EP3481360 - FLUID FLOW SENSING [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 13.01.2023 Database last updated on 12.07.2024 | |
Former | The patent has been granted Status updated on 04.02.2022 | ||
Former | Grant of patent is intended Status updated on 07.10.2021 | ||
Former | Examination is in progress Status updated on 18.06.2021 | ||
Former | Request for examination was made Status updated on 12.04.2019 | ||
Former | The international publication has been made Status updated on 12.01.2018 | Most recent event Tooltip | 03.05.2024 | Lapse of the patent in a contracting state New state(s): MK | published on 05.06.2024 [2024/23] | Applicant(s) | For all designated states ConvaTec Technologies Inc. 3993 Howard Hughes Parkway Suite 250 Las Vegas, NV 89169 / US | [2022/10] |
Former [2019/20] | For all designated states ConvaTec Technologies Inc. 3993 Howard Hughes Parkway Suite 250 Las Vegas, NV 89169 / US | Inventor(s) | 01 /
SELBY, Robert Gordon Maurice Melbourn Science Park Melbourn Royston Hertfordshire SG8 6EE / GB | 02 /
PERDIGO-OLIVERAS, Arnau Melbourn Science Park Melbourn Royston Hertfordshire SG8 6EE / GB | 03 /
VAN DEN BERGH, Roderick Marcus Melbourn Science Park Melbourn Royston Hertfordshire SG8 6EE / GB | [2019/20] | Representative(s) | Wilson Gunn Blackfriars House The Parsonage 5th Floor Manchester M3 2JA / GB | [2022/10] |
Former [2019/20] | Johnson, Stephen William, et al Venner Shipley LLP Byron House Cambridge Business Park Cowley Road Cambridge CB4 0WZ / GB | Application number, filing date | 17825035.3 | 07.07.2017 | [2019/20] | WO2017US41216 | Priority number, date | US201662360248P | 08.07.2016 Original published format: US 201662360248 P | [2019/20] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2018009879 | Date: | 11.01.2018 | Language: | EN | [2018/02] | Type: | A1 Application with search report | No.: | EP3481360 | Date: | 15.05.2019 | Language: | EN | The application published by WIPO in one of the EPO official languages on 11.01.2018 takes the place of the publication of the European patent application. | [2019/20] | Type: | B1 Patent specification | No.: | EP3481360 | Date: | 09.03.2022 | Language: | EN | [2022/10] | Search report(s) | International search report - published on: | US | 11.01.2018 | (Supplementary) European search report - dispatched on: | EP | 27.01.2020 | Classification | IPC: | A61M1/00 | [2021/43] | CPC: |
A61M1/88 (EP,KR,US);
A61M1/73 (EP,KR,US);
A61F13/05 (KR);
A61M1/60 (EP,KR,US);
A61M1/734 (KR,US);
A61M1/96 (EP,US);
A61M1/962 (KR);
A61M1/98 (EP,US);
A61M1/982 (EP,KR,US);
A61M27/00 (KR,US);
A61F2013/0094 (KR);
A61F2013/00957 (KR);
A61M2205/3306 (EP,KR,US);
