| EP3554794 - PREHEATING OF MATERIAL IN AN ADDITIVE MANUFACTURING APPARATUS [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 03.03.2023 Database last updated on 28.03.2026 | |
| Former | The patent has been granted Status updated on 25.03.2022 | ||
| Former | Grant of patent is intended Status updated on 06.02.2022 | ||
| Former | Examination is in progress Status updated on 30.06.2020 | ||
| Former | Request for examination was made Status updated on 20.09.2019 | ||
| Former | The international publication has been made Status updated on 23.06.2018 | ||
| Former | unknown Status updated on 19.01.2018 | Most recent event Tooltip | 15.11.2024 | Change - lapse in a contracting state Updated state(s): BG | published on 18.12.2024 [2024/51] | Applicant(s) | For all designated states CSIR Scientia 0002 Pretoria / ZA | For all designated states Aerosud Innovation Centre (Pty) Ltd 520 van Ryneveld Avenue Pierre van Ryneveld 0045 Centurion / ZA | [2019/43] | Inventor(s) | 01 /
VERMEULEN, Marius 85 Hardekool Avenue Val de Grace 0184 Pretoria / ZA | 02 /
PREUSSLER, Dieter, Rainer 522 Farm Road Die Wilgers 0041 Pretoria / ZA | [2019/43] | Representative(s) | Greif, Thomas Thul Patentanwaltsgesellschaft mbH Derendorfer Allee 6 40476 Düsseldorf / DE | [N/P] |
| Former [2019/43] | Greif, Thomas Thul Patentanwaltsgesellschaft mbH Rheinmetall Platz 1 40476 Düsseldorf / DE | Application number, filing date | 17826299.4 | 15.12.2017 | [2019/43] | WO2017IB57992 | Priority number, date | ZA20160008320 | 18.12.2016 Original published format: ZA 201608320 | ZA20160008321 | 18.12.2016 Original published format: ZA 201608321 | [2019/43] | Filing language | EN | Procedural language | EN | Publication | Type: | A2 Application without search report | No.: | WO2018109735 | Date: | 21.06.2018 | Language: | EN | [2018/25] | Type: | A2 Application without search report | No.: | EP3554794 | Date: | 23.10.2019 | Language: | EN | The application published by WIPO in one of the EPO official languages on 21.06.2018 takes the place of the publication of the European patent application. | [2019/43] | Type: | B1 Patent specification | No.: | EP3554794 | Date: | 27.04.2022 | Language: | EN | [2022/17] | Search report(s) | International search report - published on: | EP | 25.10.2018 | Classification | IPC: | B29C64/153, B29C64/364, B29C64/295, B33Y30/00, B22F12/00 | [2022/01] | CPC: |
B29C64/153 (EP,US);
B29C64/209 (US);
B29C64/232 (US);
B29C64/236 (US);
B29C64/245 (US);
B29C64/264 (US);
B29C64/295 (EP,US);
B29C64/314 (US);
B29C64/364 (EP);
B33Y30/00 (EP,US);
B22F12/13 (EP,US);
B22F12/224 (EP,US);
B22F12/49 (EP,US);
B22F12/90 (EP,US);
B33Y10/00 (US);
|
