EP3563233 - COMPUTER NETWORK OF COMPUTING RESOURCE INFRASTRUCTURES AND METHOD FOR ALLOCATING THESE RESOURCES TO CLIENT APPLICATIONS [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 02.06.2023 Database last updated on 19.10.2024 | |
Former | The patent has been granted Status updated on 24.06.2022 | ||
Former | Grant of patent is intended Status updated on 22.02.2022 | ||
Former | Examination is in progress Status updated on 09.05.2020 | ||
Former | Request for examination was made Status updated on 04.10.2019 | ||
Former | The international publication has been made Status updated on 07.07.2018 | ||
Former | unknown Status updated on 30.01.2018 | Most recent event Tooltip | 27.09.2024 | Lapse of the patent in a contracting state New state(s): MT | published on 30.10.2024 [2024/44] | Applicant(s) | For all designated states Bull SAS Rue Jean Jaurès 78340 Les Clayes-sous-Bois / FR | [2019/45] | Inventor(s) | 01 /
ALBERTIN, Loic 13 Avenue du Vercors 38240 Meylan / FR | 02 /
PELLETIER, Benoît 23 rue du Crest 38960 Saint Etienne de Crossey / FR | [2019/45] | Representative(s) | Plasseraud IP 104 Rue de Richelieu CS92104 75080 Paris Cedex 02 / FR | [N/P] |
Former [2019/45] | Plasseraud IP 66, rue de la Chaussée d'Antin 75440 Paris Cedex 09 / FR | Application number, filing date | 17832310.1 | 28.12.2017 | [2019/45] | WO2017FR53864 | Priority number, date | FR20160063536 | 29.12.2016 Original published format: FR 1663536 | [2019/45] | Filing language | FR | Procedural language | FR | Publication | Type: | A1 Application with search report | No.: | WO2018122540 | Date: | 05.07.2018 | Language: | FR | [2018/27] | Type: | A1 Application with search report | No.: | EP3563233 | Date: | 06.11.2019 | Language: | FR | The application published by WIPO in one of the EPO official languages on 05.07.2018 takes the place of the publication of the European patent application. | [2019/45] | Type: | B1 Patent specification | No.: | EP3563233 | Date: | 27.07.2022 | Language: | FR | [2022/30] | Search report(s) | International search report - published on: | EP | 05.07.2018 | Classification | IPC: | H04L67/1004 | [2022/09] | CPC: |
H04L67/1004 (EP);
H04L47/783 (US);
H04L47/803 (US);
H04L47/806 (US);
H04L67/1023 (EP);
H04L67/125 (US)
|
Former IPC [2019/45] | G06F9/44, H04L29/08 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2019/45] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | MD | Not yet paid | TN | Not yet paid | Title | German: | COMPUTERNETZWERK ZUR BERECHNUNG VON RESSOURCENINFRASTRUKTUREN UND VERFAHREN ZUR ZUWEISUNG DIESER RESSOURCEN ZU CLIENT-ANWENDUNGEN | [2019/45] | English: | COMPUTER NETWORK OF COMPUTING RESOURCE INFRASTRUCTURES AND METHOD FOR ALLOCATING THESE RESOURCES TO CLIENT APPLICATIONS | [2019/45] | French: | RÉSEAU INFORMATIQUE D'INFRASTRUCTURES DE RESSOURCES DE CALCUL ET PROCÉDÉ D'AFFECTATION DE CES RESSOURCES A DES APPLICATIONS CLIENT | [2022/10] |
