blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3496368

EP3496368 - DATA PROCESSING METHOD, APPARATUS, AND SYSTEM [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  08.07.2022
Database last updated on 11.09.2024
FormerThe patent has been granted
Status updated on  30.07.2021
FormerGrant of patent is intended
Status updated on  20.04.2021
FormerRequest for examination was made
Status updated on  10.05.2019
FormerThe international publication has been made
Status updated on  07.04.2018
Most recent event   Tooltip03.05.2024Lapse of the patent in a contracting state
New state(s): MK
published on 05.06.2024  [2024/23]
Applicant(s)For all designated states
Huawei Technologies Co., Ltd.
Huawei Administration Building
Bantian
Longgang District
Shenzhen, Guangdong 518129 / CN
[2019/24]
Inventor(s)01 / ZENG, Xin
Huawei Administration Building
Bantian
Longgang District
Shenzhen, Guangdong 518129 / CN
02 / WANG, Zongjie
Huawei Administration Building
Bantian
Longgang District
Shenzhen, Guangdong 518129 / CN
03 / HU, Yuanzhou
Huawei Administration Building
Bantian
Longgang District
Shenzhen, Guangdong 518129 / CN
 [2019/24]
Representative(s)Epping - Hermann - Fischer
Patentanwaltsgesellschaft mbH
Schloßschmidstraße 5
80639 München / DE
[2019/24]
Application number, filing date17854800.425.09.2017
[2019/24]
WO2017CN103181
Priority number, dateCN20161087368130.09.2016         Original published format: CN201610873681
CN20161115523414.12.2016         Original published format: CN201611155234
[2019/24]
Filing languageZH
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2018059350
Date:05.04.2018
Language:ZH
[2018/14]
Type: A1 Application with search report 
No.:EP3496368
Date:12.06.2019
Language:EN
[2019/24]
Type: B1 Patent specification 
No.:EP3496368
Date:01.09.2021
Language:EN
[2021/35]
Search report(s)International search report - published on:CN05.04.2018
(Supplementary) European search report - dispatched on:EP19.08.2019
ClassificationIPC:H04L29/08, H04L27/34, H04L27/26, H04L27/36, H04L27/20
[2019/38]
CPC:
H04L27/361 (EP,US); H04L27/2614 (CN,US); H04L27/2636 (US);
H04L27/20 (EP,US); H04L27/3483 (EP,US)
Former IPC [2019/24]H04L29/08
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2019/24]
Extension statesBANot yet paid
MENot yet paid
Validation statesMANot yet paid
MDNot yet paid
TitleGerman:DATENVERARBEITUNGSVERFAHREN, VORRICHTUNG UND SYSTEM[2019/24]
English:DATA PROCESSING METHOD, APPARATUS, AND SYSTEM[2019/24]
French:PROCÉDÉ, APPAREIL ET SYSTÈME DE TRAITEMENT DE DONNÉES[2019/24]
Entry into regional phase04.03.2019Translation filed 
04.03.2019National basic fee paid 
04.03.2019Search fee paid 
04.03.2019Designation fee(s) paid 
04.03.2019Examination fee paid 
Examination procedure04.03.2019Examination requested  [2019/24]
20.01.2020Amendment by applicant (claims and/or description)
21.04.2021Communication of intention to grant the patent
14.07.2021Fee for grant paid
14.07.2021Fee for publishing/printing paid
21.07.2021Receipt of the translation of the claim(s)
Opposition(s)02.06.2022No opposition filed within time limit [2022/32]
Fees paidRenewal fee
