Request for examination was made Status updated on 22.03.2019 | ||
Former | The international publication has been made Status updated on 29.12.2017 | Most recent event Tooltip | 27.09.2024 | Lapse of the patent in a contracting state New state(s): MT | published on 30.10.2024 [2024/44] | Applicant(s) | For all designated states Yachiyo Industry Co., Ltd. 393 Kashiwabara Sayama-shi, Saitama 350-1335 / JP | [2019/17] | Inventor(s) | 01 /
HIROHARA, Takeshi c/o Yachiyo Industry Co. Ltd. Tochigi R&D Center 1959-5 Oshiage Sakura-shi Tochigi 329-1334 / JP | 02 /
KIM, Daesung c/o Yachiyo Industry Co. Ltd. Tochigi R&D Center 1959-5 Oshiage Sakura-shi Tochigi 329-1334 / JP | [2019/17] | Representative(s) | Dehns 10 Old Bailey London EC4M 7NG / GB | [N/P] |
Former [2021/26] | Dehns St. Bride's House 10 Salisbury Square London EC4Y 8JD / GB | ||
Former [2019/17] | Dehns St. Brides House 10 Salisbury Square London EC4Y 8JD / GB | Application number, filing date | 17815055.3 | 12.05.2017 | [2019/17] | WO2017JP18099 | Priority number, date | JP20160122074 | 20.06.2016 Original published format: JP 2016122074 | [2019/17] | Filing language | JA | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2017221585 | Date: | 28.12.2017 | Language: | JA | [2017/52] | Type: | A1 Application with search report | No.: | EP3473467 | Date: | 24.04.2019 | Language: | EN | [2019/17] | Type: | B1 Patent specification | No.: | EP3473467 | Date: | 30.06.2021 | Language: | EN | [2021/26] | Search report(s) | International search report - published on: | JP | 28.12.2017 | (Supplementary) European search report - dispatched on: | EP | 05.03.2020 | Classification | IPC: | B60K15/04, F02M37/00 | [2019/17] | CPC: |
B60K15/04 (EP,US);
B67D7/344 (US);
B60K2015/0461 (EP,US);
B60K2015/0483 (EP,US)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2019/17] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | MD | Not yet paid | Title | German: | VORRICHTUNG ZUM VERHINDERN VON FEHLERHAFTER BETANKUNG | [2019/17] | English: | ERRONEOUS REFUELING PREVENTION DEVICE | [2019/17] | French: | DISPOSITIF DE PRÉVENTION DE RAVITAILLEMENT ERRONÉ EN CARBURANT | [2019/17] | Entry into regional phase | 17.01.2019 | Translation filed | 17.01.2019 | National basic fee paid | 17.01.2019 | Search fee paid | 17.01.2019 | Designation fee(s) paid | 17.01.2019 | Examination fee paid | Examination procedure | deleted | Date on which the examining division has become responsible | 17.01.2019 | Amendment by applicant (claims and/or description) | 17.01.2019 | Examination requested [2019/17] | 03.02.2021 | Communication of intention to grant the patent | 10.05.2021 | Fee for grant paid | 10.05.2021 | Fee for publishing/printing paid | 11.05.2021 | Receipt of the translation of