EP3490163 - METHOD AND DEVICE FOR RECEIVING CHANNEL STATE INFORMATION IN MOBILE COMMUNICATION SYSTEM [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 10.06.2022 Database last updated on 15.07.2024 | |
Former | The patent has been granted Status updated on 02.07.2021 | ||
Former | Grant of patent is intended Status updated on 18.04.2021 | ||
Former | Request for examination was made Status updated on 26.04.2019 | ||
Former | The international publication has been made Status updated on 24.02.2018 | Most recent event Tooltip | 14.06.2024 | Lapse of the patent in a contracting state New state(s): TR | published on 17.07.2024 [2024/29] | Applicant(s) | For all designated states Samsung Electronics Co., Ltd. 129, Samsung-ro Yeongtong-gu Suwon-si, Gyeonggi-do 16677 / KR | [2019/22] | Inventor(s) | 01 /
KWAK, Youngwoo 129, Samsung-ro, Yeongtong-gu Suwon-si Gyeonggi-do 16677 / KR | 02 /
NOH, Hoondong 129, Samsung-ro, Yeongtong-gu Suwon-si Gyeonggi-do 16677 / KR | [2019/22] | Representative(s) | Nederlandsch Octrooibureau P.O. Box 29720 2502 LS The Hague / NL | [2019/22] | Application number, filing date | 17841605.3 | 22.06.2017 | [2019/22] | WO2017KR06610 | Priority number, date | KR20160105504 | 19.08.2016 Original published format: KR 20160105504 | [2019/22] | Filing language | KO | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2018034421 | Date: | 22.02.2018 | Language: | KO | [2018/08] | Type: | A1 Application with search report | No.: | EP3490163 | Date: | 29.05.2019 | Language: | EN | [2019/22] | Type: | B1 Patent specification | No.: | EP3490163 | Date: | 04.08.2021 | Language: | EN | [2021/31] | Search report(s) | International search report - published on: | KR | 22.02.2018 | (Supplementary) European search report - dispatched on: | EP | 24.06.2019 | Classification | IPC: | H04L1/00, H04L5/00 | [2019/30] | CPC: |
H04L1/0026 (EP,US);
H04B7/0626 (KR,US);
H04B7/0417 (US);
H04B7/06 (EP,US);
H04B7/0617 (KR,US);
H04B7/0639 (US);
H04L1/0023 (KR);
H04L1/0038 (EP,US);
H04L1/0693 (KR,US);
|
Former IPC [2019/22] | H04B7/06, H04L1/00, H04L1/06 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2019/22] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | MD | Not yet paid | Title | German: | VERFAHREN UND VORRICHTUNG ZUM EMPFANGEN VON KANALSTATUSINFORMATIONEN IN EINEM MOBILKOMMUNIKATIONSSYSTEM | [2019/22] | English: | METHOD AND DEVICE FOR RECEIVING CHANNEL STATE INFORMATION IN MOBILE COMMUNICATION SYSTEM | [2019/22] | French: | PROCÉDÉ ET DISPOSITIF DE RÉCEPTION D'INFORMATIONS D'ÉTAT DE CANAL DANS UN SYSTÈME DE COMMUNICATION MOBILE | [2019/22] | Entry into regional phase | 19.02.2019 | Translation filed | 19.02.2019 | National basic fee paid | 19.02.2019 | Search fee paid | 19.02.2019 | Designation fee(s) paid | 19.02.2019 | Examination fee paid | Examination procedure | 19.02.2019 | Examination requested [2019/22] | 29.10.2019 | Amendment by applicant (claims and/or description) | 19.04.2021 | Communication of intention to grant the patent | 28.05.2021 | Fee for grant paid | 28.05.2021 | Fee for publishing/printing paid | 28.05.2021 | Receipt of the translation of the claim(s) | Opposition(s) | 06.05.2022 | No opposition filed within time limit [2022/28] | Fees paid | Renewal fee | 19.02.2019 | Renewal fee patent year 03 | 24.06.2020 | Renewal fee patent year 04 | 23.06.2021 | Renewal fee patent year 05 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 22.06.2017 | AL | 04.08.2021 | AT | 04.08.2021 | CY | 04.08.2021 | CZ | 04.08.2021 | DK | 04.08.2021 | EE | 04.08.2021 | ES | 04.08.2021 | FI | 04.08.2021 | HR | 04.08.2021 | IT | 04.08.2021 | LT | 04.08.2021 | LV | 04.08.2021 | MC | 04.08.2021 | MK | 04.08.2021 | NL | 04.08.2021 | PL | 04.08.2021 | RO | 04.08.2021 | RS | 04.08.2021 | SE | 04.08.2021 | SI | 04.08.2021 | SK | 04.08.2021 | SM | 04.08.2021 | TR | 04.08.2021 | BG | 04.11.2021 | NO | 04.11.2021 | GR | 05.11.2021 | IS | 04.12.2021 | PT | 06.12.2021 | [2024/29] |
Former [2024/23] | HU | 22.06.2017 | |
AL | 04.08.2021 | ||
AT | 04.08.2021 | ||
CY | 04.08.2021 | ||
CZ | 04.08.2021 | ||
DK | 04.08.2021 | ||
EE | 04.08.2021 | ||
ES | 04.08.2021 | ||
FI | 04.08.2021 | ||
HR | 04.08.2021 | ||
IT | 04.08.2021 | ||
LT | 04.08.2021 | ||
LV | 04.08.2021 | ||
MC | 04.08.2021 | ||
MK | 04.08.2021 | ||
NL | 04.08.2021 | ||
PL | 04.08.2021 | ||
RO | 04.08.2021 | ||
RS | 04.08.2021 | ||
SE | 04.08.2021 | ||
SI | 04.08.2021 | ||
SK | 04.08.2021 | ||
SM | 04.08.2021 | ||
BG | 04.11.2021 | ||
NO | 04.11.2021 | ||
GR | 05.11.2021 | ||
IS | 04.12.2021 | ||
PT | 06.12.2021 | ||
Former [2024/20] | HU | 22.06.2017 | |
AL | 04.08.2021 | ||
AT | 04.08.2021 | ||
CY | 04.08.2021 | ||
CZ | 04.08.2021 | ||
DK | 04.08.2021 | ||
EE | 04.08.2021 | ||
ES | 04.08.2021 | ||
FI | 04.08.2021 | ||
HR | 04.08.2021 | ||
IT | 04.08.2021 | ||
LT | 04.08.2021 | ||
LV | 04.08.2021 | ||
MC | 04.08.2021 | ||
NL | 04.08.2021 | ||
PL | 04.08.2021 | ||
RO | 04.08.2021 | ||
RS | 04.08.2021 | ||
SE | 04.08.2021 | ||
SI | 04.08.2021 | ||
SK | 04.08.2021 | ||
SM | 04.08.2021 | ||
BG | 04.11.2021 | ||
NO | 04.11.2021 | ||
GR | 05.11.2021 | ||
IS | 04.12.2021 | ||
PT | 06.12.2021 | ||
Former [2024/18] | HU | 22.06.2017 | |
AL | 04.08.2021 | ||
AT | 04.08.2021 | ||
CZ | 04.08.2021 | ||
DK | 04.08.2021 | ||
EE | 04.08.2021 | ||
ES | 04.08.2021 | ||
FI | 04.08.2021 | ||
HR | 04.08.2021 | ||
IT | 04.08.2021 | ||
LT | 04.08.2021 | ||
LV | 04.08.2021 | ||
MC | 04.08.2021 | ||
NL | 04.08.2021 | ||
PL | 04.08.2021 | ||
