EP3498174 - SOLID-STATE IMAGE CAPTURING DEVICE, RADIATION IMAGE CAPTURING SYSTEM, AND METHOD OF CONTROLLING SOLID-STATE IMAGE CAPTURING DEVICE [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 30.07.2021 Database last updated on 29.07.2024 | |
Former | The patent has been granted Status updated on 21.08.2020 | ||
Former | Grant of patent is intended Status updated on 26.03.2020 | ||
Former | Request for examination was made Status updated on 17.05.2019 | ||
Former | The international publication has been made Status updated on 17.02.2018 | Most recent event Tooltip | 03.05.2024 | Lapse of the patent in a contracting state New state(s): MK | published on 05.06.2024 [2024/23] | Applicant(s) | For all designated states Hamamatsu Photonics K.K. 1126-1, Ichino-cho Higashi-ku Hamamatsu-shi, Shizuoka 435-8558 / JP | [2019/25] | Inventor(s) | 01 /
SAWADA Junichi c/o Hamamatsu Photonics K.K. 1126-1 Ichino-cho Higashi-ku Hamamatsu-shi Shizuoka 435-8558 / JP | 02 /
KYUSHIMA Ryuji c/o Hamamatsu Photonics K.K. 1126-1 Ichino-cho Higashi-ku Hamamatsu-shi Shizuoka 435-8558 / JP | 03 /
OKADA Haruyoshi c/o Hamamatsu Photonics K.K. 1126-1 Ichino-cho Higashi-ku Hamamatsu-shi Shizuoka 435-8558 / JP | 04 /
FUJITA Kazuki c/o Hamamatsu Photonics K.K. 1126-1 Ichino-cho Higashi-ku Hamamatsu-shi Shizuoka 435-8558 / JP | 05 /
MORI Harumichi c/o Hamamatsu Photonics K.K. 1126-1 Ichino-cho Higashi-ku Hamamatsu-shi Shizuoka 435-8558 / JP | [2019/25] | Representative(s) | Hoffmann Eitle Patent- und Rechtsanwälte PartmbB Arabellastraße 30 81925 München / DE | [2019/25] | Application number, filing date | 17839557.0 | 09.08.2017 | [2019/25] | WO2017JP29000 | Priority number, date | JP20160157981 | 10.08.2016 Original published format: JP 2016157981 | [2019/25] | Filing language | JA | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2018030490 | Date: | 15.02.2018 | Language: | JA | [2018/07] | Type: | A1 Application with search report | No.: | EP3498174 | Date: | 19.06.2019 | Language: | EN | [2019/25] | Type: | B1 Patent specification | No.: | EP3498174 | Date: | 23.09.2020 | Language: | EN | [2020/39] | Search report(s) | International search report - published on: | JP | 15.02.2018 | (Supplementary) European search report - dispatched on: | EP | 20.12.2019 | Classification | IPC: | H04N5/32, A61B6/14, A61B6/00, A61B6/03, H04N5/365, H04N5/378 | [2020/04] | CPC: |
A61B6/51 (EP,US);
A61B6/54 (KR,US);
A61B6/4233 (US);
A61B6/00 (US);
A61B6/03 (EP);
A61B6/4208 (EP);
A61B6/5205 (EP);
G01T1/17 (EP);
G01T1/247 (US);
H04N25/30 (EP,KR);
H04N25/671 (EP);
H04N25/672 (EP);
|
Former IPC [2019/25] | A61B6/14, A61B6/00 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2019/25] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | MD | Not yet paid | Title | German: | FESTKÖRPERBILDERFASSUNGSVORRICHTUNG, STRAHLUNGSBILDERFASSUNGSSYSTEM UND VERFAHREN ZUR STEUERUNG DER FESTKÖRPERBILDERFASSUNGSVORRICHTUNG | [2019/25] | English: | SOLID-STATE IMAGE CAPTURING DEVICE, RADIATION IMAGE CAPTURING SYSTEM, AND METHOD OF CONTROLLING SOLID-STATE IMAGE CAPTURING DEVICE | [2019/25] | French: | DISPOSITIF DE