EP3478902 - METHOD AND DEVICE FOR INSERTING A TONGUE [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 31.12.2021 Database last updated on 20.05.2024 | |
Former | The patent has been granted Status updated on 22.01.2021 | ||
Former | Grant of patent is intended Status updated on 13.09.2020 | ||
Former | Request for examination was made Status updated on 05.04.2019 | ||
Former | The international publication has been made Status updated on 06.01.2018 | Most recent event Tooltip | 03.05.2024 | Lapse of the patent in a contracting state New state(s): MK | published on 05.06.2024 [2024/23] | Applicant(s) | For all designated states Välinge Innovation AB Prästavägen 513 263 65 Viken / SE | [2019/19] | Inventor(s) | 01 /
FRANSSON, Jonas Allerumsvägen 317 254 76 Allerum / SE | 02 /
BLOMGREN, Andreas Lyckornavägen 33 459 33 Ljungskile / SE | [2021/08] |
Former [2019/19] | 01 /
FRANSSON, Jonas Allerumsvägen 317 SE-254 76 Allerum / SE | ||
02 /
BLOMGREN, Andreas Lyckornavägen 33 SE-459 33 Ljungskile / SE | Representative(s) | Välinge Innovation AB Patent Department Prästavägen 513 263 65 Viken / SE | [2019/19] | Application number, filing date | 17820656.1 | 28.06.2017 | [2019/19] | WO2017SE50717 | Priority number, date | SE20160050938 | 29.06.2016 Original published format: SE 1650938 | [2019/19] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2018004439 | Date: | 04.01.2018 | Language: | EN | [2018/01] | Type: | A1 Application with search report | No.: | EP3478902 | Date: | 08.05.2019 | Language: | EN | The application published by WIPO in one of the EPO official languages on 04.01.2018 takes the place of the publication of the European patent application. | [2019/19] | Type: | B1 Patent specification | No.: | EP3478902 | Date: | 24.02.2021 | Language: | EN | [2021/08] | Search report(s) | International search report - published on: | SE | 04.01.2018 | (Supplementary) European search report - dispatched on: | EP | 09.12.2019 | Classification | IPC: | E04F15/02, B27M3/04, B27M3/18, F16B12/26 | [2019/19] | CPC: |
B27M3/04 (EP);
F16B12/20 (EA,US);
B29C66/124 (EA,US);
B27M3/0026 (EP);
B27M3/0066 (EP);
B29C65/565 (EA,US);
B29C66/7487 (EA,US);
B29C66/824 (EA,US);
F16B12/26 (EP);
A47B2230/0081 (EP,EA,US);
A47B2230/0096 (EP,EA,US);
B29L2031/44 (EA,US);
E04F15/02038 (EP)