RO | 04.08.2021 | ||
RS | 04.08.2021 | ||
SE | 04.08.2021 | ||
SI | 04.08.2021 | ||
SK | 04.08.2021 | ||
SM | 04.08.2021 | ||
BG | 04.11.2021 | ||
NO | 04.11.2021 | ||
GR | 05.11.2021 | ||
IS | 04.12.2021 | ||
PT | 06.12.2021 | ||
Former [2023/08] | AL | 04.08.2021 | |
AT | 04.08.2021 | ||
CZ | 04.08.2021 | ||
DK | 04.08.2021 | ||
EE | 04.08.2021 | ||
ES | 04.08.2021 | ||
FI | 04.08.2021 | ||
HR | 04.08.2021 | ||
IT | 04.08.2021 | ||
LT | 04.08.2021 | ||
LV | 04.08.2021 | ||
MC | 04.08.2021 | ||
NL | 04.08.2021 | ||
PL | 04.08.2021 | ||
RO | 04.08.2021 | ||
RS | 04.08.2021 | ||
SE | 04.08.2021 | ||
SI | 04.08.2021 | ||
SK | 04.08.2021 | ||
SM | 04.08.2021 | ||
BG | 04.11.2021 | ||
NO | 04.11.2021 | ||
GR | 05.11.2021 | ||
IS | 04.12.2021 | ||
PT | 06.12.2021 | ||
Former [2022/36] | AL | 04.08.2021 | |
AT | 04.08.2021 | ||
CZ | 04.08.2021 | ||
DK | 04.08.2021 | ||
EE | 04.08.2021 | ||
ES | 04.08.2021 | ||
FI | 04.08.2021 | ||
HR | 04.08.2021 | ||
IT | 04.08.2021 | ||
LT | 04.08.2021 | ||
LV | 04.08.2021 | ||
NL | 04.08.2021 | ||
PL | 04.08.2021 | ||
RO | 04.08.2021 | ||
RS | 04.08.2021 | ||
SE | 04.08.2021 | ||
SI | 04.08.2021 | ||
SK | 04.08.2021 | ||
SM | 04.08.2021 | ||
BG | 04.11.2021 | ||
NO | 04.11.2021 | ||
GR | 05.11.2021 | ||
IS | 04.12.2021 | ||
PT | 06.12.2021 | ||
Former [2022/29] | AL | 04.08.2021 | |
AT | 04.08.2021 | ||
CZ | 04.08.2021 | ||
DK | 04.08.2021 | ||
EE | 04.08.2021 | ||
ES | 04.08.2021 | ||
FI | 04.08.2021 | ||
HR | 04.08.2021 | ||
LT | 04.08.2021 | ||
LV | 04.08.2021 | ||
NL | 04.08.2021 | ||
PL | 04.08.2021 | ||
RO | 04.08.2021 | ||
RS | 04.08.2021 | ||
SE | 04.08.2021 | ||
SK | 04.08.2021 | ||
SM | 04.08.2021 | ||
BG | 04.11.2021 | ||
NO | 04.11.2021 | ||
GR | 05.11.2021 | ||
IS | 04.12.2021 | ||
PT | 06.12.2021 | ||
Former [2022/25] | AT | 04.08.2021 | |
CZ | 04.08.2021 | ||
DK | 04.08.2021 | ||
EE | 04.08.2021 | ||
ES | 04.08.2021 | ||
FI | 04.08.2021 | ||
HR | 04.08.2021 | ||
LT | 04.08.2021 | ||
LV | 04.08.2021 | ||
NL | 04.08.2021 | ||
PL | 04.08.2021 | ||
RO | 04.08.2021 | ||
RS | 04.08.2021 | ||
SE | 04.08.2021 | ||
SK | 04.08.2021 | ||
SM | 04.08.2021 | ||
BG | 04.11.2021 | ||
NO | 04.11.2021 | ||
GR | 05.11.2021 | ||
IS | 04.12.2021 | ||
PT | 06.12.2021 | ||
Former [2022/24] | AT | 04.08.2021 | |
CZ | 04.08.2021 | ||
DK | 04.08.2021 | ||
EE | 04.08.2021 | ||
ES | 04.08.2021 | ||
FI | 04.08.2021 | ||
HR | 04.08.2021 | ||
LT | 04.08.2021 | ||
LV | 04.08.2021 | ||
NL | 04.08.2021 | ||
PL | 04.08.2021 | ||
RO | 04.08.2021 | ||
RS | 04.08.2021 | ||
SE | 04.08.2021 | ||
SK | 04.08.2021 | ||
BG | 04.11.2021 | ||
NO | 04.11.2021 | ||
GR | 05.11.2021 | ||
IS | 04.12.2021 | ||
PT | 06.12.2021 | ||
Former [2022/21] | AT | 04.08.2021 | |
DK | 04.08.2021 | ||
