EP3555968 - MULTIPLE PIECE CONTACT FOR AN ELECTRICAL CONNECTOR [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 22.12.2023 Database last updated on 19.10.2024 | |
Former | The patent has been granted Status updated on 13.01.2023 | ||
Former | Grant of patent is intended Status updated on 04.09.2022 | ||
Former | Examination is in progress Status updated on 25.02.2021 | ||
Former | Request for examination was made Status updated on 20.09.2019 | ||
Former | The international publication has been made Status updated on 23.06.2018 | ||
Former | unknown Status updated on 12.01.2018 | Most recent event Tooltip | 30.08.2024 | Lapse of the patent in a contracting state New state(s): MC | published on 02.10.2024 [2024/40] | Applicant(s) | For all designated states Carlisle Interconnect Technologies, Inc. 100 Tensolite Drive Saint Augustine, FL 32092 / US | [2019/43] | Inventor(s) | 01 /
BIANCA, Giuseppe 12751 Millennium Drive Unit 211 Playa Vista, CA 90034 / US | 02 /
FOSHANSKY, Leonid 11965 Meriden Lane San Diego, CA 92128 / US | [2019/43] | Representative(s) | Findlay, Alice Rosemary Reddie & Grose LLP The White Chapel Building 10 Whitechapel High Street London E1 8QS / GB | [2019/43] | Application number, filing date | 17822943.1 | 12.12.2017 | [2019/43] | WO2017US65770 | Priority number, date | US201615376891 | 13.12.2016 Original published format: US201615376891 | [2019/43] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2018111848 | Date: | 21.06.2018 | Language: | EN | [2018/25] | Type: | A1 Application with search report | No.: | EP3555968 | Date: | 23.10.2019 | Language: | EN | The application published by WIPO in one of the EPO official languages on 21.06.2018 takes the place of the publication of the European patent application. | [2019/43] | Type: | B1 Patent specification | No.: | EP3555968 | Date: | 15.02.2023 | Language: | EN | [2023/07] | Search report(s) | International search report - published on: | EP | 21.06.2018 | Classification | IPC: | H01R13/187, H01R13/11, H01R13/20 | [2019/43] | CPC: |
H01R13/111 (EP,US);
H01R13/187 (EP,CN,US);
H01R13/11 (CN);
H01R13/20 (EP,CN,US)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2019/43] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | MD | Not yet paid | TN | Not yet paid | Title | German: | MEHRTEILIGER KONTAKT FÜR EINEN ELEKTRISCHEN VERBINDER | [2019/43] | English: | MULTIPLE PIECE CONTACT FOR AN ELECTRICAL CONNECTOR | [2019/43] | French: | CONTACT À PIÈCES MULTIPLES POUR UN CONNECTEUR ÉLECTRIQUE | [2019/43] | Entry into regional phase | 24.06.2019 | National basic fee paid | 24.06.2019 | Designation fee(s) paid | 24.06.2019 | Examination fee paid | Examination procedure | 24.06.2019 | Examination requested [2019/43] | 