EP3495084 - ARC WELDING CONTROL METHOD [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 04.02.2022 Database last updated on 15.06.2024 | |
Former | The patent has been granted Status updated on 26.02.2021 | ||
Former | Grant of patent is intended Status updated on 02.11.2020 | ||
Former | Request for examination was made Status updated on 10.05.2019 | ||
Former | The international publication has been made Status updated on 10.02.2018 | Most recent event Tooltip | 03.05.2024 | Lapse of the patent in a contracting state New state(s): MK | published on 05.06.2024 [2024/23] | Applicant(s) | For all designated states Daihen Corporation 1-11, Tagawa 2-chome Yodogawa-ku Osaka-shi, Osaka 532-8512 / JP | [2019/24] | Inventor(s) | 01 /
ONO, Kohei c/o DAIHEN Corporation 1-11 Tagawa 2-chome Yodogawa-ku Osaka-shi Osaka 532-8512 / JP | 02 /
NAKAMATA, Toshiaki c/o DAIHEN Corporation 1-11 Tagawa 2-chome Yodogawa-ku Osaka-shi Osaka 532-8512 / JP | [2019/24] | Representative(s) | Epping - Hermann - Fischer Patentanwaltsgesellschaft mbH Schloßschmidstraße 5 80639 München / DE | [2019/24] | Application number, filing date | 17836679.5 | 06.07.2017 | [2019/24] | WO2017JP24849 | Priority number, date | JP20160152028 | 02.08.2016 Original published format: JP 2016152028 | [2019/24] | Filing language | JA | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2018025572 | Date: | 08.02.2018 | Language: | JA | [2018/06] | Type: | A1 Application with search report | No.: | EP3495084 | Date: | 12.06.2019 | Language: | EN | [2019/24] | Type: | B1 Patent specification | No.: | EP3495084 | Date: | 31.03.2021 | Language: | EN | [2021/13] | Search report(s) | International search report - published on: | JP | 08.02.2018 | (Supplementary) European search report - dispatched on: | EP | 04.03.2020 | Classification | IPC: | B23K9/073, B23K9/12 | [2019/24] | CPC: |
B23K9/073 (EP,US);
B23K9/0732 (KR);
B23K9/0953 (US);
B23K3/063 (KR);
B23K9/12 (EP,KR);
B23K9/124 (US)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2019/24] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | MD | Not yet paid | Title | German: | LICHTBOGENSCHWEISSSTEUERUNGSVERFAHREN | [2019/24] | English: | ARC WELDING CONTROL METHOD | [2019/24] | French: | PROCÉDÉ DE COMMANDE DE SOUDAGE À L'ARC | [2019/24] | Entry into regional phase | 23.01.2019 | Translation filed | 23.01.2019 | National basic fee paid | 23.01.2019 | Search fee paid | 23.01.2019 | Designation fee(s) paid | 23.01.2019 | Examination fee paid | Examination procedure | 23.01.2019 | Examination requested [2019/24] | 06.05.2020 | Amendment by applicant (claims and/or description) | 03.11.2020 | Communication of intention to grant the patent | 17.02.2021 | Fee for grant paid | 17.02.2021 | Fee for publishing/printing paid | 17.02.2021 | Receipt of the translation of the claim(s) | Opposition(s) | 04.01.2022 | No opposition filed within time limit [2022/10] | Fees paid | Renewal fee | 29.07.2019 | Renewal fee patent year 03 | 24.07.2020 | Renewal fee patent year 04 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 06.07.2017 | AL | 31.03.2021 | AT | 31.03.2021 | CY | 31.03.2021 | CZ | 31.03.2021 | DK | 31.03.2021 | EE | 31.03.2021 | ES | 31.03.2021 | FI | 31.03.2021 | GR | 31.03.2021 | HR | 31.03.2021 | IT | 31.03.2021 | LT | 31.03.2021 | LV | 31.03.2021 | MC | 31.03.2021 | MK | 31.03.2021 | NL | 31.03.2021 | PL | 31.03.2021 | RO | 31.03.2021 | RS | 31.03.2021 | SE | 31.03.2021 | SI | 31.03.2021 | SK | 31.03.2021 | SM | 31.03.2021 | BG | 30.06.2021 | NO | 30.06.2021 | IE | 06.07.2021 | LU | 06.07.2021 | BE | 31.07.2021 | CH | 31.07.2021 | FR | 31.07.2021 | IS | 31.07.2021 | LI | 31.07.2021 | PT | 02.08.2021 | [2024/23] |
Former [2023/36] | HU | 06.07.2017 | |
AL | 31.03.2021 | ||
AT | 31.03.2021 | ||
CY | 31.03.2021 | ||
CZ | 31.03.2021 | ||
DK | 31.03.2021 | ||
EE | 31.03.2021 | ||
ES | 31.03.2021 | ||
FI | 31.03.2021 | ||
GR | 31.03.2021 | ||
HR | 31.03.2021 | ||
IT | 31.03.2021 | ||
LT | 31.03.2021 | ||
LV | 31.03.2021 | ||
MC | 31.03.2021 | ||
NL | 31.03.2021 | ||
PL | 31.03.2021 | ||
RO | 31.03.2021 | ||
RS | 31.03.2021 | ||
SE | 31.03.2021 | ||
SI | 31.03.2021 | ||
SK | 31.03.2021 | ||
SM | 31.03.2021 | ||
BG | 30.06.2021 | ||
NO | 30.06.2021 | ||
IE | 06.07.2021 | ||
LU | 06.07.2021 | ||
BE | 31.07.2021 | ||
CH | 31.07.2021 | ||
FR | 31.07.2021 | ||
IS | 31.07.2021 | ||
LI | 31.07.2021 | ||
PT | 02.08.2021 | ||
Former [2023/33] | HU | 06.07.2017 | |
AL | 31.03.2021 | ||
AT | 31.03.2021 | ||
CY | 31.03.2021 | ||
CZ | 31.03.2021 | ||
DK | 31.03.2021 | ||
EE | 31.03.2021 | ||
ES | 31.03.2021 | ||
FI | 31.03.2021 | ||
HR | 31.03.2021 | ||
IT | 31.03.2021 | ||
LT | 31.03.2021 | ||
LV | 31.03.2021 | ||
MC | 31.03.2021 | ||
NL | 31.03.2021 | ||
PL | 31.03.2021 | ||
RO | 31.03.2021 | ||
RS | 31.03.2021 | ||
