EP3478441 - FLUID SYSTEM AND METHOD OF MANUFACTURE VIA FRICTION WELDING [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 21.01.2022 Database last updated on 26.07.2024 | |
Former | The patent has been granted Status updated on 12.02.2021 | ||
Former | Grant of patent is intended Status updated on 26.10.2020 | ||
Former | Request for examination was made Status updated on 05.04.2019 | ||
Former | The international publication has been made Status updated on 06.01.2018 | Most recent event Tooltip | 03.05.2024 | Lapse of the patent in a contracting state New state(s): MK | published on 05.06.2024 [2024/23] | Applicant(s) | For all designated states Lenlok Holdings, LLC 38376 Apollo Parkway Willoughby, OH 44094 / US | [2019/19] | Inventor(s) | 01 /
LENNON, William, H. 3045 Roundwood Road Hunting Valley, OH 44022 / US | 02 /
HODSON, George 982 Mechanicsville Rock Creek, OH 44084 / US | [2019/19] | Representative(s) | Cabinet Nony 11 rue Saint-Georges 75009 Paris / FR | [N/P] |
Former [2019/19] | Nony 11 rue Saint-Georges 75009 Paris / FR | Application number, filing date | 17821340.1 | 30.06.2017 | [2019/19] | WO2017US40227 | Priority number, date | US201662357669P | 01.07.2016 Original published format: US 201662357669 P | US201762451206P | 27.01.2017 Original published format: US 201762451206 P | [2019/19] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2018005938 | Date: | 04.01.2018 | Language: | EN | [2018/01] | Type: | A1 Application with search report | No.: | EP3478441 | Date: | 08.05.2019 | Language: | EN | The application published by WIPO in one of the EPO official languages on 04.01.2018 takes the place of the publication of the European patent application. | [2019/19] | Type: | B1 Patent specification | No.: | EP3478441 | Date: | 17.03.2021 | Language: | EN | [2021/11] | Search report(s) | International search report - published on: | KR | 04.01.2018 | (Supplementary) European search report - dispatched on: | EP | 14.01.2020 | Classification | IPC: | B23K20/12, F16L13/02, B23K101/04, F16L13/14, B23K33/00, B23K103/18, B23K101/06, B23K20/227, B23K103/08, B23K103/04 | [2020/07] | CPC: |
B23K20/129 (EP,US);
B23K20/12 (EP,KR,US);
B29C65/0681 (US);
B23K20/227 (EP,US);
B23K33/006 (EP,US);
E21B17/08 (US);
F16L13/02 (EP,KR,US);
F16L13/0236 (US);
B23K2101/06 (EP,US);
B23K2103/04 (EP,US);
B23K2103/05 (EP,US);
B23K2103/08 (EP,US);
|
Former IPC [2019/19] | B23K20/12, F16L13/02, B23K101/04 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2019/19] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | MD | Not yet paid | Title | German: | FLUIDSYSTEM UND VERFAHREN ZUR HERSTELLUNG DURCH REIBSCHWEISSEN | [2019/19] | English: | FLUID SYSTEM AND METHOD OF MANUFACTURE VIA FRICTION WELDING | [2019/19] | French: | SYSTÈME DE FLUIDE ET PROCÉDÉ DE FABRICATION PAR SOUDAGE PAR FRICTION | [2019/19] | Entry into regional phase | 04.12.2018 | National basic fee paid | 04.12.2018 | Search fee paid | 04.12.2018 | Designation fee(s) paid | 04.12.2018 | Examination fee paid | Examination procedure | deleted | Date on which the examining division has become responsible | 04.12.2018 | Examination requested [2019/19] | 18.05.2020 | Amendment by applicant (claims and/or description) | 27.10.2020 | Communication of intention to grant the patent | 04.02.2021 | Fee for grant paid | 04.02.2021 | Fee for publishing/printing paid | 04.02.2021 | Receipt of the translation of the claim(s) | Opposition(s) | 20.12.2021 | No opposition filed within time limit [2022/08] | Fees paid | Renewal fee | 26.06.2019 | Renewal fee patent year 03 | 09.06.2020 | Renewal fee patent year 04 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | AL | 17.03.2021 | CY | 17.03.2021 | EE | 17.03.2021 | HR | 17.03.2021 | LT | 17.03.2021 | LV | 17.03.2021 | MC | 17.03.2021 | MK | 17.03.2021 | RO | 17.03.2021 | RS | 17.03.2021 | SI | 17.03.2021 | SM | 17.03.2021 | BG | 17.06.2021 | GR | 18.06.2021 | LU | 30.06.2021 | IS | 17.07.2021 | [2024/23] |