the claim(s) | Opposition(s) | 31.03.2022 | No opposition filed within time limit [2022/23] | Fees paid | Renewal fee | 17.05.2019 | Renewal fee patent year 03 | 17.03.2020 | Renewal fee patent year 04 | 20.05.2021 | Renewal fee patent year 05 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 12.05.2017 | AL | 30.06.2021 | AT | 30.06.2021 | CY | 30.06.2021 | CZ | 30.06.2021 | DK | 30.06.2021 | EE | 30.06.2021 | ES | 30.06.2021 | FI | 30.06.2021 | HR | 30.06.2021 | IT | 30.06.2021 | LT | 30.06.2021 | LV | 30.06.2021 | MC | 30.06.2021 | MK | 30.06.2021 | MT | 30.06.2021 | NL | 30.06.2021 | PL | 30.06.2021 | RO | 30.06.2021 | RS | 30.06.2021 | SE | 30.06.2021 | SI | 30.06.2021 | SK | 30.06.2021 | SM | 30.06.2021 | BG | 30.09.2021 | NO | 30.09.2021 | GR | 01.10.2021 | IS | 30.10.2021 | PT | 02.11.2021 | [2024/44] |
Former [2024/23] | HU | 12.05.2017 | |
AL | 30.06.2021 | ||
AT | 30.06.2021 | ||
CY | 30.06.2021 | ||
CZ | 30.06.2021 | ||
DK | 30.06.2021 | ||
EE | 30.06.2021 | ||
ES | 30.06.2021 | ||
FI | 30.06.2021 | ||
HR | 30.06.2021 | ||
IT | 30.06.2021 | ||
LT | 30.06.2021 | ||
LV | 30.06.2021 | ||
MC | 30.06.2021 | ||
MK | 30.06.2021 | ||
NL | 30.06.2021 | ||
PL | 30.06.2021 | ||
RO | 30.06.2021 | ||
RS | 30.06.2021 | ||
SE | 30.06.2021 | ||
SI | 30.06.2021 | ||
SK | 30.06.2021 | ||
SM | 30.06.2021 | ||
BG | 30.09.2021 | ||
NO | 30.09.2021 | ||
GR | 01.10.2021 | ||
IS | 30.10.2021 | ||
PT | 02.11.2021 | ||
Former [2024/20] | HU | 12.05.2017 | |
AL | 30.06.2021 | ||
AT | 30.06.2021 | ||
CY | 30.06.2021 | ||
CZ | 30.06.2021 | ||
DK | 30.06.2021 | ||
EE | 30.06.2021 | ||
ES | 30.06.2021 | ||
FI | 30.06.2021 | ||
HR | 30.06.2021 | ||
IT | 30.06.2021 | ||
LT | 30.06.2021 | ||
LV | 30.06.2021 | ||
MC | 30.06.2021 | ||
NL | 30.06.2021 | ||
PL | 30.06.2021 | ||
RO | 30.06.2021 | ||
RS | 30.06.2021 | ||
SE | 30.06.2021 | ||
SI | 30.06.2021 | ||
SK | 30.06.2021 | ||
SM | 30.06.2021 | ||
BG | 30.09.2021 | ||
NO | 30.09.2021 | ||
GR | 01.10.2021 | ||
IS | 30.10.2021 | ||
PT | 02.11.2021 | ||
Former [2024/18] | HU | 12.05.2017 | |
AL | 30.06.2021 | ||
AT | 30.06.2021 | ||
CZ | 30.06.2021 | ||
DK | 30.06.2021 | ||
EE | 30.06.2021 | ||
ES | 30.06.2021 | ||
FI | 30.06.2021 | ||
HR | 30.06.2021 | ||
IT | 30.06.2021 | ||
LT | 30.06.2021 | ||
LV | 30.06.2021 | ||
MC | 30.06.2021 | ||
NL | 30.06.2021 | ||
PL | 30.06.2021 | ||
RO | 30.06.2021 | ||
RS | 30.06.2021 | ||
SE | 30.06.2021 | ||
SI | 30.06.2021 | ||
SK | 30.06.2021 | ||
SM | 30.06.2021 | ||
BG | 30.09.2021 | ||
NO | 30.09.2021 | ||
GR | 01.10.2021 | ||
IS | 30.10.2021 | ||
PT | 02.11.2021 | ||
Former [2023/19] | AL | 30.06.2021 | |
AT | 30.06.2021 | ||
CZ | 30.06.2021 | ||
DK | 30.06.2021 | ||
EE | 30.06.2021 | ||
ES | 30.06.2021 | ||
FI | 30.06.2021 | ||
HR | 30.06.2021 | ||
