EP3571399 - WIND TURBINE COMPRISING A GROUNDING SYSTEM FOR TRANSFERRING LIGHTNING CURRENT AND FOR PROVIDING EMF SHIELDING [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 21.04.2023 Database last updated on 27.07.2024 | |
Former | The patent has been granted Status updated on 13.05.2022 | ||
Former | Grant of patent is intended Status updated on 28.02.2022 | ||
Former | Request for examination was made Status updated on 25.10.2019 | ||
Former | The international publication has been made Status updated on 01.09.2018 | ||
Former | unknown Status updated on 03.01.2018 | Most recent event Tooltip | 14.06.2024 | Lapse of the patent in a contracting state New state(s): TR | published on 17.07.2024 [2024/29] | Applicant(s) | For all designated states Siemens Gamesa Renewable Energy A/S Borupvej 16 7330 Brande / DK | [2019/48] | Inventor(s) | 01 /
GROENDAHL, Erik Gl. Skolevej 2 8653 Them / DK | 02 /
WADSHOLT, Klaus Bjørnøvænget 23 7000 Fredericia / DK | [2019/48] | Representative(s) | SGRE-Association Siemens Energy Global GmbH & Co. KG SE I IM P Intellectual Property Siemenspromenade 9 91058 Erlangen / DE | [N/P] |
Former [2019/48] | Aspacher, Karl-Georg Siemens Wind Power GmbH & Co. KG Postfach 22 16 34 80506 München / DE | Application number, filing date | 17816511.4 | 27.11.2017 | [2019/48] | WO2017EP80441 | Priority number, date | DE201710202780 | 21.02.2017 Original published format: DE102017202780 | [2019/48] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2018153520 | Date: | 30.08.2018 | Language: | EN | [2018/35] | Type: | A1 Application with search report | No.: | EP3571399 | Date: | 27.11.2019 | Language: | EN | The application published by WIPO in one of the EPO official languages on 30.08.2018 takes the place of the publication of the European patent application. | [2019/48] | Type: | B1 Patent specification | No.: | EP3571399 | Date: | 15.06.2022 | Language: | EN | [2022/24] | Search report(s) | International search report - published on: | EP | 30.08.2018 | Classification | IPC: | F03D80/30 | [2019/48] | CPC: |
F03D80/30 (EP,US);
F03D9/25 (US);
H02K11/40 (US);
H02K7/1838 (US);
F03D15/20 (EP);
F05B2220/706 (US);
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2019/48] | Title | German: | WINDTURBINE MIT EINEM ERDUNGSSYSTEM ZUR ÜBERTRAGUNG VON BLITZSTROM UND ZUR BEREITSTELLUNG VON EMF-ABSCHIRMUNG | [2019/48] | English: | WIND TURBINE COMPRISING A GROUNDING SYSTEM FOR TRANSFERRING LIGHTNING CURRENT AND FOR PROVIDING EMF SHIELDING | [2019/48] | French: | ÉOLIENNE COMPRENANT UN SYSTÈME DE MISE À LA TERRE POUR TRANSFÉRER UN COURANT DE FOUDRE ET POUR FOURNIR UN BLINDAGE ELECTROMAGNÉTIQUE | [2022/10] |
