EP3505368 - TIRE [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 06.08.2021 Database last updated on 19.10.2024 | |
Former | The patent has been granted Status updated on 28.08.2020 | ||
Former | Grant of patent is intended Status updated on 02.04.2020 | ||
Former | Request for examination was made Status updated on 31.05.2019 | ||
Former | The international publication has been made Status updated on 03.03.2018 | Most recent event Tooltip | 13.09.2024 | Lapse of the patent in a contracting state New state(s): MT | published on 16.10.2024 [2024/42] | Applicant(s) | For all designated states Bridgestone Corporation 1-1, Kyobashi 3-chome Chuo-ku Tokyo 104-8340 / JP | [2019/27] | Inventor(s) | 01 /
YAMAGUCHI, Masashi c/o BRIDGESTONE CORPORATION 1-1, Kyobashi 3-chome Chuo-ku Tokyo, 104-8340 / JP | [2020/40] |
Former [2019/27] | 01 /
YAMAGUCHI, Masashi c/o Bridgestone Corporation 1-1, Kyobashi 3-chome Chuo-ku Tokyo 104-8340 / JP | Representative(s) | Oxley, Robin John George Marks & Clerk LLP 15 Fetter Lane London EC4A 1BW / GB | [2019/27] | Application number, filing date | 17843425.4 | 10.08.2017 | [2019/27] | WO2017JP29134 | Priority number, date | JP20160165388 | 26.08.2016 Original published format: JP 2016165388 | [2019/27] | Filing language | JA | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2018037941 | Date: | 01.03.2018 | Language: | JA | [2018/09] | Type: | A1 Application with search report | No.: | EP3505368 | Date: | 03.07.2019 | Language: | EN | [2019/27] | Type: | B1 Patent specification | No.: | EP3505368 | Date: | 30.09.2020 | Language: | EN | [2020/40] | Search report(s) | International search report - published on: | JP | 01.03.2018 | (Supplementary) European search report - dispatched on: | EP | 17.07.2019 | Classification | IPC: | B60C11/03, B60C11/13 | [2019/27] | CPC: |
B60C11/0306 (EP,US);
B60C11/0304 (US);
B60C11/03 (EP,US);
B60C11/0302 (US);
B60C11/13 (EP,US);
B60C11/1315 (EP,US);
B60C2011/0033 (US);
B60C2011/0344 (EP,US);
B60C2011/0346 (EP,US);
B60C2011/0353 (EP,US);
B60C2011/0355 (US);
B60C2011/0362 (EP,US);
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2019/27] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | MD | Not yet paid | Title | German: | REIFEN | [2019/27] | English: | TIRE | [2019/27] | French: | PNEU | [2019/27] | Entry into regional phase | 26.02.2019 | Translation filed | 26.02.2019 | National basic fee paid | 26.02.2019 | Search fee paid | 26.02.2019 | Designation fee(s) paid | 26.02.2019 | Examination fee paid | Examination procedure | 26.02.2019 | Examination requested [2019/27] | 31.01.2020 | Amendment by applicant (claims and/or description) | 03.04.2020 | Communication of intention to grant the patent | 31.07.2020 | Fee for grant paid | 31.07.2020 | Fee for publishing/printing paid | 31.07.2020 | Receipt of the translation of the claim(s) | Opposition(s) | 01.07.2021 | No opposition filed within time limit [2021/36] | Fees paid | Renewal fee | 26.08.2019 | Renewal fee patent year 03 | 20.08.2020 | Renewal fee patent year 04 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 10.08.2017 | AL | 30.09.2020 | AT | 30.09.2020 | CY | 30.09.2020 | CZ | 30.09.2020 | DK | 30.09.2020 | EE | 30.09.2020 | ES | 30.09.2020 | FI | 30.09.2020 | HR | 30.09.2020 | IT | 30.09.2020 | LT | 30.09.2020 | LV | 30.09.2020 | MC | 30.09.2020 | MK | 30.09.2020 | MT | 30.09.2020 | NL | 30.09.2020 | PL | 30.09.2020 | RO | 30.09.2020 | RS | 30.09.2020 | SE | 30.09.2020 | SI | 30.09.2020 | SK | 30.09.2020 | SM | 30.09.2020 | BG | 30.12.2020 | NO | 30.12.2020 | GR | 31.12.2020 | IS | 30.01.2021 | PT | 01.02.2021 | [2024/42] |
Former [2024/23] | HU | 10.08.2017 | |
AL | 30.09.2020 | ||
AT | 30.09.2020 | ||
CY | 30.09.2020 | ||
CZ | 30.09.2020 | ||
DK | 30.09.2020 | ||
EE | 30.09.2020 | ||
ES | 30.09.2020 | ||
FI | 30.09.2020 | ||
HR | 30.09.2020 | ||
IT | 30.09.2020 | ||
LT | 30.09.2020 | ||
LV | 30.09.2020 | ||
MC | 30.09.2020 | ||
MK | 30.09.2020 | ||
NL | 30.09.2020 | ||
PL | 30.09.2020 | ||
RO | 30.09.2020 | ||
RS | 30.09.2020 | ||
SE | 30.09.2020 | ||
SI | 30.09.2020 | ||
SK | 30.09.2020 | ||
SM | 30.09.2020 | ||
BG | 30.12.2020 | ||
NO | 30.12.2020 | ||
GR | 31.12.2020 | ||
IS | 30.01.2021 | ||
PT | 01.02.2021 | ||
Former [2023/33] | HU | 10.08.2017 | |
AL | 30.09.2020 | ||
AT | 30.09.2020 | ||
CY | 30.09.2020 | ||
CZ | 30.09.2020 | ||
DK | 30.09.2020 | ||
EE | 30.09.2020 | ||
ES | 30.09.2020 | ||
FI | 30.09.2020 | ||
HR | 30.09.2020 | ||
IT | 30.09.2020 | ||
LT | 30.09.2020 | ||
LV | 30.09.2020 | ||
MC | 30.09.2020 | ||
NL | 30.09.2020 | ||
PL | 30.09.2020 | ||
RO | 30.09.2020 | ||
RS | 30.09.2020 | ||
SE | 30.09.2020 | ||
SI | 30.09.2020 | ||
SK | 30.09.2020 | ||
SM | 30.09.2020 | ||
BG | 30.12.2020 | ||
NO | 30.12.2020 | ||
GR | 31.12.2020 | ||
IS | 30.01.2021 | ||
PT | 01.02.2021 | ||
Former [2023/30] | AL | 30.09.2020 | |
AT | 30.09.2020 | ||
CY | 30.09.2020 | ||
CZ | 30.09.2020 | ||
DK | 30.09.2020 | ||
EE | 30.09.2020 | ||
ES | 30.09.2020 | ||
FI | 30.09.2020 | ||
HR | 30.09.2020 | ||
IT | 30.09.2020 | ||
LT | 30.09.2020 | ||
LV | 30.09.2020 | ||
MC | 30.09.2020 | ||
