EP3524957 - TISSUE DIVIDING JIG [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 30.06.2023 Database last updated on 19.10.2024 | |
Former | The patent has been granted Status updated on 22.07.2022 | ||
Former | Grant of patent is intended Status updated on 20.03.2022 | ||
Former | Examination is in progress Status updated on 08.07.2021 | ||
Former | Request for examination was made Status updated on 12.07.2019 | ||
Former | The international publication has been made Status updated on 14.04.2018 | Most recent event Tooltip | 13.09.2024 | Lapse of the patent in a contracting state New state(s): MT | published on 16.10.2024 [2024/42] | Applicant(s) | For all designated states Umihira Co., Ltd. 126 Kuze Tonoshiro-cho Minami-ku Kyoto-shi, Kyoto 601-8205 / JP | For all designated states Kyoto Prefectural Public University Corporation 465 Kajii-cho Hirokoji-agaru Kawaramachi-dori Kamigyo-ku, Kyoto-shi Kyoto 602-8566 / JP | [2019/33] | Inventor(s) | 01 /
UMIHIRA, Kazuo c/o UMIHIRA CO. LTD. 126 Kuze Tonoshiro-cho Minami-ku Kyoto-shi Kyoto 601-8205 / JP | 02 /
OGINO, Keizou c/o UMIHIRA CO. LTD. 126 Kuze Tonoshiro-cho Minami-ku Kyoto-shi Kyoto 601-8205 / JP | 03 /
UKIMURA, Osamu c/o Kyoto Prefectural Public University Corporation Kyoto Prefectural University of Medicine 465 Kajii-cho Kawaramachi-dori Hirokoji-agaru, Kamigyo-ku Kyoto-shi Kyoto 602-8566 / JP | 04 /
KAMOI, Kazumi c/o Kyoto Prefectural Public University Corporation Kyoto Prefectural University of Medicine 465 Kajii-cho Kawaramachi-dori Hirokoji-agaru, Kamigyo-ku Kyoto-shi Kyoto 602-8566 / JP | [2019/33] | Representative(s) | Kador & Partner Part mbB Corneliusstraße 15 80469 München / DE | [N/P] |
Former [2019/33] | Kador & Partner PartG mbB Corneliusstraße 15 80469 München / DE | Application number, filing date | 17858494.2 | 05.10.2017 | [2019/33] | WO2017JP36333 | Priority number, date | JP20160198959 | 07.10.2016 Original published format: JP 2016198959 | [2019/33] | Filing language | JA | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2018066658 | Date: | 12.04.2018 | Language: | JA | [2018/15] | Type: | A1 Application with search report | No.: | EP3524957 | Date: | 14.08.2019 | Language: | EN | [2019/33] | Type: | B1 Patent specification | No.: | EP3524957 | Date: | 24.08.2022 | Language: | EN | [2022/34] | Search report(s) | International search report - published on: | JP | 12.04.2018 | (Supplementary) European search report - dispatched on: | EP | 20.04.2020 | Classification | IPC: | G01N1/04, A61B10/02, G01N1/28, C12N5/09 | [2020/21] | CPC: |
A61B10/0233 (EP,US);
G01N1/04 (US);
A61B10/02 (US);
A61B10/0275 (EP,US);
G01N1/06 (EP,US);
G01N1/28 (US);
|