Former [2019/48] | ÉOLIENNE COMPRENANT UN SYSTÈME DE MISE À LA TERRE POUR TRANSFÉRER UN COURANT DE FOUDRE ET POUR FOURNIR UN BLINDAGE DE F.É.M. | Entry into regional phase | 23.08.2019 | National basic fee paid | 23.08.2019 | Designation fee(s) paid | 23.08.2019 | Examination fee paid | Examination procedure | 23.08.2019 | Examination requested [2019/48] | 23.08.2019 | Date on which the examining division has become responsible | 10.03.2020 | Amendment by applicant (claims and/or description) | 01.03.2022 | Communication of intention to grant the patent | 10.05.2022 | Fee for grant paid | 10.05.2022 | Fee for publishing/printing paid | 10.05.2022 | Receipt of the translation of the claim(s) | Opposition(s) | 16.03.2023 | No opposition filed within time limit [2023/21] | Fees paid | Renewal fee | 19.11.2019 | Renewal fee patent year 03 | 18.11.2020 | Renewal fee patent year 04 | 30.11.2021 | Renewal fee patent year 05 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 27.11.2017 | AL | 15.06.2022 | AT | 15.06.2022 | CY | 15.06.2022 | CZ | 15.06.2022 | EE | 15.06.2022 | ES | 15.06.2022 | FI | 15.06.2022 | HR | 15.06.2022 | IT | 15.06.2022 | LT | 15.06.2022 | LV | 15.06.2022 | MC | 15.06.2022 | MK | 15.06.2022 | PL | 15.06.2022 | RO | 15.06.2022 | RS | 15.06.2022 | SE | 15.06.2022 | SI | 15.06.2022 | SK | 15.06.2022 | SM | 15.06.2022 | TR | 15.06.2022 | BG | 15.09.2022 | NO | 15.09.2022 | GR | 16.09.2022 | IS | 15.10.2022 | PT | 17.10.2022 | IE | 27.11.2022 | LU | 27.11.2022 | BE | 30.11.2022 | CH | 30.11.2022 | LI | 30.11.2022 | [2024/29] |
Former [2024/27] | HU | 27.11.2017 | |
AL | 15.06.2022 | ||
AT | 15.06.2022 | ||
CY | 15.06.2022 | ||
CZ | 15.06.2022 | ||
EE | 15.06.2022 | ||
ES | 15.06.2022 | ||
FI | 15.06.2022 | ||
HR | 15.06.2022 | ||
IT | 15.06.2022 | ||
LT | 15.06.2022 | ||
LV | 15.06.2022 | ||
MC | 15.06.2022 | ||
MK | 15.06.2022 | ||
PL | 15.06.2022 | ||
RO | 15.06.2022 | ||
RS | 15.06.2022 | ||
SE | 15.06.2022 | ||
SI | 15.06.2022 | ||
SK | 15.06.2022 | ||
SM | 15.06.2022 | ||
BG | 15.09.2022 | ||
NO | 15.09.2022 | ||
GR | 16.09.2022 | ||
IS | 15.10.2022 | ||
PT | 17.10.2022 | ||
IE | 27.11.2022 | ||
LU | 27.11.2022 | ||
BE | 30.11.2022 | ||
CH | 30.11.2022 | ||
LI | 30.11.2022 | ||
Former [2024/21] | HU | 27.11.2017 | |
AL | 15.06.2022 | ||
AT | 15.06.2022 | ||
CY | 15.06.2022 | ||
CZ | 15.06.2022 | ||
EE | 15.06.2022 | ||
ES | 15.06.2022 | ||
FI | 15.06.2022 | ||
HR | 15.06.2022 | ||
IT | 15.06.2022 | ||
LT | 15.06.2022 | ||
LV | 15.06.2022 | ||
MC | 15.06.2022 | ||
PL | 15.06.2022 | ||
RO | 15.06.2022 | ||
RS | 15.06.2022 | ||
SE | 15.06.2022 | ||