Former [2023/30] | AL | 17.03.2021 | |
CY | 17.03.2021 | ||
EE | 17.03.2021 | ||
HR | 17.03.2021 | ||
LT | 17.03.2021 | ||
LV | 17.03.2021 | ||
MC | 17.03.2021 | ||
RO | 17.03.2021 | ||
RS | 17.03.2021 | ||
SI | 17.03.2021 | ||
SM | 17.03.2021 | ||
BG | 17.06.2021 | ||
GR | 18.06.2021 | ||
LU | 30.06.2021 | ||
IS | 17.07.2021 | ||
Former [2022/23] | AL | 17.03.2021 | |
EE | 17.03.2021 | ||
HR | 17.03.2021 | ||
LT | 17.03.2021 | ||
LV | 17.03.2021 | ||
MC | 17.03.2021 | ||
RO | 17.03.2021 | ||
RS | 17.03.2021 | ||
SI | 17.03.2021 | ||
SM | 17.03.2021 | ||
BG | 17.06.2021 | ||
GR | 18.06.2021 | ||
LU | 30.06.2021 | ||
IS | 17.07.2021 | ||
Former [2022/18] | AL | 17.03.2021 | |
EE | 17.03.2021 | ||
HR | 17.03.2021 | ||
LT | 17.03.2021 | ||
LV | 17.03.2021 | ||
MC | 17.03.2021 | ||
RO | 17.03.2021 | ||
RS | 17.03.2021 | ||
SI | 17.03.2021 | ||
SM | 17.03.2021 | ||
BG | 17.06.2021 | ||
GR | 18.06.2021 | ||
LU | 30.06.2021 | ||
Former [2022/13] | AL | 17.03.2021 | |
EE | 17.03.2021 | ||
HR | 17.03.2021 | ||
LT | 17.03.2021 | ||
LV | 17.03.2021 | ||
MC | 17.03.2021 | ||
RO | 17.03.2021 | ||
RS | 17.03.2021 | ||
SI | 17.03.2021 | ||
SM | 17.03.2021 | ||
BG | 17.06.2021 | ||
GR | 18.06.2021 | ||
Former [2022/10] | AL | 17.03.2021 | |
EE | 17.03.2021 | ||
HR | 17.03.2021 | ||
LT | 17.03.2021 | ||
LV | 17.03.2021 | ||
MC | 17.03.2021 | ||
RO | 17.03.2021 | ||
RS | 17.03.2021 | ||
SM | 17.03.2021 | ||
BG | 17.06.2021 | ||
GR | 18.06.2021 | ||
Former [2022/07] | AL | 17.03.2021 | |
EE | 17.03.2021 | ||
HR | 17.03.2021 | ||
LT | 17.03.2021 | ||
LV | 17.03.2021 | ||
MC | 17.03.2021 | ||
RO | 17.03.2021 | ||
RS | 17.03.2021 | ||
SM | 17.03.2021 | ||
BG | 17.06.2021 | ||
GR | 18.06.2021 | ||
IS | 17.07.2021 | ||
Former [2021/51] | EE | 17.03.2021 | |
HR | 17.03.2021 | ||
LT | 17.03.2021 | ||
LV | 17.03.2021 | ||
RO | 17.03.2021 | ||
RS | 17.03.2021 | ||
SM | 17.03.2021 | ||
BG | 17.06.2021 | ||
GR | 18.06.2021 | ||
IS | 17.07.2021 | ||
Former [2021/50] | EE | 17.03.2021 | |
HR | 17.03.2021 | ||
LT | 17.03.2021 | ||
LV | 17.03.2021 | ||
RO | 17.03.2021 | ||
RS | 17.03.2021 | ||
SM | 17.03.2021 | ||
BG | 17.06.2021 | ||
GR | 18.06.2021 | ||
Former [2021/48] | EE | 17.03.2021 | |
HR | 17.03.2021 | ||
LT | 17.03.2021 | ||
LV | 17.03.2021 | ||
RS | 17.03.2021 | ||
SM | 17.03.2021 | ||
BG | 17.06.2021 | ||
GR | 18.06.2021 | ||
Former [2021/46] | HR | 17.03.2021 | |
LT | 17.03.2021 | ||
LV | 17.03.2021 | ||
RS | 17.03.2021 | ||
SM | 17.03.2021 | ||
BG | 17.06.2021 | ||
GR | 18.06.2021 | ||
Former [2021/37] | HR | 17.03.2021 | |
LV | 17.03.2021 | ||
RS | 17.03.2021 | ||
BG | 17.06.2021 | ||
GR | 18.06.2021 | ||
Former [2021/36] | HR | 17.03.2021 | |
BG | 17.06.2021 | ||
GR | 18.06.2021 | ||
Former [2021/35] | HR | 17.03.2021 | Documents cited: | Search | [ ] - No further relevant documents disclosed | International search | [XY]US7093864 (WASMUTH ERNST A [DE]) [X] 1-20 * See column 2, line 19 - column 6, line 55; claims 13-19; and figures 1-2. * [Y] 21-28; | [A]US2008012309 (BLIVET PHILIPPE [FR], et al) [A] 1-28 * See paragraphs [0029]-[0056]; and figures 1-3. *; | [A]WO2008007230 (MEZZALIRA RINALDO [IT]) [A] 1-28* See page 10, line 20 - page 12, line 4; and figures 1-4. *; | [Y]US2011163536 (SINDELAR MARK JOHN [US]) [Y] 21-28 * See paragraph [0029]; claim 1; and figures 3-8. *; | [Y]US2013180728 (HUGGHINS JOEL FRANKLIN [US]) [Y] 25-28 * See paragraph [0054]; claims 1-2; and figures 3, 16. * |