Former IPC [2019/33] | G01N1/04, A61B10/02, G01N1/28 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2019/33] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | MD | Not yet paid | Title | German: | GEWEBETEILUNGSVORRICHTUNG | [2019/33] | English: | TISSUE DIVIDING JIG | [2019/33] | French: | GABARIT DE DIVISION DE TISSU | [2019/33] | Entry into regional phase | 11.12.2018 | Translation filed | 11.12.2018 | National basic fee paid | 11.12.2018 | Search fee paid | 11.12.2018 | Designation fee(s) paid | 11.12.2018 | Examination fee paid | Examination procedure | 11.12.2018 | Examination requested [2019/33] | 14.10.2020 | Amendment by applicant (claims and/or description) | 07.07.2021 | Despatch of a communication from the examining division (Time limit: M04) | 06.10.2021 | Reply to a communication from the examining division | 21.03.2022 | Communication of intention to grant the patent | 19.07.2022 | Fee for grant paid | 19.07.2022 | Fee for publishing/printing paid | 19.07.2022 | Receipt of the translation of the claim(s) | Opposition(s) | 25.05.2023 | No opposition filed within time limit [2023/31] | Fees paid | Renewal fee | 24.10.2019 | Renewal fee patent year 03 | 15.10.2020 | Renewal fee patent year 04 | 29.10.2021 | Renewal fee patent year 05 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 05.10.2017 | AL | 24.08.2022 | AT | 24.08.2022 | BG | 24.08.2022 | CY | 24.08.2022 | CZ | 24.08.2022 | DK | 24.08.2022 | EE | 24.08.2022 | ES | 24.08.2022 | FI | 24.08.2022 | HR | 24.08.2022 | IT | 24.08.2022 | LT | 24.08.2022 | LV | 24.08.2022 | MC | 24.08.2022 | MK | 24.08.2022 | MT | 24.08.2022 | NL | 24.08.2022 | PL | 24.08.2022 | RO | 24.08.2022 | RS | 24.08.2022 | SE | 24.08.2022 | SI | 24.08.2022 | SK | 24.08.2022 | SM | 24.08.2022 | TR | 24.08.2022 | IE | 05.10.2022 | LU | 05.10.2022 | BE | 31.10.2022 | CH | 31.10.2022 | LI | 31.10.2022 | NO | 24.11.2022 | GR | 25.11.2022 | IS | 24.12.2022 | PT | 26.12.2022 | [2024/42] |
Former [2024/34] | HU | 05.10.2017 | |
AL | 24.08.2022 | ||
AT | 24.08.2022 | ||
BG | 24.08.2022 | ||
CY | 24.08.2022 | ||
CZ | 24.08.2022 | ||
DK | 24.08.2022 | ||
EE | 24.08.2022 | ||
ES | 24.08.2022 | ||
FI | 24.08.2022 | ||
HR | 24.08.2022 | ||
IT | 24.08.2022 | ||
LT | 24.08.2022 | ||
LV | 24.08.2022 | ||
MC | 24.08.2022 | ||
MK | 24.08.2022 | ||
NL | 24.08.2022 | ||
PL | 24.08.2022 | ||
RO | 24.08.2022 | ||
RS | 24.08.2022 | ||
SE | 24.08.2022 | ||
SI | 24.08.2022 | ||
SK | 24.08.2022 | ||
SM | 24.08.2022 | ||
TR | 24.08.2022 | ||
IE | 05.10.2022 | ||
LU | 05.10.2022 | ||
BE | 31.10.2022 | ||
CH | 31.10.2022 | ||
LI | 31.10.2022 | ||
NO | 24.11.2022 | ||
GR | 25.11.2022 | ||
IS | 24.12.2022 | ||
PT | 26.12.2022 | ||
Former [2024/29] | HU | 05.10.2017 | |