SI | 15.06.2022 | ||
SK | 15.06.2022 | ||
SM | 15.06.2022 | ||
BG | 15.09.2022 | ||
NO | 15.09.2022 | ||
GR | 16.09.2022 | ||
IS | 15.10.2022 | ||
PT | 17.10.2022 | ||
IE | 27.11.2022 | ||
LU | 27.11.2022 | ||
BE | 30.11.2022 | ||
CH | 30.11.2022 | ||
LI | 30.11.2022 | ||
Former [2024/18] | HU | 27.11.2017 | |
AL | 15.06.2022 | ||
AT | 15.06.2022 | ||
CZ | 15.06.2022 | ||
EE | 15.06.2022 | ||
ES | 15.06.2022 | ||
FI | 15.06.2022 | ||
HR | 15.06.2022 | ||
IT | 15.06.2022 | ||
LT | 15.06.2022 | ||
LV | 15.06.2022 | ||
MC | 15.06.2022 | ||
PL | 15.06.2022 | ||
RO | 15.06.2022 | ||
RS | 15.06.2022 | ||
SE | 15.06.2022 | ||
SI | 15.06.2022 | ||
SK | 15.06.2022 | ||
SM | 15.06.2022 | ||
BG | 15.09.2022 | ||
NO | 15.09.2022 | ||
GR | 16.09.2022 | ||
IS | 15.10.2022 | ||
PT | 17.10.2022 | ||
IE | 27.11.2022 | ||
LU | 27.11.2022 | ||
BE | 30.11.2022 | ||
CH | 30.11.2022 | ||
LI | 30.11.2022 | ||
Former [2024/11] | AL | 15.06.2022 | |
AT | 15.06.2022 | ||
CZ | 15.06.2022 | ||
EE | 15.06.2022 | ||
ES | 15.06.2022 | ||
FI | 15.06.2022 | ||
HR | 15.06.2022 | ||
IT | 15.06.2022 | ||
LT | 15.06.2022 | ||
LV | 15.06.2022 | ||
MC | 15.06.2022 | ||
PL | 15.06.2022 | ||
RO | 15.06.2022 | ||
RS | 15.06.2022 | ||
SE | 15.06.2022 | ||
SI | 15.06.2022 | ||
SK | 15.06.2022 | ||
SM | 15.06.2022 | ||
BG | 15.09.2022 | ||
NO | 15.09.2022 | ||
GR | 16.09.2022 | ||
IS | 15.10.2022 | ||
PT | 17.10.2022 | ||
IE | 27.11.2022 | ||
LU | 27.11.2022 | ||
BE | 30.11.2022 | ||
CH | 30.11.2022 | ||
LI | 30.11.2022 | ||
Former [2023/49] | AL | 15.06.2022 | |
AT | 15.06.2022 | ||
CZ | 15.06.2022 | ||
EE | 15.06.2022 | ||
ES | 15.06.2022 | ||
FI | 15.06.2022 | ||
HR | 15.06.2022 | ||
LT | 15.06.2022 | ||
LV | 15.06.2022 | ||
MC | 15.06.2022 | ||
PL | 15.06.2022 | ||
RO | 15.06.2022 | ||
RS | 15.06.2022 | ||
SE | 15.06.2022 | ||
SI | 15.06.2022 | ||
SK | 15.06.2022 | ||
SM | 15.06.2022 | ||
BG | 15.09.2022 | ||
NO | 15.09.2022 | ||
GR | 16.09.2022 | ||
IS | 15.10.2022 | ||
PT | 17.10.2022 | ||
IE | 27.11.2022 | ||
LU | 27.11.2022 | ||
BE | 30.11.2022 | ||
CH | 30.11.2022 | ||
LI | 30.11.2022 | ||
Former [2023/48] | AL | 15.06.2022 | |
AT | 15.06.2022 | ||
CZ | 15.06.2022 | ||
EE | 15.06.2022 | ||
ES | 15.06.2022 | ||
FI | 15.06.2022 | ||
HR | 15.06.2022 | ||
LT | 15.06.2022 | ||
LV | 15.06.2022 | ||
MC | 15.06.2022 | ||
PL | 15.06.2022 | ||
RO | 15.06.2022 | ||
RS | 15.06.2022 | ||
SE | 15.06.2022 | ||
SI | 15.06.2022 | ||
SK | 15.06.2022 | ||
SM | 15.06.2022 | ||
BG | 15.09.2022 | ||
NO | 15.09.2022 | ||
GR | 16.09.2022 | ||
IS | 15.10.2022 | ||
PT | 17.10.2022 | ||
IE | 27.11.2022 | ||
LU | 27.11.2022 | ||
CH | 30.11.2022 | ||
LI | 30.11.2022 | ||
