blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News flashes

New version of the European Patent Register - SPC information for Unitary Patents.

2024-03-06

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3551917

EP3551917 - IMPROVEMENTS RELATING TO PIPELAYING [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  03.12.2021
Database last updated on 13.07.2024
FormerThe patent has been granted
Status updated on  25.12.2020
FormerGrant of patent is intended
Status updated on  28.07.2020
FormerRequest for examination was made
Status updated on  13.09.2019
FormerThe international publication has been made
Status updated on  16.06.2018
Formerunknown
Status updated on  23.01.2018
Most recent event   Tooltip03.05.2024Lapse of the patent in a contracting state
New state(s): MK
published on 05.06.2024  [2024/23]
Applicant(s)For all designated states
Subsea 7 Do Brasil Serviços Ltda.
Rua Enegnheiro Fábio Goulart 155 Parte
Ilha da Conceição
24050-090 Niterói - RJ / BR
[2019/42]
Inventor(s)01 / DE LEMOS JÚNIOR, Luiz Carlos
Rua Pirineus 123
Vila da Penha
20520-202 Rio De Janeiro - RJ / BR
02 / CARVALHO GOUVEIA, João Carlos
Avenida Julio Furtado 178/701
Grajau
20561-018 Rio De Janeiro - RJ / BR
03 / NICOLETTI DE FRAGA, Frederico
Rua Dom Bosco 83/301
Icarai
24220-390 Niteroi - RJ / BR
 [2019/42]
Representative(s)Cummings, Sean Patrick, et al
Keltie LLP
No.1 London Bridge
London SE1 9BA / GB
[2019/42]
Application number, filing date17828834.608.12.2017
[2019/42]
WO2017BR50374
Priority number, dateGB2016002101209.12.2016         Original published format: GB 201621012
[2019/42]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2018102900
Date:14.06.2018
Language:EN
[2018/24]
Type: A1 Application with search report 
No.:EP3551917
Date:16.10.2019
Language:EN
The application published by WIPO in one of the EPO official languages on 14.06.2018 takes the place of the publication of the European patent application.
[2019/42]
Type: B1 Patent specification 
No.:EP3551917
Date:27.01.2021
Language:EN
[2021/04]
Search report(s)International search report - published on:EP14.06.2018
ClassificationIPC:F16L1/16, E21B43/01, F16L1/20, F16L1/26
[2019/42]
CPC:
F16L1/16 (EP,US); F16L1/20 (EP,GB,US); F16L1/12 (GB);
F16L1/26 (EP,US); F16L41/021 (GB,US)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2019/42]
Extension statesBANot yet paid
MENot yet paid
Validation statesMANot yet paid
MDNot yet paid
TNNot yet paid
TitleGerman:VERBESSERUNGEN IM ZUSAMMENHANG MIT ROHRVERLEGUNGEN[2019/42]
English:IMPROVEMENTS RELATING TO PIPELAYING[2019/42]
French:PERFECTIONNEMENTS SE RAPPORTANT À LA POSE DE CONDUITES[2019/42]
Entry into regional phase01.05.2019National basic fee paid 
01.05.2019Designation fee(s) paid 
01.05.2019Examination fee paid 
Examination procedure09.10.2018Request for preliminary examination filed
International Preliminary Examining Authority: EP