Former [2019/45] | RESEAU INFORMATIQUE D'INFRASTRUCTURES DE RESSOURCES DE CALCUL ET PROCEDE D'AFFECTATION DE CES RESSOURCES A DES APPLICATIONS CLIENT | Entry into regional phase | 27.06.2019 | National basic fee paid | 27.06.2019 | Designation fee(s) paid | 27.06.2019 | Examination fee paid | Examination procedure | 27.06.2019 | Amendment by applicant (claims and/or description) | 27.06.2019 | Examination requested [2019/45] | 27.06.2019 | Date on which the examining division has become responsible | 13.05.2020 | Despatch of a communication from the examining division (Time limit: M06) | 18.11.2020 | Reply to a communication from the examining division | 24.02.2021 | Despatch of a communication from the examining division (Time limit: M04) | 25.06.2021 | Reply to a communication from the examining division | 23.02.2022 | Communication of intention to grant the patent | 30.03.2022 | Fee for grant paid | 30.03.2022 | Fee for publishing/printing paid | 22.06.2022 | Receipt of the translation of the claim(s) | Opposition(s) | 02.05.2023 | No opposition filed within time limit [2023/27] | Fees paid | Renewal fee | 26.02.2020 | Renewal fee patent year 03 | 24.12.2020 | Renewal fee patent year 04 | 20.12.2021 | Renewal fee patent year 05 | Penalty fee | Additional fee for renewal fee | 31.12.2019 | 03   M06   Fee paid on   26.02.2020 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 28.12.2017 | AL | 27.07.2022 | AT | 27.07.2022 | BG | 27.07.2022 | CY | 27.07.2022 | CZ | 27.07.2022 | DK | 27.07.2022 | EE | 27.07.2022 | ES | 27.07.2022 | FI | 27.07.2022 | HR | 27.07.2022 | IT | 27.07.2022 | LT | 27.07.2022 | LV | 27.07.2022 | MC | 27.07.2022 | MK | 27.07.2022 | MT | 27.07.2022 | NL | 27.07.2022 | PL | 27.07.2022 | RO | 27.07.2022 | RS | 27.07.2022 | SE | 27.07.2022 | SI | 27.07.2022 | SK | 27.07.2022 | SM | 27.07.2022 | TR | 27.07.2022 | NO | 27.10.2022 | GR | 28.10.2022 | IS | 27.11.2022 | PT | 28.11.2022 | IE | 28.12.2022 | LU | 28.12.2022 | BE | 31.12.2022 | CH | 31.12.2022 | LI | 31.12.2022 | [2024/44] |
Former [2024/34] | HU | 28.12.2017 | |
AL | 27.07.2022 | ||
AT | 27.07.2022 | ||
BG | 27.07.2022 | ||
CY | 27.07.2022 | ||
CZ | 27.07.2022 | ||
DK | 27.07.2022 | ||
EE | 27.07.2022 | ||
ES | 27.07.2022 | ||
FI | 27.07.2022 | ||
HR | 27.07.2022 | ||
IT | 27.07.2022 | ||
LT | 27.07.2022 | ||
LV | 27.07.2022 | ||