(-)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2019/19] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | MD | Not yet paid | Title | German: | VERFAHREN UND VORRICHTUNG ZUM EINSETZEN EINER ZUNGE | [2019/19] | English: | METHOD AND DEVICE FOR INSERTING A TONGUE | [2019/19] | French: | PROCÉDÉ ET DISPOSITIF D'INSERTION D'UNE LANGUETTE | [2019/19] | Entry into regional phase | 05.12.2018 | National basic fee paid | 05.12.2018 | Search fee paid | 05.12.2018 | Designation fee(s) paid | 05.12.2018 | Examination fee paid | Examination procedure | deleted | Date on which the examining division has become responsible | 05.12.2018 | Examination requested [2019/19] | 01.07.2020 | Amendment by applicant (claims and/or description) | 14.09.2020 | Communication of intention to grant the patent | 15.01.2021 | Fee for grant paid | 15.01.2021 | Fee for publishing/printing paid | 15.01.2021 | Receipt of the translation of the claim(s) | Opposition(s) | 25.11.2021 | No opposition filed within time limit [2022/05] | Fees paid | Renewal fee | 21.06.2019 | Renewal fee patent year 03 | 22.06.2020 | Renewal fee patent year 04 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 28.06.2017 | AL | 24.02.2021 | AT | 24.02.2021 | CY | 24.02.2021 | CZ | 24.02.2021 | DK | 24.02.2021 | EE | 24.02.2021 | ES | 24.02.2021 | FI | 24.02.2021 | HR | 24.02.2021 | IT | 24.02.2021 | LT | 24.02.2021 | LV | 24.02.2021 | MC | 24.02.2021 | MK | 24.02.2021 | NL | 24.02.2021 | RO | 24.02.2021 | RS | 24.02.2021 | SE | 24.02.2021 | SI | 24.02.2021 | SM | 24.02.2021 | BG | 24.05.2021 | NO | 24.05.2021 | GR | 25.05.2021 | IS | 24.06.2021 | PT | 24.06.2021 | IE | 28.06.2021 | LU | 28.06.2021 | BE | 30.06.2021 | CH | 30.06.2021 | LI | 30.06.2021 | [2024/23] |
Former [2023/33] | HU | 28.06.2017 | |
AL | 24.02.2021 | ||
AT | 24.02.2021 | ||
CY | 24.02.2021 | ||
CZ | 24.02.2021 | ||
DK | 24.02.2021 | ||
EE | 24.02.2021 | ||
ES | 24.02.2021 | ||
FI | 24.02.2021 | ||
HR | 24.02.2021 | ||
IT | 24.02.2021 | ||
LT | 24.02.2021 | ||
LV | 24.02.2021 | ||
MC | 24.02.2021 | ||
NL | 24.02.2021 | ||
RO | 24.02.2021 | ||
RS | 24.02.2021 | ||
SE | 24.02.2021 | ||
SI | 24.02.2021 | ||
SM | 24.02.2021 | ||
BG | 24.05.2021 | ||
NO | 24.05.2021 | ||
GR | 25.05.2021 | ||
IS | 24.06.2021 | ||
PT | 24.06.2021 | ||
IE | 28.06.2021 | ||
LU | 28.06.2021 | ||
BE | 30.06.2021 | ||
CH | 30.06.2021 | ||
LI | 30.06.2021 | ||
Former [2023/30] | AL | 24.02.2021 | |
AT | 24.02.2021 | ||
CY | 24.02.2021 | ||
CZ | 24.02.2021 | ||
DK | 24.02.2021 | ||
EE | 24.02.2021 | ||
ES | 24.02.2021 | ||
FI | 24.02.2021 | ||
HR | 24.02.2021 | ||
IT | 24.02.2021 | ||
LT | 24.02.2021 | ||
LV | 24.02.2021 | ||
MC | 24.02.2021 | ||
NL | 24.02.2021 | ||
RO | 24.02.2021 | ||
RS | 24.02.2021 | ||
SE | 24.02.2021 | ||
SI | 24.02.2021 | ||
SM | 24.02.2021 | ||
BG | 24.05.2021 | ||
NO | 24.05.2021 | ||
GR | 25.05.2021 | ||
IS | 24.06.2021 | ||
PT | 24.06.2021 | ||
IE | 28.06.2021 | ||
LU | 28.06.2021 | ||
