EP3522816 - DENTAL SYSTEM AND METHOD [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 09.02.2024 Database last updated on 19.10.2024 | |
Former | The patent has been granted Status updated on 03.03.2023 | ||
Former | Grant of patent is intended Status updated on 27.10.2022 | ||
Former | Examination is in progress Status updated on 18.06.2021 | ||
Former | Request for examination was made Status updated on 12.07.2019 | ||
Former | The international publication has been made Status updated on 14.04.2018 | Most recent event Tooltip | 11.10.2024 | Lapse of the patent in a contracting state New state(s): IE | published on 13.11.2024 [2024/46] | Applicant(s) | For all designated states Biolase, Inc. 4 Cromwell Irvine, CA 92618 / US | [2019/33] | Inventor(s) | 01 /
BOUTOUSSOV, Dmitri 32811 Sail Way Dana Point, California 92629 / US | 02 /
ANDRIASYAN, Manvel 9207 Laurelhurst Ct. San Diego, California 92126 / US | [2019/33] | Representative(s) | WBH Wachenhausen Patentanwälte PartG mbB Müllerstraße 40 80469 München / DE | [2023/14] |
Former [2019/33] | Wachenhausen & Kollegen Patentanwälte GbR Schellingstrasse 29 80799 München / DE | Application number, filing date | 17859214.3 | 05.10.2017 | [2019/33] | WO2017US55413 | Priority number, date | US201662404698P | 05.10.2016 Original published format: US 201662404698 P | [2019/33] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2018067868 | Date: | 12.04.2018 | Language: | EN | [2018/15] | Type: | A1 Application with search report | No.: | EP3522816 | Date: | 14.08.2019 | Language: | EN | The application published by WIPO in one of the EPO official languages on 12.04.2018 takes the place of the publication of the European patent application. | [2019/33] | Type: | B1 Patent specification | No.: | EP3522816 | Date: | 05.04.2023 | Language: | EN | [2023/14] | Search report(s) | International search report - published on: | KR | 12.04.2018 | (Supplementary) European search report - dispatched on: | EP | 26.06.2020 | Classification | IPC: | A61C1/00, G06F3/048, G06F3/0488, G06Q50/22, A61C1/12 | [2020/14] | CPC: |
A61C1/0015 (EP,US);
A61C1/0046 (EP,KR,US);
A61C1/0007 (KR);
A61C1/0053 (EP);
A61C1/12 (EP);
G06F3/048 (KR);
|
Former IPC [2019/33] | A61C1/00, G06F3/048, G06F3/0488, G06Q50/22 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2019/33] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | MD | Not yet paid | Title | German: | DENTALSYSTEM UND -VERFAHREN | [2019/33] | English: | DENTAL SYSTEM AND METHOD | [2019/33] | French: | SYSTÈME ET PROCÉDÉ DENTAIRES | [2019/33] | Entry into regional phase | 19.03.2019 | National basic fee paid | 19.03.2019 | Search fee paid | 19.03.2019 | Designation fee(s) paid | 19.03.2019 | Examination fee paid | Examination procedure | 19.03.2019 | Examination requested [2019/33] | 25.01.2021 | Amendment by applicant (claims and/or description) | 18.06.2021 | Despatch of a communication from the examining division (Time limit: M04) | 26.10.2021 | Reply to a communication from the