A61M2205/3317 (EP,KR,US);
A61M2205/3334 (EP,KR,US);
|
Former IPC [2019/20] | A61J1/00, A61M1/00, A61M27/00 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2019/20] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | MD | Not yet paid | Title | German: | FLÜSSIGKEITSDURCHFLUSSMESSUNG | [2019/20] | English: | FLUID FLOW SENSING | [2019/20] | French: | DÉTECTEUR DE L'ÉCOULEMENT D'UN LIQUIDE. | [2019/20] | Entry into regional phase | 21.01.2019 | National basic fee paid | 21.01.2019 | Search fee paid | 21.01.2019 | Designation fee(s) paid | 21.01.2019 | Examination fee paid | Examination procedure | 21.01.2019 | Examination requested [2019/20] | 07.08.2020 | Amendment by applicant (claims and/or description) | 17.06.2021 | Despatch of a communication from the examining division (Time limit: M04) | 02.09.2021 | Reply to a communication from the examining division | 08.10.2021 | Communication of intention to grant the patent | 01.02.2022 | Fee for grant paid | 01.02.2022 | Fee for publishing/printing paid | 01.02.2022 | Receipt of the translation of the claim(s) | Opposition(s) | 12.12.2022 | No opposition filed within time limit [2023/07] | Fees paid | Renewal fee | 15.07.2019 | Renewal fee patent year 03 | 14.07.2020 | Renewal fee patent year 04 | 03.09.2021 | Renewal fee patent year 05 | Penalty fee | Additional fee for renewal fee | 31.07.2021 | 05   M06   Fee paid on   03.09.2021 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 07.07.2017 | AL | 09.03.2022 | AT | 09.03.2022 | CY | 09.03.2022 | CZ | 09.03.2022 | EE | 09.03.2022 | FI | 09.03.2022 | HR | 09.03.2022 | LT | 09.03.2022 | LV | 09.03.2022 | MC | 09.03.2022 | MK | 09.03.2022 | RO | 09.03.2022 | RS | 09.03.2022 | SE | 09.03.2022 | SI | 09.03.2022 | SK | 09.03.2022 | SM | 09.03.2022 | BG | 09.06.2022 | NO | 09.06.2022 | GR | 10.06.2022 | LU | 07.07.2022 | IS | 09.07.2022 | PT | 11.07.2022 | BE | 31.07.2022 | CH | 31.07.2022 | LI | 31.07.2022 | [2024/23] |
Former [2024/20] | HU | 07.07.2017 | |
AL | 09.03.2022 | ||
AT | 09.03.2022 | ||
CY | 09.03.2022 | ||
CZ | 09.03.2022 | ||
EE | 09.03.2022 | ||
FI | 09.03.2022 | ||
HR | 09.03.2022 | ||
LT | 09.03.2022 | ||
LV | 09.03.2022 | ||
MC | 09.03.2022 | ||
RO | 09.03.2022 | ||
RS | 09.03.2022 | ||
SE | 09.03.2022 | ||
SI | 09.03.2022 | ||
SK | 09.03.2022 | ||
SM | 09.03.2022 | ||
BG | 09.06.2022 | ||
NO | 09.06.2022 | ||
GR | 10.06.2022 | ||
LU | 07.07.2022 | ||
IS | 09.07.2022 | ||
PT | 11.07.2022 | ||
BE | 31.07.2022 | ||
CH | 31.07.2022 | ||
LI | 31.07.2022 | ||
Former [2024/18] | HU | 07.07.2017 | |
AL | 09.03.2022 | ||
AT | 09.03.2022 | ||
CZ | 09.03.2022 | ||
EE | 09.03.2022 | ||
