blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3519664

EP3519664 - LINER RUNNING TOOL AND ANCHOR SYSTEMS AND METHODS [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  08.04.2022
Database last updated on 13.09.2024
FormerThe patent has been granted
Status updated on  30.04.2021
FormerGrant of patent is intended
Status updated on  08.02.2021
FormerRequest for examination was made
Status updated on  05.07.2019
FormerThe international publication has been made
Status updated on  07.04.2018
Most recent event   Tooltip13.09.2024Lapse of the patent in a contracting state
New state(s): MT
published on 16.10.2024 [2024/42]
Applicant(s)For all designated states
Baker Hughes Holdings LLC
17021 Aldine Westfield
Houston, TX 77073 / US
[2021/21]
Former [2019/32]For all designated states
Baker Hughes, a GE company, LLC
17021 Aldine Westfield
Houston, TX 77073 / US
Inventor(s)01 / WECKEND, Carsten
17021 Aldine Westfield
Houston, Texas 77073 / US
02 / EGGERS, Heiko
17021 Aldine Westfield
Houston, Texas 77073 / US
03 / MAU, Fabian
17021 Aldine Westfield
Houston, Texas 77073 / US
04 / MELLES, Henning
17021 Aldine Westfield
Houston, Texas 77073 / US
05 / RODERS, Ingo
17021 Aldine Westfield
Houston, Texas 77073 / US
06 / RAHN, Henning
17021 Aldine Westfield
Houston, Texas 77073 / US
07 / OSTERKAMP, Frauke
17021 Aldine Westfield
Houston, Texas 77073 / US
 [2019/32]
Representative(s)BRP Renaud & Partner mbB Rechtsanwälte Patentanwälte Steuerberater
Königstraße 28
70173 Stuttgart / DE
[2021/22]
Former [2019/32]Dehns
St. Bride's House
10 Salisbury Square
London EC4Y 8JD / GB
Application number, filing date17857269.926.09.2017
[2019/32]
WO2017US53386
Priority number, dateUS20161527728027.09.2016         Original published format: US201615277280
[2019/32]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2018064019
Date:05.04.2018
Language:EN
[2018/14]
Type: A1 Application with search report 
No.:EP3519664
Date:07.08.2019
Language:EN
The application published by WIPO in one of the EPO official languages on 05.04.2018 takes the place of the publication of the European patent application.
[2019/32]
Type: B1 Patent specification 
No.:EP3519664
Date:02.06.2021
Language:EN
[2021/22]
Search report(s)International search report - published on:KR05.04.2018
(Supplementary) European search report - dispatched on:EP27.03.2020
ClassificationIPC:E21B23/01, E21B43/10
[2019/32]
CPC:
E21B23/01 (EP,RU,US); E21B43/10 (EP,RU,US); E21B47/09 (EP,RU,US)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2019/32]
Extension statesBANot yet paid
MENot yet paid
Validation statesMANot yet paid
