EP3488935 - CENTRIFUGAL SEPARATION CONTAINER, AND METHOD FOR MOVING SUBSTANCES INSIDE CENTRIFUGAL SEPARATION CONTAINER [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 15.07.2022 Database last updated on 10.07.2024 | |
Former | The patent has been granted Status updated on 06.08.2021 | ||
Former | Grant of patent is intended Status updated on 12.04.2021 | ||
Former | Request for examination was made Status updated on 26.04.2019 | ||
Former | The international publication has been made Status updated on 26.01.2018 | Most recent event Tooltip | 14.06.2024 | Lapse of the patent in a contracting state New state(s): TR | published on 17.07.2024 [2024/29] | Applicant(s) | For all designated states Lee, Jun Seok Rm. 501 5 UN Pyeonghwa-ro 29beon-gil Nam-gu Busan 48504 / KR | [2019/22] | Inventor(s) | 01 /
see applicant ... | [2019/22] | Representative(s) | Lavoix Bayerstraße 83 80335 München / DE | [2021/36] |
Former [2019/22] | Lavoix Bayerstrasse 83 80335 München / DE | Application number, filing date | 17831331.8 | 18.07.2017 | [2019/22] | WO2017KR07740 | Priority number, date | KR20160091523 | 19.07.2016 Original published format: KR 20160091523 | [2019/22] | Filing language | KO | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2018016858 | Date: | 25.01.2018 | Language: | KO | [2018/04] | Type: | A1 Application with search report | No.: | EP3488935 | Date: | 29.05.2019 | Language: | EN | [2019/22] | Type: | B1 Patent specification | No.: | EP3488935 | Date: | 08.09.2021 | Language: | EN | [2021/36] | Search report(s) | International search report - published on: | KR | 25.01.2018 | (Supplementary) European search report - dispatched on: | EP | 13.07.2020 | Classification | IPC: | B01L3/00, B04B5/04, A61M1/36, // G01N33/49, F16K99/00 | [2020/18] | CPC: |
B04B5/0421 (EP);
B04B11/06 (KR,US);
A61M1/3696 (EP,US);
B01L3/5021 (EP,US);
B04B11/05 (KR,US);
B04B5/0442 (EP);
F16K99/0026 (EP);
F16K99/0063 (EP);
B01L2300/0851 (EP,US);
B01L2300/0854 (EP);
B01L2300/0858 (US);
B01L2400/0409 (EP,US);
B01L2400/0478 (EP);
B01L2400/0633 (EP);
B01L3/50273 (EP);
|
Former IPC [2019/22] | B04B11/06, B04B11/05 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2019/22] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | MD | Not yet paid | Title | German: | ZENTRIFUGALABSCHEIDUNGSBEHÄLTER UND VERFAHREN ZUM BEWEGEN VON SUBSTANZEN IN EINEM ZENTRIFUGALABSCHEIDUNGSBEHÄLTER | [2019/22] | English: | CENTRIFUGAL SEPARATION CONTAINER, AND METHOD FOR MOVING SUBSTANCES INSIDE CENTRIFUGAL SEPARATION CONTAINER | [2019/22] | French: | RÉCIPIENT DE SÉPARATION CENTRIFUGE, ET PROCÉDÉ DE DÉPLACEMENT DE SUBSTANCES À L'INTÉRIEUR D'UN RÉCIPIENT DE SÉPARATION