EP3500013 - COMMUNICATION DEVICE, COMMUNICATION METHOD, AND PROGRAM FOR DUAL CONNECTIVITY [Right-click to bookmark this link] | |||
Former [2019/25] | COMMUNICATION DEVICE, COMMUNICATION METHOD, AND PROGRAM | ||
[2021/10] | Status | No opposition filed within time limit Status updated on 10.06.2022 Database last updated on 07.06.2024 | |
Former | The patent has been granted Status updated on 02.07.2021 | ||
Former | Grant of patent is intended Status updated on 16.02.2021 | ||
Former | Request for examination was made Status updated on 17.05.2019 | ||
Former | The international publication has been made Status updated on 17.02.2018 | Most recent event Tooltip | 03.05.2024 | Lapse of the patent in a contracting state New state(s): MK | published on 05.06.2024 [2024/23] | Applicant(s) | For all designated states Sony Group Corporation 1-7-1 Konan Minato-ku Tokyo 108-0075 / JP | [2021/30] |
Former [2019/25] | For all designated states Sony Corporation 1-7-1 Konan Minato-ku Tokyo 108-0075 / JP | Inventor(s) | 01 /
KUSASHIMA, Naoki c/o SONY CORPORATION 1-7-1 Konan Minato-ku Tokyo 108-0075 / JP | [2019/25] | Representative(s) | Witte, Weller & Partner Patentanwälte mbB Postfach 10 54 62 70047 Stuttgart / DE | [2019/25] | Application number, filing date | 17839067.0 | 21.06.2017 | [2019/25] | WO2017JP22765 | Priority number, date | JP20160155685 | 08.08.2016 Original published format: JP 2016155685 | [2019/25] | Filing language | JA | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2018029993 | Date: | 15.02.2018 | Language: | JA | [2018/07] | Type: | A1 Application with search report | No.: | EP3500013 | Date: | 19.06.2019 | Language: | EN | [2019/25] | Type: | B1 Patent specification | No.: | EP3500013 | Date: | 04.08.2021 | Language: | EN | [2021/31] | Search report(s) | International search report - published on: | JP | 15.02.2018 | (Supplementary) European search report - dispatched on: | EP | 12.07.2019 | Classification | IPC: | H04L5/00, H04W72/04, H04W72/12, H04L1/00, H04W76/11, H04W76/15, H04W76/27, H04W80/02 | [2019/33] | CPC: |
H04L5/0007 (EP,CN,US);
H04W72/0453 (CN,US);
H04L1/0063 (CN,US);
H04L5/0053 (EP,CN,US);
H04L5/0055 (CN,US);
H04L5/0078 (EP,CN,US);
H04W72/04 (CN,US);
H04W72/0446 (CN,US);
H04W72/12 (EP,CN,US);
H04W72/23 (US);
H04W76/11 (CN,US);
H04W76/15 (EP,CN,US);
|
Former IPC [2019/25] | H04W72/04, H04W72/12 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2019/25] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | MD | Not yet paid | Title | German: | KOMMUNIKATIONSVORRICHTUNG, KOMMUNIKATIONSVERFAHREN UND PROGRAMM FÜR DUAL CONNECTIVITY | [2021/10] | English: | COMMUNICATION DEVICE, COMMUNICATION METHOD, AND PROGRAM FOR DUAL CONNECTIVITY | [2021/10] | French: | DISPOSITIF DE COMMUNICATION, PROCÉDÉ DE COMMUNICATION, ET PROGRAMME POUR DOUBLE CONNECTIVITÉ | [2021/10] |
Former [2019/25] | KOMMUNIKATIONSVORRICHTUNG, KOMMUNIKATIONSVERFAHREN UND PROGRAMM | ||
Former [2019/25] | COMMUNICATION DEVICE, COMMUNICATION METHOD, AND PROGRAM | ||
