blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3514459

EP3514459 - AIR CONDITIONER [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  09.09.2022
Database last updated on 24.08.2024
FormerThe patent has been granted
Status updated on  01.10.2021
FormerGrant of patent is intended
Status updated on  27.05.2021
FormerRequest for examination was made
Status updated on  21.06.2019
FormerThe international publication has been made
Status updated on  28.04.2018
Most recent event   Tooltip14.06.2024Lapse of the patent in a contracting state
New state(s): TR
published on 17.07.2024  [2024/29]
Applicant(s)For all designated states
Samsung Electronics Co., Ltd.
129, Samsung-ro
Yeongtong-gu
Suwon-si, Gyeonggi-do 16677 / KR
[2021/44]
Former [2019/30]For all designated states
Samsung Electronics Co., Ltd.
129, Samsung-ro
Yeongtong-gu
Suwon-si, Gyeonggi-do 16677 / KR
Inventor(s)01 / CHOI, Sun-Muk
246 Gwongwang-ro
Paldal-gu
Suwon-si Gyeonggi-do 16534 / KR
02 / LEE, Kyeong Ae
25 Yeongtong-ro 290beon-gil
Yeongtong-gu
Suwon-si Gyeonggi-do 16697 / KR
03 / LEE, Je Gu
319 Digital-ro
Guro-gu
Seoul 08370 / KR
04 / LEE, Dong Yoon
43-23 Gwonseon-ro 882beon-gil
Yeongtong-gu
Suwon-si Gyeonggi-do 16683 / KR
05 / JEON, Byung Woo
382 Gonghang-daero
Gangseo-gu
Seoul 07648 / KR
06 / KIM, Kwon Jin
76 Central Town-ro
Yeongtong-gu
Suwon-si Gyeonggi-do 16505 / KR
 [2019/30]
Representative(s)Rose, Kathryn Clare
Venner Shipley LLP
200 Aldersgate
London EC1A 4HD / GB
[2021/44]
Former [2019/30]Walaski, Jan Filip, et al
Venner Shipley LLP
200 Aldersgate
London EC1A 4HD / GB
Application number, filing date17862937.427.07.2017
[2019/30]
WO2017KR08087
Priority number, dateKR2016013792021.10.2016         Original published format: KR 20160137920
[2019/30]
Filing languageKO
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2018074712
Date:26.04.2018
Language:KO
[2018/17]
Type: A1 Application with search report 
No.:EP3514459
Date:24.07.2019
Language:EN
[2019/30]
Type: B1 Patent specification 
No.:EP3514459
Date:03.11.2021
Language:EN
[2021/44]
Search report(s)International search report - published on:KR26.04.2018
(Supplementary) European search report - dispatched on:EP23.08.2019
ClassificationIPC:F24F13/12, F24F13/20, F24F1/00, F24F3/16, F24F1/0011
[2019/39]
CPC:
F24F13/12 (EP,KR,US); F24F1/0014 (US); F24F1/0011 (EP,KR);
F24F1/0022 (KR); F24F1/0025 (US); F24F13/20 (EP,KR);
F24F2013/205 (KR) (-)
Former IPC [2019/30]F24F13/12, F24F13/20, F24F1/00, F24F3/16
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2019/30]
Extension statesBANot yet paid
MENot yet paid
Validation statesMANot yet paid
MDNot yet paid