AL | 24.08.2022 | ||
AT | 24.08.2022 | ||
CY | 24.08.2022 | ||
CZ | 24.08.2022 | ||
DK | 24.08.2022 | ||
EE | 24.08.2022 | ||
ES | 24.08.2022 | ||
FI | 24.08.2022 | ||
HR | 24.08.2022 | ||
IT | 24.08.2022 | ||
LT | 24.08.2022 | ||
LV | 24.08.2022 | ||
MC | 24.08.2022 | ||
MK | 24.08.2022 | ||
NL | 24.08.2022 | ||
PL | 24.08.2022 | ||
RO | 24.08.2022 | ||
RS | 24.08.2022 | ||
SE | 24.08.2022 | ||
SI | 24.08.2022 | ||
SK | 24.08.2022 | ||
SM | 24.08.2022 | ||
TR | 24.08.2022 | ||
IE | 05.10.2022 | ||
LU | 05.10.2022 | ||
BE | 31.10.2022 | ||
CH | 31.10.2022 | ||
LI | 31.10.2022 | ||
NO | 24.11.2022 | ||
GR | 25.11.2022 | ||
IS | 24.12.2022 | ||
PT | 26.12.2022 | ||
Former [2024/27] | HU | 05.10.2017 | |
AL | 24.08.2022 | ||
AT | 24.08.2022 | ||
CY | 24.08.2022 | ||
CZ | 24.08.2022 | ||
DK | 24.08.2022 | ||
EE | 24.08.2022 | ||
ES | 24.08.2022 | ||
FI | 24.08.2022 | ||
HR | 24.08.2022 | ||
IT | 24.08.2022 | ||
LT | 24.08.2022 | ||
LV | 24.08.2022 | ||
MC | 24.08.2022 | ||
MK | 24.08.2022 | ||
NL | 24.08.2022 | ||
PL | 24.08.2022 | ||
RO | 24.08.2022 | ||
RS | 24.08.2022 | ||
SE | 24.08.2022 | ||
SI | 24.08.2022 | ||
SK | 24.08.2022 | ||
SM | 24.08.2022 | ||
IE | 05.10.2022 | ||
LU | 05.10.2022 | ||
BE | 31.10.2022 | ||
CH | 31.10.2022 | ||
LI | 31.10.2022 | ||
NO | 24.11.2022 | ||
GR | 25.11.2022 | ||
IS | 24.12.2022 | ||
PT | 26.12.2022 | ||
Former [2024/26] | HU | 05.10.2017 | |
AL | 24.08.2022 | ||
AT | 24.08.2022 | ||
CY | 24.08.2022 | ||
CZ | 24.08.2022 | ||
DK | 24.08.2022 | ||
EE | 24.08.2022 | ||
ES | 24.08.2022 | ||
FI | 24.08.2022 | ||
HR | 24.08.2022 | ||
IT | 24.08.2022 | ||
LT | 24.08.2022 | ||
LV | 24.08.2022 | ||
MC | 24.08.2022 | ||
NL | 24.08.2022 | ||
PL | 24.08.2022 | ||
RO | 24.08.2022 | ||
RS | 24.08.2022 | ||
SE | 24.08.2022 | ||
SI | 24.08.2022 | ||
SK | 24.08.2022 | ||
SM | 24.08.2022 | ||
IE | 05.10.2022 | ||
LU | 05.10.2022 | ||
BE | 31.10.2022 | ||
CH | 31.10.2022 | ||
LI | 31.10.2022 | ||
NO | 24.11.2022 | ||
GR | 25.11.2022 | ||
IS | 24.12.2022 | ||
PT | 26.12.2022 | ||
Former [2024/21] | HU | 05.10.2017 | |
AL | 24.08.2022 | ||
AT | 24.08.2022 | ||
CY | 24.08.2022 | ||
CZ | 24.08.2022 | ||
DK | 24.08.2022 | ||
EE | 24.08.2022 | ||
ES | 24.08.2022 | ||
FI | 24.08.2022 | ||
HR | 24.08.2022 | ||
LT | 24.08.2022 | ||
LV | 24.08.2022 | ||
MC | 24.08.2022 | ||
NL | 24.08.2022 | ||
PL | 24.08.2022 | ||
RO | 24.08.2022 | ||
RS | 24.08.2022 | ||
SE | 24.08.2022 | ||
SI | 24.08.2022 | ||
SK | 24.08.2022 | ||
SM | 24.08.2022 | ||
IE | 05.10.2022 | ||
LU | 05.10.2022 | ||
BE | 31.10.2022 | ||
CH | 31.10.2022 | ||
LI | 31.10.2022 | ||
NO | 24.11.2022 | ||
GR | 25.11.2022 | ||
IS | 24.12.2022 | ||
PT | 26.12.2022 | ||
Former [2024/18] | HU | 05.10.2017 | |