FI | 09.03.2022 | ||
HR | 09.03.2022 | ||
LT | 09.03.2022 | ||
LV | 09.03.2022 | ||
MC | 09.03.2022 | ||
RO | 09.03.2022 | ||
RS | 09.03.2022 | ||
SE | 09.03.2022 | ||
SI | 09.03.2022 | ||
SK | 09.03.2022 | ||
SM | 09.03.2022 | ||
BG | 09.06.2022 | ||
NO | 09.06.2022 | ||
GR | 10.06.2022 | ||
LU | 07.07.2022 | ||
IS | 09.07.2022 | ||
PT | 11.07.2022 | ||
BE | 31.07.2022 | ||
CH | 31.07.2022 | ||
LI | 31.07.2022 | ||
Former [2023/25] | AL | 09.03.2022 | |
AT | 09.03.2022 | ||
CZ | 09.03.2022 | ||
EE | 09.03.2022 | ||
FI | 09.03.2022 | ||
HR | 09.03.2022 | ||
LT | 09.03.2022 | ||
LV | 09.03.2022 | ||
MC | 09.03.2022 | ||
RO | 09.03.2022 | ||
RS | 09.03.2022 | ||
SE | 09.03.2022 | ||
SI | 09.03.2022 | ||
SK | 09.03.2022 | ||
SM | 09.03.2022 | ||
BG | 09.06.2022 | ||
NO | 09.06.2022 | ||
GR | 10.06.2022 | ||
LU | 07.07.2022 | ||
IS | 09.07.2022 | ||
PT | 11.07.2022 | ||
BE | 31.07.2022 | ||
CH | 31.07.2022 | ||
LI | 31.07.2022 | ||
Former [2023/21] | AL | 09.03.2022 | |
AT | 09.03.2022 | ||
CZ | 09.03.2022 | ||
EE | 09.03.2022 | ||
FI | 09.03.2022 | ||
HR | 09.03.2022 | ||
LT | 09.03.2022 | ||
LV | 09.03.2022 | ||
MC | 09.03.2022 | ||
RO | 09.03.2022 | ||
RS | 09.03.2022 | ||
SE | 09.03.2022 | ||
SI | 09.03.2022 | ||
SK | 09.03.2022 | ||
SM | 09.03.2022 | ||
BG | 09.06.2022 | ||
NO | 09.06.2022 | ||
GR | 10.06.2022 | ||
LU | 07.07.2022 | ||
IS | 09.07.2022 | ||
PT | 11.07.2022 | ||
CH | 31.07.2022 | ||
LI | 31.07.2022 | ||
Former [2023/11] | AL | 09.03.2022 | |
AT | 09.03.2022 | ||
CZ | 09.03.2022 | ||
EE | 09.03.2022 | ||
FI | 09.03.2022 | ||
HR | 09.03.2022 | ||
LT | 09.03.2022 | ||
LV | 09.03.2022 | ||
MC | 09.03.2022 | ||
RO | 09.03.2022 | ||
RS | 09.03.2022 | ||
SE | 09.03.2022 | ||
SI | 09.03.2022 | ||
SK | 09.03.2022 | ||
SM | 09.03.2022 | ||
BG | 09.06.2022 | ||
NO | 09.06.2022 | ||
GR | 10.06.2022 | ||
IS | 09.07.2022 | ||
PT | 11.07.2022 | ||
Former [2023/10] | AL | 09.03.2022 | |
AT | 09.03.2022 | ||
CZ | 09.03.2022 | ||
EE | 09.03.2022 | ||
FI | 09.03.2022 | ||
HR | 09.03.2022 | ||
LT | 09.03.2022 | ||
LV | 09.03.2022 | ||
RO | 09.03.2022 | ||
RS | 09.03.2022 | ||
SE | 09.03.2022 | ||
SI | 09.03.2022 | ||
SK | 09.03.2022 | ||
SM | 09.03.2022 | ||
BG | 09.06.2022 | ||
NO | 09.06.2022 | ||
GR | 10.06.2022 | ||
IS | 09.07.2022 | ||
PT | 11.07.2022 | ||
Former [2023/01] | AL | 09.03.2022 | |
AT | 09.03.2022 | ||
CZ | 09.03.2022 | ||
EE | 09.03.2022 | ||
FI | 09.03.2022 | ||
HR | 09.03.2022 | ||
LT | 09.03.2022 | ||
LV | 09.03.2022 | ||
RO | 09.03.2022 | ||
RS | 09.03.2022 | ||
SE | 09.03.2022 | ||
SK | 09.03.2022 | ||
SM | 09.03.2022 | ||
BG | 09.06.2022 | ||
NO | 09.06.2022 | ||
GR | 10.06.2022 | ||