examining division | 28.10.2022 | Communication of intention to grant the patent | 22.02.2023 | Fee for grant paid | 22.02.2023 | Fee for publishing/printing paid | 22.02.2023 | Receipt of the translation of the claim(s) | Opposition(s) | 08.01.2024 | No opposition filed within time limit [2024/11] | Fees paid | Renewal fee | 25.10.2019 | Renewal fee patent year 03 | 23.10.2020 | Renewal fee patent year 04 | 25.10.2021 | Renewal fee patent year 05 | 25.10.2022 | Renewal fee patent year 06 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | AL | 05.04.2023 | AT | 05.04.2023 | CZ | 05.04.2023 | DK | 05.04.2023 | EE | 05.04.2023 | FI | 05.04.2023 | HR | 05.04.2023 | LT | 05.04.2023 | LV | 05.04.2023 | MC | 05.04.2023 | NL | 05.04.2023 | PL | 05.04.2023 | RO | 05.04.2023 | RS | 05.04.2023 | SE | 05.04.2023 | SI | 05.04.2023 | SK | 05.04.2023 | SM | 05.04.2023 | NO | 05.07.2023 | GR | 06.07.2023 | IS | 05.08.2023 | PT | 07.08.2023 | IE | 05.10.2023 | LU | 05.10.2023 | BE | 31.10.2023 | CH | 31.10.2023 | [2024/46] |
Former [2024/36] | AL | 05.04.2023 | |
AT | 05.04.2023 | ||
CZ | 05.04.2023 | ||
DK | 05.04.2023 | ||
EE | 05.04.2023 | ||
FI | 05.04.2023 | ||
HR | 05.04.2023 | ||
LT | 05.04.2023 | ||
LV | 05.04.2023 | ||
MC | 05.04.2023 | ||
NL | 05.04.2023 | ||
PL | 05.04.2023 | ||
RO | 05.04.2023 | ||
RS | 05.04.2023 | ||
SE | 05.04.2023 | ||
SI | 05.04.2023 | ||
SK | 05.04.2023 | ||
SM | 05.04.2023 | ||
NO | 05.07.2023 | ||
GR | 06.07.2023 | ||
IS | 05.08.2023 | ||
PT | 07.08.2023 | ||
LU | 05.10.2023 | ||
BE | 31.10.2023 | ||
CH | 31.10.2023 | ||
Former [2024/34] | AL | 05.04.2023 | |
AT | 05.04.2023 | ||
CZ | 05.04.2023 | ||
DK | 05.04.2023 | ||
EE | 05.04.2023 | ||
FI | 05.04.2023 | ||
HR | 05.04.2023 | ||
LT | 05.04.2023 | ||
LV | 05.04.2023 | ||
MC | 05.04.2023 | ||
NL | 05.04.2023 | ||
PL | 05.04.2023 | ||
RO | 05.04.2023 | ||
RS | 05.04.2023 | ||
SE | 05.04.2023 | ||
SI | 05.04.2023 | ||
SK | 05.04.2023 | ||
SM | 05.04.2023 | ||
NO | 05.07.2023 | ||
GR | 06.07.2023 | ||
IS | 05.08.2023 | ||
PT | 07.08.2023 | ||
LU | 05.10.2023 | ||
CH | 31.10.2023 | ||
Former [2024/30] | AL | 05.04.2023 | |
AT | 05.04.2023 | ||
CZ | 05.04.2023 | ||
DK | 05.04.2023 | ||
EE | 05.04.2023 | ||
FI | 05.04.2023 | ||
HR | 05.04.2023 | ||
LT | 05.04.2023 | ||
LV | 05.04.2023 | ||
MC | 05.04.2023 | ||
NL | 05.04.2023 | ||
PL | 05.04.2023 | ||
RO | 05.04.2023 | ||
RS | 05.04.2023 | ||
SE | 05.04.2023 | ||
SI | 05.04.2023 | ||
SK | 05.04.2023 | ||
SM | 05.04.2023 | ||
NO | 05.07.2023 | ||
GR | 06.07.2023 | ||
IS | 05.08.2023 | ||
PT | 07.08.2023 | ||
LU | 05.10.2023 | ||
Former [2024/28] | AL | 05.04.2023 | |
AT | 05.04.2023 | ||
CZ | 05.04.2023 | ||
DK | 05.04.2023 | ||
EE | 05.04.2023 | ||
FI | 05.04.2023 | ||
HR | 05.04.2023 | ||
LT | 05.04.2023 | ||
LV | 05.04.2023 | ||
MC | 05.04.2023 | ||
NL | 05.04.2023 | ||
PL | 05.04.2023 | ||
RO | 05.04.2023 | ||
RS | 05.04.2023 | ||
SE | 05.04.2023 | ||
SI | 05.04.2023 | ||
SK | 05.04.2023 | ||
SM | 05.04.2023 | ||
NO | 05.07.2023 | ||