| Former IPC [2019/43] | B29C64/153, B29C64/364, B29C64/295 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2019/43] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | MD | Not yet paid | TN | Not yet paid | Title | German: | VORWÄRMUNG VON MATERIAL IN EINER VORRICHTUNG ZUR GENERATIVEN FERTIGUNG | [2019/43] | English: | PREHEATING OF MATERIAL IN AN ADDITIVE MANUFACTURING APPARATUS | [2019/43] | French: | PRÉCHAUFFAGE DE MATÉRIAU DANS UN APPAREIL DE FABRICATION ADDITIVE | [2019/43] | Entry into regional phase | 11.07.2019 | National basic fee paid | 11.07.2019 | Designation fee(s) paid | 11.07.2019 | Examination fee paid | Examination procedure | 23.11.2018 | Request for preliminary examination filed International Preliminary Examining Authority: EP | 11.07.2019 | Amendment by applicant (claims and/or description) | 11.07.2019 | Examination requested [2019/43] | 11.07.2019 | Date on which the examining division has become responsible | 03.07.2020 | Despatch of a communication from the examining division (Time limit: M04) | 07.09.2020 | Reply to a communication from the examining division | 22.04.2021 | Cancellation of oral proceeding that was planned for 19.05.2021 | 06.05.2021 | Despatch of a communication from the examining division (Time limit: M04) | 19.05.2021 | Date of oral proceedings (cancelled) | 02.09.2021 | Reply to a communication from the examining division | 07.02.2022 | Communication of intention to grant the patent | 22.03.2022 | Fee for grant paid | 22.03.2022 | Fee for publishing/printing paid | 22.03.2022 | Receipt of the translation of the claim(s) | Opposition(s) | 30.01.2023 | No opposition filed within time limit [2023/14] | Fees paid | Renewal fee | 11.07.2019 | Renewal fee patent year 03 | 14.12.2020 | Renewal fee patent year 04 | 10.11.2021 | Renewal fee patent year 05 |
| Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
| Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 15.12.2017 | AL | 27.04.2022 | AT | 27.04.2022 | BG | 27.04.2022 | CY | 27.04.2022 | CZ | 27.04.2022 | DK | 27.04.2022 | EE | 27.04.2022 | ES | 27.04.2022 | FI | 27.04.2022 | HR | 27.04.2022 | LT | 27.04.2022 | LV | 27.04.2022 | MC | 27.04.2022 | MK | 27.04.2022 | MT | 27.04.2022 | NL | 27.04.2022 | PL | 27.04.2022 | RO | 27.04.2022 | RS | 27.04.2022 | SI | 27.04.2022 | SK | 27.04.2022 | SM | 27.04.2022 | TR | 27.04.2022 | NO | 27.07.2022 | GR | 28.07.2022 | IS | 27.08.2022 | PT | 29.08.2022 | IE | 15.12.2022 | LU | 15.12.2022 | CH | 31.12.2022 | LI | 31.12.2022 | [2024/51] |
| Former [2024/42] | HU | 15.12.2017 | |
| AL | 27.04.2022 | ||
| AT | 27.04.2022 | ||
| CY | 27.04.2022 | ||
| CZ | 27.04.2022 | ||
| DK | 27.04.2022 | ||
| EE | 27.04.2022 | ||
| ES | 27.04.2022 | ||
| FI | 27.04.2022 | ||
| HR | 27.04.2022 | ||
| LT | 27.04.2022 | ||
| LV | 27.04.2022 | ||
| MC | 27.04.2022 | ||
| MK | 27.04.2022 | ||
| MT | 27.04.2022 | ||
| NL | 27.04.2022 | ||
| PL | 27.04.2022 | ||
| RO | 27.04.2022 | ||
| RS | 27.04.2022 | ||
| SI | 27.04.2022 | ||