20.09.2019Renewal fee patent year 03
25.09.2020Renewal fee patent year 04
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU25.09.2017
AL01.09.2021
AT01.09.2021
CY01.09.2021
CZ01.09.2021
DK01.09.2021
EE01.09.2021
ES01.09.2021
FI01.09.2021
HR01.09.2021
IT01.09.2021
LT01.09.2021
LV01.09.2021
MC01.09.2021
MK01.09.2021
NL01.09.2021
PL01.09.2021
RO01.09.2021
RS01.09.2021
SE01.09.2021
SI01.09.2021
SK01.09.2021
SM01.09.2021
IE25.09.2021
LU25.09.2021
BE30.09.2021
CH30.09.2021
LI30.09.2021
FR01.11.2021
BG01.12.2021
NO01.12.2021
GR02.12.2021
IS01.01.2022
PT03.01.2022
[2024/23]
Former [2023/33]HU25.09.2017
AL01.09.2021
AT01.09.2021
CY01.09.2021
CZ01.09.2021
DK01.09.2021
EE01.09.2021
ES01.09.2021
FI01.09.2021
HR01.09.2021
IT01.09.2021
LT01.09.2021
LV01.09.2021
MC01.09.2021
NL01.09.2021
PL01.09.2021
RO01.09.2021
RS01.09.2021
SE01.09.2021
SI01.09.2021
SK01.09.2021
SM01.09.2021
IE25.09.2021
LU25.09.2021
BE30.09.2021
CH30.09.2021
LI30.09.2021
FR01.11.2021
BG01.12.2021
NO01.12.2021
GR02.12.2021
IS01.01.2022
PT03.01.2022
Former [2023/30]AL01.09.2021
AT01.09.2021
CY01.09.2021
CZ01.09.2021
DK01.09.2021
EE01.09.2021
ES01.09.2021
FI01.09.2021
HR01.09.2021
IT01.09.2021
LT01.09.2021
LV01.09.2021
MC01.09.2021
NL01.09.2021
PL01.09.2021
RO01.09.2021
RS01.09.2021
SE01.09.2021
SI01.09.2021
SK01.09.2021
SM01.09.2021
IE25.09.2021
LU25.09.2021
BE30.09.2021
CH30.09.2021
LI30.09.2021
FR01.11.2021
BG01.12.2021
NO01.12.2021
GR02.12.2021
IS01.01.2022
PT03.01.2022
Former [2022/41]AL01.09.2021
AT01.09.2021
CZ01.09.2021
DK01.09.2021
EE01.09.2021
ES01.09.2021
FI01.09.2021
HR01.09.2021
IT01.09.2021
LT01.09.2021
LV01.09.2021
MC01.09.2021
NL01.09.2021
PL01.09.2021
RO01.09.2021
RS01.09.2021
SE01.09.2021
SI01.09.2021
SK01.09.2021
SM01.09.2021
IE25.09.2021
LU25.09.2021
BE30.09.2021
CH30.09.2021
LI30.09.2021
FR01.11.2021
BG01.12.2021
NO01.12.2021
GR02.12.2021
IS01.01.2022
PT03.01.2022
Former [2022/37]AL01.09.2021
AT01.09.2021
CZ01.09.2021
DK01.09.2021
EE01.09.2021
ES01.09.2021
FI01.09.2021
HR01.09.2021
IT01.09.2021
LT01.09.2021
LV01.09.2021
MC01.09.2021
NL01.09.2021
PL01.09.2021
RO01.09.2021
RS01.09.2021
SE01.09.2021
SI01.09.2021
SK01.09.2021
SM01.09.2021
IE25.09.2021
LU25.09.2021
BE30.09.2021
CH30.09.2021
LI30.09.2021
BG01.12.2021
NO01.12.2021
GR02.12.2021
IS01.01.2022
PT03.01.2022
Former [2022/36]AL01.09.2021
AT01.09.2021
CZ01.09.2021
DK01.09.2021
EE01.09.2021
ES01.09.2021
FI01.09.2021
HR01.09.2021
IT01.09.2021
LT01.09.2021
LV01.09.2021
MC01.09.2021
NL01.09.2021
PL01.09.2021
RO01.09.2021
RS01.09.2021
SE01.09.2021
SI01.09.2021
SK01.09.2021
SM01.09.2021
IE25.09.2021
LU25.09.2021
BE30.09.2021
BG01.12.2021
NO01.12.2021
GR02.12.2021
IS01.01.2022
PT03.01.2022
Former [2022/35]AL01.09.2021
AT01.09.2021
CZ01.09.2021
DK01.09.2021
EE01.09.2021
ES01.09.2021
FI01.09.2021
HR01.09.2021
LT01.09.2021
LV01.09.2021
MC01.09.2021
NL01.09.2021
PL01.09.2021
RO01.09.2021
RS01.09.2021
SE01.09.2021
SK01.09.2021
SM01.09.2021
IE25.09.2021
LU25.09.2021
BE30.09.2021
BG01.12.2021
NO01.12.2021
GR02.12.2021
IS01.01.2022
PT03.01.2022
Former [2022/34]AL01.09.2021
AT01.09.2021
CZ01.09.2021
EE01.09.2021
ES01.09.2021
FI01.09.2021
HR01.09.2021
LT01.09.2021
LV01.09.2021