MC | 27.07.2022 | ||
MK | 27.07.2022 | ||
NL | 27.07.2022 | ||
PL | 27.07.2022 | ||
RO | 27.07.2022 | ||
RS | 27.07.2022 | ||
SE | 27.07.2022 | ||
SI | 27.07.2022 | ||
SK | 27.07.2022 | ||
SM | 27.07.2022 | ||
TR | 27.07.2022 | ||
NO | 27.10.2022 | ||
GR | 28.10.2022 | ||
IS | 27.11.2022 | ||
PT | 28.11.2022 | ||
IE | 28.12.2022 | ||
LU | 28.12.2022 | ||
BE | 31.12.2022 | ||
CH | 31.12.2022 | ||
LI | 31.12.2022 | ||
Former [2024/29] | HU | 28.12.2017 | |
AL | 27.07.2022 | ||
AT | 27.07.2022 | ||
CY | 27.07.2022 | ||
CZ | 27.07.2022 | ||
DK | 27.07.2022 | ||
EE | 27.07.2022 | ||
ES | 27.07.2022 | ||
FI | 27.07.2022 | ||
HR | 27.07.2022 | ||
IT | 27.07.2022 | ||
LT | 27.07.2022 | ||
LV | 27.07.2022 | ||
MC | 27.07.2022 | ||
MK | 27.07.2022 | ||
NL | 27.07.2022 | ||
PL | 27.07.2022 | ||
RO | 27.07.2022 | ||
RS | 27.07.2022 | ||
SE | 27.07.2022 | ||
SI | 27.07.2022 | ||
SK | 27.07.2022 | ||
SM | 27.07.2022 | ||
TR | 27.07.2022 | ||
NO | 27.10.2022 | ||
GR | 28.10.2022 | ||
IS | 27.11.2022 | ||
PT | 28.11.2022 | ||
IE | 28.12.2022 | ||
LU | 28.12.2022 | ||
BE | 31.12.2022 | ||
CH | 31.12.2022 | ||
LI | 31.12.2022 | ||
Former [2024/27] | HU | 28.12.2017 | |
AL | 27.07.2022 | ||
AT | 27.07.2022 | ||
CY | 27.07.2022 | ||
CZ | 27.07.2022 | ||
DK | 27.07.2022 | ||
EE | 27.07.2022 | ||
ES | 27.07.2022 | ||
FI | 27.07.2022 | ||
HR | 27.07.2022 | ||
IT | 27.07.2022 | ||
LT | 27.07.2022 | ||
LV | 27.07.2022 | ||
MK | 27.07.2022 | ||
NL | 27.07.2022 | ||
PL | 27.07.2022 | ||
RO | 27.07.2022 | ||
RS | 27.07.2022 | ||
SE | 27.07.2022 | ||
SI | 27.07.2022 | ||
SK | 27.07.2022 | ||
SM | 27.07.2022 | ||
NO | 27.10.2022 | ||
GR | 28.10.2022 | ||
IS | 27.11.2022 | ||
PT | 28.11.2022 | ||
IE | 28.12.2022 | ||
LU | 28.12.2022 | ||
BE | 31.12.2022 | ||
CH | 31.12.2022 | ||
LI | 31.12.2022 | ||
Former [2024/26] | HU | 28.12.2017 | |
AL | 27.07.2022 | ||
AT | 27.07.2022 | ||
CY | 27.07.2022 | ||
CZ | 27.07.2022 | ||
DK | 27.07.2022 | ||
EE | 27.07.2022 | ||
ES | 27.07.2022 | ||
FI | 27.07.2022 | ||
HR | 27.07.2022 | ||
IT | 27.07.2022 | ||
LT | 27.07.2022 | ||
LV | 27.07.2022 | ||
NL | 27.07.2022 | ||
PL | 27.07.2022 | ||
RO | 27.07.2022 | ||
RS | 27.07.2022 | ||
SE | 27.07.2022 | ||
SI | 27.07.2022 | ||
SK | 27.07.2022 | ||
SM | 27.07.2022 | ||
NO | 27.10.2022 | ||
GR | 28.10.2022 | ||
IS | 27.11.2022 | ||
PT | 28.11.2022 | ||
IE | 28.12.2022 | ||
LU | 28.12.2022 | ||
BE | 31.12.2022 | ||
CH | 31.12.2022 | ||
LI | 31.12.2022 | ||
Former [2024/21] | HU | 28.12.2017 | |
AL | 27.07.2022 | ||
AT | 27.07.2022 | ||
CY | 27.07.2022 | ||
CZ | 27.07.2022 | ||
DK | 27.07.2022 | ||
EE | 27.07.2022 | ||