BE | 30.06.2021 | ||
CH | 30.06.2021 | ||
LI | 30.06.2021 | ||
Former [2022/34] | AL | 24.02.2021 | |
AT | 24.02.2021 | ||
CZ | 24.02.2021 | ||
DK | 24.02.2021 | ||
EE | 24.02.2021 | ||
ES | 24.02.2021 | ||
FI | 24.02.2021 | ||
HR | 24.02.2021 | ||
IT | 24.02.2021 | ||
LT | 24.02.2021 | ||
LV | 24.02.2021 | ||
MC | 24.02.2021 | ||
NL | 24.02.2021 | ||
RO | 24.02.2021 | ||
RS | 24.02.2021 | ||
SE | 24.02.2021 | ||
SI | 24.02.2021 | ||
SM | 24.02.2021 | ||
BG | 24.05.2021 | ||
NO | 24.05.2021 | ||
GR | 25.05.2021 | ||
IS | 24.06.2021 | ||
PT | 24.06.2021 | ||
IE | 28.06.2021 | ||
LU | 28.06.2021 | ||
BE | 30.06.2021 | ||
CH | 30.06.2021 | ||
LI | 30.06.2021 | ||
Former [2022/23] | AL | 24.02.2021 | |
AT | 24.02.2021 | ||
CZ | 24.02.2021 | ||
DK | 24.02.2021 | ||
EE | 24.02.2021 | ||
ES | 24.02.2021 | ||
FI | 24.02.2021 | ||
HR | 24.02.2021 | ||
IT | 24.02.2021 | ||
LT | 24.02.2021 | ||
LV | 24.02.2021 | ||
MC | 24.02.2021 | ||
NL | 24.02.2021 | ||
RO | 24.02.2021 | ||
RS | 24.02.2021 | ||
SE | 24.02.2021 | ||
SI | 24.02.2021 | ||
SM | 24.02.2021 | ||
BG | 24.05.2021 | ||
NO | 24.05.2021 | ||
GR | 25.05.2021 | ||
IS | 24.06.2021 | ||
PT | 24.06.2021 | ||
IE | 28.06.2021 | ||
LU | 28.06.2021 | ||
CH | 30.06.2021 | ||
LI | 30.06.2021 | ||
Former [2022/21] | AL | 24.02.2021 | |
AT | 24.02.2021 | ||
CZ | 24.02.2021 | ||
DK | 24.02.2021 | ||
EE | 24.02.2021 | ||
ES | 24.02.2021 | ||
FI | 24.02.2021 | ||
HR | 24.02.2021 | ||
LT | 24.02.2021 | ||
LV | 24.02.2021 | ||
MC | 24.02.2021 | ||
NL | 24.02.2021 | ||
RO | 24.02.2021 | ||
RS | 24.02.2021 | ||
SE | 24.02.2021 | ||
SI | 24.02.2021 | ||
SM | 24.02.2021 | ||
BG | 24.05.2021 | ||
NO | 24.05.2021 | ||
GR | 25.05.2021 | ||
PT | 24.06.2021 | ||
IE | 28.06.2021 | ||
LU | 28.06.2021 | ||
CH | 30.06.2021 | ||
LI | 30.06.2021 | ||
Former [2022/18] | AL | 24.02.2021 | |
AT | 24.02.2021 | ||
CZ | 24.02.2021 | ||
DK | 24.02.2021 | ||
EE | 24.02.2021 | ||
ES | 24.02.2021 | ||
FI | 24.02.2021 | ||
HR | 24.02.2021 | ||
LT | 24.02.2021 | ||
LV | 24.02.2021 | ||
MC | 24.02.2021 | ||
NL | 24.02.2021 | ||
RO | 24.02.2021 | ||
RS | 24.02.2021 | ||
SE | 24.02.2021 | ||
SI | 24.02.2021 | ||
SM | 24.02.2021 | ||
BG | 24.05.2021 | ||
NO | 24.05.2021 | ||
GR | 25.05.2021 | ||
PT | 24.06.2021 | ||
LU | 28.06.2021 | ||
Former [2022/13] | AL | 24.02.2021 | |
AT | 24.02.2021 | ||
CZ | 24.02.2021 | ||
DK | 24.02.2021 | ||
EE | 24.02.2021 | ||
ES | 24.02.2021 | ||
FI | 24.02.2021 | ||
HR | 24.02.2021 | ||
LT | 24.02.2021 | ||
LV | 24.02.2021 | ||
MC | 24.02.2021 | ||
NL | 24.02.2021 | ||
RO | 24.02.2021 | ||
RS | 24.02.2021 | ||
SE | 24.02.2021 | ||