CENTRIFUGE | [2019/22] | Entry into regional phase | 30.01.2019 | Translation filed | 30.01.2019 | National basic fee paid | 30.01.2019 | Search fee paid | 30.01.2019 | Designation fee(s) paid | 30.01.2019 | Examination fee paid | Examination procedure | 30.01.2019 | Examination requested [2019/22] | 28.01.2021 | Amendment by applicant (claims and/or description) | 13.04.2021 | Communication of intention to grant the patent | 29.06.2021 | Fee for grant paid | 29.06.2021 | Fee for publishing/printing paid | 29.06.2021 | Receipt of the translation of the claim(s) | Opposition(s) | 09.06.2022 | No opposition filed within time limit [2022/33] | Fees paid | Renewal fee | 29.07.2019 | Renewal fee patent year 03 | 27.07.2020 | Renewal fee patent year 04 | 29.07.2021 | Renewal fee patent year 05 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 18.07.2017 | AL | 08.09.2021 | AT | 08.09.2021 | CY | 08.09.2021 | CZ | 08.09.2021 | DK | 08.09.2021 | EE | 08.09.2021 | ES | 08.09.2021 | FI | 08.09.2021 | HR | 08.09.2021 | LT | 08.09.2021 | LV | 08.09.2021 | MC | 08.09.2021 | MK | 08.09.2021 | NL | 08.09.2021 | PL | 08.09.2021 | RO | 08.09.2021 | RS | 08.09.2021 | SE | 08.09.2021 | SI | 08.09.2021 | SK | 08.09.2021 | SM | 08.09.2021 | TR | 08.09.2021 | BG | 08.12.2021 | NO | 08.12.2021 | GR | 09.12.2021 | IS | 08.01.2022 | PT | 10.01.2022 | [2024/29] |
Former [2024/23] | HU | 18.07.2017 | |
AL | 08.09.2021 | ||
AT | 08.09.2021 | ||
CY | 08.09.2021 | ||
CZ | 08.09.2021 | ||
DK | 08.09.2021 | ||
EE | 08.09.2021 | ||
ES | 08.09.2021 | ||
FI | 08.09.2021 | ||
HR | 08.09.2021 | ||
LT | 08.09.2021 | ||
LV | 08.09.2021 | ||
MC | 08.09.2021 | ||
MK | 08.09.2021 | ||
NL | 08.09.2021 | ||
PL | 08.09.2021 | ||
RO | 08.09.2021 | ||
RS | 08.09.2021 | ||
SE | 08.09.2021 | ||
SI | 08.09.2021 | ||
SK | 08.09.2021 | ||
SM | 08.09.2021 | ||
BG | 08.12.2021 | ||
NO | 08.12.2021 | ||
GR | 09.12.2021 | ||
IS | 08.01.2022 | ||
PT | 10.01.2022 | ||
Former [2024/20] | HU | 18.07.2017 | |
AL | 08.09.2021 | ||
AT | 08.09.2021 | ||
CY | 08.09.2021 | ||
CZ | 08.09.2021 | ||
DK | 08.09.2021 | ||
EE | 08.09.2021 | ||
ES | 08.09.2021 | ||
FI | 08.09.2021 | ||
HR | 08.09.2021 | ||
LT | 08.09.2021 | ||
LV | 08.09.2021 | ||
MC | 08.09.2021 | ||
NL | 08.09.2021 | ||
PL | 08.09.2021 | ||
RO | 08.09.2021 | ||
RS | 08.09.2021 | ||
SE | 08.09.2021 | ||
SI | 08.09.2021 | ||
SK | 08.09.2021 | ||
SM | 08.09.2021 | ||
BG | 08.12.2021 | ||
NO | 08.12.2021 | ||
GR | 09.12.2021 | ||
IS | 08.01.2022 | ||
PT | 10.01.2022 | ||
Former [2024/18] | HU | 18.07.2017 | |
AL | 08.09.2021 | ||
AT | 08.09.2021 | ||
CZ | 08.09.2021 | ||
DK | 08.09.2021 | ||
EE | 08.09.2021 | ||
ES | 08.09.2021 | ||