MC01.09.2021
NL01.09.2021
PL01.09.2021
RO01.09.2021
RS01.09.2021
SE01.09.2021
SK01.09.2021
SM01.09.2021
LU25.09.2021
BE30.09.2021
BG01.12.2021
NO01.12.2021
GR02.12.2021
IS01.01.2022
PT03.01.2022
Former [2022/33]AL01.09.2021
AT01.09.2021
CZ01.09.2021
EE01.09.2021
ES01.09.2021
FI01.09.2021
HR01.09.2021
LT01.09.2021
LV01.09.2021
MC01.09.2021
NL01.09.2021
PL01.09.2021
RO01.09.2021
RS01.09.2021
SE01.09.2021
SK01.09.2021
SM01.09.2021
BE30.09.2021
BG01.12.2021
NO01.12.2021
GR02.12.2021
IS01.01.2022
PT03.01.2022
Former [2022/29]AL01.09.2021
AT01.09.2021
CZ01.09.2021
EE01.09.2021
ES01.09.2021
FI01.09.2021
HR01.09.2021
LT01.09.2021
LV01.09.2021
NL01.09.2021
PL01.09.2021
RO01.09.2021
RS01.09.2021
SE01.09.2021
SK01.09.2021
SM01.09.2021
BG01.12.2021
NO01.12.2021
GR02.12.2021
IS01.01.2022
PT03.01.2022
Former [2022/25]AT01.09.2021
CZ01.09.2021
EE01.09.2021
ES01.09.2021
FI01.09.2021
HR01.09.2021
LT01.09.2021
LV01.09.2021
NL01.09.2021
PL01.09.2021
RO01.09.2021
RS01.09.2021
SE01.09.2021
SK01.09.2021
SM01.09.2021
BG01.12.2021
NO01.12.2021
GR02.12.2021
IS01.01.2022
PT03.01.2022
Former [2022/24]AT01.09.2021
CZ01.09.2021
EE01.09.2021
ES01.09.2021
FI01.09.2021
HR01.09.2021
LT01.09.2021
LV01.09.2021
NL01.09.2021
PL01.09.2021
RO01.09.2021
RS01.09.2021
SE01.09.2021
SK01.09.2021
BG01.12.2021
NO01.12.2021
GR02.12.2021
IS01.01.2022
PT03.01.2022
Former [2022/21]AT01.09.2021
ES01.09.2021
FI01.09.2021
HR01.09.2021
LT01.09.2021
LV01.09.2021
PL01.09.2021
RS01.09.2021
SE01.09.2021
BG01.12.2021
NO01.12.2021
GR02.12.2021
Former [2022/10]ES01.09.2021
FI01.09.2021
HR01.09.2021
LT01.09.2021
LV01.09.2021
PL01.09.2021
RS01.09.2021
SE01.09.2021
BG01.12.2021
NO01.12.2021
GR02.12.2021
Former [2022/09]ES01.09.2021
FI01.09.2021
LT01.09.2021
RS01.09.2021
SE01.09.2021
BG01.12.2021
NO01.12.2021
Former [2022/08]ES01.09.2021
FI01.09.2021
LT01.09.2021
SE01.09.2021
BG01.12.2021
NO01.12.2021
Former [2022/07]LT01.09.2021
NO01.12.2021
Documents cited:Search[A]WO2016075475  (SONY CORP [JP], et al) [A] 1-15 * the whole document *;
 [XA]WO2016117973  (SAMSUNG ELECTRONICS CO LTD [KR]) [X] 1-3,5-11,13-15 * paragraphs [0017] , [0021] , [0046] * * figure 1 * [A] 4,12;
 [T]US2017338907  (ATUNGSIRI SAMUEL ASANGBENG [GB], et al) [T] 1-15 * paragraph [0008] - paragraph [0010] * * paragraph [0048] * * paragraph [0171] *;
 [A]  - XIQI GAO ET AL, "Cyclic Prefixed OQAM-OFDM and its Application to Single-Carrier FDMA", IEEE TRANSACTIONS ON COMMUNICATIONS, IEEE SERVICE CENTER, PISCATAWAY, NJ. USA, (20110501), vol. 59, no. 5, doi:10.1109/TCOMM.2011.031611.100045, ISSN 0090-6778, pages 1467 - 1480, XP011322161 [A] 1-15 * Section II * * figures 1,2 *

DOI:   http://dx.doi.org/10.1109/TCOMM.2011.031611.100045
 [A]  - CHUNG HIM YUEN ET AL, "Single carrier frequency division multiple access (SC-FDMA) for filter bank multicarrier communication systems", COGNITIVE RADIO ORIENTED WIRELESS NETWORKS&COMMUNICATIONS (CROWNCOM), 2010 PROCEEDINGS OF THE FIFTH INTERNATIONAL CONFERENCE ON, IEEE, PISCATAWAY, NJ, USA, (20100609), ISBN 978-1-4244-5885-1, pages 1 - 5, XP031757371 [A] 1-9 * figures 1,2 * * Section II *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.