SI | 24.02.2021 | ||
SM | 24.02.2021 | ||
BG | 24.05.2021 | ||
NO | 24.05.2021 | ||
GR | 25.05.2021 | ||
PT | 24.06.2021 | ||
Former [2022/10] | AL | 24.02.2021 | |
AT | 24.02.2021 | ||
CZ | 24.02.2021 | ||
DK | 24.02.2021 | ||
EE | 24.02.2021 | ||
ES | 24.02.2021 | ||
FI | 24.02.2021 | ||
HR | 24.02.2021 | ||
LT | 24.02.2021 | ||
LV | 24.02.2021 | ||
MC | 24.02.2021 | ||
NL | 24.02.2021 | ||
RO | 24.02.2021 | ||
RS | 24.02.2021 | ||
SE | 24.02.2021 | ||
SM | 24.02.2021 | ||
BG | 24.05.2021 | ||
NO | 24.05.2021 | ||
GR | 25.05.2021 | ||
PT | 24.06.2021 | ||
Former [2022/08] | AL | 24.02.2021 | |
AT | 24.02.2021 | ||
CZ | 24.02.2021 | ||
DK | 24.02.2021 | ||
EE | 24.02.2021 | ||
ES | 24.02.2021 | ||
FI | 24.02.2021 | ||
HR | 24.02.2021 | ||
LT | 24.02.2021 | ||
LV | 24.02.2021 | ||
MC | 24.02.2021 | ||
NL | 24.02.2021 | ||
RO | 24.02.2021 | ||
RS | 24.02.2021 | ||
SE | 24.02.2021 | ||
SM | 24.02.2021 | ||
BG | 24.05.2021 | ||
NO | 24.05.2021 | ||
GR | 25.05.2021 | ||
IS | 24.06.2021 | ||
PT | 24.06.2021 | ||
Former [2022/07] | AL | 24.02.2021 | |
AT | 24.02.2021 | ||
CZ | 24.02.2021 | ||
DK | 24.02.2021 | ||
EE | 24.02.2021 | ||
FI | 24.02.2021 | ||
HR | 24.02.2021 | ||
LT | 24.02.2021 | ||
LV | 24.02.2021 | ||
MC | 24.02.2021 | ||
NL | 24.02.2021 | ||
RO | 24.02.2021 | ||
RS | 24.02.2021 | ||
SE | 24.02.2021 | ||
SM | 24.02.2021 | ||
BG | 24.05.2021 | ||
NO | 24.05.2021 | ||
GR | 25.05.2021 | ||
IS | 24.06.2021 | ||
PT | 24.06.2021 | ||
Former [2021/50] | AT | 24.02.2021 | |
CZ | 24.02.2021 | ||
DK | 24.02.2021 | ||
EE | 24.02.2021 | ||
FI | 24.02.2021 | ||
HR | 24.02.2021 | ||
LT | 24.02.2021 | ||
LV | 24.02.2021 | ||
NL | 24.02.2021 | ||
RO | 24.02.2021 | ||
RS | 24.02.2021 | ||
SE | 24.02.2021 | ||
SM | 24.02.2021 | ||
BG | 24.05.2021 | ||
NO | 24.05.2021 | ||
GR | 25.05.2021 | ||
IS | 24.06.2021 | ||
PT | 24.06.2021 | ||
Former [2021/49] | AT | 24.02.2021 | |
CZ | 24.02.2021 | ||
DK | 24.02.2021 | ||
EE | 24.02.2021 | ||
FI | 24.02.2021 | ||
HR | 24.02.2021 | ||
LT | 24.02.2021 | ||
LV | 24.02.2021 | ||
NL | 24.02.2021 | ||
RS | 24.02.2021 | ||
SE | 24.02.2021 | ||
SM | 24.02.2021 | ||
BG | 24.05.2021 | ||
NO | 24.05.2021 | ||
GR | 25.05.2021 | ||
IS | 24.06.2021 | ||
PT | 24.06.2021 | ||
Former [2021/48] | AT | 24.02.2021 | |
CZ | 24.02.2021 | ||
EE | 24.02.2021 | ||
FI | 24.02.2021 | ||
HR | 24.02.2021 | ||
LT | 24.02.2021 | ||
LV | 24.02.2021 | ||
NL | 24.02.2021 | ||
RS | 24.02.2021 | ||
SE | 24.02.2021 | ||
SM | 24.02.2021 | ||
BG | 24.05.2021 | ||
NO | 24.05.2021 | ||
GR | 25.05.2021 | ||
IS | 24.06.2021 | ||
PT | 24.06.2021 | ||
Former [2021/46] | AT | 24.02.2021 | |
FI | 24.02.2021 | ||