| SK | 27.04.2022 | ||
| SM | 27.04.2022 | ||
| TR | 27.04.2022 | ||
| BG | 27.07.2022 | ||
| NO | 27.07.2022 | ||
| GR | 28.07.2022 | ||
| IS | 27.08.2022 | ||
| PT | 29.08.2022 | ||
| IE | 15.12.2022 | ||
| LU | 15.12.2022 | ||
| CH | 31.12.2022 | ||
| LI | 31.12.2022 | ||
| Former [2024/29] | HU | 15.12.2017 | |
| AL | 27.04.2022 | ||
| AT | 27.04.2022 | ||
| CY | 27.04.2022 | ||
| CZ | 27.04.2022 | ||
| DK | 27.04.2022 | ||
| EE | 27.04.2022 | ||
| ES | 27.04.2022 | ||
| FI | 27.04.2022 | ||
| HR | 27.04.2022 | ||
| LT | 27.04.2022 | ||
| LV | 27.04.2022 | ||
| MC | 27.04.2022 | ||
| MK | 27.04.2022 | ||
| NL | 27.04.2022 | ||
| PL | 27.04.2022 | ||
| RO | 27.04.2022 | ||
| RS | 27.04.2022 | ||
| SI | 27.04.2022 | ||
| SK | 27.04.2022 | ||
| SM | 27.04.2022 | ||
| TR | 27.04.2022 | ||
| BG | 27.07.2022 | ||
| NO | 27.07.2022 | ||
| GR | 28.07.2022 | ||
| IS | 27.08.2022 | ||
| PT | 29.08.2022 | ||
| IE | 15.12.2022 | ||
| LU | 15.12.2022 | ||
| CH | 31.12.2022 | ||
| LI | 31.12.2022 | ||
| Former [2024/27] | HU | 15.12.2017 | |
| AL | 27.04.2022 | ||
| AT | 27.04.2022 | ||
| CY | 27.04.2022 | ||
| CZ | 27.04.2022 | ||
| DK | 27.04.2022 | ||
| EE | 27.04.2022 | ||
| ES | 27.04.2022 | ||
| FI | 27.04.2022 | ||
| HR | 27.04.2022 | ||
| LT | 27.04.2022 | ||
| LV | 27.04.2022 | ||
| MK | 27.04.2022 | ||
| NL | 27.04.2022 | ||
| PL | 27.04.2022 | ||
| RO | 27.04.2022 | ||
| RS | 27.04.2022 | ||
| SI | 27.04.2022 | ||
| SK | 27.04.2022 | ||
| SM | 27.04.2022 | ||
| BG | 27.07.2022 | ||
| NO | 27.07.2022 | ||
| GR | 28.07.2022 | ||
| IS | 27.08.2022 | ||
| PT | 29.08.2022 | ||
| IE | 15.12.2022 | ||
| LU | 15.12.2022 | ||
| CH | 31.12.2022 | ||
| LI | 31.12.2022 | ||
| Former [2024/21] | HU | 15.12.2017 | |
| AL | 27.04.2022 | ||
| AT | 27.04.2022 | ||
| CY | 27.04.2022 | ||
| CZ | 27.04.2022 | ||
| DK | 27.04.2022 | ||
| EE | 27.04.2022 | ||
| ES | 27.04.2022 | ||
| FI | 27.04.2022 | ||
| HR | 27.04.2022 | ||
| LT | 27.04.2022 | ||
| LV | 27.04.2022 | ||
| NL | 27.04.2022 | ||
| PL | 27.04.2022 | ||
| RO | 27.04.2022 | ||
| RS | 27.04.2022 | ||
| SI | 27.04.2022 | ||
| SK | 27.04.2022 | ||
| SM | 27.04.2022 | ||
| BG | 27.07.2022 | ||
| NO | 27.07.2022 | ||
| GR | 28.07.2022 | ||
| IS | 27.08.2022 | ||
| PT | 29.08.2022 | ||
| IE | 15.12.2022 | ||
| LU | 15.12.2022 | ||
| CH | 31.12.2022 | ||
| LI | 31.12.2022 | ||
| Former [2024/18] | HU | 15.12.2017 | |
| AL | 27.04.2022 | ||
| AT | 27.04.2022 | ||
| CZ | 27.04.2022 | ||
| DK | 27.04.2022 | ||
| EE | 27.04.2022 | ||
| ES | 27.04.2022 | ||
| FI | 27.04.2022 | ||
| HR | 27.04.2022 | ||
| LT | 27.04.2022 | ||
| LV | 27.04.2022 | ||
| NL | 27.04.2022 | ||
| PL | 27.04.2022 | ||
| RO | 27.04.2022 | ||
| RS | 27.04.2022 | ||
| SI | 27.04.2022 | ||
| SK | 27.04.2022 | ||
| SM | 27.04.2022 | ||
| BG | 27.07.2022 | ||
| NO | 27.07.2022 | ||