Former [2023/37] | AL | 15.06.2022 | |
AT | 15.06.2022 | ||
CZ | 15.06.2022 | ||
EE | 15.06.2022 | ||
ES | 15.06.2022 | ||
FI | 15.06.2022 | ||
HR | 15.06.2022 | ||
LT | 15.06.2022 | ||
LV | 15.06.2022 | ||
MC | 15.06.2022 | ||
PL | 15.06.2022 | ||
RO | 15.06.2022 | ||
RS | 15.06.2022 | ||
SE | 15.06.2022 | ||
SI | 15.06.2022 | ||
SK | 15.06.2022 | ||
SM | 15.06.2022 | ||
BG | 15.09.2022 | ||
NO | 15.09.2022 | ||
GR | 16.09.2022 | ||
IS | 15.10.2022 | ||
PT | 17.10.2022 | ||
LU | 27.11.2022 | ||
CH | 30.11.2022 | ||
LI | 30.11.2022 | ||
Former [2023/35] | AL | 15.06.2022 | |
AT | 15.06.2022 | ||
CZ | 15.06.2022 | ||
EE | 15.06.2022 | ||
ES | 15.06.2022 | ||
FI | 15.06.2022 | ||
HR | 15.06.2022 | ||
LT | 15.06.2022 | ||
LV | 15.06.2022 | ||
MC | 15.06.2022 | ||
PL | 15.06.2022 | ||
RO | 15.06.2022 | ||
RS | 15.06.2022 | ||
SE | 15.06.2022 | ||
SI | 15.06.2022 | ||
SK | 15.06.2022 | ||
SM | 15.06.2022 | ||
BG | 15.09.2022 | ||
NO | 15.09.2022 | ||
GR | 16.09.2022 | ||
IS | 15.10.2022 | ||
PT | 17.10.2022 | ||
CH | 30.11.2022 | ||
LI | 30.11.2022 | ||
Former [2023/31] | AL | 15.06.2022 | |
AT | 15.06.2022 | ||
CZ | 15.06.2022 | ||
EE | 15.06.2022 | ||
ES | 15.06.2022 | ||
FI | 15.06.2022 | ||
HR | 15.06.2022 | ||
LT | 15.06.2022 | ||
LV | 15.06.2022 | ||
MC | 15.06.2022 | ||
PL | 15.06.2022 | ||
RO | 15.06.2022 | ||
RS | 15.06.2022 | ||
SE | 15.06.2022 | ||
SI | 15.06.2022 | ||
SK | 15.06.2022 | ||
SM | 15.06.2022 | ||
BG | 15.09.2022 | ||
NO | 15.09.2022 | ||
GR | 16.09.2022 | ||
IS | 15.10.2022 | ||
PT | 17.10.2022 | ||
Former [2023/25] | AL | 15.06.2022 | |
AT | 15.06.2022 | ||
CZ | 15.06.2022 | ||
EE | 15.06.2022 | ||
ES | 15.06.2022 | ||
FI | 15.06.2022 | ||
HR | 15.06.2022 | ||
LT | 15.06.2022 | ||
LV | 15.06.2022 | ||
PL | 15.06.2022 | ||
RO | 15.06.2022 | ||
RS | 15.06.2022 | ||
SE | 15.06.2022 | ||
SI | 15.06.2022 | ||
SK | 15.06.2022 | ||
SM | 15.06.2022 | ||
BG | 15.09.2022 | ||
NO | 15.09.2022 | ||
GR | 16.09.2022 | ||
IS | 15.10.2022 | ||
PT | 17.10.2022 | ||
Former [2023/17] | AL | 15.06.2022 | |
AT | 15.06.2022 | ||
CZ | 15.06.2022 | ||
EE | 15.06.2022 | ||
ES | 15.06.2022 | ||
FI | 15.06.2022 | ||
HR | 15.06.2022 | ||
LT | 15.06.2022 | ||
LV | 15.06.2022 | ||
PL | 15.06.2022 | ||
RO | 15.06.2022 | ||
RS | 15.06.2022 | ||
SE | 15.06.2022 | ||
SK | 15.06.2022 | ||
SM | 15.06.2022 | ||
BG | 15.09.2022 | ||
NO | 15.09.2022 | ||
GR | 16.09.2022 | ||
IS | 15.10.2022 | ||
PT | 17.10.2022 | ||
Former [2023/12] | AT | 15.06.2022 | |
CZ | 15.06.2022 | ||
EE | 15.06.2022 | ||
ES | 15.06.2022 | ||
FI | 15.06.2022 | ||
HR | 15.06.2022 | ||
LT | 15.06.2022 | ||
LV | 15.06.2022 | ||
PL | 15.06.2022 | ||