IT | 30.06.2021 | ||
LT | 30.06.2021 | ||
LV | 30.06.2021 | ||
MC | 30.06.2021 | ||
NL | 30.06.2021 | ||
PL | 30.06.2021 | ||
RO | 30.06.2021 | ||
RS | 30.06.2021 | ||
SE | 30.06.2021 | ||
SI | 30.06.2021 | ||
SK | 30.06.2021 | ||
SM | 30.06.2021 | ||
BG | 30.09.2021 | ||
NO | 30.09.2021 | ||
GR | 01.10.2021 | ||
IS | 30.10.2021 | ||
PT | 02.11.2021 | ||
Former [2023/06] | AL | 30.06.2021 | |
AT | 30.06.2021 | ||
CZ | 30.06.2021 | ||
DK | 30.06.2021 | ||
EE | 30.06.2021 | ||
ES | 30.06.2021 | ||
FI | 30.06.2021 | ||
HR | 30.06.2021 | ||
IT | 30.06.2021 | ||
LV | 30.06.2021 | ||
MC | 30.06.2021 | ||
NL | 30.06.2021 | ||
PL | 30.06.2021 | ||
RO | 30.06.2021 | ||
RS | 30.06.2021 | ||
SE | 30.06.2021 | ||
SI | 30.06.2021 | ||
SK | 30.06.2021 | ||
SM | 30.06.2021 | ||
BG | 30.09.2021 | ||
NO | 30.09.2021 | ||
GR | 01.10.2021 | ||
IS | 30.10.2021 | ||
PT | 02.11.2021 | ||
Former [2022/36] | AL | 30.06.2021 | |
AT | 30.06.2021 | ||
CZ | 30.06.2021 | ||
DK | 30.06.2021 | ||
EE | 30.06.2021 | ||
ES | 30.06.2021 | ||
FI | 30.06.2021 | ||
HR | 30.06.2021 | ||
IT | 30.06.2021 | ||
LV | 30.06.2021 | ||
NL | 30.06.2021 | ||
PL | 30.06.2021 | ||
RO | 30.06.2021 | ||
RS | 30.06.2021 | ||
SE | 30.06.2021 | ||
SI | 30.06.2021 | ||
SK | 30.06.2021 | ||
SM | 30.06.2021 | ||
BG | 30.09.2021 | ||
NO | 30.09.2021 | ||
GR | 01.10.2021 | ||
IS | 30.10.2021 | ||
PT | 02.11.2021 | ||
Former [2022/29] | AL | 30.06.2021 | |
AT | 30.06.2021 | ||
CZ | 30.06.2021 | ||
DK | 30.06.2021 | ||
EE | 30.06.2021 | ||
ES | 30.06.2021 | ||
FI | 30.06.2021 | ||
HR | 30.06.2021 | ||
LV | 30.06.2021 | ||
NL | 30.06.2021 | ||
PL | 30.06.2021 | ||
RO | 30.06.2021 | ||
RS | 30.06.2021 | ||
SE | 30.06.2021 | ||
SI | 30.06.2021 | ||
SK | 30.06.2021 | ||
SM | 30.06.2021 | ||
BG | 30.09.2021 | ||
NO | 30.09.2021 | ||
GR | 01.10.2021 | ||
IS | 30.10.2021 | ||
PT | 02.11.2021 | ||
Former [2022/26] | AL | 30.06.2021 | |
AT | 30.06.2021 | ||
CZ | 30.06.2021 | ||
DK | 30.06.2021 | ||
EE | 30.06.2021 | ||
ES | 30.06.2021 | ||
FI | 30.06.2021 | ||
HR | 30.06.2021 | ||
LV | 30.06.2021 | ||
NL | 30.06.2021 | ||
PL | 30.06.2021 | ||
RO | 30.06.2021 | ||
RS | 30.06.2021 | ||
SE | 30.06.2021 | ||
SK | 30.06.2021 | ||
SM | 30.06.2021 | ||
BG | 30.09.2021 | ||
NO | 30.09.2021 | ||
GR | 01.10.2021 | ||
IS | 30.10.2021 | ||
PT | 02.11.2021 | ||
Former [2022/21] | AT | 30.06.2021 | |
CZ | 30.06.2021 | ||
DK | 30.06.2021 | ||
EE | 30.06.2021 | ||
ES | 30.06.2021 | ||
FI | 30.06.2021 | ||
HR | 30.06.2021 | ||
LV | 30.06.2021 | ||
NL | 30.06.2021 | ||
PL | 30.06.2021 | ||
RO | 30.06.2021 | ||
RS | 30.06.2021 | ||
SE | 30.06.2021 | ||
SK | 30.06.2021 | ||
SM | 30.06.2021 | ||
BG | 30.09.2021 | ||
NO | 30.09.2021 | ||
GR | 01.10.2021 | ||
IS | 30.10.2021 | ||
PT | 02.11.2021 | ||