TitleGerman:KLIMAANLAGE[2019/30]
English:AIR CONDITIONER[2019/30]
French:CLIMATISEUR[2019/30]
Entry into regional phase18.04.2019Translation filed 
18.04.2019National basic fee paid 
18.04.2019Search fee paid 
18.04.2019Designation fee(s) paid 
18.04.2019Examination fee paid 
Examination procedure18.04.2019Examination requested  [2019/30]
18.12.2019Amendment by applicant (claims and/or description)
28.05.2021Communication of intention to grant the patent
27.09.2021Fee for grant paid
27.09.2021Fee for publishing/printing paid
27.09.2021Receipt of the translation of the claim(s)
Opposition(s)04.08.2022No opposition filed within time limit [2022/41]
Fees paidRenewal fee
17.07.2019Renewal fee patent year 03
17.07.2020Renewal fee patent year 04
22.07.2021Renewal fee patent year 05
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU27.07.2017
AL03.11.2021
AT03.11.2021
CY03.11.2021
CZ03.11.2021
DK03.11.2021
EE03.11.2021
ES03.11.2021
FI03.11.2021
HR03.11.2021
IT03.11.2021
LT03.11.2021
LV03.11.2021
MC03.11.2021
MK03.11.2021
NL03.11.2021
PL03.11.2021
RO03.11.2021
RS03.11.2021
SE03.11.2021
SI03.11.2021
SK03.11.2021
SM03.11.2021
TR03.11.2021
BG03.02.2022
NO03.02.2022
GR04.02.2022
IS03.03.2022
PT03.03.2022
IE27.07.2022
LU27.07.2022
BE31.07.2022
CH31.07.2022
FR31.07.2022
LI31.07.2022
[2024/29]
Former [2024/23]HU27.07.2017
AL03.11.2021
AT03.11.2021
CY03.11.2021
CZ03.11.2021
DK03.11.2021
EE03.11.2021
ES03.11.2021
FI03.11.2021
HR03.11.2021
IT03.11.2021
LT03.11.2021
LV03.11.2021
MC03.11.2021
MK03.11.2021
NL03.11.2021
PL03.11.2021
RO03.11.2021
RS03.11.2021
SE03.11.2021
SI03.11.2021
SK03.11.2021
SM03.11.2021
BG03.02.2022
NO03.02.2022
GR04.02.2022
IS03.03.2022
PT03.03.2022
IE27.07.2022
LU27.07.2022
BE31.07.2022
CH31.07.2022
FR31.07.2022
LI31.07.2022
Former [2024/20]HU27.07.2017
AL03.11.2021
AT03.11.2021
CY03.11.2021
CZ03.11.2021
DK03.11.2021
EE03.11.2021
ES03.11.2021
FI03.11.2021
HR03.11.2021
IT03.11.2021
LT03.11.2021
LV03.11.2021
MC03.11.2021
NL03.11.2021
PL03.11.2021
RO03.11.2021
RS03.11.2021
SE03.11.2021
SI03.11.2021
SK03.11.2021
SM03.11.2021
BG03.02.2022
NO03.02.2022
GR04.02.2022
IS03.03.2022
PT03.03.2022
IE27.07.2022
LU27.07.2022
BE31.07.2022
CH31.07.2022
FR31.07.2022
LI31.07.2022
Former [2024/18]HU27.07.2017
AL03.11.2021
AT03.11.2021
CZ03.11.2021
DK03.11.2021
EE03.11.2021
ES03.11.2021
FI03.11.2021
HR03.11.2021
IT03.11.2021
LT03.11.2021
LV03.11.2021
MC03.11.2021
NL03.11.2021
PL03.11.2021
RO03.11.2021
RS03.11.2021
SE03.11.2021
SI03.11.2021
SK03.11.2021
SM03.11.2021
BG03.02.2022
NO03.02.2022
GR04.02.2022
IS03.03.2022
PT03.03.2022
IE27.07.2022
LU27.07.2022
BE31.07.2022
CH31.07.2022
FR31.07.2022
LI31.07.2022
Former [2023/33]AL03.11.2021