RO | 15.06.2022 | ||
RS | 15.06.2022 | ||
SE | 15.06.2022 | ||
SK | 15.06.2022 | ||
SM | 15.06.2022 | ||
BG | 15.09.2022 | ||
NO | 15.09.2022 | ||
GR | 16.09.2022 | ||
IS | 15.10.2022 | ||
PT | 17.10.2022 | ||
Former [2023/11] | AT | 15.06.2022 | |
CZ | 15.06.2022 | ||
EE | 15.06.2022 | ||
ES | 15.06.2022 | ||
FI | 15.06.2022 | ||
HR | 15.06.2022 | ||
LT | 15.06.2022 | ||
LV | 15.06.2022 | ||
PL | 15.06.2022 | ||
RO | 15.06.2022 | ||
RS | 15.06.2022 | ||
SE | 15.06.2022 | ||
SK | 15.06.2022 | ||
SM | 15.06.2022 | ||
BG | 15.09.2022 | ||
NO | 15.09.2022 | ||
GR | 16.09.2022 | ||
PT | 17.10.2022 | ||
Former [2023/09] | AT | 15.06.2022 | |
CZ | 15.06.2022 | ||
EE | 15.06.2022 | ||
ES | 15.06.2022 | ||
FI | 15.06.2022 | ||
HR | 15.06.2022 | ||
LT | 15.06.2022 | ||
LV | 15.06.2022 | ||
RO | 15.06.2022 | ||
RS | 15.06.2022 | ||
SE | 15.06.2022 | ||
SK | 15.06.2022 | ||
SM | 15.06.2022 | ||
BG | 15.09.2022 | ||
NO | 15.09.2022 | ||
GR | 16.09.2022 | ||
PT | 17.10.2022 | ||
Former [2023/08] | AT | 15.06.2022 | |
ES | 15.06.2022 | ||
FI | 15.06.2022 | ||
HR | 15.06.2022 | ||
LT | 15.06.2022 | ||
LV | 15.06.2022 | ||
RS | 15.06.2022 | ||
SE | 15.06.2022 | ||
BG | 15.09.2022 | ||
NO | 15.09.2022 | ||
GR | 16.09.2022 | ||
Former [2023/07] | AT | 15.06.2022 | |
FI | 15.06.2022 | ||
HR | 15.06.2022 | ||
LT | 15.06.2022 | ||
LV | 15.06.2022 | ||
RS | 15.06.2022 | ||
SE | 15.06.2022 | ||
BG | 15.09.2022 | ||
NO | 15.09.2022 | ||
GR | 16.09.2022 | ||
Former [2022/50] | FI | 15.06.2022 | |
HR | 15.06.2022 | ||
LT | 15.06.2022 | ||
LV | 15.06.2022 | ||
RS | 15.06.2022 | ||
SE | 15.06.2022 | ||
BG | 15.09.2022 | ||
NO | 15.09.2022 | ||
GR | 16.09.2022 | ||
Former [2022/49] | FI | 15.06.2022 | |
HR | 15.06.2022 | ||
LT | 15.06.2022 | ||
LV | 15.06.2022 | ||
SE | 15.06.2022 | ||
BG | 15.09.2022 | ||
NO | 15.09.2022 | ||
GR | 16.09.2022 | ||
Former [2022/47] | FI | 15.06.2022 | |
LT | 15.06.2022 | ||
SE | 15.06.2022 | ||
NO | 15.09.2022 | Cited in | International search | [A]US7377750 (COSTIN DANIEL P [US], et al) [A] 1-9 * the whole document *; | [A]US2009121491 (MIKKELSEN PER SVEIGAARD [DK]) [A] 1-9 * the whole document *; | [X]EP2395238 (SIEMENS AG [DE]) [X] 1-9 * paragraphs [0009] - [0021] - [0 24] - [0031] - [0 37] - [0040]; figures 1, 5, 7 *; | [A]US2013115073 (THIEL ENRICO [DE], et al) [A] 1-9 * the whole document *; | [A] - AKIHIRO AMETANI ET AL, "A study of transient magnetic fields in a wind turbine nacelle", ELECTROMAGNETIC COMPATIBILITY (APEMC), 2010 ASIA-PACIFIC SYMPOSIUM ON, IEEE, PISCATAWAY, NJ, USA, (20100412), ISBN 978-1-4244-5621-5, pages 1201 - 1204, XP031682884 [A] 1-9 * the whole document * |