ES | 27.07.2022 | ||
FI | 27.07.2022 | ||
HR | 27.07.2022 | ||
LT | 27.07.2022 | ||
LV | 27.07.2022 | ||
NL | 27.07.2022 | ||
PL | 27.07.2022 | ||
RO | 27.07.2022 | ||
RS | 27.07.2022 | ||
SE | 27.07.2022 | ||
SI | 27.07.2022 | ||
SK | 27.07.2022 | ||
SM | 27.07.2022 | ||
NO | 27.10.2022 | ||
GR | 28.10.2022 | ||
IS | 27.11.2022 | ||
PT | 28.11.2022 | ||
IE | 28.12.2022 | ||
LU | 28.12.2022 | ||
BE | 31.12.2022 | ||
CH | 31.12.2022 | ||
LI | 31.12.2022 | ||
Former [2024/18] | HU | 28.12.2017 | |
AL | 27.07.2022 | ||
AT | 27.07.2022 | ||
CZ | 27.07.2022 | ||
DK | 27.07.2022 | ||
EE | 27.07.2022 | ||
ES | 27.07.2022 | ||
FI | 27.07.2022 | ||
HR | 27.07.2022 | ||
LT | 27.07.2022 | ||
LV | 27.07.2022 | ||
NL | 27.07.2022 | ||
PL | 27.07.2022 | ||
RO | 27.07.2022 | ||
RS | 27.07.2022 | ||
SE | 27.07.2022 | ||
SI | 27.07.2022 | ||
SK | 27.07.2022 | ||
SM | 27.07.2022 | ||
NO | 27.10.2022 | ||
GR | 28.10.2022 | ||
IS | 27.11.2022 | ||
PT | 28.11.2022 | ||
IE | 28.12.2022 | ||
LU | 28.12.2022 | ||
BE | 31.12.2022 | ||
CH | 31.12.2022 | ||
LI | 31.12.2022 | ||
Former [2023/49] | AL | 27.07.2022 | |
AT | 27.07.2022 | ||
CZ | 27.07.2022 | ||
DK | 27.07.2022 | ||
EE | 27.07.2022 | ||
ES | 27.07.2022 | ||
FI | 27.07.2022 | ||
HR | 27.07.2022 | ||
LT | 27.07.2022 | ||
LV | 27.07.2022 | ||
NL | 27.07.2022 | ||
PL | 27.07.2022 | ||
RO | 27.07.2022 | ||
RS | 27.07.2022 | ||
SE | 27.07.2022 | ||
SI | 27.07.2022 | ||
SK | 27.07.2022 | ||
SM | 27.07.2022 | ||
NO | 27.10.2022 | ||
GR | 28.10.2022 | ||
IS | 27.11.2022 | ||
PT | 28.11.2022 | ||
IE | 28.12.2022 | ||
LU | 28.12.2022 | ||
BE | 31.12.2022 | ||
CH | 31.12.2022 | ||
LI | 31.12.2022 | ||
Former [2023/48] | AL | 27.07.2022 | |
AT | 27.07.2022 | ||
CZ | 27.07.2022 | ||
DK | 27.07.2022 | ||
EE | 27.07.2022 | ||
ES | 27.07.2022 | ||
FI | 27.07.2022 | ||
HR | 27.07.2022 | ||
LT | 27.07.2022 | ||
LV | 27.07.2022 | ||
NL | 27.07.2022 | ||
PL | 27.07.2022 | ||
RO | 27.07.2022 | ||
RS | 27.07.2022 | ||
SE | 27.07.2022 | ||
SI | 27.07.2022 | ||
SK | 27.07.2022 | ||
SM | 27.07.2022 | ||
NO | 27.10.2022 | ||
GR | 28.10.2022 | ||
IS | 27.11.2022 | ||
PT | 28.11.2022 | ||
IE | 28.12.2022 | ||
LU | 28.12.2022 | ||
CH | 31.12.2022 | ||
LI | 31.12.2022 | ||
Former [2023/47] | AL | 27.07.2022 | |
AT | 27.07.2022 | ||
CZ | 27.07.2022 | ||
DK | 27.07.2022 | ||
EE | 27.07.2022 | ||
ES | 27.07.2022 | ||
FI | 27.07.2022 | ||
HR | 27.07.2022 | ||
LT | 27.07.2022 | ||
LV | 27.07.2022 | ||
NL | 27.07.2022 | ||
PL | 27.07.2022 | ||
RO | 27.07.2022 | ||
RS | 27.07.2022 | ||
SE | 27.07.2022 | ||
SI | 27.07.2022 | ||
SK | 27.07.2022 | ||
SM | 27.07.2022 | ||
NO | 27.10.2022 | ||