SE | 31.03.2021 | ||
SI | 31.03.2021 | ||
SK | 31.03.2021 | ||
SM | 31.03.2021 | ||
BG | 30.06.2021 | ||
NO | 30.06.2021 | ||
IE | 06.07.2021 | ||
LU | 06.07.2021 | ||
BE | 31.07.2021 | ||
CH | 31.07.2021 | ||
FR | 31.07.2021 | ||
IS | 31.07.2021 | ||
LI | 31.07.2021 | ||
PT | 02.08.2021 | ||
Former [2023/30] | AL | 31.03.2021 | |
AT | 31.03.2021 | ||
CY | 31.03.2021 | ||
CZ | 31.03.2021 | ||
DK | 31.03.2021 | ||
EE | 31.03.2021 | ||
ES | 31.03.2021 | ||
FI | 31.03.2021 | ||
HR | 31.03.2021 | ||
IT | 31.03.2021 | ||
LT | 31.03.2021 | ||
LV | 31.03.2021 | ||
MC | 31.03.2021 | ||
NL | 31.03.2021 | ||
PL | 31.03.2021 | ||
RO | 31.03.2021 | ||
RS | 31.03.2021 | ||
SE | 31.03.2021 | ||
SI | 31.03.2021 | ||
SK | 31.03.2021 | ||
SM | 31.03.2021 | ||
BG | 30.06.2021 | ||
NO | 30.06.2021 | ||
IE | 06.07.2021 | ||
LU | 06.07.2021 | ||
BE | 31.07.2021 | ||
CH | 31.07.2021 | ||
FR | 31.07.2021 | ||
IS | 31.07.2021 | ||
LI | 31.07.2021 | ||
PT | 02.08.2021 | ||
Former [2022/36] | AL | 31.03.2021 | |
AT | 31.03.2021 | ||
CZ | 31.03.2021 | ||
DK | 31.03.2021 | ||
EE | 31.03.2021 | ||
ES | 31.03.2021 | ||
FI | 31.03.2021 | ||
HR | 31.03.2021 | ||
IT | 31.03.2021 | ||
LT | 31.03.2021 | ||
LV | 31.03.2021 | ||
MC | 31.03.2021 | ||
NL | 31.03.2021 | ||
PL | 31.03.2021 | ||
RO | 31.03.2021 | ||
RS | 31.03.2021 | ||
SE | 31.03.2021 | ||
SI | 31.03.2021 | ||
SK | 31.03.2021 | ||
SM | 31.03.2021 | ||
BG | 30.06.2021 | ||
NO | 30.06.2021 | ||
IE | 06.07.2021 | ||
LU | 06.07.2021 | ||
BE | 31.07.2021 | ||
CH | 31.07.2021 | ||
FR | 31.07.2021 | ||
IS | 31.07.2021 | ||
LI | 31.07.2021 | ||
PT | 02.08.2021 | ||
Former [2022/35] | AL | 31.03.2021 | |
AT | 31.03.2021 | ||
CZ | 31.03.2021 | ||
DK | 31.03.2021 | ||
EE | 31.03.2021 | ||
ES | 31.03.2021 | ||
FI | 31.03.2021 | ||
HR | 31.03.2021 | ||
LT | 31.03.2021 | ||
LV | 31.03.2021 | ||
MC | 31.03.2021 | ||
NL | 31.03.2021 | ||
PL | 31.03.2021 | ||
RO | 31.03.2021 | ||
RS | 31.03.2021 | ||
SE | 31.03.2021 | ||
SI | 31.03.2021 | ||
SK | 31.03.2021 | ||
SM | 31.03.2021 | ||
BG | 30.06.2021 | ||
NO | 30.06.2021 | ||
IE | 06.07.2021 | ||
LU | 06.07.2021 | ||
BE | 31.07.2021 | ||
CH | 31.07.2021 | ||
FR | 31.07.2021 | ||
IS | 31.07.2021 | ||
LI | 31.07.2021 | ||
PT | 02.08.2021 | ||
Former [2022/34] | AL | 31.03.2021 | |
AT | 31.03.2021 | ||
CZ | 31.03.2021 | ||
DK | 31.03.2021 | ||
EE | 31.03.2021 | ||
ES | 31.03.2021 | ||