GR | 06.07.2023 | ||
IS | 05.08.2023 | ||
PT | 07.08.2023 | ||
Former [2024/24] | AL | 05.04.2023 | |
AT | 05.04.2023 | ||
CZ | 05.04.2023 | ||
DK | 05.04.2023 | ||
EE | 05.04.2023 | ||
FI | 05.04.2023 | ||
HR | 05.04.2023 | ||
LT | 05.04.2023 | ||
LV | 05.04.2023 | ||
NL | 05.04.2023 | ||
PL | 05.04.2023 | ||
RO | 05.04.2023 | ||
RS | 05.04.2023 | ||
SE | 05.04.2023 | ||
SI | 05.04.2023 | ||
SK | 05.04.2023 | ||
SM | 05.04.2023 | ||
NO | 05.07.2023 | ||
GR | 06.07.2023 | ||
IS | 05.08.2023 | ||
PT | 07.08.2023 | ||
Former [2024/10] | AL | 05.04.2023 | |
AT | 05.04.2023 | ||
CZ | 05.04.2023 | ||
DK | 05.04.2023 | ||
EE | 05.04.2023 | ||
FI | 05.04.2023 | ||
HR | 05.04.2023 | ||
LT | 05.04.2023 | ||
LV | 05.04.2023 | ||
NL | 05.04.2023 | ||
PL | 05.04.2023 | ||
RO | 05.04.2023 | ||
RS | 05.04.2023 | ||
SE | 05.04.2023 | ||
SK | 05.04.2023 | ||
SM | 05.04.2023 | ||
NO | 05.07.2023 | ||
GR | 06.07.2023 | ||
IS | 05.08.2023 | ||
PT | 07.08.2023 | ||
Former [2024/08] | AL | 05.04.2023 | |
AT | 05.04.2023 | ||
FI | 05.04.2023 | ||
HR | 05.04.2023 | ||
LT | 05.04.2023 | ||
LV | 05.04.2023 | ||
NL | 05.04.2023 | ||
PL | 05.04.2023 | ||
RS | 05.04.2023 | ||
SE | 05.04.2023 | ||
SK | 05.04.2023 | ||
SM | 05.04.2023 | ||
NO | 05.07.2023 | ||
GR | 06.07.2023 | ||
IS | 05.08.2023 | ||
PT | 07.08.2023 | ||
Former [2024/03] | AL | 05.04.2023 | |
AT | 05.04.2023 | ||
FI | 05.04.2023 | ||
HR | 05.04.2023 | ||
LT | 05.04.2023 | ||
LV | 05.04.2023 | ||
NL | 05.04.2023 | ||
PL | 05.04.2023 | ||
RS | 05.04.2023 | ||
SE | 05.04.2023 | ||
NO | 05.07.2023 | ||
GR | 06.07.2023 | ||
IS | 05.08.2023 | ||
PT | 07.08.2023 | ||
Former [2024/01] | AL | 05.04.2023 | |
AT | 05.04.2023 | ||
HR | 05.04.2023 | ||
LT | 05.04.2023 | ||
LV | 05.04.2023 | ||
NL | 05.04.2023 | ||
PL | 05.04.2023 | ||
RS | 05.04.2023 | ||
SE | 05.04.2023 | ||
NO | 05.07.2023 | ||
GR | 06.07.2023 | ||
IS | 05.08.2023 | ||
PT | 07.08.2023 | ||
Former [2023/51] | AL | 05.04.2023 | |
AT | 05.04.2023 | ||
HR | 05.04.2023 | ||
NL | 05.04.2023 | ||
PL | 05.04.2023 | ||
RS | 05.04.2023 | ||
SE | 05.04.2023 | ||
NO | 05.07.2023 | ||
GR | 06.07.2023 | ||
IS | 05.08.2023 | ||
PT | 07.08.2023 | ||
Former [2023/50] | AL | 05.04.2023 | |
AT | 05.04.2023 | ||
NL | 05.04.2023 | ||
PL | 05.04.2023 | ||
SE | 05.04.2023 | ||
NO | 05.07.2023 | ||
GR | 06.07.2023 | ||
IS | 05.08.2023 | ||
PT | 07.08.2023 | ||
Former [2023/48] | AT | 05.04.2023 | |
NL | 05.04.2023 | ||
SE | 05.04.2023 | ||
NO | 05.07.2023 | ||
PT | 07.08.2023 | ||
Former [2023/46] | NL | 05.04.2023 | |
PT | 07.08.2023 | ||
Former [2023/43] | NL | 05.04.2023 | Documents cited: | Search | [A]US2014113243 (BOUTOUSSOV DMITRI [US], et al); | [A]US2014170588 (MILLER ALAN [US], et al); | [X]US2014272771 (BOUTOUSSOV DMITRI [US], et al) | International search | [A]US6663386 (MOELSGAARD EIGIL [DK]); | [X]US2013190743 (BOUTOUSSOV DMITRI [US], et al); | [A]JP5512835B ; | [XA]US2014272771 (BOUTOUSSOV DMITRI [US], et al); | [A]WO2016122266 (B&B SYSTEMS CO LTD [KR]) | by applicant | US2014272771 |