AT03.11.2021
CZ03.11.2021
DK03.11.2021
EE03.11.2021
ES03.11.2021
FI03.11.2021
HR03.11.2021
IT03.11.2021
LT03.11.2021
LV03.11.2021
MC03.11.2021
NL03.11.2021
PL03.11.2021
RO03.11.2021
RS03.11.2021
SE03.11.2021
SI03.11.2021
SK03.11.2021
SM03.11.2021
BG03.02.2022
NO03.02.2022
GR04.02.2022
IS03.03.2022
PT03.03.2022
IE27.07.2022
LU27.07.2022
BE31.07.2022
CH31.07.2022
FR31.07.2022
LI31.07.2022
Former [2023/25]AL03.11.2021
AT03.11.2021
CZ03.11.2021
DK03.11.2021
EE03.11.2021
ES03.11.2021
FI03.11.2021
HR03.11.2021
IT03.11.2021
LT03.11.2021
LV03.11.2021
MC03.11.2021
NL03.11.2021
PL03.11.2021
RO03.11.2021
RS03.11.2021
SE03.11.2021
SI03.11.2021
SK03.11.2021
SM03.11.2021
BG03.02.2022
NO03.02.2022
GR04.02.2022
IS03.03.2022
PT03.03.2022
LU27.07.2022
BE31.07.2022
CH31.07.2022
FR31.07.2022
LI31.07.2022
Former [2023/22]AL03.11.2021
AT03.11.2021
CZ03.11.2021
DK03.11.2021
EE03.11.2021
ES03.11.2021
FI03.11.2021
HR03.11.2021
LT03.11.2021
LV03.11.2021
MC03.11.2021
NL03.11.2021
PL03.11.2021
RO03.11.2021
RS03.11.2021
SE03.11.2021
SI03.11.2021
SK03.11.2021
SM03.11.2021
BG03.02.2022
NO03.02.2022
GR04.02.2022
IS03.03.2022
PT03.03.2022
LU27.07.2022
CH31.07.2022
FR31.07.2022
LI31.07.2022
Former [2023/21]AL03.11.2021
AT03.11.2021
CZ03.11.2021
DK03.11.2021
EE03.11.2021
ES03.11.2021
FI03.11.2021
HR03.11.2021
LT03.11.2021
LV03.11.2021
MC03.11.2021
NL03.11.2021
PL03.11.2021
RO03.11.2021
RS03.11.2021
SE03.11.2021
SI03.11.2021
SK03.11.2021
SM03.11.2021
BG03.02.2022
NO03.02.2022
GR04.02.2022
IS03.03.2022
PT03.03.2022
LU27.07.2022
CH31.07.2022
LI31.07.2022
Former [2023/11]AL03.11.2021
AT03.11.2021
CZ03.11.2021
DK03.11.2021
EE03.11.2021
ES03.11.2021
FI03.11.2021
HR03.11.2021
LT03.11.2021
LV03.11.2021
MC03.11.2021
NL03.11.2021
PL03.11.2021
RO03.11.2021
RS03.11.2021
SE03.11.2021
SI03.11.2021
SK03.11.2021
SM03.11.2021
BG03.02.2022
NO03.02.2022
GR04.02.2022
IS03.03.2022
PT03.03.2022
Former [2023/01]AL03.11.2021
AT03.11.2021
CZ03.11.2021
DK03.11.2021
EE03.11.2021
ES03.11.2021
FI03.11.2021
HR03.11.2021
LT03.11.2021
LV03.11.2021
NL03.11.2021
PL03.11.2021
RO03.11.2021
RS03.11.2021
SE03.11.2021
SI03.11.2021
SK03.11.2021
SM03.11.2021
BG03.02.2022
NO03.02.2022
GR04.02.2022
IS03.03.2022
PT03.03.2022
Former [2022/49]AL03.11.2021
AT03.11.2021
CZ03.11.2021
DK03.11.2021
EE03.11.2021
ES03.11.2021
FI03.11.2021
HR03.11.2021
LT03.11.2021
LV03.11.2021
NL03.11.2021
PL03.11.2021
RO03.11.2021
RS03.11.2021
SE03.11.2021
SK03.11.2021
SM03.11.2021
BG03.02.2022
NO03.02.2022
GR04.02.2022
IS03.03.2022
PT03.03.2022
Former [2022/35]AT03.11.2021
CZ03.11.2021
DK03.11.2021
EE03.11.2021
ES03.11.2021
FI03.11.2021
HR03.11.2021
LT03.11.2021
LV03.11.2021
NL03.11.2021