GR | 28.10.2022 | ||
IS | 27.11.2022 | ||
PT | 28.11.2022 | ||
LU | 28.12.2022 | ||
CH | 31.12.2022 | ||
LI | 31.12.2022 | ||
Former [2023/38] | AL | 27.07.2022 | |
AT | 27.07.2022 | ||
CZ | 27.07.2022 | ||
DK | 27.07.2022 | ||
EE | 27.07.2022 | ||
ES | 27.07.2022 | ||
FI | 27.07.2022 | ||
HR | 27.07.2022 | ||
LT | 27.07.2022 | ||
LV | 27.07.2022 | ||
NL | 27.07.2022 | ||
PL | 27.07.2022 | ||
RO | 27.07.2022 | ||
RS | 27.07.2022 | ||
SE | 27.07.2022 | ||
SI | 27.07.2022 | ||
SK | 27.07.2022 | ||
SM | 27.07.2022 | ||
NO | 27.10.2022 | ||
GR | 28.10.2022 | ||
IS | 27.11.2022 | ||
PT | 28.11.2022 | ||
LU | 28.12.2022 | ||
Former [2023/37] | AL | 27.07.2022 | |
AT | 27.07.2022 | ||
CZ | 27.07.2022 | ||
DK | 27.07.2022 | ||
EE | 27.07.2022 | ||
ES | 27.07.2022 | ||
FI | 27.07.2022 | ||
HR | 27.07.2022 | ||
LT | 27.07.2022 | ||
LV | 27.07.2022 | ||
NL | 27.07.2022 | ||
PL | 27.07.2022 | ||
RO | 27.07.2022 | ||
RS | 27.07.2022 | ||
SE | 27.07.2022 | ||
SI | 27.07.2022 | ||
SK | 27.07.2022 | ||
SM | 27.07.2022 | ||
NO | 27.10.2022 | ||
GR | 28.10.2022 | ||
IS | 27.11.2022 | ||
PT | 28.11.2022 | ||
Former [2023/29] | AL | 27.07.2022 | |
AT | 27.07.2022 | ||
CZ | 27.07.2022 | ||
DK | 27.07.2022 | ||
EE | 27.07.2022 | ||
ES | 27.07.2022 | ||
FI | 27.07.2022 | ||
HR | 27.07.2022 | ||
LT | 27.07.2022 | ||
LV | 27.07.2022 | ||
NL | 27.07.2022 | ||
PL | 27.07.2022 | ||
RO | 27.07.2022 | ||
RS | 27.07.2022 | ||
SE | 27.07.2022 | ||
SK | 27.07.2022 | ||
SM | 27.07.2022 | ||
NO | 27.10.2022 | ||
GR | 28.10.2022 | ||
IS | 27.11.2022 | ||
PT | 28.11.2022 | ||
Former [2023/23] | AT | 27.07.2022 | |
CZ | 27.07.2022 | ||
DK | 27.07.2022 | ||
EE | 27.07.2022 | ||
ES | 27.07.2022 | ||
FI | 27.07.2022 | ||
HR | 27.07.2022 | ||
LT | 27.07.2022 | ||
LV | 27.07.2022 | ||
NL | 27.07.2022 | ||
PL | 27.07.2022 | ||
RO | 27.07.2022 | ||
RS | 27.07.2022 | ||
SE | 27.07.2022 | ||
SK | 27.07.2022 | ||
SM | 27.07.2022 | ||
NO | 27.10.2022 | ||
GR | 28.10.2022 | ||
IS | 27.11.2022 | ||
PT | 28.11.2022 | ||
Former [2023/22] | AT | 27.07.2022 | |
CZ | 27.07.2022 | ||
DK | 27.07.2022 | ||
ES | 27.07.2022 | ||
FI | 27.07.2022 | ||
HR | 27.07.2022 | ||
LT | 27.07.2022 | ||
LV | 27.07.2022 | ||
NL | 27.07.2022 | ||
PL | 27.07.2022 | ||
RO | 27.07.2022 | ||
RS | 27.07.2022 | ||
SE | 27.07.2022 | ||
SM | 27.07.2022 | ||
NO | 27.10.2022 | ||
GR | 28.10.2022 | ||
IS | 27.11.2022 | ||
PT | 28.11.2022 | ||
Former [2023/21] | DK | 27.07.2022 | |
ES | 27.07.2022 | ||
FI | 27.07.2022 | ||
HR | 27.07.2022 | ||
LT | 27.07.2022 | ||
LV | 27.07.2022 | ||
NL | 27.07.2022 | ||
PL | 27.07.2022 | ||
RS | 27.07.2022 | ||
SE | 27.07.2022 | ||