AL | 24.08.2022 | ||
AT | 24.08.2022 | ||
CZ | 24.08.2022 | ||
DK | 24.08.2022 | ||
EE | 24.08.2022 | ||
ES | 24.08.2022 | ||
FI | 24.08.2022 | ||
HR | 24.08.2022 | ||
LT | 24.08.2022 | ||
LV | 24.08.2022 | ||
MC | 24.08.2022 | ||
NL | 24.08.2022 | ||
PL | 24.08.2022 | ||
RO | 24.08.2022 | ||
RS | 24.08.2022 | ||
SE | 24.08.2022 | ||
SI | 24.08.2022 | ||
SK | 24.08.2022 | ||
SM | 24.08.2022 | ||
IE | 05.10.2022 | ||
LU | 05.10.2022 | ||
BE | 31.10.2022 | ||
CH | 31.10.2022 | ||
LI | 31.10.2022 | ||
NO | 24.11.2022 | ||
GR | 25.11.2022 | ||
IS | 24.12.2022 | ||
PT | 26.12.2022 | ||
Former [2023/48] | AL | 24.08.2022 | |
AT | 24.08.2022 | ||
CZ | 24.08.2022 | ||
DK | 24.08.2022 | ||
EE | 24.08.2022 | ||
ES | 24.08.2022 | ||
FI | 24.08.2022 | ||
HR | 24.08.2022 | ||
LT | 24.08.2022 | ||
LV | 24.08.2022 | ||
MC | 24.08.2022 | ||
NL | 24.08.2022 | ||
PL | 24.08.2022 | ||
RO | 24.08.2022 | ||
RS | 24.08.2022 | ||
SE | 24.08.2022 | ||
SI | 24.08.2022 | ||
SK | 24.08.2022 | ||
SM | 24.08.2022 | ||
IE | 05.10.2022 | ||
LU | 05.10.2022 | ||
BE | 31.10.2022 | ||
CH | 31.10.2022 | ||
LI | 31.10.2022 | ||
NO | 24.11.2022 | ||
GR | 25.11.2022 | ||
IS | 24.12.2022 | ||
PT | 26.12.2022 | ||
Former [2023/42] | AL | 24.08.2022 | |
AT | 24.08.2022 | ||
CZ | 24.08.2022 | ||
DK | 24.08.2022 | ||
EE | 24.08.2022 | ||
ES | 24.08.2022 | ||
FI | 24.08.2022 | ||
HR | 24.08.2022 | ||
LT | 24.08.2022 | ||
LV | 24.08.2022 | ||
MC | 24.08.2022 | ||
NL | 24.08.2022 | ||
PL | 24.08.2022 | ||
RO | 24.08.2022 | ||
RS | 24.08.2022 | ||
SE | 24.08.2022 | ||
SI | 24.08.2022 | ||
SK | 24.08.2022 | ||
SM | 24.08.2022 | ||
LU | 05.10.2022 | ||
BE | 31.10.2022 | ||
CH | 31.10.2022 | ||
LI | 31.10.2022 | ||
NO | 24.11.2022 | ||
GR | 25.11.2022 | ||
IS | 24.12.2022 | ||
PT | 26.12.2022 | ||
Former [2023/37] | AL | 24.08.2022 | |
AT | 24.08.2022 | ||
CZ | 24.08.2022 | ||
DK | 24.08.2022 | ||
EE | 24.08.2022 | ||
ES | 24.08.2022 | ||
FI | 24.08.2022 | ||
HR | 24.08.2022 | ||
LT | 24.08.2022 | ||
LV | 24.08.2022 | ||
MC | 24.08.2022 | ||
NL | 24.08.2022 | ||
PL | 24.08.2022 | ||
RO | 24.08.2022 | ||
RS | 24.08.2022 | ||
SE | 24.08.2022 | ||
SI | 24.08.2022 | ||
SK | 24.08.2022 | ||
SM | 24.08.2022 | ||
LU | 05.10.2022 | ||
CH | 31.10.2022 | ||
LI | 31.10.2022 | ||
NO | 24.11.2022 | ||
GR | 25.11.2022 | ||
IS | 24.12.2022 | ||
PT | 26.12.2022 | ||
Former [2023/35] | AL | 24.08.2022 | |
AT | 24.08.2022 | ||
CZ | 24.08.2022 | ||
DK | 24.08.2022 | ||
EE | 24.08.2022 | ||
ES | 24.08.2022 | ||
FI | 24.08.2022 | ||
HR | 24.08.2022 | ||
LT | 24.08.2022 | ||
LV | 24.08.2022 | ||
MC | 24.08.2022 | ||
NL | 24.08.2022 | ||
PL | 24.08.2022 | ||
RO | 24.08.2022 | ||
RS | 24.08.2022 | ||
SE | 24.08.2022 | ||