FI | 08.09.2021 | ||
HR | 08.09.2021 | ||
LT | 08.09.2021 | ||
LV | 08.09.2021 | ||
MC | 08.09.2021 | ||
NL | 08.09.2021 | ||
PL | 08.09.2021 | ||
RO | 08.09.2021 | ||
RS | 08.09.2021 | ||
SE | 08.09.2021 | ||
SI | 08.09.2021 | ||
SK | 08.09.2021 | ||
SM | 08.09.2021 | ||
BG | 08.12.2021 | ||
NO | 08.12.2021 | ||
GR | 09.12.2021 | ||
IS | 08.01.2022 | ||
PT | 10.01.2022 | ||
Former [2023/11] | AL | 08.09.2021 | |
AT | 08.09.2021 | ||
CZ | 08.09.2021 | ||
DK | 08.09.2021 | ||
EE | 08.09.2021 | ||
ES | 08.09.2021 | ||
FI | 08.09.2021 | ||
HR | 08.09.2021 | ||
LT | 08.09.2021 | ||
LV | 08.09.2021 | ||
MC | 08.09.2021 | ||
NL | 08.09.2021 | ||
PL | 08.09.2021 | ||
RO | 08.09.2021 | ||
RS | 08.09.2021 | ||
SE | 08.09.2021 | ||
SI | 08.09.2021 | ||
SK | 08.09.2021 | ||
SM | 08.09.2021 | ||
BG | 08.12.2021 | ||
NO | 08.12.2021 | ||
GR | 09.12.2021 | ||
IS | 08.01.2022 | ||
PT | 10.01.2022 | ||
Former [2022/36] | AL | 08.09.2021 | |
AT | 08.09.2021 | ||
CZ | 08.09.2021 | ||
DK | 08.09.2021 | ||
EE | 08.09.2021 | ||
ES | 08.09.2021 | ||
FI | 08.09.2021 | ||
HR | 08.09.2021 | ||
LT | 08.09.2021 | ||
LV | 08.09.2021 | ||
NL | 08.09.2021 | ||
PL | 08.09.2021 | ||
RO | 08.09.2021 | ||
RS | 08.09.2021 | ||
SE | 08.09.2021 | ||
SI | 08.09.2021 | ||
SK | 08.09.2021 | ||
SM | 08.09.2021 | ||
BG | 08.12.2021 | ||
NO | 08.12.2021 | ||
GR | 09.12.2021 | ||
IS | 08.01.2022 | ||
PT | 10.01.2022 | ||
Former [2022/29] | AL | 08.09.2021 | |
AT | 08.09.2021 | ||
CZ | 08.09.2021 | ||
EE | 08.09.2021 | ||
ES | 08.09.2021 | ||
FI | 08.09.2021 | ||
HR | 08.09.2021 | ||
LT | 08.09.2021 | ||
LV | 08.09.2021 | ||
NL | 08.09.2021 | ||
PL | 08.09.2021 | ||
RO | 08.09.2021 | ||
RS | 08.09.2021 | ||
SE | 08.09.2021 | ||
SK | 08.09.2021 | ||
SM | 08.09.2021 | ||
BG | 08.12.2021 | ||
NO | 08.12.2021 | ||
GR | 09.12.2021 | ||
IS | 08.01.2022 | ||
PT | 10.01.2022 | ||
Former [2022/25] | AT | 08.09.2021 | |
CZ | 08.09.2021 | ||
EE | 08.09.2021 | ||
ES | 08.09.2021 | ||
FI | 08.09.2021 | ||
HR | 08.09.2021 | ||
LT | 08.09.2021 | ||
LV | 08.09.2021 | ||
NL | 08.09.2021 | ||
PL | 08.09.2021 | ||
RO | 08.09.2021 | ||
RS | 08.09.2021 | ||
SE | 08.09.2021 | ||
SK | 08.09.2021 | ||
SM | 08.09.2021 | ||
BG | 08.12.2021 | ||
NO | 08.12.2021 | ||
GR | 09.12.2021 | ||
IS | 08.01.2022 | ||
PT | 10.01.2022 | ||
Former [2022/24] | AT | 08.09.2021 | |
CZ | 08.09.2021 | ||
EE | 08.09.2021 | ||
ES | 08.09.2021 | ||
FI | 08.09.2021 | ||
HR | 08.09.2021 | ||
LT | 08.09.2021 | ||
LV | 08.09.2021 | ||
NL | 08.09.2021 | ||
PL | 08.09.2021 | ||
RO | 08.09.2021 | ||
RS | 08.09.2021 | ||
SE | 08.09.2021 | ||
SK | 08.09.2021 | ||
BG | 08.12.2021 | ||
NO | 08.12.2021 | ||
GR | 09.12.2021 | ||
