blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3505368

EP3505368 - TIRE [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  06.08.2021
Database last updated on 19.10.2024
FormerThe patent has been granted
Status updated on  28.08.2020
FormerGrant of patent is intended
Status updated on  02.04.2020
FormerRequest for examination was made
Status updated on  31.05.2019
FormerThe international publication has been made
Status updated on  03.03.2018
Most recent event   Tooltip13.09.2024Lapse of the patent in a contracting state
New state(s): MT
published on 16.10.2024  [2024/42]
Applicant(s)For all designated states
Bridgestone Corporation
1-1, Kyobashi 3-chome
Chuo-ku
Tokyo 104-8340 / JP
[2019/27]
Inventor(s)01 / YAMAGUCHI, Masashi
c/o BRIDGESTONE CORPORATION
1-1, Kyobashi 3-chome
Chuo-ku
Tokyo, 104-8340 / JP
 [2020/40]
Former [2019/27]01 / YAMAGUCHI, Masashi
c/o Bridgestone Corporation
1-1, Kyobashi 3-chome Chuo-ku
Tokyo 104-8340 / JP
Representative(s)Oxley, Robin John George
Marks & Clerk LLP
15 Fetter Lane
London EC4A 1BW / GB
[2019/27]
Application number, filing date17843425.410.08.2017
[2019/27]
WO2017JP29134
Priority number, dateJP2016016538826.08.2016         Original published format: JP 2016165388
[2019/27]
Filing languageJA
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2018037941
Date:01.03.2018
Language:JA
[2018/09]
Type: A1 Application with search report 
No.:EP3505368
Date:03.07.2019
Language:EN
[2019/27]
Type: B1 Patent specification 
No.:EP3505368
Date:30.09.2020
Language:EN
[2020/40]
Search report(s)International search report - published on:JP01.03.2018
(Supplementary) European search report - dispatched on:EP17.07.2019
ClassificationIPC:B60C11/03, B60C11/13
[2019/27]
CPC:
B60C11/0306 (EP,US); B60C11/0304 (US); B60C11/03 (EP,US);
B60C11/0302 (US); B60C11/13 (EP,US); B60C11/1315 (EP,US);
B60C2011/0033 (US); B60C2011/0344 (EP,US); B60C2011/0346 (EP,US);
B60C2011/0353 (EP,US); B60C2011/0355 (US); B60C2011/0362 (EP,US);
B60C2011/0365 (US); B60C2011/0369 (US) (-)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2019/27]
Extension statesBANot yet paid
MENot yet paid
Validation statesMANot yet paid
MDNot yet paid
TitleGerman:REIFEN[2019/27]
English:TIRE[2019/27]
French:PNEU[2019/27]
Entry into regional phase26.02.2019Translation filed 
26.02.2019National basic fee paid 
26.02.2019Search fee paid 
26.02.2019Designation fee(s) paid 
26.02.2019Examination fee paid 
Examination procedure26.02.2019Examination requested  [2019/27]
31.01.2020Amendment by applicant (claims and/or description)
03.04.2020Communication of intention to grant the patent
31.07.2020Fee for grant paid
31.07.2020Fee for publishing/printing paid
31.07.2020Receipt of the translation of the claim(s)
Opposition(s)01.07.2021No opposition filed within time limit [2021/36]
Fees paidRenewal fee
26.08.2019Renewal fee patent year 03
20.08.2020Renewal fee patent year 04
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU10.08.2017
AL30.09.2020
AT30.09.2020
CY30.09.2020
CZ30.09.2020
DK30.09.2020
EE30.09.2020
ES30.09.2020
FI30.09.2020
HR30.09.2020
IT30.09.2020
LT30.09.2020
LV30.09.2020
MC30.09.2020
MK30.09.2020
MT30.09.2020
NL30.09.2020
PL30.09.2020
RO30.09.2020
RS30.09.2020
SE30.09.2020
SI30.09.2020
SK30.09.2020