MDNot yet paid
TitleGerman:AUSKLEIDUNGSLAUFWERKZEUG UND ANKERSYSTEME UND -VERFAHREN[2019/32]
English:LINER RUNNING TOOL AND ANCHOR SYSTEMS AND METHODS[2019/32]
French:OUTIL DE POSE DE CHEMISAGE ET SYSTÈMES ET PROCÉDÉS D'ANCRAGE[2019/32]
Entry into regional phase23.04.2019National basic fee paid 
23.04.2019Search fee paid 
23.04.2019Designation fee(s) paid 
23.04.2019Examination fee paid 
Examination procedure23.04.2019Examination requested  [2019/32]
26.10.2020Amendment by applicant (claims and/or description)
09.02.2021Communication of intention to grant the patent
07.04.2021Fee for grant paid
07.04.2021Fee for publishing/printing paid
07.04.2021Receipt of the translation of the claim(s)
Opposition(s)03.03.2022No opposition filed within time limit [2022/19]
Fees paidRenewal fee
19.09.2019Renewal fee patent year 03
17.09.2020Renewal fee patent year 04
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU26.09.2017
AL02.06.2021
AT02.06.2021
CY02.06.2021
CZ02.06.2021
DK02.06.2021
EE02.06.2021
ES02.06.2021
FI02.06.2021
HR02.06.2021
IT02.06.2021
LT02.06.2021
LV02.06.2021
MC02.06.2021
MK02.06.2021
MT02.06.2021
NL02.06.2021
PL02.06.2021
RO02.06.2021
RS02.06.2021
SE02.06.2021
SI02.06.2021
SK02.06.2021
SM02.06.2021
TR02.06.2021
BG02.09.2021
GR03.09.2021
IE26.09.2021
LU26.09.2021
BE30.09.2021
CH30.09.2021
FR30.09.2021
LI30.09.2021
IS02.10.2021
PT04.10.2021
[2024/42]
Former [2024/29]HU26.09.2017
AL02.06.2021
AT02.06.2021
CY02.06.2021
CZ02.06.2021
DK02.06.2021
EE02.06.2021
ES02.06.2021
FI02.06.2021
HR02.06.2021
IT02.06.2021
LT02.06.2021
LV02.06.2021
MC02.06.2021
MK02.06.2021
NL02.06.2021
PL02.06.2021
RO02.06.2021
RS02.06.2021
SE02.06.2021
SI02.06.2021
SK02.06.2021
SM02.06.2021
TR02.06.2021
BG02.09.2021
GR03.09.2021
IE26.09.2021
LU26.09.2021
BE30.09.2021
CH30.09.2021
FR30.09.2021
LI30.09.2021
IS02.10.2021
PT04.10.2021
Former [2024/23]HU26.09.2017
AL02.06.2021
AT02.06.2021
CY02.06.2021
CZ02.06.2021
DK02.06.2021
EE02.06.2021
ES02.06.2021
FI02.06.2021
HR02.06.2021
IT02.06.2021
LT02.06.2021
LV02.06.2021
MC02.06.2021
MK02.06.2021
NL02.06.2021
PL02.06.2021
RO02.06.2021
RS02.06.2021
SE02.06.2021
SI02.06.2021
SK02.06.2021
SM02.06.2021
BG02.09.2021
GR03.09.2021
IE26.09.2021
LU26.09.2021
BE30.09.2021
CH30.09.2021
FR30.09.2021
LI30.09.2021
IS02.10.2021
PT04.10.2021
Former [2023/33]HU26.09.2017
AL02.06.2021
AT02.06.2021
CY02.06.2021
CZ02.06.2021
DK02.06.2021
EE02.06.2021
ES02.06.2021
FI02.06.2021
HR02.06.2021
IT02.06.2021
LT02.06.2021
LV02.06.2021
MC02.06.2021
NL02.06.2021
PL02.06.2021
RO02.06.2021
RS02.06.2021
SE02.06.2021
SI02.06.2021
SK02.06.2021
SM02.06.2021