01.05.2019Examination requested  [2019/42]
01.05.2019Date on which the examining division has become responsible
21.01.2020Amendment by applicant (claims and/or description)
29.07.2020Communication of intention to grant the patent
08.12.2020Fee for grant paid
08.12.2020Fee for publishing/printing paid
08.12.2020Receipt of the translation of the claim(s)
Divisional application(s)EP20216412.5  / EP3828453
Opposition(s)28.10.2021No opposition filed within time limit [2022/01]
Fees paidRenewal fee
30.12.2019Renewal fee patent year 03
21.12.2020Renewal fee patent year 04
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU08.12.2017
AL27.01.2021
AT27.01.2021
CY27.01.2021
CZ27.01.2021
DK27.01.2021
EE27.01.2021
ES27.01.2021
FI27.01.2021
HR27.01.2021
LT27.01.2021
LV27.01.2021
MC27.01.2021
MK27.01.2021
NL27.01.2021
PL27.01.2021
RO27.01.2021
RS27.01.2021
SE27.01.2021
SI27.01.2021
SK27.01.2021
SM27.01.2021
BG27.04.2021
GR28.04.2021
IS27.05.2021
PT27.05.2021
[2024/23]
Former [2023/33]HU08.12.2017
AL27.01.2021
AT27.01.2021
CY27.01.2021
CZ27.01.2021
DK27.01.2021
EE27.01.2021
ES27.01.2021
FI27.01.2021
HR27.01.2021
LT27.01.2021
LV27.01.2021
MC27.01.2021
NL27.01.2021
PL27.01.2021
RO27.01.2021
RS27.01.2021
SE27.01.2021
SI27.01.2021
SK27.01.2021
SM27.01.2021
BG27.04.2021
GR28.04.2021
IS27.05.2021
PT27.05.2021
Former [2023/30]AL27.01.2021
AT27.01.2021
CY27.01.2021
CZ27.01.2021
DK27.01.2021
EE27.01.2021
ES27.01.2021
FI27.01.2021
HR27.01.2021
LT27.01.2021
LV27.01.2021
MC27.01.2021
NL27.01.2021
PL27.01.2021
RO27.01.2021
RS27.01.2021
SE27.01.2021
SI27.01.2021
SK27.01.2021
SM27.01.2021
BG27.04.2021
GR28.04.2021
IS27.05.2021
PT27.05.2021
Former [2023/29]AL27.01.2021
AT27.01.2021
CZ27.01.2021
DK27.01.2021
EE27.01.2021
ES27.01.2021
FI27.01.2021
HR27.01.2021
LT27.01.2021
LV27.01.2021
MC27.01.2021
NL27.01.2021
PL27.01.2021
RO27.01.2021
RS27.01.2021
SE27.01.2021
SI27.01.2021
SK27.01.2021
SM27.01.2021
BG27.04.2021
GR28.04.2021
IS27.05.2021
PT27.05.2021
Former [2022/33]AL27.01.2021
AT27.01.2021
CZ27.01.2021
DK27.01.2021
EE27.01.2021
ES27.01.2021
FI27.01.2021
HR27.01.2021
LT27.01.2021
LV27.01.2021
MC27.01.2021
PL27.01.2021
RO27.01.2021
RS27.01.2021
SE27.01.2021
SI27.01.2021
SK27.01.2021
SM27.01.2021
BG27.04.2021
GR28.04.2021
IS27.05.2021
PT27.05.2021
Former [2022/23]AL27.01.2021
AT27.01.2021
CZ27.01.2021
DK27.01.2021
EE27.01.2021
ES27.01.2021
FI27.01.2021
HR27.01.2021
LT27.01.2021
LV27.01.2021
PL27.01.2021
RO27.01.2021
RS27.01.2021
SE27.01.2021
SI27.01.2021
SK27.01.2021
SM27.01.2021
BG27.04.2021
GR28.04.2021
IS27.05.2021
PT27.05.2021
Former [2022/13]AL27.01.2021
AT27.01.2021
CZ27.01.2021
DK27.01.2021
EE27.01.2021
ES27.01.2021
FI27.01.2021
HR27.01.2021
LT27.01.2021
LV27.01.2021
PL27.01.2021
RO27.01.2021
RS27.01.2021
SE27.01.2021
SI27.01.2021
SK27.01.2021
SM27.01.2021
BG27.04.2021
GR28.04.2021
PT27.05.2021
Former [2022/10]AL27.01.2021
AT27.01.2021
CZ27.01.2021
DK27.01.2021