FI | 31.03.2021 | ||
HR | 31.03.2021 | ||
LT | 31.03.2021 | ||
LV | 31.03.2021 | ||
MC | 31.03.2021 | ||
NL | 31.03.2021 | ||
PL | 31.03.2021 | ||
RO | 31.03.2021 | ||
RS | 31.03.2021 | ||
SE | 31.03.2021 | ||
SI | 31.03.2021 | ||
SK | 31.03.2021 | ||
SM | 31.03.2021 | ||
BG | 30.06.2021 | ||
NO | 30.06.2021 | ||
LU | 06.07.2021 | ||
BE | 31.07.2021 | ||
CH | 31.07.2021 | ||
FR | 31.07.2021 | ||
IS | 31.07.2021 | ||
LI | 31.07.2021 | ||
PT | 02.08.2021 | ||
Former [2022/29] | AL | 31.03.2021 | |
AT | 31.03.2021 | ||
CZ | 31.03.2021 | ||
DK | 31.03.2021 | ||
EE | 31.03.2021 | ||
ES | 31.03.2021 | ||
FI | 31.03.2021 | ||
HR | 31.03.2021 | ||
LT | 31.03.2021 | ||
LV | 31.03.2021 | ||
MC | 31.03.2021 | ||
NL | 31.03.2021 | ||
PL | 31.03.2021 | ||
RO | 31.03.2021 | ||
RS | 31.03.2021 | ||
SE | 31.03.2021 | ||
SI | 31.03.2021 | ||
SK | 31.03.2021 | ||
SM | 31.03.2021 | ||
BG | 30.06.2021 | ||
NO | 30.06.2021 | ||
LU | 06.07.2021 | ||
CH | 31.07.2021 | ||
FR | 31.07.2021 | ||
IS | 31.07.2021 | ||
LI | 31.07.2021 | ||
PT | 02.08.2021 | ||
Former [2022/23] | AL | 31.03.2021 | |
AT | 31.03.2021 | ||
CZ | 31.03.2021 | ||
DK | 31.03.2021 | ||
EE | 31.03.2021 | ||
ES | 31.03.2021 | ||
FI | 31.03.2021 | ||
HR | 31.03.2021 | ||
LT | 31.03.2021 | ||
LV | 31.03.2021 | ||
MC | 31.03.2021 | ||
NL | 31.03.2021 | ||
PL | 31.03.2021 | ||
RO | 31.03.2021 | ||
RS | 31.03.2021 | ||
SE | 31.03.2021 | ||
SK | 31.03.2021 | ||
SM | 31.03.2021 | ||
BG | 30.06.2021 | ||
NO | 30.06.2021 | ||
LU | 06.07.2021 | ||
CH | 31.07.2021 | ||
FR | 31.07.2021 | ||
IS | 31.07.2021 | ||
LI | 31.07.2021 | ||
PT | 02.08.2021 | ||
Former [2022/21] | AL | 31.03.2021 | |
AT | 31.03.2021 | ||
CZ | 31.03.2021 | ||
DK | 31.03.2021 | ||
EE | 31.03.2021 | ||
ES | 31.03.2021 | ||
FI | 31.03.2021 | ||
HR | 31.03.2021 | ||
LT | 31.03.2021 | ||
LV | 31.03.2021 | ||
MC | 31.03.2021 | ||
NL | 31.03.2021 | ||
PL | 31.03.2021 | ||
RO | 31.03.2021 | ||
RS | 31.03.2021 | ||
SE | 31.03.2021 | ||
SK | 31.03.2021 | ||
SM | 31.03.2021 | ||
BG | 30.06.2021 | ||
NO | 30.06.2021 | ||
CH | 31.07.2021 | ||
LI | 31.07.2021 | ||
PT | 02.08.2021 | ||
IS | 24.12.2021 | ||
Former [2022/18] | AL | 31.03.2021 | |
AT | 31.03.2021 | ||
CZ | 31.03.2021 | ||
DK | 31.03.2021 | ||
EE | 31.03.2021 | ||
ES | 31.03.2021 | ||
FI | 31.03.2021 | ||
HR | 31.03.2021 | ||
LT | 31.03.2021 | ||
LV | 31.03.2021 | ||
MC | 31.03.2021 | ||
NL | 31.03.2021 | ||