CAPTURE D'IMAGES À SEMI-CONDUCTEURS, SYSTÈME DE CAPTURE D'IMAGES À SEMI-CONDUCTEURS, ET PROCÉDÉ DE COMMANDE DE DISPOSITIF DE CAPTURE D'IMAGES À SEMI-CONDUCTEURS | [2019/25] | Entry into regional phase | 12.02.2019 | Translation filed | 12.02.2019 | National basic fee paid | 12.02.2019 | Search fee paid | 12.02.2019 | Designation fee(s) paid | 12.02.2019 | Examination fee paid | Examination procedure | 12.02.2019 | Examination requested [2019/25] | 27.03.2020 | Communication of intention to grant the patent | 20.07.2020 | Fee for grant paid | 20.07.2020 | Fee for publishing/printing paid | 20.07.2020 | Receipt of the translation of the claim(s) | Opposition(s) | 24.06.2021 | No opposition filed within time limit [2021/35] | Fees paid | Renewal fee | 12.08.2019 | Renewal fee patent year 03 | 13.08.2020 | Renewal fee patent year 04 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 09.08.2017 | AL | 23.09.2020 | AT | 23.09.2020 | CY | 23.09.2020 | CZ | 23.09.2020 | DK | 23.09.2020 | EE | 23.09.2020 | ES | 23.09.2020 | HR | 23.09.2020 | LT | 23.09.2020 | LV | 23.09.2020 | MC | 23.09.2020 | MK | 23.09.2020 | NL | 23.09.2020 | PL | 23.09.2020 | RO | 23.09.2020 | RS | 23.09.2020 | SE | 23.09.2020 | SI | 23.09.2020 | SK | 23.09.2020 | SM | 23.09.2020 | BG | 23.12.2020 | NO | 23.12.2020 | GR | 24.12.2020 | IS | 23.01.2021 | PT | 25.01.2021 | [2024/23] |
Former [2023/33] | HU | 09.08.2017 | |
AL | 23.09.2020 | ||
AT | 23.09.2020 | ||
CY | 23.09.2020 | ||
CZ | 23.09.2020 | ||
DK | 23.09.2020 | ||
EE | 23.09.2020 | ||
ES | 23.09.2020 | ||
HR | 23.09.2020 | ||
LT | 23.09.2020 | ||
LV | 23.09.2020 | ||
MC | 23.09.2020 | ||
NL | 23.09.2020 | ||
PL | 23.09.2020 | ||
RO | 23.09.2020 | ||
RS | 23.09.2020 | ||
SE | 23.09.2020 | ||
SI | 23.09.2020 | ||
SK | 23.09.2020 | ||
SM | 23.09.2020 | ||
BG | 23.12.2020 | ||
NO | 23.12.2020 | ||
GR | 24.12.2020 | ||
IS | 23.01.2021 | ||
PT | 25.01.2021 | ||
Former [2023/30] | AL | 23.09.2020 | |
AT | 23.09.2020 | ||
CY | 23.09.2020 | ||
CZ | 23.09.2020 | ||
DK | 23.09.2020 | ||
EE | 23.09.2020 | ||
ES | 23.09.2020 | ||
HR | 23.09.2020 | ||
LT | 23.09.2020 | ||
LV | 23.09.2020 | ||
MC | 23.09.2020 | ||
NL | 23.09.2020 | ||
PL | 23.09.2020 | ||
RO | 23.09.2020 | ||
RS | 23.09.2020 | ||
SE | 23.09.2020 | ||
SI | 23.09.2020 | ||
SK | 23.09.2020 | ||
SM | 23.09.2020 | ||
BG | 23.12.2020 | ||
NO | 23.12.2020 | ||
GR | 24.12.2020 | ||
IS | 23.01.2021 | ||
PT | 25.01.2021 | ||
Former [2023/29] | AL | 23.09.2020 | |
AT | 23.09.2020 | ||
CZ | 23.09.2020 | ||
DK | 23.09.2020 | ||
EE | 23.09.2020 | ||
ES | 23.09.2020 | ||
HR | 23.09.2020 | ||
LT | 23.09.2020 | ||
LV | 23.09.2020 | ||
MC | 23.09.2020 | ||
NL | 23.09.2020 | ||
PL | 23.09.2020 | ||
RO | 23.09.2020 | ||
RS | 23.09.2020 | ||
SE | 23.09.2020 | ||
SI | 23.09.2020 | ||
SK | 23.09.2020 | ||
SM | 23.09.2020 | ||
BG | 23.12.2020 | ||
NO | 23.12.2020 | ||
GR | 24.12.2020 | ||
IS | 23.01.2021 | ||
PT | 25.01.2021 | ||
Former [2022/18] | AL | 23.09.2020 | |
AT | 23.09.2020 | ||
CZ | 23.09.2020 | ||
DK | 23.09.2020 | ||
EE | 23.09.2020 | ||
ES | 23.09.2020 | ||
HR | 23.09.2020 | ||
LT | 23.09.2020 | ||