| GR | 28.07.2022 | ||
| IS | 27.08.2022 | ||
| PT | 29.08.2022 | ||
| IE | 15.12.2022 | ||
| LU | 15.12.2022 | ||
| CH | 31.12.2022 | ||
| LI | 31.12.2022 | ||
| Former [2023/48] | AL | 27.04.2022 | |
| AT | 27.04.2022 | ||
| CZ | 27.04.2022 | ||
| DK | 27.04.2022 | ||
| EE | 27.04.2022 | ||
| ES | 27.04.2022 | ||
| FI | 27.04.2022 | ||
| HR | 27.04.2022 | ||
| LT | 27.04.2022 | ||
| LV | 27.04.2022 | ||
| NL | 27.04.2022 | ||
| PL | 27.04.2022 | ||
| RO | 27.04.2022 | ||
| RS | 27.04.2022 | ||
| SI | 27.04.2022 | ||
| SK | 27.04.2022 | ||
| SM | 27.04.2022 | ||
| BG | 27.07.2022 | ||
| NO | 27.07.2022 | ||
| GR | 28.07.2022 | ||
| IS | 27.08.2022 | ||
| PT | 29.08.2022 | ||
| IE | 15.12.2022 | ||
| LU | 15.12.2022 | ||
| CH | 31.12.2022 | ||
| LI | 31.12.2022 | ||
| Former [2023/47] | AL | 27.04.2022 | |
| AT | 27.04.2022 | ||
| CZ | 27.04.2022 | ||
| DK | 27.04.2022 | ||
| EE | 27.04.2022 | ||
| ES | 27.04.2022 | ||
| FI | 27.04.2022 | ||
| HR | 27.04.2022 | ||
| LT | 27.04.2022 | ||
| LV | 27.04.2022 | ||
| NL | 27.04.2022 | ||
| PL | 27.04.2022 | ||
| RO | 27.04.2022 | ||
| RS | 27.04.2022 | ||
| SI | 27.04.2022 | ||
| SK | 27.04.2022 | ||
| SM | 27.04.2022 | ||
| BG | 27.07.2022 | ||
| NO | 27.07.2022 | ||
| GR | 28.07.2022 | ||
| IS | 27.08.2022 | ||
| PT | 29.08.2022 | ||
| LU | 15.12.2022 | ||
| CH | 31.12.2022 | ||
| LI | 31.12.2022 | ||
| Former [2023/38] | AL | 27.04.2022 | |
| AT | 27.04.2022 | ||
| CZ | 27.04.2022 | ||
| DK | 27.04.2022 | ||
| EE | 27.04.2022 | ||
| ES | 27.04.2022 | ||
| FI | 27.04.2022 | ||
| HR | 27.04.2022 | ||
| LT | 27.04.2022 | ||
| LV | 27.04.2022 | ||
| NL | 27.04.2022 | ||
| PL | 27.04.2022 | ||
| RO | 27.04.2022 | ||
| RS | 27.04.2022 | ||
| SI | 27.04.2022 | ||
| SK | 27.04.2022 | ||
| SM | 27.04.2022 | ||
| BG | 27.07.2022 | ||
| NO | 27.07.2022 | ||
| GR | 28.07.2022 | ||
| IS | 27.08.2022 | ||
| PT | 29.08.2022 | ||
| LU | 15.12.2022 | ||
| Former [2023/25] | AL | 27.04.2022 | |
| AT | 27.04.2022 | ||
| CZ | 27.04.2022 | ||
| DK | 27.04.2022 | ||
| EE | 27.04.2022 | ||
| ES | 27.04.2022 | ||
| FI | 27.04.2022 | ||
| HR | 27.04.2022 | ||
| LT | 27.04.2022 | ||
| LV | 27.04.2022 | ||
| NL | 27.04.2022 | ||
| PL | 27.04.2022 | ||
| RO | 27.04.2022 | ||
| RS | 27.04.2022 | ||
| SI | 27.04.2022 | ||
| SK | 27.04.2022 | ||
| SM | 27.04.2022 | ||
| BG | 27.07.2022 | ||
| NO | 27.07.2022 | ||
| GR | 28.07.2022 | ||
| IS | 27.08.2022 | ||
| PT | 29.08.2022 | ||
| Former [2023/17] | AL | 27.04.2022 | |
| AT | 27.04.2022 | ||
| CZ | 27.04.2022 | ||
| DK | 27.04.2022 | ||
| EE | 27.04.2022 | ||
| ES | 27.04.2022 | ||
| FI | 27.04.2022 | ||
| HR | 27.04.2022 | ||
| LT | 27.04.2022 | ||
| LV | 27.04.2022 | ||
| NL | 27.04.2022 | ||
| PL | 27.04.2022 | ||
| RO | 27.04.2022 | ||
| RS | 27.04.2022 | ||
| SK | 27.04.2022 | ||
| SM | 27.04.2022 | ||