IS | 09.07.2022 | ||
PT | 11.07.2022 | ||
Former [2022/51] | AT | 09.03.2022 | |
CZ | 09.03.2022 | ||
EE | 09.03.2022 | ||
FI | 09.03.2022 | ||
HR | 09.03.2022 | ||
LT | 09.03.2022 | ||
LV | 09.03.2022 | ||
RO | 09.03.2022 | ||
RS | 09.03.2022 | ||
SE | 09.03.2022 | ||
SK | 09.03.2022 | ||
SM | 09.03.2022 | ||
BG | 09.06.2022 | ||
NO | 09.06.2022 | ||
GR | 10.06.2022 | ||
IS | 09.07.2022 | ||
PT | 11.07.2022 | ||
Former [2022/49] | AT | 09.03.2022 | |
CZ | 09.03.2022 | ||
EE | 09.03.2022 | ||
FI | 09.03.2022 | ||
HR | 09.03.2022 | ||
LT | 09.03.2022 | ||
LV | 09.03.2022 | ||
RO | 09.03.2022 | ||
RS | 09.03.2022 | ||
SE | 09.03.2022 | ||
SK | 09.03.2022 | ||
SM | 09.03.2022 | ||
BG | 09.06.2022 | ||
NO | 09.06.2022 | ||
GR | 10.06.2022 | ||
PT | 11.07.2022 | ||
Former [2022/48] | AT | 09.03.2022 | |
CZ | 09.03.2022 | ||
EE | 09.03.2022 | ||
FI | 09.03.2022 | ||
HR | 09.03.2022 | ||
LT | 09.03.2022 | ||
LV | 09.03.2022 | ||
RO | 09.03.2022 | ||
RS | 09.03.2022 | ||
SE | 09.03.2022 | ||
SM | 09.03.2022 | ||
BG | 09.06.2022 | ||
NO | 09.06.2022 | ||
GR | 10.06.2022 | ||
PT | 11.07.2022 | ||
Former [2022/47] | AT | 09.03.2022 | |
FI | 09.03.2022 | ||
HR | 09.03.2022 | ||
LT | 09.03.2022 | ||
LV | 09.03.2022 | ||
RO | 09.03.2022 | ||
RS | 09.03.2022 | ||
SE | 09.03.2022 | ||
SM | 09.03.2022 | ||
BG | 09.06.2022 | ||
NO | 09.06.2022 | ||
GR | 10.06.2022 | ||
PT | 11.07.2022 | ||
Former [2022/39] | FI | 09.03.2022 | |
HR | 09.03.2022 | ||
LT | 09.03.2022 | ||
LV | 09.03.2022 | ||
RS | 09.03.2022 | ||
SE | 09.03.2022 | ||
BG | 09.06.2022 | ||
NO | 09.06.2022 | ||
GR | 10.06.2022 | ||
Former [2022/36] | HR | 09.03.2022 | |
LT | 09.03.2022 | ||
LV | 09.03.2022 | ||
RS | 09.03.2022 | ||
SE | 09.03.2022 | ||
BG | 09.06.2022 | ||
NO | 09.06.2022 | ||
GR | 10.06.2022 | ||
Former [2022/35] | HR | 09.03.2022 | |
LT | 09.03.2022 | ||
RS | 09.03.2022 | ||
SE | 09.03.2022 | ||
BG | 09.06.2022 | ||
NO | 09.06.2022 | ||
Former [2022/33] | LT | 09.03.2022 | |
NO | 09.06.2022 | Documents cited: | Search | [X]US2006015019 (WATT PAUL W [GB], et al) [X] 1,2* figure 1 *; | [X]EP1905465 (TYCO HEALTHCARE [US]) [X] 1,7,9,11-13,15 * paragraphs [0019] , [0020] , [0038]; figure 8 * | International search | [A]US6695823 (LINA CESAR Z [US], et al) [A] 1-4, 47-49, 91-96 * entire document *; | [X]US2012100538 (MIKOLAJCZYK STEPHEN D [US], et al) [X] 1-4 * entire document *; | [A]US8308714 (WESTON RICHARD SCOTT [US], et al) [A] 1-4, 47-49, 91-96* entire document *; | [A]US8814840 (EVANS JOHN JAMES HENRY [GB], et al) [A] 1-4, 47-49, 91-96 * entire document * | Examination | US2010100075 | EP1905465 | by applicant | EP0905465 | US2006015019 | US20110623602 |