SM30.09.2020
BG30.12.2020
NO30.12.2020
GR31.12.2020
IS30.01.2021
PT01.02.2021
[2024/42]
Former [2024/23]HU10.08.2017
AL30.09.2020
AT30.09.2020
CY30.09.2020
CZ30.09.2020
DK30.09.2020
EE30.09.2020
ES30.09.2020
FI30.09.2020
HR30.09.2020
IT30.09.2020
LT30.09.2020
LV30.09.2020
MC30.09.2020
MK30.09.2020
NL30.09.2020
PL30.09.2020
RO30.09.2020
RS30.09.2020
SE30.09.2020
SI30.09.2020
SK30.09.2020
SM30.09.2020
BG30.12.2020
NO30.12.2020
GR31.12.2020
IS30.01.2021
PT01.02.2021
Former [2023/33]HU10.08.2017
AL30.09.2020
AT30.09.2020
CY30.09.2020
CZ30.09.2020
DK30.09.2020
EE30.09.2020
ES30.09.2020
FI30.09.2020
HR30.09.2020
IT30.09.2020
LT30.09.2020
LV30.09.2020
MC30.09.2020
NL30.09.2020
PL30.09.2020
RO30.09.2020
RS30.09.2020
SE30.09.2020
SI30.09.2020
SK30.09.2020
SM30.09.2020
BG30.12.2020
NO30.12.2020
GR31.12.2020
IS30.01.2021
PT01.02.2021
Former [2023/30]AL30.09.2020
AT30.09.2020
CY30.09.2020
CZ30.09.2020
DK30.09.2020
EE30.09.2020
ES30.09.2020
FI30.09.2020
HR30.09.2020
IT30.09.2020
LT30.09.2020
LV30.09.2020
MC30.09.2020
NL30.09.2020
PL30.09.2020
RO30.09.2020
RS30.09.2020
SE30.09.2020
SI30.09.2020
SK30.09.2020
SM30.09.2020
BG30.12.2020
NO30.12.2020
GR31.12.2020
IS30.01.2021
PT01.02.2021
Former [2022/23]AL30.09.2020
AT30.09.2020
CZ30.09.2020
DK30.09.2020
EE30.09.2020
ES30.09.2020
FI30.09.2020
HR30.09.2020
IT30.09.2020
LT30.09.2020
LV30.09.2020
MC30.09.2020
NL30.09.2020
PL30.09.2020
RO30.09.2020
RS30.09.2020
SE30.09.2020
SI30.09.2020
SK30.09.2020
SM30.09.2020
BG30.12.2020
NO30.12.2020
GR31.12.2020
IS30.01.2021
PT01.02.2021
Former [2022/18]AL30.09.2020
AT30.09.2020
CZ30.09.2020
DK30.09.2020
EE30.09.2020
ES30.09.2020
FI30.09.2020
HR30.09.2020
IT30.09.2020
LT30.09.2020
LV30.09.2020
MC30.09.2020
NL30.09.2020
PL30.09.2020
RO30.09.2020
RS30.09.2020
SE30.09.2020
SI30.09.2020
SK30.09.2020
SM30.09.2020
BG30.12.2020
NO30.12.2020
GR31.12.2020
PT01.02.2021
Former [2022/10]AL30.09.2020
AT30.09.2020
CZ30.09.2020
DK30.09.2020
EE30.09.2020
ES30.09.2020
FI30.09.2020
HR30.09.2020
IT30.09.2020
LT30.09.2020
LV30.09.2020
NL30.09.2020
PL30.09.2020
RO30.09.2020
RS30.09.2020
SE30.09.2020
SI30.09.2020
SK30.09.2020
SM30.09.2020
BG30.12.2020
NO30.12.2020
GR31.12.2020
PT01.02.2021
Former [2021/50]AL30.09.2020
AT30.09.2020
CZ30.09.2020
DK30.09.2020
EE30.09.2020
ES30.09.2020
FI30.09.2020
HR30.09.2020
IT30.09.2020
LT30.09.2020
LV30.09.2020
NL30.09.2020
PL30.09.2020
RO30.09.2020
RS30.09.2020
SE30.09.2020
SI30.09.2020
SK30.09.2020
SM30.09.2020
BG30.12.2020
NO30.12.2020
GR31.12.2020
IS30.01.2021
PT01.02.2021
Former [2021/48]AL30.09.2020
AT30.09.2020
CZ30.09.2020
DK30.09.2020
EE30.09.2020
ES30.09.2020
FI30.09.2020
HR30.09.2020
IT30.09.2020
LT30.09.2020
LV30.09.2020
NL30.09.2020
PL30.09.2020
RO30.09.2020
RS30.09.2020
SE30.09.2020
SK30.09.2020
SM30.09.2020
BG30.12.2020
NO30.12.2020
GR31.12.2020
IS30.01.2021
PT01.02.2021
Former [2021/37]AL30.09.2020
AT30.09.2020
CZ30.09.2020
DK30.09.2020
EE30.09.2020
ES30.09.2020
FI30.09.2020
HR30.09.2020
LT30.09.2020
LV30.09.2020
NL30.09.2020
PL30.09.2020
RO30.09.2020
RS30.09.2020
SE30.09.2020
SK30.09.2020
SM30.09.2020
BG30.12.2020
NO30.12.2020
GR31.12.2020
IS30.01.2021
PT01.02.2021
Former [2021/30]AL30.09.2020
AT30.09.2020
CZ30.09.2020
EE30.09.2020
ES30.09.2020
FI30.09.2020
HR30.09.2020
LT30.09.2020
LV30.09.2020