HR | 24.02.2021 | ||
LT | 24.02.2021 | ||
LV | 24.02.2021 | ||
NL | 24.02.2021 | ||
RS | 24.02.2021 | ||
SE | 24.02.2021 | ||
SM | 24.02.2021 | ||
BG | 24.05.2021 | ||
NO | 24.05.2021 | ||
GR | 25.05.2021 | ||
IS | 24.06.2021 | ||
PT | 24.06.2021 | ||
Former [2021/42] | FI | 24.02.2021 | |
HR | 24.02.2021 | ||
LT | 24.02.2021 | ||
LV | 24.02.2021 | ||
NL | 24.02.2021 | ||
RS | 24.02.2021 | ||
SE | 24.02.2021 | ||
BG | 24.05.2021 | ||
NO | 24.05.2021 | ||
GR | 25.05.2021 | ||
IS | 24.06.2021 | ||
PT | 24.06.2021 | ||
Former [2021/38] | FI | 24.02.2021 | |
HR | 24.02.2021 | ||
LT | 24.02.2021 | ||
LV | 24.02.2021 | ||
NL | 24.02.2021 | ||
RS | 24.02.2021 | ||
SE | 24.02.2021 | ||
BG | 24.05.2021 | ||
NO | 24.05.2021 | ||
GR | 25.05.2021 | ||
PT | 24.06.2021 | ||
Former [2021/37] | FI | 24.02.2021 | |
HR | 24.02.2021 | ||
LT | 24.02.2021 | ||
LV | 24.02.2021 | ||
RS | 24.02.2021 | ||
BG | 24.05.2021 | ||
NO | 24.05.2021 | ||
GR | 25.05.2021 | ||
PT | 24.06.2021 | ||
Former [2021/36] | FI | 24.02.2021 | |
HR | 24.02.2021 | ||
LT | 24.02.2021 | ||
BG | 24.05.2021 | ||
NO | 24.05.2021 | ||
GR | 25.05.2021 | ||
PT | 24.06.2021 | ||
Former [2021/35] | FI | 24.02.2021 | |
HR | 24.02.2021 | ||
LT | 24.02.2021 | ||
NO | 24.05.2021 | ||
PT | 24.06.2021 | ||
Former [2021/33] | FI | 24.02.2021 | |
LT | 24.02.2021 | ||
NO | 24.05.2021 | ||
PT | 24.06.2021 | Documents cited: | Search | [X]DE19752286 (EASTMAN KODAK CO [US]) [X] 9,10,12,13 * figures 1-5 * * paragraph [0001] *; | [A]WO2006043893 (VAELINGE INNOVATION AB [SE], et al) [A] 1-15 * figures 8-10 *; | [A]US2009193748 (BOO CHRISTIAN [SE], et al) [A] 1-15 * figures 22a-22f *; | [A]US2013042563 (PERVAN DARKO [SE], et al) [A] 1-15 * figures 13b-13f *; | [A]EP2689904 (BARLINEK SA [PL]) [A] 1-15 * figures 20-21 ** paragraphs [0034] - [0035] *; | [X]US2014042203 (ABE SHINYA [JP]) [X] 9,10,12-15 * figures 6A,6B * | International search | [A]EP1650375 (VAELINGE INNOVATION AB [SE]) [A] 1-16 * ; abstract; figures *; | [A]WO2010087752 (VAELINGE INNOVATION BELGIUM BV [BE], et al) [A] 1-16 * ; abstract; figures *; | [A]US2011094083 (SCHULTE GUIDO [DE]) [A] 1-16 * ; abstract; figures *; | [A]US2013042563 (PERVAN DARKO [SE], et al) [A] 1-16 * ; abstract; figures *; | [A]US2013042562 (PERVAN DARKO [SE], et al) [A] 1-16 * ; abstract; figures *; | [A]EP2689904 (BARLINEK SA [PL]) [A] 1-16 * ; abstract; figures *; | [A]EP2732923 (FASCO SRL [IT]) [A] 1-16* ; 1 abstract; figures *; | [A]US2014338177 (VERMEULEN BRUNO PAUL LOUIS [BE], et al) [A] 1-16 * ; abstract; figures * | by applicant | SE1650135 | WO2006043893 | WO2007015669 | WO2012154113 | WO2015038059 |