ES | 04.08.2021 | ||
FI | 04.08.2021 | ||
HR | 04.08.2021 | ||
LT | 04.08.2021 | ||
LV | 04.08.2021 | ||
NL | 04.08.2021 | ||
PL | 04.08.2021 | ||
RS | 04.08.2021 | ||
SE | 04.08.2021 | ||
BG | 04.11.2021 | ||
NO | 04.11.2021 | ||
GR | 05.11.2021 | ||
IS | 04.12.2021 | ||
PT | 06.12.2021 | ||
Former [2022/16] | AT | 04.08.2021 | |
ES | 04.08.2021 | ||
FI | 04.08.2021 | ||
HR | 04.08.2021 | ||
LT | 04.08.2021 | ||
LV | 04.08.2021 | ||
NL | 04.08.2021 | ||
PL | 04.08.2021 | ||
RS | 04.08.2021 | ||
SE | 04.08.2021 | ||
BG | 04.11.2021 | ||
NO | 04.11.2021 | ||
GR | 05.11.2021 | ||
IS | 04.12.2021 | ||
PT | 06.12.2021 | ||
Former [2022/10] | AT | 04.08.2021 | |
ES | 04.08.2021 | ||
FI | 04.08.2021 | ||
HR | 04.08.2021 | ||
LT | 04.08.2021 | ||
LV | 04.08.2021 | ||
PL | 04.08.2021 | ||
RS | 04.08.2021 | ||
SE | 04.08.2021 | ||
BG | 04.11.2021 | ||
NO | 04.11.2021 | ||
GR | 05.11.2021 | ||
IS | 04.12.2021 | ||
PT | 06.12.2021 | ||
Former [2022/09] | AT | 04.08.2021 | |
ES | 04.08.2021 | ||
FI | 04.08.2021 | ||
LT | 04.08.2021 | ||
RS | 04.08.2021 | ||
SE | 04.08.2021 | ||
BG | 04.11.2021 | ||
NO | 04.11.2021 | ||
PT | 06.12.2021 | ||
Former [2022/08] | AT | 04.08.2021 | |
ES | 04.08.2021 | ||
FI | 04.08.2021 | ||
LT | 04.08.2021 | ||
SE | 04.08.2021 | ||
BG | 04.11.2021 | ||
NO | 04.11.2021 | ||
Former [2022/07] | AT | 04.08.2021 | |
LT | 04.08.2021 | ||
NO | 04.11.2021 | Documents cited: | Search | [XI]WO2015190847 (SAMSUNG ELECTRONICS CO LTD [KR]) [X] 1,3,5,6,8,9,11,13,14 * abstract * * page 1, paragraph 3 - page 4, paragraph 14 * * page 12, paragraph 93 - page 17, paragraph 111 * * figures 2-13 * [I] 2,4,7,10,12,15; | [X]EP2966931 (ZTE CORP [CN]) [X] 1,6,9,14 * abstract * * page 3, paragraph 12 - page 6, line 42 *; | [A] - CATT, "High-level design principles for CSI-RS enhancements", vol. RAN WG1, no. Beijing, P.R. China; 20150824 - 20150828, (20150823), 3GPP DRAFT; R1-153932, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, URL: http://www.3gpp.org/ftp/Meetings_3GPP_SYNC/RAN1/Docs/, (20150823), XP051001362 [A] 1-15 * the whole document * | International search | [Y]US2014211873 (PARK HANJUN [KR], et al) [Y] 5, 13 * See paragraphs [0163], [0173]; and figure 9. *; | [Y]US2015063236 (SEO INKWON [KR], et al) [Y] 1, 5-6, 8-9, 13-14 * See paragraphs [0093]-[0109]; claim 5; and figure 10. *; | [A]US2015237642 (IHM BIN CHUL [KR], et al) [A] 1-15* See paragraphs [0008]-[0010]; and figure 9. *; | [Y]WO2015199588 (ERICSSON TELEFON AB L M [SE]) [Y] 8 * See page 9, lines 5-15; and figures 2-3. *; | [YA]US2016057708 (SIOMINA IANA [SE], et al) [Y] 1, 5-6, 8-9, 13-14 * See paragraphs [0004]-[0013], [0070]-[0073], [0119]-[0158], [0186]-[0224], claim 53; and figure 7. * [A] 2-4, 7, 10-12, 15 |