NL | 30.09.2020 | ||
PL | 30.09.2020 | ||
RO | 30.09.2020 | ||
RS | 30.09.2020 | ||
SE | 30.09.2020 | ||
SI | 30.09.2020 | ||
SK | 30.09.2020 | ||
SM | 30.09.2020 | ||
BG | 30.12.2020 | ||
NO | 30.12.2020 | ||
GR | 31.12.2020 | ||
IS | 30.01.2021 | ||
PT | 01.02.2021 | ||
Former [2022/23] | AL | 30.09.2020 | |
AT | 30.09.2020 | ||
CZ | 30.09.2020 | ||
DK | 30.09.2020 | ||
EE | 30.09.2020 | ||
ES | 30.09.2020 | ||
FI | 30.09.2020 | ||
HR | 30.09.2020 | ||
IT | 30.09.2020 | ||
LT | 30.09.2020 | ||
LV | 30.09.2020 | ||
MC | 30.09.2020 | ||
NL | 30.09.2020 | ||
PL | 30.09.2020 | ||
RO | 30.09.2020 | ||
RS | 30.09.2020 | ||
SE | 30.09.2020 | ||
SI | 30.09.2020 | ||
SK | 30.09.2020 | ||
SM | 30.09.2020 | ||
BG | 30.12.2020 | ||
NO | 30.12.2020 | ||
GR | 31.12.2020 | ||
IS | 30.01.2021 | ||
PT | 01.02.2021 | ||
Former [2022/18] | AL | 30.09.2020 | |
AT | 30.09.2020 | ||
CZ | 30.09.2020 | ||
DK | 30.09.2020 | ||
EE | 30.09.2020 | ||
ES | 30.09.2020 | ||
FI | 30.09.2020 | ||
HR | 30.09.2020 | ||
IT | 30.09.2020 | ||
LT | 30.09.2020 | ||
LV | 30.09.2020 | ||
MC | 30.09.2020 | ||
NL | 30.09.2020 | ||
PL | 30.09.2020 | ||
RO | 30.09.2020 | ||
RS | 30.09.2020 | ||
SE | 30.09.2020 | ||
SI | 30.09.2020 | ||
SK | 30.09.2020 | ||
SM | 30.09.2020 | ||
BG | 30.12.2020 | ||
NO | 30.12.2020 | ||
GR | 31.12.2020 | ||
PT | 01.02.2021 | ||
Former [2022/10] | AL | 30.09.2020 | |
AT | 30.09.2020 | ||
CZ | 30.09.2020 | ||
DK | 30.09.2020 | ||
EE | 30.09.2020 | ||
ES | 30.09.2020 | ||
FI | 30.09.2020 | ||
HR | 30.09.2020 | ||
IT | 30.09.2020 | ||
LT | 30.09.2020 | ||
LV | 30.09.2020 | ||
NL | 30.09.2020 | ||
PL | 30.09.2020 | ||
RO | 30.09.2020 | ||
RS | 30.09.2020 | ||
SE | 30.09.2020 | ||
SI | 30.09.2020 | ||
SK | 30.09.2020 | ||
SM | 30.09.2020 | ||
BG | 30.12.2020 | ||
NO | 30.12.2020 | ||
GR | 31.12.2020 | ||
PT | 01.02.2021 | ||
Former [2021/50] | AL | 30.09.2020 | |
AT | 30.09.2020 | ||
CZ | 30.09.2020 | ||
DK | 30.09.2020 | ||
EE | 30.09.2020 | ||
ES | 30.09.2020 | ||
FI | 30.09.2020 | ||
HR | 30.09.2020 | ||
IT | 30.09.2020 | ||
LT | 30.09.2020 | ||
LV | 30.09.2020 | ||
NL | 30.09.2020 | ||
PL | 30.09.2020 | ||
RO | 30.09.2020 | ||
RS | 30.09.2020 | ||
SE | 30.09.2020 | ||
SI | 30.09.2020 | ||
SK | 30.09.2020 | ||
SM | 30.09.2020 | ||
BG | 30.12.2020 | ||
NO | 30.12.2020 | ||
GR | 31.12.2020 | ||
IS | 30.01.2021 | ||
PT | 01.02.2021 | ||
Former [2021/48] | AL | 30.09.2020 | |
AT | 30.09.2020 | ||
CZ | 30.09.2020 | ||
DK | 30.09.2020 | ||
EE | 30.09.2020 | ||
ES | 30.09.2020 | ||
FI | 30.09.2020 | ||
HR | 30.09.2020 | ||
IT | 30.09.2020 | ||