IS | 08.01.2022 | ||
PT | 10.01.2022 | ||
Former [2022/23] | AT | 08.09.2021 | |
CZ | 08.09.2021 | ||
EE | 08.09.2021 | ||
ES | 08.09.2021 | ||
FI | 08.09.2021 | ||
HR | 08.09.2021 | ||
LT | 08.09.2021 | ||
LV | 08.09.2021 | ||
PL | 08.09.2021 | ||
RS | 08.09.2021 | ||
SE | 08.09.2021 | ||
SK | 08.09.2021 | ||
BG | 08.12.2021 | ||
NO | 08.12.2021 | ||
GR | 09.12.2021 | ||
PT | 10.01.2022 | ||
Former [2022/21] | AT | 08.09.2021 | |
ES | 08.09.2021 | ||
FI | 08.09.2021 | ||
HR | 08.09.2021 | ||
LT | 08.09.2021 | ||
LV | 08.09.2021 | ||
RS | 08.09.2021 | ||
SE | 08.09.2021 | ||
BG | 08.12.2021 | ||
NO | 08.12.2021 | ||
GR | 09.12.2021 | ||
Former [2022/10] | ES | 08.09.2021 | |
FI | 08.09.2021 | ||
HR | 08.09.2021 | ||
LT | 08.09.2021 | ||
LV | 08.09.2021 | ||
RS | 08.09.2021 | ||
SE | 08.09.2021 | ||
BG | 08.12.2021 | ||
NO | 08.12.2021 | ||
GR | 09.12.2021 | ||
Former [2022/09] | ES | 08.09.2021 | |
FI | 08.09.2021 | ||
LT | 08.09.2021 | ||
RS | 08.09.2021 | ||
SE | 08.09.2021 | ||
BG | 08.12.2021 | ||
NO | 08.12.2021 | ||
Former [2022/08] | ES | 08.09.2021 | |
FI | 08.09.2021 | ||
LT | 08.09.2021 | ||
SE | 08.09.2021 | ||
BG | 08.12.2021 | ||
NO | 08.12.2021 | ||
Former [2022/07] | LT | 08.09.2021 | |
NO | 08.12.2021 | Documents cited: | Search | [A]US4904284 (HANABUSA OSAMU [JP]) [A] 1 * column 1 lines 7-12; column 5 lines 5-36;; figures 2(E1), 2(E2) *; | [YA]JP3137413U (SHIMADZU CORPORATION) [Y] 7,8 * paragraphs [0008] - [0010]; figure 1; claim 1 *[A] 9; | [XI]JP2010099616 (OLYMPUS CORP) [X] 1-3 * paragraphs [0001] , [00 2]; figures 1, 3; claims 1, 2 * [I] 4; | [A]KR20120092934 (MOOHAN ENTPR CO LTD [KR]) [A] 1-13 * paragraphs [0001] , [0 34] , [0 44] - [0047]; figures 1, 4(a), 4(b), 6b-6d *; | [A]US2013226150 (NASH JOHN E [US], et al) [A] 1-13 * paragraphs [0003] - [0005]; figure 2; claim 28 *; | [IAY]WO2015147606 (LEE JUN SEOK [KR]) [I] 1-4,11-13 * abstract * [A] 5,6,9,10 [Y] 7,8; | [A]EP3025788 (RIERA NADEU S A [ES]) [A] 1 * paragraphs [0001] , [0 37]; figures 1-3 *; | [P]EP3124121 (LEE JUN SEOK [KR]) [P] * paragraphs [0001] , [00 5] , [0 79]; figures 1-5; claims 1-4 * | International search | [A]JP2005013783 (MORIAI SEIKI KK, et al) [A] 1-14 * See the entire document. *; | [Y]JP3137413U (SHIMADZU CORPORATION) [Y] 1, 2, 7, 11, 13 * See claim 1; paragraphs [0009], [0010], [0014]; and figure 1. *; | [A]US2013226150 (NASH JOHN E [US], et al) [A] 1-14* See the entire document. *; | [Y]KR101390247B (EME CORPORATION) [Y] 11, 13 * See claim 1; paragraph [0022]; and figure 1. *; | [YA]KR101466762B (LEE JUN SEOK [KR]) [Y] 1, 2, 7, 11, 13 * See claim 12; paragraphs [0060], [0061], [0091], [0092], [0097]; and figure 8. * [A] 3-6, 8-10, 12, 14 |