EE27.01.2021
ES27.01.2021
FI27.01.2021
HR27.01.2021
LT27.01.2021
LV27.01.2021
PL27.01.2021
RO27.01.2021
RS27.01.2021
SE27.01.2021
SK27.01.2021
SM27.01.2021
BG27.04.2021
GR28.04.2021
PT27.05.2021
Former [2022/08]AL27.01.2021
AT27.01.2021
CZ27.01.2021
DK27.01.2021
EE27.01.2021
ES27.01.2021
FI27.01.2021
HR27.01.2021
LT27.01.2021
LV27.01.2021
PL27.01.2021
RO27.01.2021
RS27.01.2021
SE27.01.2021
SK27.01.2021
SM27.01.2021
BG27.04.2021
GR28.04.2021
IS27.05.2021
PT27.05.2021
Former [2022/07]AL27.01.2021
AT27.01.2021
CZ27.01.2021
DK27.01.2021
EE27.01.2021
FI27.01.2021
HR27.01.2021
LT27.01.2021
LV27.01.2021
PL27.01.2021
RO27.01.2021
RS27.01.2021
SE27.01.2021
SK27.01.2021
SM27.01.2021
BG27.04.2021
GR28.04.2021
IS27.05.2021
PT27.05.2021
Former [2021/50]AT27.01.2021
CZ27.01.2021
DK27.01.2021
EE27.01.2021
FI27.01.2021
HR27.01.2021
LT27.01.2021
LV27.01.2021
PL27.01.2021
RO27.01.2021
RS27.01.2021
SE27.01.2021
SK27.01.2021
SM27.01.2021
BG27.04.2021
GR28.04.2021
IS27.05.2021
PT27.05.2021
Former [2021/49]AT27.01.2021
CZ27.01.2021
DK27.01.2021
EE27.01.2021
FI27.01.2021
HR27.01.2021
LT27.01.2021
LV27.01.2021
PL27.01.2021
RS27.01.2021
SE27.01.2021
SM27.01.2021
BG27.04.2021
GR28.04.2021
IS27.05.2021
PT27.05.2021
Former [2021/48]AT27.01.2021
CZ27.01.2021
EE27.01.2021
FI27.01.2021
HR27.01.2021
LT27.01.2021
LV27.01.2021
PL27.01.2021
RS27.01.2021
SE27.01.2021
SM27.01.2021
BG27.04.2021
GR28.04.2021
IS27.05.2021
PT27.05.2021
Former [2021/46]AT27.01.2021
FI27.01.2021
HR27.01.2021
LT27.01.2021
LV27.01.2021
PL27.01.2021
RS27.01.2021
SE27.01.2021
SM27.01.2021
BG27.04.2021
GR28.04.2021
IS27.05.2021
PT27.05.2021
Former [2021/42]AT27.01.2021
FI27.01.2021
HR27.01.2021
LT27.01.2021
LV27.01.2021
PL27.01.2021
RS27.01.2021
SE27.01.2021
BG27.04.2021
GR28.04.2021
IS27.05.2021
PT27.05.2021
Former [2021/39]AT27.01.2021
FI27.01.2021
HR27.01.2021
LT27.01.2021
LV27.01.2021
PL27.01.2021
RS27.01.2021
SE27.01.2021
BG27.04.2021
GR28.04.2021
PT27.05.2021
Former [2021/38]AT27.01.2021
FI27.01.2021
HR27.01.2021
LT27.01.2021
LV27.01.2021
RS27.01.2021
SE27.01.2021
BG27.04.2021
GR28.04.2021
PT27.05.2021
Former [2021/37]AT27.01.2021
FI27.01.2021
HR27.01.2021
LT27.01.2021
LV27.01.2021
RS27.01.2021
BG27.04.2021
GR28.04.2021
PT27.05.2021
Former [2021/36]FI27.01.2021
HR27.01.2021
LT27.01.2021
BG27.04.2021
GR28.04.2021
PT27.05.2021
Former [2021/35]FI27.01.2021
HR27.01.2021
LT27.01.2021
PT27.05.2021
Former [2021/33]FI27.01.2021
LT27.01.2021
PT27.05.2021
Cited inInternational search[A]US6200068  (BATH WILLIAM R [US], et al) [A] 1-39 * figure 1 *;
 [XA]US2008038066  (RENARD DIDIER [FR], et al) [X] 36-39 * figures 3, 5 * [A] 1-35;
 [A]US2012090414  (KEARNS JOHN P [US], et al) [A] 1-39 * figure 2b *;
 [XA]US2014193205  (PARSINEJAD FARZAN [US], et al) [X] 36-39 * figure 7a * [A] 1-35;
 [XA]US2015337988  (HUANG ZHIMING [US], et al) [X] 36-39 * figure 1 *[A] 1-35
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.