LV | 23.09.2020 | ||
MC | 23.09.2020 | ||
PL | 23.09.2020 | ||
RO | 23.09.2020 | ||
RS | 23.09.2020 | ||
SE | 23.09.2020 | ||
SI | 23.09.2020 | ||
SK | 23.09.2020 | ||
SM | 23.09.2020 | ||
BG | 23.12.2020 | ||
NO | 23.12.2020 | ||
GR | 24.12.2020 | ||
IS | 23.01.2021 | ||
PT | 25.01.2021 | ||
Former [2021/37] | AL | 23.09.2020 | |
AT | 23.09.2020 | ||
CZ | 23.09.2020 | ||
DK | 23.09.2020 | ||
EE | 23.09.2020 | ||
ES | 23.09.2020 | ||
HR | 23.09.2020 | ||
LT | 23.09.2020 | ||
LV | 23.09.2020 | ||
PL | 23.09.2020 | ||
RO | 23.09.2020 | ||
RS | 23.09.2020 | ||
SE | 23.09.2020 | ||
SI | 23.09.2020 | ||
SK | 23.09.2020 | ||
SM | 23.09.2020 | ||
BG | 23.12.2020 | ||
NO | 23.12.2020 | ||
GR | 24.12.2020 | ||
IS | 23.01.2021 | ||
PT | 25.01.2021 | ||
Former [2021/36] | AL | 23.09.2020 | |
AT | 23.09.2020 | ||
CZ | 23.09.2020 | ||
EE | 23.09.2020 | ||
ES | 23.09.2020 | ||
HR | 23.09.2020 | ||
LT | 23.09.2020 | ||
LV | 23.09.2020 | ||
PL | 23.09.2020 | ||
RO | 23.09.2020 | ||
RS | 23.09.2020 | ||
SE | 23.09.2020 | ||
SI | 23.09.2020 | ||
SK | 23.09.2020 | ||
SM | 23.09.2020 | ||
BG | 23.12.2020 | ||
NO | 23.12.2020 | ||
GR | 24.12.2020 | ||
IS | 23.01.2021 | ||
PT | 25.01.2021 | ||
Former [2021/28] | AL | 23.09.2020 | |
AT | 23.09.2020 | ||
CZ | 23.09.2020 | ||
EE | 23.09.2020 | ||
ES | 23.09.2020 | ||
HR | 23.09.2020 | ||
LT | 23.09.2020 | ||
LV | 23.09.2020 | ||
PL | 23.09.2020 | ||
RO | 23.09.2020 | ||
RS | 23.09.2020 | ||
SE | 23.09.2020 | ||
SK | 23.09.2020 | ||
SM | 23.09.2020 | ||
BG | 23.12.2020 | ||
NO | 23.12.2020 | ||
GR | 24.12.2020 | ||
IS | 23.01.2021 | ||
PT | 25.01.2021 | ||
Former [2021/25] | AL | 23.09.2020 | |
AT | 23.09.2020 | ||
CZ | 23.09.2020 | ||
EE | 23.09.2020 | ||
ES | 23.09.2020 | ||
HR | 23.09.2020 | ||
LT | 23.09.2020 | ||
LV | 23.09.2020 | ||
PL | 23.09.2020 | ||
RO | 23.09.2020 | ||
RS | 23.09.2020 | ||
SE | 23.09.2020 | ||
SM | 23.09.2020 | ||
BG | 23.12.2020 | ||
NO | 23.12.2020 | ||
GR | 24.12.2020 | ||
IS | 23.01.2021 | ||
PT | 25.01.2021 | ||
Former [2021/22] | CZ | 23.09.2020 | |
EE | 23.09.2020 | ||
HR | 23.09.2020 | ||
LT | 23.09.2020 | ||
LV | 23.09.2020 | ||
RO | 23.09.2020 | ||
RS | 23.09.2020 | ||
SE | 23.09.2020 | ||
SM | 23.09.2020 | ||
BG | 23.12.2020 | ||
NO | 23.12.2020 | ||
GR | 24.12.2020 | ||
PT | 25.01.2021 | ||
Former [2021/21] | HR | 23.09.2020 | |
LT | 23.09.2020 | ||
LV | 23.09.2020 | ||
RS | 23.09.2020 | ||
SE | 23.09.2020 | ||
BG | 23.12.2020 | ||
NO | 23.12.2020 | ||
GR | 24.12.2020 | ||
PT | 25.01.2021 | ||
Former [2021/20] | HR | 23.09.2020 | |
LT | 23.09.2020 | ||
LV | 23.09.2020 | ||
RS | 23.09.2020 | ||
SE | 23.09.2020 | ||
BG | 23.12.2020 | ||
NO | 23.12.2020 | ||
GR | 24.12.2020 | ||
Former [2021/10] | HR | 23.09.2020 | |
LV | 23.09.2020 | ||
RS | 23.09.2020 | ||
SE | 23.09.2020 | ||
BG | 23.12.2020 | ||
NO | 23.12.2020 | ||
GR | 24.12.2020 | ||
Former [2021/07] | NO | 23.12.2020 | Documents cited: | Search | [A]EP2269514 (HAMAMATSU PHOTONICS KK [JP]); | [A]US2016131772 (SATO KANAKO [JP]) | International search | [A]JP2004032212 (JAPAN BROADCASTING CORP); | [A]JP2006094108 (FUJI XEROX CO LTD) |