SK | 24.08.2022 | ||
SM | 24.08.2022 | ||
LU | 05.10.2022 | ||
CH | 31.10.2022 | ||
LI | 31.10.2022 | ||
NO | 24.11.2022 | ||
GR | 25.11.2022 | ||
IS | 24.12.2022 | ||
PT | 26.12.2022 | ||
Former [2023/30] | AL | 24.08.2022 | |
AT | 24.08.2022 | ||
CZ | 24.08.2022 | ||
DK | 24.08.2022 | ||
EE | 24.08.2022 | ||
ES | 24.08.2022 | ||
FI | 24.08.2022 | ||
HR | 24.08.2022 | ||
LT | 24.08.2022 | ||
LV | 24.08.2022 | ||
MC | 24.08.2022 | ||
NL | 24.08.2022 | ||
PL | 24.08.2022 | ||
RO | 24.08.2022 | ||
RS | 24.08.2022 | ||
SE | 24.08.2022 | ||
SK | 24.08.2022 | ||
SM | 24.08.2022 | ||
LU | 05.10.2022 | ||
NO | 24.11.2022 | ||
GR | 25.11.2022 | ||
IS | 24.12.2022 | ||
PT | 26.12.2022 | ||
Former [2023/29] | AL | 24.08.2022 | |
AT | 24.08.2022 | ||
CZ | 24.08.2022 | ||
DK | 24.08.2022 | ||
EE | 24.08.2022 | ||
ES | 24.08.2022 | ||
FI | 24.08.2022 | ||
HR | 24.08.2022 | ||
LT | 24.08.2022 | ||
LV | 24.08.2022 | ||
MC | 24.08.2022 | ||
NL | 24.08.2022 | ||
PL | 24.08.2022 | ||
RO | 24.08.2022 | ||
RS | 24.08.2022 | ||
SE | 24.08.2022 | ||
SK | 24.08.2022 | ||
SM | 24.08.2022 | ||
NO | 24.11.2022 | ||
GR | 25.11.2022 | ||
IS | 24.12.2022 | ||
PT | 26.12.2022 | ||
Former [2023/25] | AT | 24.08.2022 | |
CZ | 24.08.2022 | ||
DK | 24.08.2022 | ||
EE | 24.08.2022 | ||
ES | 24.08.2022 | ||
FI | 24.08.2022 | ||
HR | 24.08.2022 | ||
LT | 24.08.2022 | ||
LV | 24.08.2022 | ||
MC | 24.08.2022 | ||
NL | 24.08.2022 | ||
PL | 24.08.2022 | ||
RO | 24.08.2022 | ||
RS | 24.08.2022 | ||
SE | 24.08.2022 | ||
SK | 24.08.2022 | ||
SM | 24.08.2022 | ||
NO | 24.11.2022 | ||
GR | 25.11.2022 | ||
IS | 24.12.2022 | ||
PT | 26.12.2022 | ||
Former [2023/23] | AT | 24.08.2022 | |
CZ | 24.08.2022 | ||
DK | 24.08.2022 | ||
EE | 24.08.2022 | ||
ES | 24.08.2022 | ||
FI | 24.08.2022 | ||
HR | 24.08.2022 | ||
LT | 24.08.2022 | ||
LV | 24.08.2022 | ||
NL | 24.08.2022 | ||
PL | 24.08.2022 | ||
RO | 24.08.2022 | ||
RS | 24.08.2022 | ||
SE | 24.08.2022 | ||
SK | 24.08.2022 | ||
SM | 24.08.2022 | ||
NO | 24.11.2022 | ||
GR | 25.11.2022 | ||
IS | 24.12.2022 | ||
PT | 26.12.2022 | ||
Former [2023/22] | AT | 24.08.2022 | |
CZ | 24.08.2022 | ||
DK | 24.08.2022 | ||
ES | 24.08.2022 | ||
FI | 24.08.2022 | ||
HR | 24.08.2022 | ||
LT | 24.08.2022 | ||
LV | 24.08.2022 | ||
NL | 24.08.2022 | ||
PL | 24.08.2022 | ||
RO | 24.08.2022 | ||
RS | 24.08.2022 | ||
SE | 24.08.2022 | ||
SM | 24.08.2022 | ||
NO | 24.11.2022 | ||
GR | 25.11.2022 | ||
IS | 24.12.2022 | ||
PT | 26.12.2022 | ||
Former [2023/21] | DK | 24.08.2022 | |
FI | 24.08.2022 | ||
HR | 24.08.2022 | ||
LT | 24.08.2022 | ||
LV | 24.08.2022 | ||
NL | 24.08.2022 | ||
PL | 24.08.2022 | ||
RS | 24.08.2022 | ||
SE | 24.08.2022 | ||
SM | 24.08.2022 | ||
NO | 24.11.2022 | ||