Former [2022/10] | AT | 30.06.2021 | |
CZ | 30.06.2021 | ||
EE | 30.06.2021 | ||
ES | 30.06.2021 | ||
FI | 30.06.2021 | ||
HR | 30.06.2021 | ||
LV | 30.06.2021 | ||
NL | 30.06.2021 | ||
PL | 30.06.2021 | ||
RO | 30.06.2021 | ||
RS | 30.06.2021 | ||
SE | 30.06.2021 | ||
SK | 30.06.2021 | ||
SM | 30.06.2021 | ||
BG | 30.09.2021 | ||
NO | 30.09.2021 | ||
GR | 01.10.2021 | ||
IS | 30.10.2021 | ||
PT | 02.11.2021 | ||
Former [2022/09] | AT | 30.06.2021 | |
CZ | 30.06.2021 | ||
ES | 30.06.2021 | ||
FI | 30.06.2021 | ||
HR | 30.06.2021 | ||
LV | 30.06.2021 | ||
NL | 30.06.2021 | ||
RO | 30.06.2021 | ||
RS | 30.06.2021 | ||
SE | 30.06.2021 | ||
SK | 30.06.2021 | ||
SM | 30.06.2021 | ||
BG | 30.09.2021 | ||
NO | 30.09.2021 | ||
GR | 01.10.2021 | ||
PT | 02.11.2021 | ||
Former [2022/08] | AT | 30.06.2021 | |
CZ | 30.06.2021 | ||
ES | 30.06.2021 | ||
FI | 30.06.2021 | ||
HR | 30.06.2021 | ||
LV | 30.06.2021 | ||
NL | 30.06.2021 | ||
RS | 30.06.2021 | ||
SE | 30.06.2021 | ||
SM | 30.06.2021 | ||
BG | 30.09.2021 | ||
NO | 30.09.2021 | ||
GR | 01.10.2021 | ||
Former [2022/07] | AT | 30.06.2021 | |
FI | 30.06.2021 | ||
HR | 30.06.2021 | ||
LV | 30.06.2021 | ||
NL | 30.06.2021 | ||
RS | 30.06.2021 | ||
SE | 30.06.2021 | ||
SM | 30.06.2021 | ||
BG | 30.09.2021 | ||
NO | 30.09.2021 | ||
GR | 01.10.2021 | ||
Former [2021/51] | FI | 30.06.2021 | |
HR | 30.06.2021 | ||
LV | 30.06.2021 | ||
RS | 30.06.2021 | ||
SE | 30.06.2021 | ||
BG | 30.09.2021 | ||
NO | 30.09.2021 | ||
GR | 01.10.2021 | ||
Former [2021/49] | FI | 30.06.2021 | |
HR | 30.06.2021 | ||
LV | 30.06.2021 | ||
SE | 30.06.2021 | ||
BG | 30.09.2021 | ||
NO | 30.09.2021 | ||
GR | 01.10.2021 | ||
Former [2021/47] | FI | 30.06.2021 | |
BG | 30.09.2021 | ||
Former [2021/46] | FI | 30.06.2021 | Documents cited: | Search | [A]EP1736351 (STANT MFG INC [US]) [A] 1 * figures 3-5 *; | [A]DE202005014387U (DURA AUTOMOTIVE SYSTEMS KOEHLE [DE]) [A] 1* figures 1,2 * | International search | [A]JP2006103679 (STANT MFG INC) [A] 1-3 * , entire text; all drawings & US 2006/0096662 A1 entire text; all drawings & US 2007/0034287 A1 & EP 1642761 A1 & EP 1690727 A2 & CA 2521557 A1 *; | [A]GB2431634 (HOLDAWAY RHYS [GB]) [A] 1-3 * , entire text; all drawings (Family: none) *; | [A]JP2007261492 (TOYODA GOSEI KK) [A] 1-3 * , entire text; all drawings & DE 102007000183 A1 entire text; all drawings *; | [A]JP2008049952 (TOYODA GOSEI KK) [A] 1-3 * , entire text; all drawings & DE 102007000455 A1 entire text; all drawings *; | [A]JP2011213235 (ASTEER CO LTD) [A] 1-3 * , entire text; all drawings (Family: none) *; | [A]JP5385288B (Nifco Inc.) [A] 1-3 * , entire text; all drawings (Family: none) *; | [PA]WO2017056914 (YACHIYO IND CO LTD [JP]) [PA] 1-3* , entire text; all drawings (Family: none) * |