NL30.09.2020
PL30.09.2020
RO30.09.2020
RS30.09.2020
SE30.09.2020
SK30.09.2020
SM30.09.2020
BG30.12.2020
NO30.12.2020
GR31.12.2020
IS30.01.2021
PT01.02.2021
Former [2021/28]AL30.09.2020
AT30.09.2020
CZ30.09.2020
EE30.09.2020
ES30.09.2020
FI30.09.2020
HR30.09.2020
LT30.09.2020
LV30.09.2020
PL30.09.2020
RO30.09.2020
RS30.09.2020
SE30.09.2020
SK30.09.2020
SM30.09.2020
BG30.12.2020
NO30.12.2020
GR31.12.2020
IS30.01.2021
PT01.02.2021
Former [2021/25]AL30.09.2020
AT30.09.2020
CZ30.09.2020
EE30.09.2020
ES30.09.2020
FI30.09.2020
HR30.09.2020
LT30.09.2020
LV30.09.2020
PL30.09.2020
RO30.09.2020
RS30.09.2020
SE30.09.2020
SM30.09.2020
BG30.12.2020
NO30.12.2020
GR31.12.2020
IS30.01.2021
PT01.02.2021
Former [2021/23]AT30.09.2020
CZ30.09.2020
EE30.09.2020
FI30.09.2020
HR30.09.2020
LT30.09.2020
LV30.09.2020
RO30.09.2020
RS30.09.2020
SE30.09.2020
SM30.09.2020
BG30.12.2020
NO30.12.2020
GR31.12.2020
PT01.02.2021
Former [2021/22]CZ30.09.2020
EE30.09.2020
FI30.09.2020
HR30.09.2020
LT30.09.2020
LV30.09.2020
RO30.09.2020
RS30.09.2020
SE30.09.2020
SM30.09.2020
BG30.12.2020
NO30.12.2020
GR31.12.2020
PT01.02.2021
Former [2021/21]FI30.09.2020
HR30.09.2020
LT30.09.2020
LV30.09.2020
RS30.09.2020
SE30.09.2020
BG30.12.2020
NO30.12.2020
GR31.12.2020
PT01.02.2021
Former [2021/20]FI30.09.2020
HR30.09.2020
LT30.09.2020
LV30.09.2020
RS30.09.2020
SE30.09.2020
BG30.12.2020
NO30.12.2020
GR31.12.2020
Former [2021/10]FI30.09.2020
HR30.09.2020
LV30.09.2020
RS30.09.2020
SE30.09.2020
BG30.12.2020
NO30.12.2020
GR31.12.2020
Former [2021/08]FI30.09.2020
SE30.09.2020
BG30.12.2020
NO30.12.2020
Former [2021/07]FI30.09.2020
NO30.12.2020
Documents cited:Search[Y]EP0520755  (BRIDGESTONE CORP [JP]) [Y] 5-7* figure -; claim - *;
 [Y]EP0648622  (SUMITOMO RUBBER IND [JP]) [Y] 5,6 * figures 1-3; claim - *;
 [XY]US2009090445  (ITOU KUNIAKI [JP]) [X] 1,2,4,7,9,10 * paragraphs [0041] , [0042]; figure -; claim - * [Y] 5,6;
 [XY]JP2011178306  (BRIDGESTONE CORP) [X] 1,3,8,10 * paragraphs [0001] , [0037]; figure -; claim - * [Y] 5-7;
 [XY]EP2614966  (SUMITOMO RUBBER IND [JP]) [X] 1,2,4,10 * paragraphs [0032] , [0040] , [0042] , [0062] - [0064]; figure -; claim - * [Y] 5-7;
 [X]WO2015093238  (SUMITOMO RUBBER IND [JP]) [X] 1,8 * paragraphs [0047] , [0060]; figure -; claim - *
International search[A]JP2007008342  (SUMITOMO RUBBER IND) [A] 1-10* , entire text & US 2007/0000590 A1 & CN 1891500 A & AU 2006201886 A *;
 [XY]WO2007072717  (SUMITOMO RUBBER IND [JP], et al) [X] 1-2, 4, 7, 9-10 * , paragraphs [0010] to [0023]; each drawing & US 2009/0090445 A1 paragraphs [0037] to [0051]; each drawing & CN 101341035 A * [Y] 5-6;
 [A]JP2008221977  (BRIDGESTONE CORP) [A] 1-10 * , entire text (Family: none) *;
 [XY]JP2011178306  (BRIDGESTONE CORP) [X] 1, 3-4, 8, 10 * , claims; paragraphs [0027] to [0037]; fig. 1 (Family: none) * [Y] 5-6;
 [Y]JP2012111342  (SUMITOMO RUBBER IND) [Y] 5-6 * , claims; paragraphs [0006], [0029] to [0045]; fig. 6 & CN 102555684 A & KR 10-2012-0056209 A *;
 [A]JP2012153156  (BRIDGESTONE CORP) [A] 1-10 * , entire text (Family: none) *;
 [A]JP2012183885  (BRIDGESTONE CORP) [A] 1-10 * , entire text (Family: none) *;
 [A]JP2014076764  (YOKOHAMA RUBBER CO LTD) [A] 1-10 * , entire text (Family: none) *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.