24.06.2019 | Date on which the examining division has become responsible | 17.01.2020 | Amendment by applicant (claims and/or description) | 24.02.2021 | Despatch of a communication from the examining division (Time limit: M06) | 13.08.2021 | Reply to a communication from the examining division | 05.09.2022 | Communication of intention to grant the patent | 05.01.2023 | Fee for grant paid | 05.01.2023 | Fee for publishing/printing paid | 05.01.2023 | Receipt of the translation of the claim(s) | Opposition(s) | 16.11.2023 | No opposition filed within time limit [2024/04] | Fees paid | Renewal fee | 10.12.2019 | Renewal fee patent year 03 | 09.12.2020 | Renewal fee patent year 04 | 16.12.2021 | Renewal fee patent year 05 | 09.12.2022 | Renewal fee patent year 06 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | AT | 15.02.2023 | CZ | 15.02.2023 | DK | 15.02.2023 | EE | 15.02.2023 | FI | 15.02.2023 | HR | 15.02.2023 | IT | 15.02.2023 | LT | 15.02.2023 | LV | 15.02.2023 | MC | 15.02.2023 | NL | 15.02.2023 | PL | 15.02.2023 | RO | 15.02.2023 | RS | 15.02.2023 | SE | 15.02.2023 | SI | 15.02.2023 | SK | 15.02.2023 | SM | 15.02.2023 | NO | 15.05.2023 | GR | 16.05.2023 | IS | 15.06.2023 | PT | 15.06.2023 | [2024/40] |
Former [2024/26] | AT | 15.02.2023 | |
CZ | 15.02.2023 | ||
DK | 15.02.2023 | ||
EE | 15.02.2023 | ||
FI | 15.02.2023 | ||
HR | 15.02.2023 | ||
IT | 15.02.2023 | ||
LT | 15.02.2023 | ||
LV | 15.02.2023 | ||
NL | 15.02.2023 | ||
PL | 15.02.2023 | ||
RO | 15.02.2023 | ||
RS | 15.02.2023 | ||
SE | 15.02.2023 | ||
SI | 15.02.2023 | ||
SK | 15.02.2023 | ||
SM | 15.02.2023 | ||
NO | 15.05.2023 | ||
GR | 16.05.2023 | ||
IS | 15.06.2023 | ||
PT | 15.06.2023 | ||
Former [2024/11] | AT | 15.02.2023 | |
CZ | 15.02.2023 | ||
DK | 15.02.2023 | ||
EE | 15.02.2023 | ||
FI | 15.02.2023 | ||
HR | 15.02.2023 | ||
LT | 15.02.2023 | ||
LV | 15.02.2023 | ||
NL | 15.02.2023 | ||
PL | 15.02.2023 | ||
RO | 15.02.2023 | ||
RS | 15.02.2023 | ||
SE | 15.02.2023 | ||
SI | 15.02.2023 | ||
SK | 15.02.2023 | ||
SM | 15.02.2023 | ||
NO | 15.05.2023 | ||
GR | 16.05.2023 | ||
IS | 15.06.2023 | ||
PT | 15.06.2023 | ||
Former [2023/50] | AT | 15.02.2023 | |
CZ | 15.02.2023 | ||
DK | 15.02.2023 | ||
EE | 15.02.2023 | ||
FI | 15.02.2023 | ||
HR | 15.02.2023 | ||
LT | 15.02.2023 | ||
LV | 15.02.2023 | ||
NL | 15.02.2023 | ||
PL | 15.02.2023 | ||
RO | 15.02.2023 | ||
RS | 15.02.2023 | ||
SE | 15.02.2023 | ||
SK | 15.02.2023 | ||
SM | 15.02.2023 | ||
NO | 15.05.2023 | ||
GR | 16.05.2023 | ||
IS | 15.06.2023 | ||
PT | 15.06.2023 | ||
Former [2023/49] | AT | 15.02.2023 | |
CZ | 15.02.2023 | ||
DK | 15.02.2023 | ||
EE | 15.02.2023 | ||
FI | 15.02.2023 | ||
HR | 15.02.2023 | ||
LT | 15.02.2023 | ||
LV | 15.02.2023 | ||