Former [2019/25] | DISPOSITIF DE COMMUNICATION, PROCÉDÉ DE COMMUNICATION, ET PROGRAMME | Entry into regional phase | 01.02.2019 | Translation filed | 01.02.2019 | National basic fee paid | 01.02.2019 | Search fee paid | 01.02.2019 | Designation fee(s) paid | 01.02.2019 | Examination fee paid | Examination procedure | 01.02.2019 | Examination requested [2019/25] | 02.03.2020 | Amendment by applicant (claims and/or description) | 17.02.2021 | Communication of intention to grant the patent | 25.06.2021 | Fee for grant paid | 25.06.2021 | Fee for publishing/printing paid | 25.06.2021 | Receipt of the translation of the claim(s) | Divisional application(s) | EP21189248.4 / EP3923508 | EP23197303.3 / EP4271119 | Opposition(s) | 06.05.2022 | No opposition filed within time limit [2022/28] | Fees paid | Renewal fee | 25.06.2019 | Renewal fee patent year 03 | 31.03.2020 | Renewal fee patent year 04 | 23.06.2021 | Renewal fee patent year 05 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 21.06.2017 | AL | 04.08.2021 | AT | 04.08.2021 | CY | 04.08.2021 | CZ | 04.08.2021 | DK | 04.08.2021 | EE | 04.08.2021 | FI | 04.08.2021 | HR | 04.08.2021 | IT | 04.08.2021 | LT | 04.08.2021 | LV | 04.08.2021 | MC | 04.08.2021 | MK | 04.08.2021 | PL | 04.08.2021 | RO | 04.08.2021 | RS | 04.08.2021 | SE | 04.08.2021 | SI | 04.08.2021 | SK | 04.08.2021 | SM | 04.08.2021 | BG | 04.11.2021 | NO | 04.11.2021 | GR | 05.11.2021 | IS | 04.12.2021 | PT | 06.12.2021 | [2024/23] |
Former [2024/20] | HU | 21.06.2017 | |
AL | 04.08.2021 | ||
AT | 04.08.2021 | ||
CY | 04.08.2021 | ||
CZ | 04.08.2021 | ||
DK | 04.08.2021 | ||
EE | 04.08.2021 | ||
FI | 04.08.2021 | ||
HR | 04.08.2021 | ||
IT | 04.08.2021 | ||
LT | 04.08.2021 | ||
LV | 04.08.2021 | ||
MC | 04.08.2021 | ||
PL | 04.08.2021 | ||
RO | 04.08.2021 | ||
RS | 04.08.2021 | ||
SE | 04.08.2021 | ||
SI | 04.08.2021 | ||
SK | 04.08.2021 | ||
SM | 04.08.2021 | ||
BG | 04.11.2021 | ||
NO | 04.11.2021 | ||
GR | 05.11.2021 | ||
IS | 04.12.2021 | ||
PT | 06.12.2021 | ||
Former [2024/18] | HU | 21.06.2017 | |
AL | 04.08.2021 | ||
AT | 04.08.2021 | ||
CZ | 04.08.2021 | ||
DK | 04.08.2021 | ||
EE | 04.08.2021 | ||
FI | 04.08.2021 | ||
HR | 04.08.2021 | ||
IT | 04.08.2021 | ||
LT | 04.08.2021 | ||
LV | 04.08.2021 | ||
MC | 04.08.2021 | ||
PL | 04.08.2021 | ||
RO | 04.08.2021 | ||
RS | 04.08.2021 | ||
SE | 04.08.2021 | ||
SI | 04.08.2021 | ||
SK | 04.08.2021 | ||
SM | 04.08.2021 | ||
BG | 04.11.2021 | ||
NO | 04.11.2021 | ||
GR | 05.11.2021 | ||
IS | 04.12.2021 | ||
PT | 06.12.2021 | ||
Former [2023/08] | AL | 04.08.2021 | |
AT | 04.08.2021 | ||
CZ | 04.08.2021 | ||
DK | 04.08.2021 | ||
EE | 04.08.2021 | ||
FI | 04.08.2021 | ||
HR | 04.08.2021 | ||
IT | 04.08.2021 | ||
LT | 04.08.2021 | ||
LV | 04.08.2021 | ||
MC | 04.08.2021 | ||
PL | 04.08.2021 | ||
RO | 04.08.2021 | ||
RS | 04.08.2021 | ||
SE | 04.08.2021 | ||
SI | 04.08.2021 | ||
SK | 04.08.2021 | ||
SM | 04.08.2021 | ||
BG | 04.11.2021 | ||
NO | 04.11.2021 | ||
GR | 05.11.2021 | ||
IS | 04.12.2021 | ||
PT | 06.12.2021 | ||
Former [2022/36] | AL | 04.08.2021 | |
AT | 04.08.2021 | ||
CZ | 04.08.2021 | ||
DK | 04.08.2021 | ||
EE | 04.08.2021 | ||
FI | 04.08.2021 | ||
HR | 04.08.2021 | ||
IT | 04.08.2021 | ||
LT | 04.08.2021 | ||
LV | 04.08.2021 | ||
PL | 04.08.2021 | ||
RO | 04.08.2021 | ||
RS | 04.08.2021 | ||
SE | 04.08.2021 | ||
SI | 04.08.2021 | ||
SK | 04.08.2021 | ||
SM | 04.08.2021 | ||
BG | 04.11.2021 | ||
NO | 04.11.2021 | ||
GR | 05.11.2021 | ||
IS | 04.12.2021 | ||
PT | 06.12.2021 | ||
Former [2022/29] | AL | 04.08.2021 | |