| BG | 27.07.2022 | ||
| NO | 27.07.2022 | ||
| GR | 28.07.2022 | ||
| IS | 27.08.2022 | ||
| PT | 29.08.2022 | ||
| Former [2023/09] | AT | 27.04.2022 | |
| CZ | 27.04.2022 | ||
| DK | 27.04.2022 | ||
| EE | 27.04.2022 | ||
| ES | 27.04.2022 | ||
| FI | 27.04.2022 | ||
| HR | 27.04.2022 | ||
| LT | 27.04.2022 | ||
| LV | 27.04.2022 | ||
| NL | 27.04.2022 | ||
| PL | 27.04.2022 | ||
| RO | 27.04.2022 | ||
| RS | 27.04.2022 | ||
| SK | 27.04.2022 | ||
| SM | 27.04.2022 | ||
| BG | 27.07.2022 | ||
| NO | 27.07.2022 | ||
| GR | 28.07.2022 | ||
| IS | 27.08.2022 | ||
| PT | 29.08.2022 | ||
| Former [2023/07] | AT | 27.04.2022 | |
| DK | 27.04.2022 | ||
| ES | 27.04.2022 | ||
| FI | 27.04.2022 | ||
| HR | 27.04.2022 | ||
| LT | 27.04.2022 | ||
| LV | 27.04.2022 | ||
| NL | 27.04.2022 | ||
| PL | 27.04.2022 | ||
| RS | 27.04.2022 | ||
| BG | 27.07.2022 | ||
| NO | 27.07.2022 | ||
| GR | 28.07.2022 | ||
| IS | 27.08.2022 | ||
| PT | 29.08.2022 | ||
| Former [2022/51] | AT | 27.04.2022 | |
| ES | 27.04.2022 | ||
| FI | 27.04.2022 | ||
| HR | 27.04.2022 | ||
| LT | 27.04.2022 | ||
| LV | 27.04.2022 | ||
| NL | 27.04.2022 | ||
| PL | 27.04.2022 | ||
| RS | 27.04.2022 | ||
| BG | 27.07.2022 | ||
| NO | 27.07.2022 | ||
| GR | 28.07.2022 | ||
| IS | 27.08.2022 | ||
| PT | 29.08.2022 | ||
| Former [2022/50] | AT | 27.04.2022 | |
| ES | 27.04.2022 | ||
| FI | 27.04.2022 | ||
| HR | 27.04.2022 | ||
| LT | 27.04.2022 | ||
| LV | 27.04.2022 | ||
| NL | 27.04.2022 | ||
| PL | 27.04.2022 | ||
| RS | 27.04.2022 | ||
| BG | 27.07.2022 | ||
| NO | 27.07.2022 | ||
| GR | 28.07.2022 | ||
| PT | 29.08.2022 | ||
| Former [2022/49] | AT | 27.04.2022 | |
| ES | 27.04.2022 | ||
| FI | 27.04.2022 | ||
| HR | 27.04.2022 | ||
| LT | 27.04.2022 | ||
| LV | 27.04.2022 | ||
| NL | 27.04.2022 | ||
| BG | 27.07.2022 | ||
| NO | 27.07.2022 | ||
| GR | 28.07.2022 | ||
| PT | 29.08.2022 | ||
| Former [2022/47] | AT | 27.04.2022 | |
| ES | 27.04.2022 | ||
| FI | 27.04.2022 | ||
| LT | 27.04.2022 | ||
| NL | 27.04.2022 | ||
| NO | 27.07.2022 | ||
| PT | 29.08.2022 | ||
| Former [2022/44] | NL | 27.04.2022 | Cited in | International search | [XY] WO2016201309 (IPG PHOTONICS CORP et al.) [X] 1-3,5-10,13-15,20-26,28-32,34 * paragraphs [0099] , [ 00100] , [ 00105]; figures 19, 20 *[Y] 4,27 | [Y] EP2915611 (MTU AERO ENGINES AG et al.) [Y] 4,27 * figures 1,2; claims 1,2,7 * | [X] DE102014204580 (SIEMENS AG et al.) [X] 1,9,11,12,35-37 * paragraph [0021]; figure - * | [X] QI LIU ET AL: "Effect of high-temperature preheating on the selective laser melting of yttria-stabilized zirconia ceramic", JOURNAL OF MATERIALS PROCESSING TECHNOLOGY, vol. 222, 11 March 2015 (2015-03-11), NL, pages 61 - 74, XP055389876, ISSN: 0924-0136, DOI: 10.1016/j.jmatprotec.2015.02.036 [X] 1,9,11,35,37 * figure 4 * DOI: http://dx.doi.org/10.1016/j.jmatprotec.2015.02.036 |