LT | 30.09.2020 | ||
LV | 30.09.2020 | ||
NL | 30.09.2020 | ||
PL | 30.09.2020 | ||
RO | 30.09.2020 | ||
RS | 30.09.2020 | ||
SE | 30.09.2020 | ||
SK | 30.09.2020 | ||
SM | 30.09.2020 | ||
BG | 30.12.2020 | ||
NO | 30.12.2020 | ||
GR | 31.12.2020 | ||
IS | 30.01.2021 | ||
PT | 01.02.2021 | ||
Former [2021/37] | AL | 30.09.2020 | |
AT | 30.09.2020 | ||
CZ | 30.09.2020 | ||
DK | 30.09.2020 | ||
EE | 30.09.2020 | ||
ES | 30.09.2020 | ||
FI | 30.09.2020 | ||
HR | 30.09.2020 | ||
LT | 30.09.2020 | ||
LV | 30.09.2020 | ||
NL | 30.09.2020 | ||
PL | 30.09.2020 | ||
RO | 30.09.2020 | ||
RS | 30.09.2020 | ||
SE | 30.09.2020 | ||
SK | 30.09.2020 | ||
SM | 30.09.2020 | ||
BG | 30.12.2020 | ||
NO | 30.12.2020 | ||
GR | 31.12.2020 | ||
IS | 30.01.2021 | ||
PT | 01.02.2021 | ||
Former [2021/30] | AL | 30.09.2020 | |
AT | 30.09.2020 | ||
CZ | 30.09.2020 | ||
EE | 30.09.2020 | ||
ES | 30.09.2020 | ||
FI | 30.09.2020 | ||
HR | 30.09.2020 | ||
LT | 30.09.2020 | ||
LV | 30.09.2020 | ||
NL | 30.09.2020 | ||
PL | 30.09.2020 | ||
RO | 30.09.2020 | ||
RS | 30.09.2020 | ||
SE | 30.09.2020 | ||
SK | 30.09.2020 | ||
SM | 30.09.2020 | ||
BG | 30.12.2020 | ||
NO | 30.12.2020 | ||
GR | 31.12.2020 | ||
IS | 30.01.2021 | ||
PT | 01.02.2021 | ||
Former [2021/28] | AL | 30.09.2020 | |
AT | 30.09.2020 | ||
CZ | 30.09.2020 | ||
EE | 30.09.2020 | ||
ES | 30.09.2020 | ||
FI | 30.09.2020 | ||
HR | 30.09.2020 | ||
LT | 30.09.2020 | ||
LV | 30.09.2020 | ||
PL | 30.09.2020 | ||
RO | 30.09.2020 | ||
RS | 30.09.2020 | ||
SE | 30.09.2020 | ||
SK | 30.09.2020 | ||
SM | 30.09.2020 | ||
BG | 30.12.2020 | ||
NO | 30.12.2020 | ||
GR | 31.12.2020 | ||
IS | 30.01.2021 | ||
PT | 01.02.2021 | ||
Former [2021/25] | AL | 30.09.2020 | |
AT | 30.09.2020 | ||
CZ | 30.09.2020 | ||
EE | 30.09.2020 | ||
ES | 30.09.2020 | ||
FI | 30.09.2020 | ||
HR | 30.09.2020 | ||
LT | 30.09.2020 | ||
LV | 30.09.2020 | ||
PL | 30.09.2020 | ||
RO | 30.09.2020 | ||
RS | 30.09.2020 | ||
SE | 30.09.2020 | ||
SM | 30.09.2020 | ||
BG | 30.12.2020 | ||
NO | 30.12.2020 | ||
GR | 31.12.2020 | ||
IS | 30.01.2021 | ||
PT | 01.02.2021 | ||
Former [2021/23] | AT | 30.09.2020 | |
CZ | 30.09.2020 | ||
EE | 30.09.2020 | ||
FI | 30.09.2020 | ||
HR | 30.09.2020 | ||
LT | 30.09.2020 | ||
LV | 30.09.2020 | ||
RO | 30.09.2020 | ||
RS | 30.09.2020 | ||
SE | 30.09.2020 | ||
SM | 30.09.2020 | ||
BG | 30.12.2020 | ||
NO | 30.12.2020 | ||
GR | 31.12.2020 | ||
PT | 01.02.2021 | ||
Former [2021/22] | CZ | 30.09.2020 | |
EE | 30.09.2020 | ||
FI | 30.09.2020 | ||
HR | 30.09.2020 | ||
LT | 30.09.2020 | ||