PL | 31.03.2021 | ||
RO | 31.03.2021 | ||
RS | 31.03.2021 | ||
SE | 31.03.2021 | ||
SK | 31.03.2021 | ||
SM | 31.03.2021 | ||
BG | 30.06.2021 | ||
NO | 30.06.2021 | ||
PT | 02.08.2021 | ||
IS | 24.12.2021 | ||
Former [2022/10] | AL | 31.03.2021 | |
AT | 31.03.2021 | ||
CZ | 31.03.2021 | ||
DK | 31.03.2021 | ||
EE | 31.03.2021 | ||
ES | 31.03.2021 | ||
FI | 31.03.2021 | ||
HR | 31.03.2021 | ||
LT | 31.03.2021 | ||
LV | 31.03.2021 | ||
NL | 31.03.2021 | ||
PL | 31.03.2021 | ||
RO | 31.03.2021 | ||
RS | 31.03.2021 | ||
SE | 31.03.2021 | ||
SK | 31.03.2021 | ||
SM | 31.03.2021 | ||
BG | 30.06.2021 | ||
NO | 30.06.2021 | ||
PT | 02.08.2021 | ||
IS | 24.12.2021 | ||
Former [2022/08] | AL | 31.03.2021 | |
AT | 31.03.2021 | ||
CZ | 31.03.2021 | ||
DK | 31.03.2021 | ||
EE | 31.03.2021 | ||
ES | 31.03.2021 | ||
FI | 31.03.2021 | ||
HR | 31.03.2021 | ||
LT | 31.03.2021 | ||
LV | 31.03.2021 | ||
NL | 31.03.2021 | ||
PL | 31.03.2021 | ||
RO | 31.03.2021 | ||
RS | 31.03.2021 | ||
SE | 31.03.2021 | ||
SK | 31.03.2021 | ||
SM | 31.03.2021 | ||
BG | 30.06.2021 | ||
NO | 30.06.2021 | ||
IS | 31.07.2021 | ||
PT | 02.08.2021 | ||
Former [2022/07] | AL | 31.03.2021 | |
AT | 31.03.2021 | ||
CZ | 31.03.2021 | ||
EE | 31.03.2021 | ||
FI | 31.03.2021 | ||
HR | 31.03.2021 | ||
LT | 31.03.2021 | ||
LV | 31.03.2021 | ||
NL | 31.03.2021 | ||
PL | 31.03.2021 | ||
RO | 31.03.2021 | ||
RS | 31.03.2021 | ||
SE | 31.03.2021 | ||
SK | 31.03.2021 | ||
SM | 31.03.2021 | ||
BG | 30.06.2021 | ||
NO | 30.06.2021 | ||
IS | 31.07.2021 | ||
PT | 02.08.2021 | ||
Former [2021/52] | AT | 31.03.2021 | |
CZ | 31.03.2021 | ||
EE | 31.03.2021 | ||
FI | 31.03.2021 | ||
HR | 31.03.2021 | ||
LT | 31.03.2021 | ||
LV | 31.03.2021 | ||
NL | 31.03.2021 | ||
PL | 31.03.2021 | ||
RO | 31.03.2021 | ||
RS | 31.03.2021 | ||
SE | 31.03.2021 | ||
SK | 31.03.2021 | ||
SM | 31.03.2021 | ||
BG | 30.06.2021 | ||
NO | 30.06.2021 | ||
IS | 31.07.2021 | ||
PT | 02.08.2021 | ||
Former [2021/51] | AT | 31.03.2021 | |
CZ | 31.03.2021 | ||
EE | 31.03.2021 | ||
FI | 31.03.2021 | ||
HR | 31.03.2021 | ||
LT | 31.03.2021 | ||
LV | 31.03.2021 | ||
NL | 31.03.2021 | ||
RO | 31.03.2021 | ||
RS | 31.03.2021 | ||
SE | 31.03.2021 | ||
SK | 31.03.2021 | ||
SM | 31.03.2021 | ||
BG | 30.06.2021 | ||
NO | 30.06.2021 | ||
IS | 31.07.2021 | ||
PT | 02.08.2021 | ||
Former [2021/50] | AT | 31.03.2021 | |
CZ | 31.03.2021 | ||
EE | 31.03.2021 | ||