PL03.11.2021
RO03.11.2021
RS03.11.2021
SE03.11.2021
SK03.11.2021
SM03.11.2021
BG03.02.2022
NO03.02.2022
GR04.02.2022
IS03.03.2022
PT03.03.2022
Former [2022/34]AT03.11.2021
EE03.11.2021
ES03.11.2021
FI03.11.2021
HR03.11.2021
LT03.11.2021
LV03.11.2021
NL03.11.2021
PL03.11.2021
RO03.11.2021
RS03.11.2021
SE03.11.2021
SM03.11.2021
BG03.02.2022
NO03.02.2022
GR04.02.2022
IS03.03.2022
PT03.03.2022
Former [2022/33]AT03.11.2021
ES03.11.2021
FI03.11.2021
HR03.11.2021
LT03.11.2021
LV03.11.2021
NL03.11.2021
PL03.11.2021
RS03.11.2021
SE03.11.2021
SM03.11.2021
BG03.02.2022
NO03.02.2022
GR04.02.2022
IS03.03.2022
PT03.03.2022
Former [2022/25]AT03.11.2021
ES03.11.2021
FI03.11.2021
HR03.11.2021
LT03.11.2021
LV03.11.2021
NL03.11.2021
PL03.11.2021
RS03.11.2021
SE03.11.2021
BG03.02.2022
NO03.02.2022
GR04.02.2022
IS03.03.2022
PT03.03.2022
Former [2022/24]AT03.11.2021
ES03.11.2021
FI03.11.2021
HR03.11.2021
LT03.11.2021
LV03.11.2021
NL03.11.2021
PL03.11.2021
RS03.11.2021
SE03.11.2021
BG03.02.2022
GR04.02.2022
IS03.03.2022
PT03.03.2022
Former [2022/23]AT03.11.2021
ES03.11.2021
FI03.11.2021
HR03.11.2021
LT03.11.2021
LV03.11.2021
PL03.11.2021
RS03.11.2021
BG03.02.2022
PT03.03.2022
Former [2022/22]AT03.11.2021
FI03.11.2021
LT03.11.2021
RS03.11.2021
BG03.02.2022
Former [2022/21]AT03.11.2021
RS03.11.2021
BG03.02.2022
Former [2022/19]BG03.02.2022
Documents cited:Search[YA]JPS63147652U  (MATSUSHITA ELECTRIC INDUSTRIAL CO., LTD.) [Y] 1-7,9-13 * figures 4,5; claim 1 * [A] 8;
 [A]EP1188993  (DAIKIN IND LTD [JP]) [A] 1 * figures 9-11 *;
 [A]JP2008128622  (SHARP KK) [A] 1* the whole document *;
 [Y]JP2008151477  (DAIKIN IND LTD) [Y] 1-7,9-13 * the whole document *;
 [Y]KR20080101476  (LG ELECTRONICS INC [KR]) [Y] 9-11 * paragraphs [0103] - [0108]; figures 3-5 *;
 [Y]EP2559572  (HALLA CLIMATE CONTROL CORP [KR]) [Y] 1-7,9-13 * paragraphs [0063] - [0103]; figures 14-16 *;
 [Y]EP2719969  (LG ELECTRONICS INC [KR]) [Y] 1-7,9-13 * paragraphs [0038] - [0070]; figures 10-12 *;
 [Y]EP2719958  (LG ELECTRONICS INC [KR]) [Y] 1-7,9-13 * paragraphs [0026] - [0141]; figures 4-13 *
International search[Y]JPS63147652U  (MATSUSHITA ELECTRIC INDUSTRIAL CO., LTD.) [Y] 1-13 * See claim 1 and figures 4, 5. *;
 [A]KR100554285B  (SAMSUNG ELECTRONICS CO., LTD.) [A] 1-13* See claim 1 and figure 4. *;
 [Y]JP2008151477  (DAIKIN IND LTD) [Y] 1-13 * See paragraphs [0028]-[0033] and figures 3, 4. *;
 [Y]KR101339940B  (LG ELECTRONICS INC.) [Y] 9-11 * See paragraphs [0103]-[0108] and figures 3-5. *;
 [A]KR20140018445  (SAMSUNG ELECTRONICS CO LTD [KR]) [A] 1-13 * See paragraphs [0020]-[0043] and figure 6. *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.