LV | 30.09.2020 | ||
RO | 30.09.2020 | ||
RS | 30.09.2020 | ||
SE | 30.09.2020 | ||
SM | 30.09.2020 | ||
BG | 30.12.2020 | ||
NO | 30.12.2020 | ||
GR | 31.12.2020 | ||
PT | 01.02.2021 | ||
Former [2021/21] | FI | 30.09.2020 | |
HR | 30.09.2020 | ||
LT | 30.09.2020 | ||
LV | 30.09.2020 | ||
RS | 30.09.2020 | ||
SE | 30.09.2020 | ||
BG | 30.12.2020 | ||
NO | 30.12.2020 | ||
GR | 31.12.2020 | ||
PT | 01.02.2021 | ||
Former [2021/20] | FI | 30.09.2020 | |
HR | 30.09.2020 | ||
LT | 30.09.2020 | ||
LV | 30.09.2020 | ||
RS | 30.09.2020 | ||
SE | 30.09.2020 | ||
BG | 30.12.2020 | ||
NO | 30.12.2020 | ||
GR | 31.12.2020 | ||
Former [2021/10] | FI | 30.09.2020 | |
HR | 30.09.2020 | ||
LV | 30.09.2020 | ||
RS | 30.09.2020 | ||
SE | 30.09.2020 | ||
BG | 30.12.2020 | ||
NO | 30.12.2020 | ||
GR | 31.12.2020 | ||
Former [2021/08] | FI | 30.09.2020 | |
SE | 30.09.2020 | ||
BG | 30.12.2020 | ||
NO | 30.12.2020 | ||
Former [2021/07] | FI | 30.09.2020 | |
NO | 30.12.2020 | Documents cited: | Search | [Y]EP0520755 (BRIDGESTONE CORP [JP]) [Y] 5-7* figure -; claim - *; | [Y]EP0648622 (SUMITOMO RUBBER IND [JP]) [Y] 5,6 * figures 1-3; claim - *; | [XY]US2009090445 (ITOU KUNIAKI [JP]) [X] 1,2,4,7,9,10 * paragraphs [0041] , [0042]; figure -; claim - * [Y] 5,6; | [XY]JP2011178306 (BRIDGESTONE CORP) [X] 1,3,8,10 * paragraphs [0001] , [0037]; figure -; claim - * [Y] 5-7; | [XY]EP2614966 (SUMITOMO RUBBER IND [JP]) [X] 1,2,4,10 * paragraphs [0032] , [0040] , [0042] , [0062] - [0064]; figure -; claim - * [Y] 5-7; | [X]WO2015093238 (SUMITOMO RUBBER IND [JP]) [X] 1,8 * paragraphs [0047] , [0060]; figure -; claim - * | International search | [A]JP2007008342 (SUMITOMO RUBBER IND) [A] 1-10* , entire text & US 2007/0000590 A1 & CN 1891500 A & AU 2006201886 A *; | [XY]WO2007072717 (SUMITOMO RUBBER IND [JP], et al) [X] 1-2, 4, 7, 9-10 * , paragraphs [0010] to [0023]; each drawing & US 2009/0090445 A1 paragraphs [0037] to [0051]; each drawing & CN 101341035 A * [Y] 5-6; | [A]JP2008221977 (BRIDGESTONE CORP) [A] 1-10 * , entire text (Family: none) *; | [XY]JP2011178306 (BRIDGESTONE CORP) [X] 1, 3-4, 8, 10 * , claims; paragraphs [0027] to [0037]; fig. 1 (Family: none) * [Y] 5-6; | [Y]JP2012111342 (SUMITOMO RUBBER IND) [Y] 5-6 * , claims; paragraphs [0006], [0029] to [0045]; fig. 6 & CN 102555684 A & KR 10-2012-0056209 A *; | [A]JP2012153156 (BRIDGESTONE CORP) [A] 1-10 * , entire text (Family: none) *; | [A]JP2012183885 (BRIDGESTONE CORP) [A] 1-10 * , entire text (Family: none) *; | [A]JP2014076764 (YOKOHAMA RUBBER CO LTD) [A] 1-10 * , entire text (Family: none) * |