SM | 27.07.2022 | ||
NO | 27.10.2022 | ||
GR | 28.10.2022 | ||
IS | 27.11.2022 | ||
PT | 28.11.2022 | ||
Former [2023/20] | ES | 27.07.2022 | |
FI | 27.07.2022 | ||
HR | 27.07.2022 | ||
LT | 27.07.2022 | ||
LV | 27.07.2022 | ||
NL | 27.07.2022 | ||
PL | 27.07.2022 | ||
RS | 27.07.2022 | ||
SE | 27.07.2022 | ||
SM | 27.07.2022 | ||
NO | 27.10.2022 | ||
GR | 28.10.2022 | ||
IS | 27.11.2022 | ||
PT | 28.11.2022 | ||
Former [2023/12] | ES | 27.07.2022 | |
FI | 27.07.2022 | ||
HR | 27.07.2022 | ||
LT | 27.07.2022 | ||
LV | 27.07.2022 | ||
NL | 27.07.2022 | ||
PL | 27.07.2022 | ||
RS | 27.07.2022 | ||
SE | 27.07.2022 | ||
NO | 27.10.2022 | ||
GR | 28.10.2022 | ||
IS | 27.11.2022 | ||
PT | 28.11.2022 | ||
Former [2023/11] | ES | 27.07.2022 | |
FI | 27.07.2022 | ||
HR | 27.07.2022 | ||
LT | 27.07.2022 | ||
LV | 27.07.2022 | ||
NL | 27.07.2022 | ||
PL | 27.07.2022 | ||
RS | 27.07.2022 | ||
SE | 27.07.2022 | ||
NO | 27.10.2022 | ||
GR | 28.10.2022 | ||
PT | 28.11.2022 | ||
Former [2023/10] | ES | 27.07.2022 | |
FI | 27.07.2022 | ||
HR | 27.07.2022 | ||
LT | 27.07.2022 | ||
LV | 27.07.2022 | ||
NL | 27.07.2022 | ||
RS | 27.07.2022 | ||
SE | 27.07.2022 | ||
NO | 27.10.2022 | ||
GR | 28.10.2022 | ||
PT | 28.11.2022 | ||
Former [2023/09] | ES | 27.07.2022 | |
FI | 27.07.2022 | ||
LT | 27.07.2022 | ||
LV | 27.07.2022 | ||
NL | 27.07.2022 | ||
RS | 27.07.2022 | ||
SE | 27.07.2022 | ||
NO | 27.10.2022 | ||
PT | 28.11.2022 | ||
Former [2023/08] | ES | 27.07.2022 | |
FI | 27.07.2022 | ||
LT | 27.07.2022 | ||
NL | 27.07.2022 | ||
RS | 27.07.2022 | ||
SE | 27.07.2022 | ||
NO | 27.10.2022 | ||
Former [2023/06] | NL | 27.07.2022 | Cited in | International search | [A]WO2011075150 (INTEL CORP [US], et al) [A] 1-19* page 6 - page 7; figure 8 *; | [A] - ALEXANDRU-FLORIAN ANTONESCU ET AL, "Dynamic Topology Orchestration for Distributed Cloud-Based Applications", NETWORK CLOUD COMPUTING AND APPLICATIONS (NCCA), 2012 SECOND SYMPOSIUM ON, IEEE, (20121203), doi:10.1109/NCCA.2012.14, ISBN 978-1-4673-5581-0, pages 116 - 123, XP032339559 [A] 1-19 * paragraph [II.background.and.related.work] * * paragraph [III.enabling.topology.orchestration] * DOI: http://dx.doi.org/10.1109/NCCA.2012.14 | [A] - ZHAO XINGYU ET AL, "Computational and communication resource allocation for mobile cooperative cloudlet computing systems", 2015 INTERNATIONAL CONFERENCE ON WIRELESS COMMUNICATIONS & SIGNAL PROCESSING (WCSP), IEEE, (20151015), doi:10.1109/WCSP.2015.7341155, pages 1 - 5, XP032820560 [A] 1-19 * paragraph [I.introduction] * * paragraph [II.sytem.assumptions.and.problem.formulation] * DOI: http://dx.doi.org/10.1109/WCSP.2015.7341155 |