FI | 31.03.2021 | ||
HR | 31.03.2021 | ||
LT | 31.03.2021 | ||
LV | 31.03.2021 | ||
NL | 31.03.2021 | ||
RO | 31.03.2021 | ||
RS | 31.03.2021 | ||
SE | 31.03.2021 | ||
SK | 31.03.2021 | ||
SM | 31.03.2021 | ||
BG | 30.06.2021 | ||
NO | 30.06.2021 | ||
PT | 02.08.2021 | ||
Former [2021/48] | AT | 31.03.2021 | |
CZ | 31.03.2021 | ||
EE | 31.03.2021 | ||
FI | 31.03.2021 | ||
HR | 31.03.2021 | ||
LT | 31.03.2021 | ||
LV | 31.03.2021 | ||
NL | 31.03.2021 | ||
RS | 31.03.2021 | ||
SE | 31.03.2021 | ||
SM | 31.03.2021 | ||
BG | 30.06.2021 | ||
NO | 30.06.2021 | ||
Former [2021/47] | AT | 31.03.2021 | |
FI | 31.03.2021 | ||
HR | 31.03.2021 | ||
LT | 31.03.2021 | ||
LV | 31.03.2021 | ||
NL | 31.03.2021 | ||
RS | 31.03.2021 | ||
SE | 31.03.2021 | ||
SM | 31.03.2021 | ||
BG | 30.06.2021 | ||
NO | 30.06.2021 | ||
Former [2021/46] | AT | 31.03.2021 | |
FI | 31.03.2021 | ||
HR | 31.03.2021 | ||
LT | 31.03.2021 | ||
LV | 31.03.2021 | ||
RS | 31.03.2021 | ||
SE | 31.03.2021 | ||
SM | 31.03.2021 | ||
BG | 30.06.2021 | ||
NO | 30.06.2021 | ||
Former [2021/38] | FI | 31.03.2021 | |
HR | 31.03.2021 | ||
LV | 31.03.2021 | ||
RS | 31.03.2021 | ||
SE | 31.03.2021 | ||
BG | 30.06.2021 | ||
NO | 30.06.2021 | ||
Former [2021/37] | FI | 31.03.2021 | |
HR | 31.03.2021 | ||
LV | 31.03.2021 | ||
RS | 31.03.2021 | ||
BG | 30.06.2021 | ||
NO | 30.06.2021 | ||
Former [2021/36] | FI | 31.03.2021 | |
HR | 31.03.2021 | ||
BG | 30.06.2021 | ||
NO | 30.06.2021 | ||
Former [2021/35] | FI | 31.03.2021 | |
HR | 31.03.2021 | ||
NO | 30.06.2021 | ||
Former [2021/33] | FI | 31.03.2021 | |
NO | 30.06.2021 | Documents cited: | Search | [A]JP2012006020 (DAIHEN CORP) [A] 1-4* abstract *; | [A]WO2012046411 (PANASONIC CORP [JP], et al) [A] 1-4 * abstract *; | [A]WO2013008394 (PANASONIC CORP [JP], et al) [A] 1-4 * abstract * | International search | [A]JP2012006020 (DAIHEN CORP) [A] 1-4* , paragraphs [0021] to [0026]; fig. 1 (Family: none) *; | [A]WO2012046411 (PANASONIC CORP [JP], et al) [A] 1-4 * , paragraphs [0019] to [0021], [0034] to [0035], [0100]; fig. 1, 8 & US 2012/0255940 A1 paragraphs [0027] to [0029], [0042] to [0043], [0107]; fig. 1, 8 & EP 2505294 A1 & CN 102652045 A *; | [A]WO2013008394 (PANASONIC CORP [JP], et al) [A] 1-4 * , paragraphs [0020] to [0022], [0025] to [0028]; fig. 1 & US 2013/0299476 A1 paragraphs [0030] to [0032], [0035] to [0038]; fig. 1 & EP 2732901 A1 & CN 103260807 A * |