BG02.09.2021
GR03.09.2021
IE26.09.2021
LU26.09.2021
BE30.09.2021
CH30.09.2021
FR30.09.2021
LI30.09.2021
IS02.10.2021
PT04.10.2021
Former [2023/30]AL02.06.2021
AT02.06.2021
CY02.06.2021
CZ02.06.2021
DK02.06.2021
EE02.06.2021
ES02.06.2021
FI02.06.2021
HR02.06.2021
IT02.06.2021
LT02.06.2021
LV02.06.2021
MC02.06.2021
NL02.06.2021
PL02.06.2021
RO02.06.2021
RS02.06.2021
SE02.06.2021
SI02.06.2021
SK02.06.2021
SM02.06.2021
BG02.09.2021
GR03.09.2021
IE26.09.2021
LU26.09.2021
BE30.09.2021
CH30.09.2021
FR30.09.2021
LI30.09.2021
IS02.10.2021
PT04.10.2021
Former [2022/37]AL02.06.2021
AT02.06.2021
CZ02.06.2021
DK02.06.2021
EE02.06.2021
ES02.06.2021
FI02.06.2021
HR02.06.2021
IT02.06.2021
LT02.06.2021
LV02.06.2021
MC02.06.2021
NL02.06.2021
PL02.06.2021
RO02.06.2021
RS02.06.2021
SE02.06.2021
SI02.06.2021
SK02.06.2021
SM02.06.2021
BG02.09.2021
GR03.09.2021
IE26.09.2021
LU26.09.2021
BE30.09.2021
CH30.09.2021
FR30.09.2021
LI30.09.2021
IS02.10.2021
PT04.10.2021
Former [2022/36]AL02.06.2021
AT02.06.2021
CZ02.06.2021
DK02.06.2021
EE02.06.2021
ES02.06.2021
FI02.06.2021
HR02.06.2021
IT02.06.2021
LT02.06.2021
LV02.06.2021
MC02.06.2021
NL02.06.2021
PL02.06.2021
RO02.06.2021
RS02.06.2021
SE02.06.2021
SI02.06.2021
SK02.06.2021
SM02.06.2021
BG02.09.2021
GR03.09.2021
IE26.09.2021
LU26.09.2021
BE30.09.2021
FR30.09.2021
IS02.10.2021
PT04.10.2021
Former [2022/35]AL02.06.2021
AT02.06.2021
CZ02.06.2021
DK02.06.2021
EE02.06.2021
ES02.06.2021
FI02.06.2021
HR02.06.2021
LT02.06.2021
LV02.06.2021
MC02.06.2021
NL02.06.2021
PL02.06.2021
RO02.06.2021
RS02.06.2021
SE02.06.2021
SI02.06.2021
SK02.06.2021
SM02.06.2021
BG02.09.2021
GR03.09.2021
IE26.09.2021
LU26.09.2021
BE30.09.2021
FR30.09.2021
IS02.10.2021
PT04.10.2021
Former [2022/34]AL02.06.2021
AT02.06.2021
CZ02.06.2021
DK02.06.2021
EE02.06.2021
ES02.06.2021
FI02.06.2021
HR02.06.2021
LT02.06.2021
LV02.06.2021
MC02.06.2021
NL02.06.2021
PL02.06.2021
RO02.06.2021
RS02.06.2021
SE02.06.2021
SI02.06.2021
SK02.06.2021
SM02.06.2021
BG02.09.2021
GR03.09.2021
LU26.09.2021
BE30.09.2021
FR30.09.2021
IS02.10.2021
PT04.10.2021
Former [2022/29]AL02.06.2021
AT02.06.2021
CZ02.06.2021
DK02.06.2021
EE02.06.2021
ES02.06.2021
FI02.06.2021
HR02.06.2021
LT02.06.2021
LV02.06.2021
MC02.06.2021
NL02.06.2021
PL02.06.2021
RO02.06.2021
RS02.06.2021
SE02.06.2021
SI02.06.2021
SK02.06.2021
SM02.06.2021
BG02.09.2021
GR03.09.2021
IS02.10.2021
PT04.10.2021
Former [2022/25]AL02.06.2021
AT02.06.2021
CZ02.06.2021
DK02.06.2021
EE02.06.2021
ES02.06.2021
FI02.06.2021
HR02.06.2021
LT02.06.2021
LV02.06.2021
MC02.06.2021
NL02.06.2021
PL02.06.2021
RO02.06.2021
RS02.06.2021
SE02.06.2021