NL | 15.02.2023 | ||
PL | 15.02.2023 | ||
RO | 15.02.2023 | ||
RS | 15.02.2023 | ||
SE | 15.02.2023 | ||
SM | 15.02.2023 | ||
NO | 15.05.2023 | ||
GR | 16.05.2023 | ||
IS | 15.06.2023 | ||
PT | 15.06.2023 | ||
Former [2023/48] | AT | 15.02.2023 | |
DK | 15.02.2023 | ||
EE | 15.02.2023 | ||
FI | 15.02.2023 | ||
HR | 15.02.2023 | ||
LT | 15.02.2023 | ||
LV | 15.02.2023 | ||
NL | 15.02.2023 | ||
PL | 15.02.2023 | ||
RS | 15.02.2023 | ||
SE | 15.02.2023 | ||
SM | 15.02.2023 | ||
NO | 15.05.2023 | ||
GR | 16.05.2023 | ||
IS | 15.06.2023 | ||
PT | 15.06.2023 | ||
Former [2023/46] | AT | 15.02.2023 | |
DK | 15.02.2023 | ||
FI | 15.02.2023 | ||
HR | 15.02.2023 | ||
LT | 15.02.2023 | ||
LV | 15.02.2023 | ||
NL | 15.02.2023 | ||
PL | 15.02.2023 | ||
RS | 15.02.2023 | ||
SE | 15.02.2023 | ||
SM | 15.02.2023 | ||
NO | 15.05.2023 | ||
GR | 16.05.2023 | ||
IS | 15.06.2023 | ||
PT | 15.06.2023 | ||
Former [2023/39] | AT | 15.02.2023 | |
FI | 15.02.2023 | ||
HR | 15.02.2023 | ||
LT | 15.02.2023 | ||
LV | 15.02.2023 | ||
NL | 15.02.2023 | ||
PL | 15.02.2023 | ||
RS | 15.02.2023 | ||
SE | 15.02.2023 | ||
NO | 15.05.2023 | ||
GR | 16.05.2023 | ||
IS | 15.06.2023 | ||
PT | 15.06.2023 | ||
Former [2023/38] | AT | 15.02.2023 | |
FI | 15.02.2023 | ||
HR | 15.02.2023 | ||
LT | 15.02.2023 | ||
LV | 15.02.2023 | ||
NL | 15.02.2023 | ||
PL | 15.02.2023 | ||
RS | 15.02.2023 | ||
SE | 15.02.2023 | ||
NO | 15.05.2023 | ||
GR | 16.05.2023 | ||
PT | 15.06.2023 | ||
Former [2023/37] | AT | 15.02.2023 | |
FI | 15.02.2023 | ||
HR | 15.02.2023 | ||
LT | 15.02.2023 | ||
LV | 15.02.2023 | ||
NL | 15.02.2023 | ||
RS | 15.02.2023 | ||
SE | 15.02.2023 | ||
NO | 15.05.2023 | ||
GR | 16.05.2023 | ||
PT | 15.06.2023 | ||
Former [2023/36] | AT | 15.02.2023 | |
FI | 15.02.2023 | ||
HR | 15.02.2023 | ||
LT | 15.02.2023 | ||
LV | 15.02.2023 | ||
NL | 15.02.2023 | ||
RS | 15.02.2023 | ||
SE | 15.02.2023 | ||
NO | 15.05.2023 | ||
PT | 15.06.2023 | ||
Former [2023/35] | AT | 15.02.2023 | |
HR | 15.02.2023 | ||
LT | 15.02.2023 | ||
NL | 15.02.2023 | ||
RS | 15.02.2023 | ||
NO | 15.05.2023 | ||
PT | 15.06.2023 | ||
Former [2023/34] | LT | 15.02.2023 | |
RS | 15.02.2023 | ||
PT | 15.06.2023 | ||
Former [2023/33] | LT | 15.02.2023 | Cited in | International search | [YA]US4734064 (KNAPP ANTHONY W [US], et al) [Y] 8,15,19 * figure 7 *[A] 1-7,9-14,16-18,20; | [XYI]US4780097 (PISCITELLI R AMELIA [US]) [X] 1,2,5,6,9-13,16-18,20 * figures 1,2,3,5,6,7 * * column 3, line 20 - column 3, line 30 * [Y] 8,15,19 [I] 3,4; | [A]US6475039 (DESPOUYS PAUL JEAN-BERNARD [FR]) [A] 1-20 * figure 1 *; | [I]US2014017960 (FRIEDHOF JAMES P [US], et al) [I] 1-20 * figures 1,2,5,6 * * paragraph [0025] - paragraph [0030] * | by applicant | US6250974 | US8851974 |