AT | 04.08.2021 | ||
CZ | 04.08.2021 | ||
DK | 04.08.2021 | ||
EE | 04.08.2021 | ||
FI | 04.08.2021 | ||
HR | 04.08.2021 | ||
LT | 04.08.2021 | ||
LV | 04.08.2021 | ||
PL | 04.08.2021 | ||
RO | 04.08.2021 | ||
RS | 04.08.2021 | ||
SE | 04.08.2021 | ||
SK | 04.08.2021 | ||
SM | 04.08.2021 | ||
BG | 04.11.2021 | ||
NO | 04.11.2021 | ||
GR | 05.11.2021 | ||
IS | 04.12.2021 | ||
PT | 06.12.2021 | ||
Former [2022/25] | AT | 04.08.2021 | |
CZ | 04.08.2021 | ||
DK | 04.08.2021 | ||
EE | 04.08.2021 | ||
FI | 04.08.2021 | ||
HR | 04.08.2021 | ||
LT | 04.08.2021 | ||
LV | 04.08.2021 | ||
PL | 04.08.2021 | ||
RO | 04.08.2021 | ||
RS | 04.08.2021 | ||
SE | 04.08.2021 | ||
SK | 04.08.2021 | ||
SM | 04.08.2021 | ||
BG | 04.11.2021 | ||
NO | 04.11.2021 | ||
GR | 05.11.2021 | ||
IS | 04.12.2021 | ||
PT | 06.12.2021 | ||
Former [2022/24] | AT | 04.08.2021 | |
CZ | 04.08.2021 | ||
DK | 04.08.2021 | ||
EE | 04.08.2021 | ||
FI | 04.08.2021 | ||
HR | 04.08.2021 | ||
LT | 04.08.2021 | ||
LV | 04.08.2021 | ||
PL | 04.08.2021 | ||
RO | 04.08.2021 | ||
RS | 04.08.2021 | ||
SE | 04.08.2021 | ||
SK | 04.08.2021 | ||
BG | 04.11.2021 | ||
NO | 04.11.2021 | ||
GR | 05.11.2021 | ||
IS | 04.12.2021 | ||
PT | 06.12.2021 | ||
Former [2022/21] | AT | 04.08.2021 | |
DK | 04.08.2021 | ||
FI | 04.08.2021 | ||
HR | 04.08.2021 | ||
LT | 04.08.2021 | ||
LV | 04.08.2021 | ||
PL | 04.08.2021 | ||
RS | 04.08.2021 | ||
SE | 04.08.2021 | ||
BG | 04.11.2021 | ||
NO | 04.11.2021 | ||
GR | 05.11.2021 | ||
IS | 04.12.2021 | ||
PT | 06.12.2021 | ||
Former [2022/10] | AT | 04.08.2021 | |
FI | 04.08.2021 | ||
HR | 04.08.2021 | ||
LT | 04.08.2021 | ||
LV | 04.08.2021 | ||
PL | 04.08.2021 | ||
RS | 04.08.2021 | ||
SE | 04.08.2021 | ||
BG | 04.11.2021 | ||
NO | 04.11.2021 | ||
GR | 05.11.2021 | ||
IS | 04.12.2021 | ||
PT | 06.12.2021 | ||
Former [2022/09] | AT | 04.08.2021 | |
FI | 04.08.2021 | ||
LT | 04.08.2021 | ||
RS | 04.08.2021 | ||
SE | 04.08.2021 | ||
BG | 04.11.2021 | ||
NO | 04.11.2021 | ||
PT | 06.12.2021 | ||
Former [2022/08] | AT | 04.08.2021 | |
FI | 04.08.2021 | ||
LT | 04.08.2021 | ||
SE | 04.08.2021 | ||
BG | 04.11.2021 | ||
NO | 04.11.2021 | ||
Former [2022/07] | AT | 04.08.2021 | |
LT | 04.08.2021 | ||
NO | 04.11.2021 | Documents cited: | Search | [XI]US2016165547 (OUCHI WATARU [JP], et al) [X] 1,7,13-15 * paragraphs [0044] - [0065] * [I] 2-6,8-12; | [XI] - INTEL CORPORATION, "Summary on remaining issues on narrowband retuning for eMTC", vol. RAN WG1, no. St Julian's, Malta; 20160215 - 20160219, (20160224), 3GPP DRAFT; R1-161255 - EMTC FREQRETUNING, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, URL: http://www.3gpp.org/ftp/tsg_ran/WG1_RL1/TSGR1_84/Docs/, (20160224), XP051079188 [X] 1,7,13-15 * section 2 * [I] 2-6,8-12 | International search | [XYA] - LG ELECTRONICS, "Discussion on trame structure for NR", 3GPP TSG-RAN WG1#85, R1-164560 , 3GPP, (20160527), URL: http://www.3gpp.org/ftp/tsg-ran/WG1_RL1/TSGR1_676/Docs/R1-164560.zip, (20170824), XP051096379 [X] 1, 2, 10, 12-14, 18, 20-25 [Y] 3, 15 [A] 4-9, 11, 16, 17, 19 | [Y] - HUAWEI et al., "Discussion on frame structure for NR", 3GPP TSG-RAN WG1#85, R1-164032, 3GPP, (20160527), URL: http://www.3gpp.org/ftp/tsg_ran/WG1_RL1/TSGR1_156/Docs/R1-164032.zip, (20170824), XP051089779 [Y] 3, 15 |