GR | 25.11.2022 | ||
IS | 24.12.2022 | ||
PT | 26.12.2022 | ||
Former [2023/20] | FI | 24.08.2022 | |
HR | 24.08.2022 | ||
LT | 24.08.2022 | ||
LV | 24.08.2022 | ||
NL | 24.08.2022 | ||
PL | 24.08.2022 | ||
RS | 24.08.2022 | ||
SE | 24.08.2022 | ||
SM | 24.08.2022 | ||
NO | 24.11.2022 | ||
GR | 25.11.2022 | ||
IS | 24.12.2022 | ||
PT | 26.12.2022 | ||
Former [2023/12] | FI | 24.08.2022 | |
HR | 24.08.2022 | ||
LT | 24.08.2022 | ||
LV | 24.08.2022 | ||
NL | 24.08.2022 | ||
PL | 24.08.2022 | ||
RS | 24.08.2022 | ||
SE | 24.08.2022 | ||
NO | 24.11.2022 | ||
GR | 25.11.2022 | ||
IS | 24.12.2022 | ||
PT | 26.12.2022 | ||
Former [2023/11] | FI | 24.08.2022 | |
HR | 24.08.2022 | ||
LT | 24.08.2022 | ||
LV | 24.08.2022 | ||
NL | 24.08.2022 | ||
PL | 24.08.2022 | ||
RS | 24.08.2022 | ||
SE | 24.08.2022 | ||
NO | 24.11.2022 | ||
GR | 25.11.2022 | ||
PT | 26.12.2022 | ||
Former [2023/10] | FI | 24.08.2022 | |
HR | 24.08.2022 | ||
LT | 24.08.2022 | ||
LV | 24.08.2022 | ||
NL | 24.08.2022 | ||
RS | 24.08.2022 | ||
SE | 24.08.2022 | ||
NO | 24.11.2022 | ||
GR | 25.11.2022 | ||
PT | 26.12.2022 | ||
Former [2023/09] | FI | 24.08.2022 | |
LT | 24.08.2022 | ||
LV | 24.08.2022 | ||
NL | 24.08.2022 | ||
RS | 24.08.2022 | ||
SE | 24.08.2022 | ||
NO | 24.11.2022 | ||
PT | 26.12.2022 | ||
Former [2023/08] | FI | 24.08.2022 | |
LT | 24.08.2022 | ||
NL | 24.08.2022 | ||
RS | 24.08.2022 | ||
SE | 24.08.2022 | ||
NO | 24.11.2022 | Documents cited: | Search | [X]JP2000210892 (OSAKA GAS CO LTD) [X] 1,2 * figures 2-4 *; | [X]US2006106378 (KOBAYASHI HIRONORI [JP], et al) [X] 1-5 * paragraph [0066]; figures 1-41 * * paragraph [0074] - paragraph [0075] * * paragraph [0079] - paragraph [0085] * * paragraph [0101] - paragraph [0110] *; | [X]US7393685 (JORDAN ANDREAS [DE]) [X] 1-5 * figures 1-4 *; | [A]US2009293689 (ICHIHARA SHU [JP]) [A] 1-5 * figures 1-5 *; | [A]WO2010130974 (CANCER RES INST ROYAL [GB], et al) [A] 1-5* figures 1, 2 *; | [X]KR20130045465 (MICRO IS CO LTD [KR]) [X] 1-5 * figures 1-4 * | International search | [A]US5612218 (BUSCH CHRISTER [SE], et al) [A] 1-6 * , column 5, line 55 to column 6, line 22, fig. 1-4 (Family: none) *; | [A]JP2004028985 (LEICA MIKROSYSTEME GMBH) [A] 1-6 * , paragraphs [0021]-[0029], fig. 1-2] & US 2003/0198574 A1, paragraphs [0024]-[0031], fig. 1-2 & EP 1336834 A1 *; | [A]JP2012220280 (TAKEZAKI TEIJI) [A] 1-6 * , paragraphs [0038]-[0053], fig. 16 & WO 2011/149100 A1 *; | [A]JP2016505841 (UC-CARE LTD) [A] 1-6 * , paragraphs [0031]-[0059], fig. 1A- 8D & WO 2014/097295 A1, page 11, line 10 to page 20, line 4, fig. IA-8D & US 2015/0008616 A1 & EP 2932230 A1 & CN 104995498 A *; | [PX]JP2017003504 (BREAST HEALTHCARE INC) [PX] 1-4* , (Family: none) * |