SK02.06.2021
SM02.06.2021
BG02.09.2021
GR03.09.2021
IS02.10.2021
PT04.10.2021
Former [2022/21]AT02.06.2021
CZ02.06.2021
DK02.06.2021
EE02.06.2021
ES02.06.2021
FI02.06.2021
HR02.06.2021
LT02.06.2021
LV02.06.2021
NL02.06.2021
PL02.06.2021
RO02.06.2021
RS02.06.2021
SE02.06.2021
SK02.06.2021
SM02.06.2021
BG02.09.2021
GR03.09.2021
IS02.10.2021
PT04.10.2021
Former [2022/10]AT02.06.2021
CZ02.06.2021
EE02.06.2021
ES02.06.2021
FI02.06.2021
HR02.06.2021
LT02.06.2021
LV02.06.2021
NL02.06.2021
PL02.06.2021
RO02.06.2021
RS02.06.2021
SE02.06.2021
SK02.06.2021
SM02.06.2021
BG02.09.2021
GR03.09.2021
IS02.10.2021
PT04.10.2021
Former [2022/09]AT02.06.2021
CZ02.06.2021
ES02.06.2021
FI02.06.2021
HR02.06.2021
LT02.06.2021
LV02.06.2021
NL02.06.2021
PL02.06.2021
RO02.06.2021
RS02.06.2021
SE02.06.2021
SK02.06.2021
SM02.06.2021
BG02.09.2021
GR03.09.2021
PT04.10.2021
Former [2022/08]AT02.06.2021
CZ02.06.2021
ES02.06.2021
FI02.06.2021
HR02.06.2021
LT02.06.2021
LV02.06.2021
NL02.06.2021
PL02.06.2021
RS02.06.2021
SE02.06.2021
SM02.06.2021
BG02.09.2021
GR03.09.2021
Former [2022/07]AT02.06.2021
FI02.06.2021
HR02.06.2021
LT02.06.2021
LV02.06.2021
NL02.06.2021
PL02.06.2021
RS02.06.2021
SE02.06.2021
SM02.06.2021
BG02.09.2021
GR03.09.2021
Former [2021/52]FI02.06.2021
HR02.06.2021
LT02.06.2021
LV02.06.2021
PL02.06.2021
RS02.06.2021
SE02.06.2021
BG02.09.2021
GR03.09.2021
Former [2021/51]FI02.06.2021
HR02.06.2021
LT02.06.2021
LV02.06.2021
RS02.06.2021
SE02.06.2021
BG02.09.2021
GR03.09.2021
Former [2021/49]FI02.06.2021
HR02.06.2021
LT02.06.2021
LV02.06.2021
SE02.06.2021
BG02.09.2021
GR03.09.2021
Former [2021/47]FI02.06.2021
LT02.06.2021
BG02.09.2021
Former [2021/46]FI02.06.2021
LT02.06.2021
Documents cited:Search[A]US2015369038  (BROWN-KERR WILLIAM [GB], et al) [A] 1-15 * page 4, paragraph 57 - page 5, paragraph 61 *;
 [A]US2016138373  (WOOD EDWARD T [US], et al) [A] 1-15* page 1, paragraph 13 - page 2, paragraph 16 *
International search[A]US4463814  (HORSTMEYER ROBERT J [US], et al) [A] 1-15 * See column 3, line 51 - column 8, line 26; and figures 1-9. *;
 [A]US2009071659  (SPENCER MAX E [US], et al) [A] 1-15* See paragraphs [0021]-[0035]; and figures 1-10. *;
 [A]US2009101362  (LOUGHLIN MICHAEL J [US]) [A] 1-15 * See paragraphs [0015]-[0034]; and figures 1, 2A-2B. *;
 [Y]US2012186874  (MALONE SCOTT [US], et al) [Y] 1-15 * See paragraphs [0021]-[0061]; and figures 1-13. *;
 [Y]WO2015094317  (HALLIBURTON ENERGY SERVICES INC [US]) [Y] 1-15 * See paragraphs [0016]-[0042]; claim 1; and figures 1-5. *
by applicantUS9004195
 US2015369038
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.